high gor environment gas handling solutions...high gor environment gas handling solutions...

30
High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology Workshop 13-14 March 2012 Amwaj Rotana Hotel, JBR Dubai, UAE Aslan Mollaev

Upload: others

Post on 30-Mar-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

High GOR Environment Gas Handling Solutions

“Unconventional Artificial Lift Configurations and Deployment Methods”

SPE Applied Technology Workshop

13-14 March 2012Amwaj Rotana Hotel, JBR Dubai, UAE

Aslan Mollaev

Page 2: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Overview

- Why is High GOR a Problem- How to Recognize the Gas Influence- Solutions Available- Gas Separators- Abrasion Problems- Multiphase Pump

Page 3: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

ä Gas tends to "Gas Lock" a pump

ä Gas does not allow to properly lubricate bearings

ä Pumping efficiency is reduced

ä Overall System efficiency will be reduced

Page 4: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Gas Impact

Pump efficient capacity is reduced when Gas occupiespart of a space in pump’s lower stages

Page 5: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Recognizing a “Gas Problem”

1 – motor load, 27-55%2 – bottom hole pressure, 1300psi (90atm)

Page 6: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Stage Designs

Pancake Stages

Mixed Flow Stages

10 to 15% free gas by volume

15 to 25% free gas by volume Vortex Type 30%

Vortex Type 20%

Page 7: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Managing a Gas

GAS SEPARATION

- Rotary or Vortex Gas Separator

GAS HANDLING

- Multiphase Pump

SOLUTIONS AVAILABLE:

Page 8: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Gas Separators

Challenges/limitations:

1. Severe abrasive down-hole conditions(bearings failure)

2. Extremely gassy wells3. Oil production with non-

vented packers4. Horizontal wells

AR Bearings – Tungsten and Silicon Carbide

Page 9: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Gas Separators

Housing Cutting

Page 10: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Problem Investigation

Page 11: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Problem Investigation

0 40 80 120 160 200 240 280 320 360 400 440

510152025303540455055606570758085

g/l

Page 12: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Problem Investigation

0 40 80 120 160 200 240 280 320 360 400 440

102030405060708090

100110120130

Sleeve length, mm

Solid

s con

cent

ratio

n, g

/l

• Maximum solids concentration is in the area of vortex impeller.

• At 1900 BPD flow rate solids concentration in the critical area is 8 times as much than concentration of the injected solids, and 11-14 times as much at 950 BPD flow rate.

1900 BPD

950 BPD

Page 13: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

No gas – bigger wearS

peed

of w

ear,

mkm

/h

Length, cm

Blue – 20% gas, red – no gas

02468

10121416182022242628303234363840

1 5 9 13 17 21 25 29 33 37 41 45

Page 14: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

New Gas Separator design

Helical inducer of varied pitch 1,containing sleeve 2with spiral vanes 3,inclined toward the fluid flow

Pumping and separation units are combined

Page 15: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Results Achieved•Dependence of sleeve thickness along its length after 100 hours of Hydro-Abrasive testing on test bench at equal flow rate 500-630 BPD

Page 16: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Actual Experience

Wide experience: since 2006 more than 1420 abrasion resistant gas separators were supplied to the Customers

Application of such gas separators helped to eliminate the problem of housing cutting by abrasive flow

Page 17: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

High GOR Solutions

Challenges/limitations:

1. Extremely gassy wells3. Producing in non-venting conditions4. Deviated/horizontal wells

Application of Gas separators

Solutions 1. Application of Multiphase Pump

Page 18: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Multiphase Pump Application

What does it do?

Homogenizes the fluidPushes gas-liquid mixture thru Main ESP stagesDrastically reduces a possibility of pump to Gas Lock at low Pi

Page 19: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

How does it work?

