Henderson Settlement Henderson Settlement Campus Work Areas As of 4/8/2020 HC01 ADMINISTRATION BUILDING Project Description Skill Time/persons Cost Proj. Start Replace 5 windows in east apartment (upper level) $1,000 2,3 1 week 4 people HC01-1 Taken Install gutter guards $300 2,3 1 day 4 people HC01-2 Taken Make curtains for work camp office $150 2,3 2 days 2 people HC01-3 Taken Build shelving in lower stock room $200 1,2,3 2 days 2 people HC01-4 Taken Pressure wash deck near walking trail $25 1 1 day 2 people HC01-5 Taken Pressure wash front of building $25 1 1 day 2 people HC01-6 Taken Lay one row of concrete block at bottom of steps on east end of building $100 2,3 1 day 2 people HC01-7 Taken Pressure wash and apply stain to decking and post on lower section of front porch on building $400 1,2,3 3 days 4 people HC01-8 Taken Paint lower exterior wall on west end of building $125 1,2 1 day 3 people HC01-9 Taken Apply waterseal to steps to park on west side $125 1,2 1 day 3 people HC01-10 Taken Paint concrete blocks at tennis court retaining wall $175 1,2 1 day 4 people HC01-11 Taken Replace 4 lights with LED lights in workcamp office $400 2,3 1 day 4 people HC01-12 Taken Replace ceiling tiles with beadboard on ceiling in workcamp office $900 1,2,3 1 week 4 people HC01-13 Taken Replace 7 lights with LED lights in middle room and kitchen $700 2,3 2 days 4 people HC01-14 Taken Paint middle 2 rooms at main entrance $275 1,2 2 days 4 people HC01-15 Taken Paint ceiling in mission advancement office $75 1,2 1 day 3 people HC01-16 Taken Replace 3 lights with LED lights in mission advancement office $300 2,3 1 day 2 people HC01-17 Taken Replace 6 lights with LED lights in directors office $600 2,3 2 days 4 people HC01-18 Taken Build small wood retainer, apply landscaping cloth and gravel to create walkway in back of admin building $600 1,2 2 days 4 people HC01-19 Taken Replace 6 lights with LED lights in finance office and entry room $600 2,3 2 days 4 people HC01-20 Taken Replace 3 lights with LED lights in accountant office $300 2,3 2 people 1 day HC01-21 Taken Clear small brush from behind parking $25 1 4 people 1 day HC01-22 Taken As of 4/8/2020

Upload: others

Post on 11-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC01 ADMINISTRATION BUILDING

Project Description Skill Time/persons CostProj.Start

Replace 5 windows in east apartment (upper level)

$1,0002,3 1 week 4 peopleHC01-1Taken

Install gutter guards $3002,3 1 day 4 peopleHC01-2Taken

Make curtains for work camp office $1502,3 2 days 2 peopleHC01-3Taken

Build shelving in lower stock room $2001,2,3 2 days 2 peopleHC01-4Taken

Pressure wash deck near walking trail $251 1 day 2 peopleHC01-5Taken

Pressure wash front of building $251 1 day 2 peopleHC01-6Taken

Lay one row of concrete block at bottom of steps on east end of building

$1002,3 1 day 2 peopleHC01-7Taken

Pressure wash and apply stain to decking and post on lower section of front porch on building

$4001,2,3 3 days 4 peopleHC01-8Taken

Paint lower exterior wall on west end of building

$1251,2 1 day 3 peopleHC01-9Taken

Apply waterseal to steps to park on west side

$1251,2 1 day 3 peopleHC01-10Taken

Paint concrete blocks at tennis court retaining wall

$1751,2 1 day 4 peopleHC01-11Taken

Replace 4 lights with LED lights in workcamp office

$4002,3 1 day 4 peopleHC01-12Taken

Replace ceiling tiles with beadboard on ceiling in workcamp office

$9001,2,3 1 week 4 peopleHC01-13Taken

Replace 7 lights with LED lights in middle room and kitchen

$7002,3 2 days 4 peopleHC01-14Taken

Paint middle 2 rooms at main entrance $2751,2 2 days 4 peopleHC01-15Taken

Paint ceiling in mission advancement office

$751,2 1 day 3 peopleHC01-16Taken

Replace 3 lights with LED lights in mission advancement office

$3002,3 1 day 2 peopleHC01-17Taken

Replace 6 lights with LED lights in directors office

$6002,3 2 days 4 peopleHC01-18Taken

Build small wood retainer, apply landscaping cloth and gravel to create walkway in back of admin building

$6001,2 2 days 4 peopleHC01-19Taken

Replace 6 lights with LED lights in finance office and entry room

$6002,3 2 days 4 peopleHC01-20Taken

Replace 3 lights with LED lights in accountant office

$3002,3 2 people 1 dayHC01-21Taken

Clear small brush from behind parking $251 4 people 1 dayHC01-22Taken

As of 4/8/2020

Page 2: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC01 ADMINISTRATION BUILDING

