HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1

Upload: earl-lloyd

Post on 06-Jan-2018

219 views

Category:

Documents


1 download

DESCRIPTION

Recent Highlights and News-I The PMT deliveries are now completed. Testing is going well. We had a meeting with Hamamatsu regarding our reject tubes. We have shipped back about 20 PMT’s ( low gain, high dark current and black cover problems) to be tested by them. We will give a go ahead to Sergey Los soon for the Base Board Production. Working on the New HV testing system and forming a committee to evaluate the RFP responses. Bulgarian new module testing is completed as well as the CAEN system. Received a detailed Draft Report from German and Alexi. Both power supplies were tested and evaluated at CERN E-pool using professional equipment and high expertise level of pool technicians. The HV RFP and decision committee is now formed. Members are: Germain, Alexi, Ianos, S.Los, M.Miller, D.Winn from HF and Magnus and S. Lusin from CMS Coordination. HF Upgrade PM will write a charge to this committee– late this week. We have decided on the shield length- 54 mm (looks good !! the presentation by Ianos during HF meeting on May 14 th anf got confirmation by Pawel. Mike Fountain has started with the production. 3

TRANSCRIPT

Page 1: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

HF UPGRADE PROJECT

Y. Onel PM July 9, 2012

1

Page 2: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

OLD PMT vs NEW PMT

2

Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing down.

New PMTs (24 installed in Feb-2012) show no signs of gain changes so far (3mo, ~6fb-1)

https://indico.cern.ch/getFile.py/access?contribId=1&resId=0&materialId=slides&confId=195406

HCAL Operations report CMS Week June 2012 Pavel Bunin, JINR, Sudan Paramesvaran,

Page 3: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Recent Highlights and News-I• The PMT deliveries are now completed. Testing is going well. We had a meeting with

Hamamatsu regarding our reject tubes. We have shipped back about 20 PMT’s ( low gain, high dark current and black cover problems) to be tested by them. We will give a go ahead to Sergey Los soon for the Base Board Production.

• Working on the New HV testing system and forming a committee to evaluate the RFP responses. Bulgarian new module testing is completed as well as the CAEN system. Received a detailed Draft Report from German and Alexi. Both power supplies were tested and evaluated at CERN E-pool using professional equipment and high expertise level of pool technicians.

• The HV RFP and decision committee is now formed. Members are: Germain, Alexi, Ianos, S.Los, M.Miller, D.Winn from HF and Magnus and S. Lusin from CMS Coordination.

• HF Upgrade PM will write a charge to this committee– late this week.

• We have decided on the shield length- 54 mm (looks good !! the presentation by Ianos during HF meeting on May 14thanf got confirmation by Pawel. Mike Fountain has started with the production.

3

Page 4: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Recent Highlights and News-II Gain Sorting Proposal by Ugur is now ready. -A uniform gain distribution for one HF is outlined from the first 900 PMT sample. Other than the fringes at the edge of the sample, we can get gain uniformity within2%. -EM and HAD, and 4 Quadrant separation would work if we can deliver different HV for each group (total 24 groups). -As the operation gain is decided, we can develop sorting and HV distributions for each group. - Base Board testing on the 11 Pre-production boards are done. We see no problems and requested to start for the production. We have shipped 6 boards to CERN last week. Different testing using the QIE readout was performed at CERN. Ferhat will report. -Life-time results for the first 200C is reported even if Iowa task is to verify the gain drop specs at 3000C. We have requested more info from Hamamatsu. - New cable specs for the request of quotes are ready ( Terry Shaw) -Connectors and cables for two new dark boxes are ordered. -First 864 PMT’s (900– spares) were delivered to CERN.

4

Page 5: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Recent Highlights and News-IIIThere is an agreement for a new cable purchases– Thanks Chris Tully, Jeremy Mans and Pawel De Barbaro for this. There is also a strong support from Austin and Magnus on this.

