high performance modular housing for vermonters: net-zero ready for the 21st century
TRANSCRIPT
![Page 1: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/1.jpg)
![Page 2: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/2.jpg)
Why I Came to VEIC?
![Page 3: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/3.jpg)
2014 Summer In Shanghai, China: Worked on North America’s Largest Outsourced Housing Project
![Page 4: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/4.jpg)
High Performance Modular Home ProjectJonathan DeLaBruere
![Page 5: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/5.jpg)
…60% of all new homes in Vermont to ENERGY STAR standards or Efficiency Vermont’s Energy Code Plus and broader market penetration of net-zero energy buildings, with a goal of having 30% built to net-zero design standards by 2020 as an interim target on the way to 100% net-zero buildings by 2030.
Vermont’s Comprehensive Energy Plan
![Page 6: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/6.jpg)
We Have A Problem“The Awful Odyssey of FEMA’s Hurricane Katrina Trailers . . . spending $2.7 billion on 145,000 trailers and mobile homes . . . Even worse, an estimated 42% of them emitted toxic levels of formaldehyde.”
http://www.nytimes.com/2006/06/27/washington/27katrina.html?_r=0
![Page 7: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/7.jpg)
Hurricane Irene Hits Close To Home
![Page 8: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/8.jpg)
Problems With Traditional Mobile Homes
• Depreciating Value• High Interest Rates • Short Term Mortgages • High Energy Costs • Unhealthy Air• Cheap (Price/Quality)
Construction Materials
![Page 9: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/9.jpg)
![Page 10: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/10.jpg)
Percentage of Vermont housing market we were initially targeting
7.7%
![Page 11: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/11.jpg)
Vermont Housing Statistics
http://www.census.gov/hhes/www/housing/census/historic/units.html
1, Detached 1, Attached 2 to 4 5 or more Mobile Home
Number Percent Number Percent Number Percent Number Percent Number Percent
193,229 65.6% 10,080 3.4% 39,955 13.6% 27,813 9.4% 22,631 7.7%
![Page 12: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/12.jpg)
Meet the Team
![Page 13: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/13.jpg)
Organizations Solve the Problem
![Page 14: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/14.jpg)
VERMOD: High Performance Homes for the 21st Century
![Page 15: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/15.jpg)
CERV: Conditioning Energy Recovery Ventilator
• Fresh Air Ventilation
• Conditioned Recirculation
• Energy Recovery
• Monitoring
![Page 16: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/16.jpg)
Mitsubishi Electric Mini Split Air Source Heat Pump
Indoor Unit uses refrigerant to cool or heat air where needed.
Outdoor Unit has an inverter-driven heat pump that cools or warms refrigerant and sends itinside to an air handler through small lines.
![Page 17: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/17.jpg)
Exterior Envelope (Framing, Insulation, Windows)
![Page 18: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/18.jpg)
Quality Materials Make a Quality Environment
Triple Pane Windows
Thick Walls
![Page 19: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/19.jpg)
6kW Photovoltaic (PV) system on the roof makes these homes net zero
![Page 20: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/20.jpg)
Financing Options• Efficiency Vermont Incentive ($8,500)
• USDA Rural Development Loan ($0 down payment @ 3.25% for 30
years)
• Manufactured Housing Down Payment Loan Program ($35,000 @ 0.00%)
• Vermont State Employees Credit Union VERMOD Loan ($2,500 down payment)
![Page 21: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/21.jpg)
Financing Options
![Page 22: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/22.jpg)
But which way do we take this from here?
![Page 23: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/23.jpg)
Open House Tours and Events
Hosted 20 open houses
Gave private tours upon request
(XX)
USDA Rural Development unveiled new 502 loan at the Shelburne model home
Hosting event at factory in Wilder on September, 12
![Page 24: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/24.jpg)
Contacting Mobile Home Park Owners
• Letter went out to people listed on the 2014 Vermont Mobile Home Park Registry (177 Park Owners)
• A follow-up phone call was then placed to answer any remaining questions
![Page 25: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/25.jpg)
Marketing Efforts
![Page 26: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/26.jpg)
Homeownership Center Process
• Home buyer education is offered once a month in both Burlington and St. Albans
• After Home Buyer and Counseling session are complete, buyer is eligible to apply for great financing options
![Page 27: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/27.jpg)
Obstacles and Challenges
• Deconstruction of old mobile homes
• Finding vacant mobile home park lots or private land for sale
• Homeownership Center Process
• Marketing/Awareness
![Page 28: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/28.jpg)
Suggestions Moving Forward
• Need to keep only one copy of lead sheet and keep it updated daily
• Price charts need to reflect modifications such as:• Deck/Handicap Ramp• Pitched roof• Garage• Alternative foundation
![Page 29: High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st Century](https://reader035.vdocuments.site/reader035/viewer/2022062821/58a1eeff1a28ab531e8b6659/html5/thumbnails/29.jpg)
Come visit an open house located at 186 Shelburnewood Drive, Shelburne, Vermont
Tuesdays & Thursdays 3-7
Saturdays 10-2
Questions?