Project Description Skill Time/persons CostProj.Start

lot fence and behind building

Pressure wash small porch on back of building

$251 2 people 1 dayHC01-23Taken

Sew curtains for 2 large windows and 3 standard windows

$2753 2 days 4 peopleHC01-24Taken

Text3:HC02 PARK AREA

Project Description Skill Time/persons CostProj.Start

Install (2) exterior doors in bath house $4502,3 2 days 3 peopleHC02-1Taken

Build retaining wall #1 $7001,2,3 2 days 6 peopleHC02-2Taken

Build retaining wall #2 $7001,2,3 2 days 6 peopleHC02-3Taken

Build retaining wall #3 $7001,2,3 2 days 6 peopleHC02-4Taken

Replace window in storage building $2002,3 1 day 2 peopleHC02-5Taken

Replace 6 picnic tables $4001,2,3 3 days 6 peopleHC02-6Taken

Remove wire fence around tennis/basketball court

$251,2 2 days 6 peopleHC02-7Taken

Build new wire fence (4 feet high) around tennis/basketball court

$6001,2,3 3 days 6 peopleHC02-8Taken

Remove wall with basketball goal and add 2 new basketball goals

$7501,2,3 3days 6 peopleHC02-9Taken

Remove non load bearing concrete block partition walls in park bathroom building

$501,2 3 days 6 peopleHC02-10Taken

Create doorway and at least 1 window opening in existing block wall

$1002,3 2 days 3 peopleHC02-11Taken

Replace ceiling in mens section of park bathroom building

$5001,2,3 3 days 4 peopleHC02-12Taken

Replace ceiling in womens section of park bathroom building

$5001,2,3 3 days 4 peopleHC02-13Taken

Apply insulation board and wall covering in mens section of park bathroom building

$8001,2,3 3 days 6 peopleHC02-14Taken

Apply insulation board and wall covering in womens section of park bathroom building

$8001,2,3 3 days 6 peopleHC02-15Taken

Paint all walls and ceilings in park bathroom building

$3001,2 2 days 4 peopleHC02-16Taken

Install floor over concrete in mens $1,0001,2,3 1 week 6 peopleHC02-17Taken

As of 4/8/2020

Page 3: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC02 PARK AREA

Project Description Skill Time/persons CostProj.Start

section of park bathroom building

Install floor over concrete in womens section of park bathroom building

$1,0001,2,3 1 week 6 peopleHC02-18Taken

Install ferring strips and vinyl siding to to park bathroom building

$2,0001,2,3 3 days 8 peopleHC02-19Taken

Repair/replace gutters on bathroom building

$2251,2,3 2 days 4 peopleHC02-20Taken

Pressure wash bridge on walking track $251,2 1 day 2 peopleHC02-21Taken

Pressure wash and water seal park shelter

$2001,2 2 days 4 peopleHC02-22Taken

Text3:HC04 HOPE CHURCH

Project Description Skill Time/persons CostProj.Start

Install 6 foot gates in chain link fence $4001,2,3 2 days 3 peopleHC04-1Taken

Build gravel walkway from gates to pavement

$5001,2 2 days 4 peopleHC04-2Taken

Text3:HC05 HOPE HOUSE

Project Description Skill Time/persons CostProj.Start

Remove ceiling tile and install sheetrock to back bedroom ceiling add mud, sand, and tape

$2501,2,3 3 days 3 peopleHC05-Taken

Install gutter guards $3002,3 1 day 4 peopleHC05-1Taken

Install shoe mold to floors $1502,3 2 day 4HC05-2Taken

Replace exterior basement door $2502,3 1 day 3 peopleHC05-3Taken

Remove ceiling tile and install sheetrock to kitchen ceiling and mud, sand, and paint

$2501,2,3 3 days 3 peopleHC05-4Taken

Remove ceiling tile and install sheetrock to kitchen ceiling and mud, sand, and paint

$2501,2,3 2 days 3 peopleHC05-5Taken

As of 4/8/2020

Page 4: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC06 PARSONAGE

Project Description Skill Time/persons CostProj.Start

Prepare site and pour 24x24 concrete pad

$1,4001,2,3 3 days 5 peopleHC06-1Taken

Install gutter guards $2502,3 1 day 4 peopleHC06-2Taken

Build (1) garage door $5001,2,3 3 days 4 peopleHC06-3Taken

Build second garage door $5001,2,3 3 days 4 peopleHC06-4Taken

Text3:HC07 EVANS HOUSE

Project Description Skill Time/persons CostProj.Start

Replace vanity tops, bowls and mirrors in (3) bathrooms

$7503 1 week 4HC07-1Taken 6/7/2020

Dig out and install 20' section of culvert 1st. Section

$2001,2,3 3 days 6 peopleHC07-2Taken

Dig out and install 20' section of culvert 2nd. Section

$2001,2,3 3 days 6 peopleHC07-3Taken

Dig out and install 20' section of culvert 3rd. Section

$2001,2,3 3 days 6 peopleHC07-4Taken

Apply furring strips and metal roofing over shingles on half of roof

$1,8001,2,3 1 week 8 peopleHC07-5Taken

Apply furring strips and metal roofing over shingles on second half of roof

$1,8001,2,3 1 week 8 peopleHC07-6Taken 6/7/2020

Pressure wash and water seal shelter $2001,2 2 days 4 peopleHC07-7Taken 6/7/2020

Pressure wash exterior of house $501,2 2 days 3 peopleHC07-8Taken

Replace back exterior door on house $2502,3 1 day 2 peopleHC07-9Taken

Remove aluminum siding and apply insulation board and vinyl siding to front of house