Decision is to purchase all ROBOX inside cables and 1/8 of 5m cables FEE and connector cables to the existing FEE and start installing these and purchase the remaining by Mid-2013 that we have all cables installed during LS1. This will enable us to go to the 2 channel readout option by LS1.5 or YETS (2014-15).This means that the HF FEE design and construction will go rather fast ( att. to our Turkish and Brazilian groups)HF new front end integration will be presented by Ianos. HF Electronics Packaging as well as the agreement within HCAL that we should pursue the Winchester Cables presented by Terry Shaw.Developing our “Project Org Chart” adding Brazilian Universities and ITU, Istanbul. Alberto Santoro and Gilvan-Augusto Alves are named as Co-L2’s for Brazil in our org chart. E.Gulmez BU-Istanbul is L2 for Turkey.

5

Page 6: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

HF2012 Organization Chart

6

C M S H F U P G R AD E 2 0 1 2 O R G A N IZ A T IO N C H A RT

J . N a ch tm a n /C .T u llyH F F E

E .G u lm ezT R C M S L 2 P M

N e u h au s (U I)C a n did a te P M T S tu d ies

J ia (U I)P ro du c tion T es tin g Io wa

F u n k (U I)B a tc h P M T Te s t ing

T ira s (U I )S p e c ia lity T e st

D u m a n og lu (C U )P ro du c tio n Te s t ing A d a na

Jo sh i (F N A L)D a tab a se

C o rs e / K in g sto n (U I)D a tab a se

P M T Ch a ra c teriza tionA kg un

1 .1.2 .1 .3

K e n t, D e b b ins (U I)S le e ve M e ch a n ics

C re m a ld i (M iss )S c in tilla tio n T e s ts

A kg u n (U I)R a d ia tio n D a m a ge

W in n (Fa ir)N e w S le e ve M a te ria l

C re m a ld i (M iss )S le ev e P ro d uc tion

S le ev e s A nd L ig h t G u id esW inn

1 .1 .2 .1 .4

S ch m id t (U I)D e s ign

F o u n ta in (U I)P re -P ro d uc tion

F o u n ta in (U I)P ro du c tion

D e b b in s (U I)M e ch an ica l Te s ting

L o s (F N A L)D e s ign

M ille r (U I )P ro du c tion

L o s (FN A L ), N e u h au s (U I)P M T B a s e Bo a rds

B u lg a ria n H VS o fia G ro up

M a rtin e z (F IU)C A E N H V

R O B O X De s ig n a n d P ro d .S ch m id t1 .1 .2 .1 .6

T e rry, S h a w (F N A L)C a b le D e s ign

F e rm i T ec h . T B AC a b le /C o nn e c tor T e st

F e rm i Te ch T B AC a b le P ro d uc t ion

P M T C a b lingT e rry S h a w (F N A L)

