hershey chocolate factory

32
Hershey Chocolate Factory Final Production and Operations Management Project Seong-Hun AHN, Yoon Ju HWANG, Byung-Im KIM, So Jeong Yoo

Upload: landry

Post on 25-Feb-2016

167 views

Category:

Documents


2 download

DESCRIPTION

Hershey Chocolate Factory . Final Production and Operations Management Project. Seong -Hun AHN, Yoon Ju HWANG, Byung -Im KIM, So Jeong Yoo . Outline of Hershey Chocolate Factory. Pennsylvania Plant built in 1992 Makes milk chocolate in the traditional fashion of Hershey - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Hershey Chocolate Factory

Hershey Chocolate Factory Final Production and Operations Management

Project

Seong-Hun AHN, Yoon Ju HWANG, Byung-Im KIM, So Jeong Yoo

Page 2: Hershey Chocolate Factory

• Pennsylvania Plant built in 1992• Makes milk chocolate in the tradi-

tional fashion of Hershey• Old video old strategies• Limited amount of information

Outline of Hershey Chocolate Factory

Page 3: Hershey Chocolate Factory

Index

1. Problems from Video2. Additional research: ERP 3. Solutions 4. Additional suggestion

Page 4: Hershey Chocolate Factory

1.Problems from Video2. Additional research: ERP 3. Solutions 4. Additional suggestion

Page 5: Hershey Chocolate Factory

• Milk: one of the most fundamental supply chain

• Sugar: essential for sweetening the main product, chocolate

Supply chain of Milk and Sugar

Page 6: Hershey Chocolate Factory

• Milk is carried through pipes that are located outside of the milk receiving building

• Milk leaves the receiving building flows through the pipes to choco-

late processing are

Inefficiency Layout (1)

Page 7: Hershey Chocolate Factory

• Too much unnecessary movements of products within the lab

• Machines located inefficiently – loss in time and costs

Inefficiency Layout (2)

Page 8: Hershey Chocolate Factory

• Repetitive stages of alignment and misalignment

• Useless transfers of final product around the plant

Inefficiency Layout (3)

Page 9: Hershey Chocolate Factory

Unnecessary labor input• People measuring the temperature of the milk

Page 10: Hershey Chocolate Factory

Unnecessary labor input

Is the temperature informa-tion reliable?

Page 11: Hershey Chocolate Factory

Unnecessary labor input

Is the product clean and safe?

Page 12: Hershey Chocolate Factory

1. Problems from Video2.Additional research:

ERP 3. Solutions 4. Additional suggestion

Page 13: Hershey Chocolate Factory

• Invested 10million on SAP R/3 program• Error in ordering and shipping process be-fore the 1999 Halloween• Inventories 20% increased, 19% decrease in profit as a result of sales reduction

Hershey’s failure

Page 14: Hershey Chocolate Factory

ERP

Back

Of -fice

Shop

Front

Of -fice

Manufacture

• Scheduling function• Forecasting sales/ demand function• Accounting function

• Build Database • Unify the boundaries among functions, busi-ness units, regions, process lines • Information distribu-tion among processes

So what is ERP?

Page 15: Hershey Chocolate Factory

So what is ERP? Account-ing &

Financial Informa-

tion

Human ResourceManage-

ment

Supply Chain

Con-sumer

Informa-tion

Page 16: Hershey Chocolate Factory

• Increase in average profit rates by 29%

• Improve the launching of products on time by 95%, inventory reduction by 10~40%

• Cost Reduction by 5~10%

• Reduce unnecessary labors in assemble line by 25~40%

• Reduce overtime work by 50%

Benefits of Usage

Page 17: Hershey Chocolate Factory

• Adopted hasty method-ology

• Confusion of managers

• Reduction in process time and costs

• Decrease in defects by improving working environment

Up-grade

Hershey’s Lesson

Page 18: Hershey Chocolate Factory

1. Problems from Video2. Additional research: ERP 3.Solutions 4. Additional suggestion

Page 19: Hershey Chocolate Factory

SolutionWhat is primary directing point for Hershey’s?

Page 20: Hershey Chocolate Factory

Details in process

1. Layout : Rearrange equipments effec-tively

2. Additional automation

Page 21: Hershey Chocolate Factory

Layout : More effective arrange-mentExample 1) : Milk truck and pipe-

lineExample 2) : Milk balancing tank

and dryerExample 3) : Process before

packaging

Page 22: Hershey Chocolate Factory

Additional automationAutomated process to reduce errors

or cost from human

Safer

Page 23: Hershey Chocolate Factory

Solution for ERP

Elite human resource : Get more reliable workers who

can treat equipments and process

Page 24: Hershey Chocolate Factory

Elite human resourceHow to get more trained worker

who can control the process and automated equipments?

1. Training

2. Outsourcing

Page 25: Hershey Chocolate Factory

1. Problems from Video2. Additional research: ERP 3. Solutions 4.Additional suggestion

Page 26: Hershey Chocolate Factory

Suggestion - Forecasting de-mand

Product trait : Milk Chocolate 1) Short retention period 2) the demand boom in specific pe-

riods

Exact demand forecasting is most important to Hershey’s!

Page 27: Hershey Chocolate Factory

Suggestion - Forecasting de-mand

To get cost reduction, making ex-act forecasting demand model must be preceded.

Collecting historical data is es-sential.

Page 28: Hershey Chocolate Factory

Suggestion - Forecasting de-mandDemand is very fluctuating and

seasonal

Page 29: Hershey Chocolate Factory

Forecasting demand : additional operationSharing demand / producing in-

formation From supplier to sale department

Page 30: Hershey Chocolate Factory

Cost balance Cost up VS Cost down Cost UP Cost DOWN

Information sharing cost for managing quality of material

Cost cutting from Inventory man-aging

Cost from additional auto-mated process

Benefit from additional automated process

Training / outsourcing cost for advanced worker

Benefit from achieving lean sys-tem

Benefit from effective layout

Page 31: Hershey Chocolate Factory

Expectations Managing quality

Managing inventory : lean sys-tem

Page 32: Hershey Chocolate Factory

Any Q & A??

Thanks for watch-ing!!