$1,3001,2,3 1 week 6 peopleHC07-10Taken

Remove aluminum siding and apply insulation board and vinyl siding to right side of house

$1,1001,2,3 3 days 6 peopleHC07-11Taken

Remove aluminum siding and apply insulation board and vinyl siding to back of house

$1,0001,2,3 3 days 6 peopleHC07-12Taken

Remove aluminum siding and apply insulation board and vinyl siding to left side of house

$1,0001,2,3 3 days 6 peopleHC07-13Taken

Build small roof over side deck $4501,2,3 2 days 4 peopleHC07-14Taken

As of 4/8/2020

Page 5: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC08 PARTIN HOUSE - YOUTH CENTER

Project Description Skill Time/persons CostProj.Start

Apply furring strips over shingles on garage roof and cover with metal

$1,0001,2,3 2 days 5 peopleHC08-1Taken

Install gutter guards $3502,3 2 days 4 peopleHC08-2Taken

Install wall cabinets in kitchen $8001,2,3 2 day 4HC08-3Taken

Install base cabinets in kitchen $8001,2,3 2 day 4HC08-4Taken

Pour concrete pad and install basketball goal

$7001,2,3 3 days 4 peopleHC08-5Taken

Remove wood parking bumps and spread gravel to enlarge parking lot

$7501,2 2 days 6 peopleHC08-6Taken

Pressure wash exterior of large building and garage

$501,2 2 days 3 peopleHC08-7Taken

Replace 5 lights with LED lights in garage

$4502,3 2 days 2 peopleHC08-8Taken

Replace 8 lights with LED lights in basement entry

$7002,3 3 days 4 peopleHC08-9Taken

Install LED light in basement closet $402,3 1 days 2 peopleHC08-10Taken

Install LED light in basement bathroom $402,3 1 day 2 peopleHC08-11Taken

Install 10 LED lights in activitys room $9002,3 3 days 4 peopleHC08-12Taken

Install 10 LED lights in activitys room part 2

$9002,3 3 days 4 peopleHC08-13Taken

Install 10 LED lights in activitys room part 3

$9002,3 3 days 4 peopleHC08-14Taken

Install 10 LED lights in activitys room part 4

$9002,3 3 days 4 peopleHC08-15Taken

Install 3 LED lights in stair way and hall $1502,3 1 day 2 peopleHC08-16Taken

Install 2 LED lights in kitchen $1002,3 1 day 2 peopleHC08-17Taken

Install 4 LED lights in hallway up stairs $3502,3 2 days 2 peopleHC08-18Taken

Install 1 LED light in library entry $502,3 1 day 2 peopleHC08-19Taken

Install 1 LED light in storage room $502,3 1 day 2 peopleHC08-20Taken

Install 1 LED light in music room $502,3 1 day 2 peopleHC08-21Taken

Install 1 LED light in craft room $502,3 1 day 2 peopleHC08-22Taken

Install 2 LED lights in computer lab $1802,3 1 day 2 peopleHC08-23Taken

Install 1 LED light in office $1002,3 1 day 2 peopleHC08-24Taken

Run electric from youth center to garage $2002,3 2 day 3 peopleHC08-25Taken

As of 4/8/2020

Page 6: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC09 FRAKES HOUSE

Project Description Skill Time/persons CostProj.Start

Build form and pour concrete slab $1,3001,2,3 3 days 8 peopleHC09-1Taken

Install laminate flooring to upstairs rooms and hallway

$1,2002,3 1 week 8 peopleHC09-2Taken

Install gutter guards $3502,3 2 day 4HC09-3Taken

Trim and caulk porch ceiling $2501,2,3 2 days 4 peopleHC09-4Taken

Replace full glass storm door on front entry

$2001,2,3 1 day 2 peopleHC09-5Taken

Replace step rail cap boards $1252,3 1 day 3 peopleHC09-6Taken

Replace (2) basement windows $3502,3 2 days 3 peopleHC09-7Taken

Remove concrete at lower entry and replace with gravel and pavers

$4001,2,3 3 days 4 peopleHC09-8Taken

Repair porch ceiling $3002,3 2 days 4 peopleHC09-9Taken

Finish window glazing and paint all wood work in dining area

$1252,3 1 day 2 peopleHC09-10Taken

Remove decking boards, add 4 more step stringers and reapply decking boards to front steps on Frakes House