1 .1 .2 .1 .5

A kg un , N eu h a us (U I)Io w a T e s ts

K a ya , Is ild a k (B U -T R)9 0 4 T e s ts

M e s tv iris h v ili, S c h m id t (U I)In s ta lla tio n in U X C

S u la k (B U -U S )T e s t B ea m 2 0 11

D e m o B o x , L ig ht G uid e P h i3Ye tk in

1 .1 .2 .1 .8

B a k irc i,C e rc i,O zo k (T R )T e s t S ta nd s in S X 5

D e b b ins , K en t (U I)R O B O X R e s em b ly A n d T e st

H F C E R N T e am

H F Tu rk is h T e am

C a n ko ca k,K a ya ,Isild a k (T R )R O B O X T es t in g in S X 5

F e rm i Te ch T B AR O B O X C a b ling

H F C E R N T e amR O B O X B u rn in

In s ta lla tio n A n d C o m m issio n ingM e s tv irishv ili. P e n zo

1 .1 .2 .2

O n e lC M S H F P R O J E C T

1 .1 .2

S .T ka czyk /T .Y e tk inU S C M S L 2 P M

G . A . A lve s /A .S an to roB ra z il C M S L 2 PM

O n e lH F U P G R A D E P M

P .D e B arb a roH C A L P M

Page 7: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Milestones 2012 HF UPGRADE PROJECT MILESTONS• PMT Testing 50% Complete 1/1/2012• Production Readiness Review 1/12/2012• New YETS 2012 ROBOX manufactured, tested and installed in CMS 2/17/2012• New cable purchase decision 2 or 4 channel 7/1/2012 • Start of CMS 2012 Shutdown 12/5/12 (DELAY IS EXPECTED)• Equip ROBOX test stands at SX5 11/23/12• Gather Miscellaneous Hardware/Equipment for in-situ HF Testing in Garages 11/23/12• Install Miscellaneous Hardware/Equipment for in-situ HF Testing in Garages 12/19/12• HF Plus Moved into Garages 12/21/12 HCAL INTERNAL MILESTONES• New HV system purchase decision 8/15/2012• HF PMT characterization and testing 100% done 10/1/2012• HF PMT's are shipped to CERN 10/15/2012• HF PMT Boards QC testing 100% at Iowa 11/1/2012• Start of the HF ROBOXes shipping to CERN 11/1/2012• HF PMT's are shipped to CERN 10/15/2012

7

Page 8: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

HF PMT UPGRADE SORTING•This is only first 900 PMTs sorted for one HF module. The absolute gain values are defined as the ratio between cathode current and anode current. The gain values listed are for 800 V, which is the manufacturer listed operating voltage for Hamamatsu R7600 PMTs. We have measured the absolute gains at 600V, 650V, 700V, 750V, 800V, 850V, and 900V. All data is on database for further needs.

•The sorting philosophy is using low gain PMTs for EM (long fiber) and high gain PMTs for Hadronic (short fiber) sections. We also divided the HF module to 4 quandrants, and 3 rings; inner, middle, and outer, with respect to eta regions. Inner ring being the highest eta region, we chose to insert low gain PMTs to inner ring, and high gains to outer ring. The possible backups are listed under every group. Total 864 PMTs are used for distribution, and 36 PMTs are assigned as backups.

•Overall 2-3% gain variation within each group is satisfied. However at the far edges of the gain distribution the gain variation gets higher, we recommend locating these high and low gain extremes, to most inner and most outer towers (13, 14, 1).

8

Page 9: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Single HF wedge has 24 towers.

9

Page 10: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Four quadrands of HF module

10

Page 11: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

An ExampleQ-1 Inner Ring EM Q-2 Inner Ring EM Q-3 Inner Ring EM Q-4 Inner Ring EM

