Page 1: Hfserverinstruction booksNew

www.horman

n-fle

xon.co

m

Instructions ForInstallation, Operating and Maintenance

Screen-Master® Insect Control Barrier

Keep this document in a safe place for future reference. ICB

SC

400

FO

W /

9.30

.201

0

Model SC 300 / Single Slide / Face-of-Wall

Page 2: Hfserverinstruction booksNew
Page 3: Hfserverinstruction booksNew

INSTALLATION INSTRUCTIONSSINGLE SLIIDING INSECT BARRIER - FACE OF BUILDING MOUNT

I. Receiving and Handling1. Upon receipt of the Hörmann Flexon LLC insect barrier, unpackage and inspect contents for shipping damageor missing hardware and if necessary prepare claims against the freight carrier for any damage discovered.

Important Note:Any damage to the crate or packaging material should be noted on the shipping paperwork.Exterior damage may indicate concealed damage. This notation will preserve your rights should a freight claimbe necessary.

II. Mounting Instructions

1. Lay curtain out on the floor so the orange pipe staff pockets are facing up.-The “Fixed” end of the curtain is the end without the orange pipe staff pocket.-The orange pipe staff pockets will face the inside of the building after installation.

2. Install the pipe staffs into the curtain pockets.-A plain pipe staff with no hardware attached goes into the pocket at the “leading edge” of the curtain.-The other pipe staff(s) may or may not have “cane bolt” hardware attached. Slide one of these pipe staffs into each of the remaining curtain pockets.

3. Slide trollies into the track in proper order.-Lay the 2 x 4 lumber with the pre-attached track down along the top of the curtain.-Each “trolley with a hook” must line up with a grommet along the top of the curtain.-Each “trolley with a tab” must line up with a pipe staff.-DO NOT FASTEN TROLLIES TO CURTAIN OR PIPE STAFFS YET!

Page 4: Hfserverinstruction booksNew

Figure “1”

5. Hang Curtain Assembly-Take the entire curtain assembly with pipe staffs installed and lean it against the jamb on the “locking side” of the door opening. (2 x 4 with locking angle attached).-Fasten the pipe staffs to the “trollies with tabs” by inserting the tabs into the tops of the pipe staffs and lining up the holes in the curtain, pipe staff and trolley tab. Fasten with 5/16" x 2" bolts and nuts provided.-Line up each “trolley with hook” with the appropriate grommet hole in the curtain and attach.

4. Install the lumber on the doorway (See Figure 1).-There are (3) pcs. of 2 x 4 lumber supplied. (2) of the 2 x 4’s install vertically and are equal to door height. The third 2 x 4, with the pre-attached track, mounts horizontally across the header-The vertical 2 x 4 with the locking angle attached should be installed first. Mount it flush with the jamb on the side of the doorway to which the leading edge of the curtain will be locked closed.-The 2 x 4 with the pre-attached track and trollies installed should be mounted second. It mounts across the header, on top of, and flush with the outside edge of the vertical 2 x 4 which was installed first.-The plain vertical 2 x 4 should be installed last. It mounts under, and flush with the end of the horizontal 2 x 4 at the fixed end. Make sure it is plumb.

Page 5: Hfserverinstruction booksNew

7. Lock “Leading Edge” pipe staff into place before fastening the “Fixed End” of curtain.-Move leading edge pipe staff into locking angle and insert pin through locking bracket and behind pipe staff, securing pipe staff in locking angle. See Figure 2.-Pull the fixed end of the curtain (no pipe staff) back to the 2 x 4 on the other jamb of the doorway.

8. Fasten fixed end of curtain.-Starting at the top of the curtain, pull the curtain snug to the outside edge of the vertical 2 x 4. Neatly fold under any excess and fasten with one of the roofing nails provided.-Working down the curtain, repeat approximately every 12".-See Figure 3.

Figure “3”

6. Mount locking bracket to jamb.-Mount the locking bracket with pin attached to the jamb on the locking side of doorway (2x4 with locking angle attached).-The bottom of the locking bracket should be 72” from floor level, and flush with the outside surface of the

jamb. See Figure “2” below.

Figure “2”

Page 6: Hfserverinstruction booksNew

9. Install cane bolts (if supplied)-Each cane bolt has a chain attached with a key ring at the end.-Fasten key ring through the hole in the “cane bolt retainer” on the upper cane bolt sleeve.-Install cane bolt into cane bolt sleeve.-Line up each cane bolt on the floor and drill a 11/16" hole 2" deep in the floor to accept the cane bolt.

10. Install aluminum trip strip.-Install the aluminum trim strip over the curtain on fixed end. Make sure the trim strip is flush with the outside edge of vertical 2 x 4.

11. Install header curtain.-Fasten header curtain along the top of horizontal 2 x 4 with clamp strip and roofing nails provided. The Logo should face building exterior. See Figure 4.

Figure “4”

12. See Figure “5” for exploded drawing and parts breakdown.

Page 7: Hfserverinstruction booksNew
Page 8: Hfserverinstruction booksNew

NOTES:

Page 9: Hfserverinstruction booksNew

German Engineered, American Made

Everything you’ve wanted in a high performance door, and more.

Hörmann Flexon LLC • Buncher Commerce Park • Avenue C • Building 20A • Leetsdale, PA 15056-1376Phone: 724.385.9150 • Fax: 724.385.9151 • www.hormann-flexon.com • Email: [email protected]

Our promise to you.As one of the world's leading manufacturers of doors, we're committed to providing the best quality, value, and selection. Whether, industrial or commercial, whether it's a high performance door or loading dock equipment,

we have the door or dock product you're looking for. The Hörmann Flexon product line gives you the ability to accommodate any door or dock application with the right product from one manufacturer.

Hörmann Flexon LLC, Leetsdale, PAHeadquarters and Manufacturing Plant

For assistance call 1-800-365-3667

High Performance Doors and Dock Equipment

Environmental commitment has beenpart of our corporate culture fordecades, from our manufacturingprocesses to the products we make.

In everything we do, we strive tominimize energy and resource use, through efficient processes, long-lasting quality and innovative engineering.