$1501,2,3 2 days 3 peopleHC09-11Taken

Text3:HC11 BRICK HOUSE

Project Description Skill Time/persons CostProj.Start

Replace 5 lights with LED lights $4502,3 2 days 4 peopleHC11-3Taken

Replace 6 lights with LED lights $5002,3 2 days 4 peopleHC11-4Taken

Text3:HC12 LOG CABIN

Project Description Skill Time/persons CostProj.Start

Replace wood shingles $2,0002,3 1 weeek 6 HC12-1Taken

Text3:HC14 GREEN HOUSE

Project Description Skill Time/persons CostProj.Start

Replace stairs near high tunnel $5001,2,3 2 days 4 peopleHC14-1Taken

Build 12X12 storage building between high tunnel and green house

$1,8001,2,3 3 days 6 peopleHC14-2Taken

Apply vinyl sidding and soffit to storage building

$1,1001,2,3 2 days 6 peopleHC14-3Taken

As of 4/8/2020

Page 7: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC14 GREEN HOUSE

Project Description Skill Time/persons CostProj.Start

Build small shelter for green house tractor

$3751,2,3 1 day 3 peopleHC14-4Taken

Build 1st row of terracing below germination room

$1,5001,2,3 3 days 6 peopleHC14-5Taken

Build 2nd row of terracing below germination room

$1,5001,2,3 3 days 6 peopleHC14-6Taken

Build 3rd row of terracing below germination room

$1,5001,2,3 3 days 6 peopleHC14-7Taken

Repair downspouts and drain at germination room

$2502,3 2 days 4 peopleHC14-8Taken

Build custom greenhouse table $751,2,3 1 day 3 peopleHC14-9Taken 4/5/2020

Paint germination room exterior $1001,2 2 days 3 peopleHC14-10Taken

Lay block on concrete slab (slab already there) for 2 sided compost bin

$6001,2,3 2 days 4 peopleHC14-11Taken 3/15/2020

Pour concrete slab and lay block for 2 sided compost bin

$8001,2,3 3 days 4 peopleHC14-12Taken 3/15/2020

Pour 2nd slab and lay block for 3 sided compost bin

$8001,2,3 4 days 4 peopleHC14-13Taken 3/15/2020

Spread gravel near green house $9001,2 3 days 8 peopleHC14-14Taken

Text3:HC16 RED BARN

Project Description Skill Time/persons CostProj.Start

Replace (4) windows $8002,3 1 week 5 peopleHC16-1Taken

Text3:HC17 LOWER FARM HOUSE

Project Description Skill Time/persons CostProj.Start

Replace (2) access doors $1251,2,3 1 day 3 peopleHC17-1Taken

Build concrete wall, install exterior door on well house

$1,0002,3 1 week 3 peopleHC17-2Taken

Replace all base cabinets in kitchen $1,5502,3 3 days 4 peopleHC17-3Taken

Replace wall cabinets on (3) walls in kitchen

$1,3502,3 3 days 4 peopleHC17-4Taken

Replace kitchen storm door $2002,3 1 day 2 peopleHC17-5Taken

Replace (9) light exterior door at back porch

$2002,3 1 day 2 peopleHC17-6Taken

Clean gutters and install gutter guards $2502,3 1 day 4 peopleHC17-7Taken

As of 4/8/2020

Page 8: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC17 LOWER FARM HOUSE

Project Description Skill Time/persons CostProj.Start

Replace wood casing and basement door on Lower Farm House

$4002,3 2 days 2 peopleHC17-8Taken

Replace wood casing and back exterior door

$3002,3 2 days 3 peopleHC17-9Taken

Scrape and paint all wood trim on exterior of farm house

$1501,2 2 days 4 peopleHC17-10Taken

Scrape, clean, and paint concrete floor and post on back porch

$1501,2 1 day 2 peopleHC17-11Taken

Replace and trim 1 window $2002,3 1 days 2 peopleHC17-12Taken

Install exterior door and apply vinyl siding to 6x6 water tank building

$5001,2,3 2 days 3 peopleHC17-13Taken

Dig out some dirt and install steps on storage building

$1251,2 1 day 3 peopleHC17-14Taken

Replace front porch storm door $2001,2,3 1 day 2HC17-15Taken

Replace screen in window of one room $252 1 day 1 personHC17-16Taken

Trim and paint storage building doors $751,2 1 day 3 peopleHC17-17Taken

Install ceiling in shed $2001,2,3 2 days 4 peopleHC17-18Taken

Landscape front of house $2002,3 2 days 4 peopleHC17-19Taken

Replace porch gate $752,3 1 day 2 peopleHC17-20Taken

Install range hood $1502,3 1 day 2 peopleHC17-21Taken

Build 8X16 deck to front porch $8001,2,3 1 week 6 peopleHC17-22Taken

Enlarge parking area (install wood bumpers and spread gravel)