JA0625 1.6E+05 JA0609 7.5E+05 JA1145 8.9E+05 JA0639 1.0E+06JA1297 1.9E+05 JA0884 7.6E+05 JA0929 9.8E+05 JA0557 1.0E+06JA0181 2.6E+05 JA0800 7.6E+05 JA0545 8.9E+05 JA0261 1.0E+06JA0987 3.2E+05 JA0653 7.6E+05 JA0678 8.9E+05 JA0747 1.1E+06JA0590 3.2E+05 JA1011 7.7E+05 JA0677 8.9E+05 JA0551 1.0E+06JA0877 3.6E+05 JA0516 7.7E+05 JA0268 9.0E+05 JA1065 1.0E+06JA0735 4.1E+05 JA0650 7.7E+05 JA0553 9.0E+05 JA0289 1.0E+06JA0587 4.7E+05 JA0833 7.7E+05 JA0267 9.0E+05 JA0812 1.0E+06JA0738 5.0E+05 JA0920 7.8E+05 JA0768 9.1E+05 JA1006 1.0E+06JA0687 5.5E+05 JA1141 7.8E+05 JA0801 9.1E+05 JA0255 1.0E+06JA0777 5.6E+05 JA0183 7.8E+05 JA0226 9.1E+05 JA0257 1.0E+06JA0284 5.6E+05 JA0773 7.9E+05 JA0154 9.1E+05 JA0156 1.0E+06JA0285 5.7E+05 JA1008 8.0E+05 JA0666 9.1E+05 JA0493 1.0E+06JA0591 5.8E+05 JA0753 8.0E+05 JA1016 9.2E+05 JA0246 1.0E+06JA0751 6.1E+05 JA0299 8.1E+05 JA0630 9.2E+05 JA0546 1.0E+06JA0642 6.1E+05 JA0510 8.1E+05 JA0891 9.3E+05 JA0646 1.1E+06JA0645 6.2E+05 JA0651 8.1E+05 JA0808 9.4E+05 JA0977 1.1E+06JA0733 6.3E+05 JA0312 8.2E+05 JA0633 9.4E+05 JA0296 1.1E+06JA0748 6.4E+05 JA0809 8.2E+05 JA0806 9.4E+05 JA1233 1.1E+06JA0643 6.5E+05 JA1043 9.5E+05 JA0459 9.4E+05 JA0253 1.1E+06JA0056 6.5E+05 JA0974 8.2E+05 JA0305 9.5E+05 JA0515 1.1E+06JA0688 6.6E+05 JA0228 8.2E+05 JA0942 9.5E+05 JA0640 1.1E+06JA0286 6.6E+05 JA1064 8.3E+05 JA0153 9.5E+05 JA0826 1.1E+06JA2094 8.6E+05 JA0266 8.4E+05 JA0876 9.6E+05 JA1522 1.1E+06JA0254 6.8E+05 JA0918 8.4E+05 JA0159 9.6E+05 JA0554 1.1E+06JA0858 6.8E+05 JA0935 8.4E+05 JA0672 9.7E+05 JA0803 1.1E+06JA0737 6.9E+05 JA0298 8.4E+05 JA0390 9.7E+05 JA0048 1.1E+06JA0902 8.8E+05 JA0589 8.5E+05 JA0279 9.7E+05 JA0191 1.1E+06JA0309 7.1E+05 JA0269 8.5E+05 JA0776 9.8E+05 JA0310 1.1E+06JA0922 7.2E+05 JA0588 8.6E+05 JA1128 9.8E+05 JA0634 1.1E+06JA0830 7.2E+05 JA0297 8.6E+05 JA1398 9.8E+05 JA0337 1.1E+06JA0293 7.2E+05 JA0686 8.6E+05 JA0772 9.8E+05 JA0682 1.1E+06JA0860 7.3E+05 JA0839 8.7E+05 JA0674 9.8E+05 JA0094 1.1E+06JA1379 5.0E+05 JA2179 9.8E+05 JA1005 9.9E+05 JA0528 1.1E+06JA0758 7.4E+05 JA0897 8.8E+05 JA0991 9.9E+05 JA0886 1.1E+06JA0915 7.5E+05 JA1009 8.9E+05 JA0805 9.9E+05 JA0916 1.1E+06

 AVE 5.8E+05   8.2E+05   9.4E+05   1.1E+06 STDEV 1.7E+05   5.1E+04   3.5E+04   3.3E+04

 % 30.0   6.2   3.7   3.1 11

Page 12: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

NEW CABLE SPECS HF Signal Cables – Manufacturer Winchester Electronics• Suggested improvements (from Ianos Schmidt):– REQUIRED: Cable is stiff at the shrink tubing used to terminate the outer sheath. This could present some difficulties if too long as tightest bends are required near the ends of the cables.-- Need to determine an acceptable length.– REQUIRED or WOULD LIKE ??: Would prefer longer and knurled connector nuts so that they could be turned by hand without need of a screw driver. Over tightening of jack screws on the existing D sub connectors has been a persistent problem.‐– REQUIRED: Cable connectors should be identically keyed so that cables can be easily swapped. Very important for rapid trouble shooting and fast cable replacement if necessary. Very important.‐– WOULD LIKE: Would like grips on cable connectors to ease connecting/disconnecting.• Also noted – hoods on cable connectors would prevent damage seen from

snagging exposed coax connector.• – Adapter cable must be re defined to fanout to two 8w8DIN connectors ‐

(suggestion below)• – Need to sign off on all lengths and materials used

12

Page 13: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Adaptor cable-fanout to 8w8DIN

13

Page 14: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

14

Page 15: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

15

Page 16: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

16

Page 17: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

17

Page 18: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

HF Upgrade StagingStage 1 (LS1)• PMT replacement• Upgrade cabling to allow transition to new FEE

and 2-anode readout• Use existing FE electronics.