Diffuser

Axial type im

peller

MPP stage design has axial screw type impeller and gas handling diffuser

MPP primes the Main ESP and pushes the gas-liquid flow into centrigugal stages with no gas locks

Operation:1. Flow streams to the axial

type impeller gas volume is compressed

2. Compressed gas streams to the diffuser gas bubbles break into smallResult: homogeneous gas-liquid mixture

Page 20: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

ESP Sizing considerations when using MPP

MPP flow capacity should be not less then main pump capacity

Pump Head degradation Better to use ESP with vortex-type stages.

Page 21: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

ESP system designs for gassy fluids production

7570653025C

V -

Pum

p * *

Inta

keC

-Pu

mp*

Prot

ecto

r M

otor

* centrifugal pump ** centrifugal-vortex pump

Maximum gas content at pump intake, %

Inta

kePr

otec

tor

Mot

or

Inta

keM

ultip

hase

pum

p

CV

-Pu

mp

* *Pr

otec

tor

Mot

or

CV

-Pu

mp

* *G

asse

para

tor

Prot

ecto

r M

otor

CV

-Pu

mp

* *M

ultip

hase

pum

pG

asse

para

tor

Prot

ecto

r M

otor

CV

-Pu

mp

* *

Test results for different ESP configurations achieved on working fluid (water+gas+surface-active substance) imitated reservoir fluid properties on Test bench for gas handling application

Page 22: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

ESP Vs. MPPESP: OD 4.06”, 3145 bpd

(500m3/day)

Dis

char

ge p

ress

ure,

psi

Dis

char

ge p

ress

ure,

psi

MPP has stable and wide range operation (even at low intake pressure) vs. ESP performance

Flow rate, bpd Flow rate, bpd

MPP: OD 4.06”, 3145 bpd (500m3/day)

Page 23: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Motor current analysisESP without MPP:

1 – motor load, 27-55%2 – bottom hole pressure, 1300psi (90atm)

1 – motor load, 42%2 – bottom hole pressure, 1000psi (70atm)

532 well, Vyngapurovskoye oilfield

Gas pulses at pump intake

Unstable mode of motor operation

ESP system reliability decreasing

ESP with MPP:

Page 24: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

MPP operation at different intake pressure

MPPMax free gas volume up to

@ Pi = 40psi (3atm)

@ Pi = 700psi (50atm)

406 series >40-45% >60-65%

362 series >35% >45-50%

319 series >30% >40-45%

The bigger MPP series the bigger volume of gas can be handled

Page 25: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

MPP nomenclature

MPPFlow rate

Bpd @60Hz m3/day @50Hz

272 series 950 125319 series 950 125362 series 1500 200406 series 940, 2400, 3800 125, 320, 500449 series* 7600 1000535 series* 12000 1600

* coming soon

Page 26: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Achieved results:

Increased production and reservoir life in gassy wells by increasing drawdown and allowing effective pump operation at lower intake pressure

Due to gas-lift effect greater lift per stage and efficiency are ensured

Increased production by reducing gas locking production shutdowns

Extended System Runlife by stabilizing motor current Laboratory tests and actual field applications proved MPP to be an

excellent solution for high GOR wells Wide experience: since 2006 more than 550 MPP were supplied

to the Customers

Page 27: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Case study data

• Customer: GazPromNeft-Noyabrsk• Number of operating well: 80• Problems:

• High reservoirs free gas content• High number of ESP shutdowns caused

by high free gas content• No possibility to use gas separator due

to under-packer design• Wells after interventions

Page 28: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Operating results: MTBF increase

Solution:Installation of Novomet Multiphase pump to avoid gas locks

Result:Increase of run life by 230%

247

405

0

50

100

150

200

250

300

350

400

450

MTB

F, d

ays

1 2

Operating resultsafter MPP implementation

Cur

rent

run

life

with

MPP

MTB

F b

efor

e

Page 29: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

Num

ber o

f

shut

dow

ns

Operating results: shutdowns decrease

Number of shutdowns due to free gas content decrease 20 times as less!

Num

ber o

f wel

ls

with

MPP

Page 30: High GOR Environment Gas Handling Solutions...High GOR Environment Gas Handling Solutions “Unconventional Artificial Lift Configurations and Deployment Methods” SPE Applied Technology

THANK YOU !!!