$1,0001,2,3 3 days 6 peopleHC17-23Taken

Text3:HC18 FARM

Project Description Skill Time/persons CostProj.Start

Board up 2 windows $8001,2,3 1 wk 6HC18-Taken

Build smooth wire fence #1 on main campus

$1,0001,2,3 1 week 8 peopleHC18-1Taken

Build smooth wire fence #2 on main campus

$1,0001,2,3 1 week 8 peopleHC18-2Taken

Build smooth wire fence #3 on main campus

$1,0001,2,3 1 week 8 peopleHC18-3Taken

Build smooth wire fence #4 on main campus

$1,0001,2,3 1 week 8 peopleHC18-4Taken

Build smooth wire fence #5 on main campus

$1,0001,2,3 1 week 8 peopleHC18-5Taken

As of 4/8/2020

Page 9: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC18 FARM

Project Description Skill Time/persons CostProj.Start

Build smooth wire fence #6 on main campus

$1,0001,2,3 1 week 8 peopleHC18-6Taken

Take shed down and move to lower farm $6001,2 3 days 6 peopleHC18-7Taken

Reinforce roof support system on lower farm barn

$1,1001,2,3 1 week 8 peopleHC18-8Taken

Gravel around water box and road to water box at lower farm

$7501,2 2 days 6 peopleHC18-9Taken

Replace metal roof on existing barn at ballfield

$1,0001,2,3 1 wk 6HC18-10Taken

Lime field at Charley Branch at lower farm

$7501,2 2 days 6 peopleHC18-11Taken

Gravel dirt perimeter at pond on lower farm

$7001,2 2 days 6 peopleHC18-12Taken

Pressure wash storage building near red barn

$501,2 1 day 2 peopleHC18-13Taken 9/27/2020

Close up opening under overhang at front entrance of red barn

$2001,2,3 2 days 3 peopleHC18-14Taken

Replace fence around wetland system $2,6001,2,3 2 days 6 peopleHC18-15Taken

Build a board fence at lower farm $1,3001,2,3 3 days 6 peopleHC18-16Taken

Spread lime on field at Smithy bottom at lower farm

$8501,2 2 days 6 peopleHC18-17Taken

Paint fencing with water seal at lower farm

$5001,2 2 days 4 peopleHC18-18Taken

Gravel behind barn at lower farm $1,1001,2 2 days 6 peopleHC18-19Taken

Gravel road tile to gate at lower farm $7001,2 2days 6 peopleHC18-20Taken

Gravel around barn at lower farm $4501,2 2 days 6 peopleHC18-21Taken

Replace boards on some fencing on lower farm

$1,0001,2 3 days 6 peopleHC18-22Taken

Reconfigure holding pen on main campus

$1,1001,2 2 days 6 peopleHC18-23Taken

Text3:HC19 CLINIC

Project Description Skill Time/persons CostProj.Start

Pressure wash exterior of building $751,2 2 days 4 peopleHC19-1Taken

Remove interior walls and misc items for redesign (Parts 2-8 must be done in order)

$251,2,3 1 week 6 peopleHC19-2Taken

As of 4/8/2020

Page 10: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC19 CLINIC

Project Description Skill Time/persons CostProj.Start

Build interior walls for new layout (Parts 2-8 must be done in order)

$1,5001,2,3 1 week 8 peopleHC19-3Taken

Apply insulation (where needed) and drywall to walls (Parts 2-8 must be done in order)

$1,5001,2,3 1 week 8 peopleHC19-4Taken

Mud, tape, sand all drywall (Parts 2-8 must be done in order)

$5002,3 1 week 6 peopleHC19-5Taken

Paint interior walls (Parts 2-8 must be done in order)

$5001,2,3 1 week 6 peopleHC19-6Taken

Install drop ceiling (Parts 2-8 must be done in order)

$1,5001,2,3 1 week 8 peopleHC19-7Taken

Repair/replace/clean floors in all rooms (Parts 2-8 must be done in order)

$5001,2,3 1 week 6 peopleHC19-8Taken

Text3:HC20 WATER STORAGE TANK SHED

Project Description Skill Time/persons CostProj.Start

Apply furring strips and metal over shingles on roof

$9501,2,3 3 days 6 peopleHC20-1Taken

Replace exterior doors $3002,3 1 day 3 peopleHC20-2Taken

Repair gutters on back of building $1001,2,3 1 day 2 peopleHC20-3Taken

Repair damage and applt ferring strips and metal to roof of water pump house

$6001,2,3 2 days 4 peopleHC20-4Taken

Lay concrete block on 2 walls inside clear well house

$6001,2,3 2 days 4 peopleHC20-5Taken

Set 2 steel post and an I beem then build block wall and enclose chlorine room

$5001,2,3 3 days 4 peopleHC20-6Taken

Text3:HC21 VEHICLE MAINTENANCE SHOP

Project Description Skill Time/persons CostProj.Start

Remove and raise front awning and apply new metal

$6001,2,3 2 days 6 peopleHC21-1Taken

Apply paint to metal on front awning $1501,2 1 day 3 peopleHC21-2Taken

As of 4/8/2020

Page 11: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC22 VEHICLE MAINTENANCE POLE BARN