– Adapter boards in readout boxes will gang anodes– Cable Adapters at FEE crates will adapt new cabling

to present electronicsStage 2• Upgrade FE electronics for 2-anode readout and

TDC– RoBox adapter boards changed for two 2-anode– Racks will be reconfigured for new FEE

• Maintain the possibility to switch to four-anode readout in the future should that prove necessary.

18

Page 19: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Working on the planning for 2013-14HF upgrade will happen in at least two phases:1. PMT’s will be replaced (LS1)

– Rebuild readout boxes (new PMT’s, PCB’s, and new cables).– Change HV power supplies in USC.

2. Front end electronics will be replaced (eYETS?) Prefer to do this – Reconfiguration of on detector racks– Additional LV[New backend electronics already commissioned]

Before, or at same time as electronics replacement:• Front end signal cables will need to be replaced• Additional fibers will need to be pulled

(3.) If not already done, double the channel count to fully exploit multi-anode PMT’s.

in LS1

19

Page 20: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

ROB work flow• Work starts as soon as HF’s are in garages and

boxes accessible.• Refurbishment will happen in SX5, HCAL alcove• Boxes will be processed in groups of “quadrants”,

9 boxes that make up 90 degrees in phi on HF.• Boxes will be remounted and commissioned by

quadrants (Smallest unit due to shared HV).• Burn in and commissioning happens whenever

services are available.– Off critical path. Have flexibility here

Remove boxes from both HF’s

RP screening

Disassembly

Refurbishment

Testing

Remount on HF’s

Testing/burn-in, commissioning

UXC

UXC

USC

Sourcing 20

Page 21: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

HF Integration• PMT Installation (Jun 2011- Apr 2014)‐‑• -- QA tests at Iowa.‐‑• -- QC tests at 904 and HCAL P5 Alcove with spare RBX and two/three additional “dark boxes” for ‐‑

components.• -- Removal of RBXs from detector, re- assembly, initial tests (P5 Alcove)‐‑ ‐‑• -- Installation, burn- in and commission on the detector.‐‑ ‐‑• -- Cable installation for electronics upgrade (LS1).‐‑• -- At this stage back- end fw/sw is already verified via slice test parallel reading.‐‑ ‐‑• -- QC and burn- in (Jun 2013- Oct 2013)‐‑ ‐‑ ‐‑• -- Installation and commissioning with old FE and CMS Trigger/cDAQ (Nov 2013 - Apr 2014).‐‑ ‐‑• Back- End (Jun 2013 - Apr 2014)‐‑ ‐‑• Front- End (Feb 2015 - Mar 2016)‐‑ ‐‑• -- By using additional readout boxes and dark boxes built for new HF PMTs make a small unit with BE and ‐‑

FE electronics to perform QC and burn- in* at 904 and/or HCAL P5 Alcove.‐‑• -- Sockets, adapter boards, connectors, cables will also be part of the test.‐‑• -- 144 front- end cards (and ~12 calibration modules) will be tested‐‑ ‐‑• -- Unlike HBHE RMs, QIE10, FPGA and GBT are on the cards inside crate.‐‑• -- Also, beam test with finalized BE/FE electronics and HF mock- up in will be done in Summer 2015 to ‐‑ ‐‑

define/check pre- thresholds for TDC in QIE10 and FPGA.‐‑• *QC/Burn-- in‐‑• 1- LED and pedestal runs noise runs.‐‑• 2- Charge injection with Pulser to (re)study QIE10 characteristics.‐‑• 3- SPE, QIE noise, light ‐‑ tightness.• 4- ADC performance, TDC and serial output functionalities.‐‑