Project Description Skill Time/persons CostProj.Start

Replace metal on two car shed $5501,2,3 2 days 6 peopleHC22-1Taken

Replace metal roofing on back section of car huts

$5501,2,3 2 days 6 peopleHC22-2Taken

Replace metal roofing on front section of car huts

$1,4001,2,3 3 days 6 peopleHC22-3Taken

Paint all metal roofing on shed type roofs $7001,2 2 days 4 peopleHC22-4Taken

Text3:HC23 ZOOCHIE HOUSE

Project Description Skill Time/persons CostProj.Start

Replace (4) windows upstairs $8002,3 1 week 4 peopleHC23-1Taken

Polyurethane floors $2502,3 2 days 4 peopleHC23-2Taken

Text3:HC24 COMMUNITY CENTER

Project Description Skill Time/persons CostProj.Start

Apply laminate flooring in senior office $1,7001,2,3 1 week 6 peopleHC24-1Taken

Install drop ceiling in first old pantry room $7001,2,3 1 wk 6HC24-2Taken

Close up interior of 2 unused windows in womens restroom

$1502,3 1 day 2 peopleHC24-3Taken

Paint walls in womens restrooms $1751,2 1 day 4 peopleHC24-4Taken

Build book shelf in thrift store $1001,2,3 1 day 2 peopleHC24-5Taken

Replace 2 faucets on sink in womens restrooms

$1252,3 1 day 2 peoplHC24-6Taken

Replace (8) attic windows $1,6002,3 4 days 4 peopleHC24-7Taken

Replace 4 lights with LED lights in womens restroom

$4002,3 2 days 3 peopleHC24-8Taken

Replace (4) senior center upper windows $8001,2,3 2 days 4 peopleHC24-9Taken

Install vinyl siding on wall of community center facing gym

$1,0001,2,3 3 days 6 peopleHC24-10Taken

Install gutter guards $4002,3 2 days 4 peopleHC24-11Taken

Remove and replace tile in senior kitchen $1,1001,2,3 1 week 6 peopleHC24-12Taken

Apply waterseal to large dumpster fence $1501,2 1 day 3 peopleHC24-13Taken

Remove wall paper border and paint walls in outreach director office

$1751,2 2 days 4 peopleHC24-14Taken

Replace double doors in hallway in Community Center

$3502,3 2 day 2HC24-15Taken

As of 4/8/2020

Page 12: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC24 COMMUNITY CENTER

Project Description Skill Time/persons CostProj.Start

Water seal small arch bridge $751,2 1 day 2 peopleHC24-16Taken 9/27/2020

Apply water seal to wood fence by entertainment stand

$1501,2 1 day 3 peopleHC24-17Taken 9/27/2020

Apply water seal to wood fence by senior ramp

$751,2 1 day 2 peopleHC24-18Taken 9/27/2020

Build hand rails and close in side of steps on front of building

$6001,2,3 2 days 3 peopleHC24-19Taken 7/26/2020

Build a 9x17 deck over concrete pad in front of building

$9501,2,3 2 days 4 peopleHC24-20Taken 7/26/2020

Build 36 foot wood walkway in front of building

$7001,2,3 2 days 4 peopleHC24-21Taken

Build 2nd 36 foot wood walkway in front of building

$7001,2,3 2 days 4 peopleHC24-22Taken

Repair floor and apply floor covering in stock room near mens section

$4501,2,3 2 days 4 peopleHC24-23Taken

Clean and apply polyurethane to floor in outreach directors office

$2251,2,3 2 days 4 peopleHC24-24Taken

Assemble new desk and apply chair mat in outreach directors office

$7001,2,3 2 days 3 peopleHC24-25Taken

Replace 4 lights with LED lights in outreach storage room

$4002,3 2 days 3 peopleHC24-26Taken

Replace 11 lights with LED lights in main hallway

$9502,3 3 days 4 peopleHC24-27Taken

Replace 4 lights with LED lights womens group room

$4002,3 2 days 3 peopleHC24-28Taken

Paint base and wall cabinets in womens group room

$1251,2 1 day 4 peopleHC24-29Taken

Paint walls in womens group room $2001,2 1 day 4 peopleHC24-30Taken

Take out wall shelf and relocate 2nd shelf in MIHOW room

$251,2 1 day 4 peopleHC24-31Taken

Replace 4 lights with LED lights in MIHOW room

$4002,3 2 days 3 peopleHC24-32Taken

Build doors on 3 shelves in sewing room $2002,3 2 days 2 peopleHC24-33Taken

Replace 4 lights with LED lights in sewing room

$4002,3 2 days 3 peopleHC24-34Taken

Apply louan and vinyl tile to floor in middle storage room (pnts rm)

$7001,2,3 3 days 4 peopleHC24-35Taken

Replace 3 lights with LED lights in middle storage room (pnts rm)

$3002,3 2 days 2 peopleHC24-36Taken

As of 4/8/2020

Page 13: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC24 COMMUNITY CENTER

Project Description Skill Time/persons CostProj.Start

Remove carpet, clean floor, and apply polyurethane to floor in front room of library

$4501,2,3 3 days 6 peopleHC24-37Taken

Remove carpet, clean floor and apply polyurethane to floor in back room in library

$4501,2,3 3 days 6 peopleHC24-38Taken

Build 2 shelves with plexiglass doors on front in library

$5501,2,3 3 days 3 peopleHC24-39Taken

Paint entry door at telephone room $501,2 1 day 2 peopleHC24-40Taken

Remove front stall and install bathroom vanity and mirror in mens restroom in main hallway

$6001,2,3 3 days 3 peopleHC24-41Taken

Replace 6 lights with LED lights in youth learning center

$6502,3 2 days 4 peopleHC24-42Taken

Replace 10 lights with LED lights in senior kitchen

$1752,3 3 days 4 peopleHC24-43Taken

Install ventless range hood in senior kitchen

$1752,3 1 day 2 peopleHC24-44Taken

Paint walls in senior kitchen $1751,2 1 day 4 peopleHC24-45Taken

Paint handrail and step kick plates from main hall to former food pantry

$1001,2 2 people 1 dayHC24-46Taken

Replace 3 small lights with LED lights in hallway by former food pantry

$2002,3 1 day 3 peopleHC24-47Taken

Clean, paint and apply sealer to concrete floor in hallway by former food pantry

$2501,2, 3 days 4 peopleHC24-48Taken

Paint walls in hallway by former food pantry

$1251,2 1 day 4 peopleHC24-49Taken

Clean, paint, and apply sealer to concrete floor in former food pantry

$3501,2 3 days 4 peopleHC24-50Taken

Paint walls in former food pantry $2251,2,3 1 day 4 peopleHC24-51Taken

Close in large door opening and install interior door in former food pantry

$2502,3 3 days 3 peopleHC24-52Taken

Apply water proofing to section of 1 wall, paint other walls, and replace baseboards in community development hallway

$6501,2,3 2 days 4 peopleHC24-53Taken

Replace 6 lights with LED lights in community development office and hallway

$6502,3 2 days 4 peopleHC24-54Taken

Build divider wall on pallets in food pantry $3001,2,3 1 day 4 peopleHC24-55Taken

As of 4/8/2020

Page 14: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC24 COMMUNITY CENTER

Project Description Skill Time/persons CostProj.Start

Pressure wash pathway to promise $751,2 1 day 3 peopleHC24-56Taken

Pressure wash and apply water seal to deck and shelter at senior center

$2001,2 2 days 4 peopleHC24-57Taken

Pressure was lower vinyl exterior wall below senior center

$751,2 1 day 3 peopleHC24-58Taken

Scrape and paint exterior wall by senior center

$1251,2 2 days 4 peopleHC24-59Taken

Remove and build new 2x24 raised garden at senior center

$9001,2,3 3 days 4 peopleHC24-60Taken

Build 3x24 wood walk with fence rail on 1 side at senior center raised garden

$7001,2,3 3 days 4 peopleHC24-61Taken

Dig trench, install underground conduit, electric wire and lights to both sides of pathway of promise

$9501,2,3 5 days 6 peopleHC24-62Taken

Build steps from middle road to sidewalk at senior center

$4001,2,3 2 days 4 peopleHC24-63Taken

Replace stalls and apply louan and vinyl rug to womens restroom and small utility room

$1001,2,3 1 week 4 peopleHC24-64Taken

Pressure wash and waterseal steps at senior center parking

$1001,2 1 day 3 peoplHC24-65Taken

Build and install 2 privacy doors on dumpster fence

$4501,2,3 2 days 4 peopleHC24-66Taken

Build small block retaining wall outside food pantry

$9001,2,3 2 days 4 peopleHC24-67Taken 4/5/2020

Pour concrete pad outside food pantry $8001,2,3 2 days 4 peopleHC24-68Taken

Pour 2nd concrete pad outside food pantry

$8001,2,3 2 days 4 peopleHC24-69Taken

Pour 3rd concrete pad outside food pantry

$8001,2,3 2 days 4 peopleHC24-70Taken

Apply floor tile over existing floor in womens section of thrift store

$9001,2,3 3 days 4 peopleHC24-71Taken

Apply floor tile over existing floor in mens section of thrift store

$8001,2,3 3 days 4 peopleHC24-72Taken

Replace 8 lights with LED lights in stock room

$8502,3 2 days 4 peopleHC24-73Taken

Replace 8 lights with LED lights in 2nd stock room

$8502,3 2 days 4 peopleHC24-74Taken

Replace 8 lights with LED lights in 3rd stock room

$8502,3 2 days 4 peopleHC24-75Taken

As of 4/8/2020

Page 15: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC24 COMMUNITY CENTER

Project Description Skill Time/persons CostProj.Start

Replace 9 lights with LED lights in 4th stock room

$9502,3 2 days 4 peopleHC24-76Taken

Place concrete blocks on floor and 3/4 plywood covering to create platform for storage in stock room