21

Page 22: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Front end signal cablesFor multi-anode readout:• Cable volume will double• Existing cables must be replace due to insufficient connection density

Cabling solution identified (Winchester electronics)that meets our requirements.– Connection density– Robustness– No degradation of detector performance

-Consists of 3 parts: Cable for inside RoBoxes, 5m cables to FEE, and Adapters to connect to existing FEE

24 Coax connectorInside RoBox 5m Cable to FEE Adapter forExisting FEE22

Page 23: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

HF QIE Card

Very SimilarTo HB/HE QIE Card

23

Page 24: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

TDC in HF

• Rising edge TDC data comes from the QIE10 – 5 or 6 bit - 390 to 780 ps bin size

• Falling edge comes from FPGA– Uses QIE10 discriminator output– 4 bits, one special code -1.56 ns-bin– Special code will indicate multiple pulses.

24

Page 25: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

HF Card conceptDual QIE board unit 2x24 channels =48 / unit6U crates with 1.2” module spacing.

25

Page 26: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

New Advanced Schedule

26

Page 27: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

PCB production

12x Jumper base board production/checking jumper board testing PCB production Board assembly/testing Testing and QC at IowaFirst shipment of PCB's to CERN50% board production doneAll done, tested and delivered to CERN

3/1/12 --- 4/15/124/15/12 ---5/15/125/15/12—6/15/126/15/12– 12/1/126/30/12 - 7/15/127/31/12 (Int. Milestone)10/1/12 (Int. Milestone)12/7/12 (Int. Milestone)

SLSL, IS, AMSLSLMM, JC, DS, ZJ, GF, JKZJSLSL

Page 28: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

PMT's

Delivery dates at CERNSet 1Set 2Set 3Set 4Set 5Set 6Set 7Set 8

05/15/1206/01/1206/15/1207/01/1208/01/1208/14/1209/01/1209/14/12

Page 29: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Test stand setupTest new box ( set-up new ROB) Produce and assemble test equip Establish Testing Procedures Produce Test stand equipment

AM Tests new BoxNew ROBOX at 904- operating New ROBOX at SX5- operating Test Stands at SX5—operating

4/23/12 - 5/15/123/31/12 - 6/30/124/23/12 - 7/31/124/15-6/30

5/15 - 6/7/127/31/12 - 8/31/127/31/1212/23/12

IS, AMIS, MF, PD, TKAM, IS, APIS, MF, PD, TK

AM, HB, EBAM, IS, AP, GA, YGAM, IS, AP, GA, YGAM, IS, AP, GA, YG, SD, YOz, FO, SS, SC, NB

Adding two students Marcos and Thiago from Brazil.

29

Page 30: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

ROB mechanicsFinalize Shield dimensions & All materials orderedQN + Iowa students pre-assembly Ship to CERNCERN SetupHF+ mechanics pre-assembly/cable prep.

ROB Completion Dates25% completion50% completion75% completion100% completionProduction contingency

04/01/12 - 05/14/12

06/01/12 - 07/01/1209/01/1209/14/12 - 10/01/1210/01/12 - 03/01/13

05/01/12 - 06/31/1207/01/12 - 08/31/1209/01/12 - 10/31/1211/01/12 - 12/21/1212/22/12 - 02/28/13

PB, MT, IS, PD, TKZJ, ET, GF, JC, JK, DSOlga, TK, PD, (+2 crews x2)Olga, TK, PD, (+2 crews x2)

30

Page 31: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

31

Assembly and Testing

Base board population learning/training

Populate and test baseboardsHF+ Q1 (27)HF+ Q2 (54)HF+ Q3 (81)HF+ Q4 (108)HF- Q1 (135)HF- Q2 (162)HF- Q3 (189)HF- Q4 (216)

07/31/12 - 08/21/12

08/22/12 - 09/07/1209/07/12 - 09/22/1209/22/12 - 10/07/1210/07/12 - 10/22/1210/22/12 - 11/07/1211/07/12 - 11/22/1211/22/12 - 12/07/1212/07/12 - 12/22/12

AM, IS, DK, MK, OK

AM, IS, DK, MK, OK, EE, OO, BU, MY, SD, YOz, HO, KD

Page 32: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Activities on HF (HF+ HF-)

HF +HF+ ROB’s outDisassembleReassemble + testing

HF -HF- ROB’s outDisassembleReassemble + testing

12/03/12 - 12/18/1212/19/12- 02/03/1302/04/13 - 04/08/13

12/19/12 - 01/15/1301/16/13 - 03/19/1303/20/13 - 06/25/13

32

Page 33: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

PMT LifetimePMT exposed to constant light

intensity

Current from PMT anode integrated over time gives total charge

Page 34: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

PMT Lifetime Gain vs. Coulombs Pulled from 2 PMTs: Talking to Hamamatsu-

requested detailed data on their measurements.

0 20 40 60 80 100 120 140 16010000

100000

1000000

10000000

Charge (C)

Gai

n

0 50 100 150 200 25010000

100000

1000000

10000000

Charge (C)

Gai

n

JA291JA107

Page 35: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

We are at standard gain increase region, Hamamatsu has the same plots..

We are in this box until 1000 C !!!

Page 36: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Linearity Low intensity LED directed toward face of

PMT Intensity increased until PMT output

linearity breaks

Linearity breaks at 8900 photoelectrons

00.511.522.533.541000

10000

100000

R² = NaN Linearity

Neutral Density Filters

Phot

oele

ctro

ns

8900 pe!!

Page 37: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Double Pulse Linearity Incident double pulse light is incremented

until ratio of output double pulse amplitude deviates

Double pulse linearity breaks at 9000 photoelectrons

0 2000 4000 6000 8000 10000 12000 14000 16000 180000

0.10.20.30.40.50.60.7

Double Pulse Linearity

Initial Pulse Photoelectrons

Rat

io B

etw

een

Puls

es

Page 38: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Conclusion In our regular plan the lifetime was

supposed to be after all the tests. However, we rushed it over the weekends since HCAL asked if any gain drop is observed. Over the 200 C, there is no gain drop. Now we have a dedicated box, it should go faster. We are hoping to reach 2000 C after new year. Our tasks is verify the Hamamatsu specs at 3000C.

Linearity has been tested with two different methods; single pulse and double pulse. On both of them we measure the PMTs to be within 1% linearity until ~9000 p.e.

Page 39: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Base-Board Testing

Page 40: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Conclusion• We “optically” tested all the boards with all bases

loaded.

• We got the signal from every socket. We measured the response uniformity.

• We also tested the bases for cross-talks with;

• 1 PMT lit the others covered

• 4 PMT lit the other 4 covered

• Alternated the lit-half

• In every case we did not observe any signal above pedestal on covered PMTs.

Page 41: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

New Info From Turkish ManpowerITU GROUP –KEREM CANKOCAK WILL APPLY FOR SABBATICAL for 2013

HF preparation and installation

• Ferhat Ozok (presently at CERN, until the end of 2012)

• Ozlem Ozcelik (presently at CERN, until the end of 2012)

• Cemsinan Deliduman (presently at CERN, until September 2012)

• Onur Fikri Ozturpan (July & August)

• Other related work (online software, DPG analysis, calibration, etc.)

• Fuat Ilkehan Vardarli (presently at CERN, until the end of 2012)

• Huseyin Bahtiyar (September, November, December)

• Mete Yucel (from July until the end of 2012)

• Esra Barlas (from July until the end of 2012)

• For the 2013, ITU will apply to fund for 5 people regarding HF system tests.

41

Page 42: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

CU + BU

• For 2013 The CU group asked from their funding agency for support at CERN for four PhD students (experienced) for 6 months each and one new PhD student for 10 months.

They will be spending 50% of their time on LS1 work. • The 7 young faculty members (Kenan Sogut, Numan Bakirci, Sertac Ozturk,

Huseyin Topakli, Salim Cerci, Deniz Sunar Ceci, Bayram Tali) • They submitted a new project proposal to their funding agency in which

they are asking for 45 months of support both for 2013 and 2014. with 50% on the average time spent on LS1 activities.

• For 2013 the BU asked one more additional graduate student support during the LS1.

42

Page 43: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Back-up

Page 44: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

44

IOWA Teams 1-4, HF CERN Team, HF Turkish Team

Iowa Team #1 PMT characterization Akgun- Ph.D, Lead Engineers Neuhaus, Miller, TylerGrad. Students K.Dilsiz,Harrington, Haytmuradov, Ogul, Tiras Undergrads Carso, Funk, Jia, Reed, Squires

Iowa Team #2 PMT performance studies in pp collisions Bilki, Clarida , S.Durgut , Yetkin, Y.Oz.

Iowa Team #3 Study light guide and sleeve performance Clarida, Ozok and Sen

Iowa Team #4 Radiation & Scintillation test sleeves U.Akgun, Neuhaus, Funk, Jia with Mississippi and Fairfield

POINT 5 SYSTEM TESTS

HF CERN Team: Penzo (Trieste), Merlo, Sen , Ozok, Taylan, Ianos, Alexi (Iowa), M.Kaya, O.Kaya, B.Isildak (BU, Istanbul)

HF Turkish Team –Kadir (METU, Ankara), B.Isildak ( BU, Istanbul) plus 6-8 grad.students from CU, Adana and in addition summer M.Kaya. O.Kaya ( BU, Istanbul), S.Cercin, Numan ( CU, Adana).

Page 45: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

45

HF Turkish Team• Pt 5 Test Operations ( From Turkey)• Dr.Mithat Kaya (Faculty, Former Iowa) BU, Istanbul• Dr.Murat Guler (Faculty) METU, Ankara• Dr.Omer Mermerkaya (junior faculty) METU, Ankara• Dr.Numan Bakirci (junior faculty) CU, Adana• Dr.Salim Cerci (junior faculty) CU, Adana• Bora Isildak BU, Istanbul

• PMT test station at CU, Adana• Dr.Isa Dumanoglu (Faculty)• Dr.Kenan Sogut (Junior Faculty)

Page 46: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

46

New Turkish members

• Kerem Cankocak (Faculty, ITU, Istanbul-formerly Iowa) Gural Aydin and Yusuf Gunaydin (Both Junior Faculty, ITU formerly Iowa). • Sertac Ozturk (Junior Faculty CU-formerly Iowa and FERMI LPC

and Huseyin Topakli (Junior Faculty, CU formerly FERMI LPC).• H. Bahtiyar, E.Barlas, E.Emirhan, O.Oztirpan, B.Untuc, M.Yucel

(Graduate students-ITU).• S.Durgut and Y.Oz (Bogazici University, Istanbul- Grad students

of E.Gulmez).

Page 47: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

47

New Iowa Students

• Iowa Graduate Students• K.Dilsiz, T.Harrington, M. Haytmuradov, H.Ogul• Iowa Undergraduate Students• L.Adams, J.Corso, G.Funk ,G.Jia, J.Kingyon,

D.Squires, D.Southwick

Page 48: HF UPGRADE PROJECT Y. Onel PM July 9, 2012 1. OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing

Simulation Plans Goal: study implications of HF upgrade scenarios

2 vs 4-anode readout Timing Trigger

Examples: CMS physics channels VBF Higgs – forward jet tagging MET-based channels, SUSY,etc : HF provides coverage for Missing ET

measurement Who is working on this:

Iowa group Ken Hatakeyama (Baylor) + student – MET noise studies New collaborators from Brazil : Alberto Santo, Gilvan Alves, Jorge Molina Rob Kroeger and Rahmat (Mississippi)– HFGFlash -- implement PMT

windows + pipes, fiber bundles, etc. into the G4 geometry. Kerem Cankocak and his students (ITU).