$1001,2 1 day 2 peopleHC24-77Taken

Replace 1 light with LED light in back stock room (old furnace room)

$1002,3 1 day 2 peopleHC24-78Taken

Sew curtains for 4 windows in senior kitchen

$1503 2 days 3 peopleHC24-79Taken

Sew curtains for 4 windows in former food pantry

$1503 2 day 2HC24-80Taken

Sew curtains for 4 windows in new thrift store stock room

$1503 2 day 2HC24-81Taken

Replace laminate flooring in intake office and 2 offices

$1,0001,2,3 1 week 4 peopleHC24-82Taken

Paint walls and ceiling in youth development office

$1501,2 2 days 4 peopleHC24-83Taken

Text3:HC25 GYMNASIUM

Project Description Skill Time/persons CostProj.Start

Create access door at stage area $2502,3 2 days 3 peopleHC25-1Taken

Apply metal sheeting to exterior wall and one side of building

$1,2001,2,3 1 week 8 peopleHC25-2Taken 4/5/2020

Install gutter guards $3002,3 1 day 4 peopleHC25-3Taken

Replace double door at gym entrance $6002,3 3 days 4 peopleHC25-4Taken

Create storage area in attic space $7501,2,3 3 days 4 peopleHC25-5Taken

Replace metal sheeting around 7 windows

$1,0001,2,3 3 day 6HC25-6Taken

Paint facia boards on eaves of gym $501,2 1 day 2HC25-7Taken

Paint and caulk inside window trim in gym

$1001,2 1 day 2HC25-8Taken

Pressure wash and water seal wood walk way

$2251,2 2 days 4 peopleHC25-9Taken

Assemble and install wall cabinets in concession area

$1,0001,2,3 3 days 4 peopleHC25-10Taken

Assemble and replace base cabinets and counter tops in concession area

$1,3001,2,3 3 days 4 peopleHC25-11Taken

Paint walls in concession area $1251,2 1 day 4 peopleHC25-12Taken

As of 4/8/2020

Page 16: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC25 GYMNASIUM

Project Description Skill Time/persons CostProj.Start

Pressure wash and apply waterseal to end porch on gym

$1751,2 1 day 4 peopleHC25-13Taken

Create opening and install slider window in concession area

$2502,3 1 day 2 peopleHC25-14Taken

Paint boys restroom walls and door $1751,2 2 days 5 peopleHC25-15Taken

Paint and apply sealer to concrete floor in boys restroom

$2251,2 2 days 3 peopleHC25-16Taken

Paint walls in girls restroom $1751,2 2 days 5 peopleHC25-17Taken

Paint and apply sealer to concrete floor in girls restroom

$2251,2 2 days 3 peopleHC25-18Taken

Replace vanity top in girls restroom $1002,3 1 day 2 peopleHC25-19Taken

Replace some banisters and install protective bumper guard on porch

$1001,2,3 1 day 3 peopleHC25-20Taken

Text3:HC26 MISSION DORMITORY

Project Description Skill Time/persons CostProj.Start

Dig out, form up, mix concrete, and pour 35x4 ' sidewalk #1

$5501,2,3 1 wk 6HC26-1Taken

Dig out, form up, mix concrete, and pour 35x4 ' sidewalk #2

$5501,2,3 1 wk 6HC26-2Taken

Dig out, form up, mix concrete, and pour 35x4 ' sidewalk #3

$5501,2,3 1 wk 6HC26-3Taken

Replace (1) window in upstairs lobby $7002,3 1 day 3 peopleHC26-4Taken

Replace (2nd) window in upstairs lobby $7002,3 1 day 3 peopleHC26-5Taken

Pressure wash and water seal front deck and handicap ramp

$3501,2 2 days 4 peopleHC26-6Taken

Pressure wash and water seal back and side decks

$4501,2 2 days 4 peopleHC26-7Taken

Clean walls and apply drylock in breaker box room

$2501,2 1 day 3 peopleHC26-8Taken

Water seal fence near retaining wall $1001,2 1 day 3 peopleHC26-9Taken

Water seal fence in front of Mission Dorm

$1001,2 1 day 4 peopleHC26-10Taken

Water seal fence near kitchen garbage house

$751,2 1 day 2 peopleHC26-11Taken

Water seal steps and handrails going to Mission Dorm

$751,2 1 day 2 peopleHC26-12Taken

As of 4/8/2020

Page 17: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC26 MISSION DORMITORY

Project Description Skill Time/persons CostProj.Start

Add LED step lights to stairs going down to Mission Dorm

$3002,3 1 day 2 peopleHC26-13Taken

Install gate to access HVAC and fire connection

$1002,3 1 day 2 peopleHC26-14Taken

Install 10 LED lights in lobby $9002,3 3 days 4 peopleHC26-15Taken

Install 10 LED lights in lobby $9002,3 3 days 4 peopleHC26-16Taken

Install 4 LED lights in lobby $3502,3 1 day 2 peopleHC26-17Taken

Install 10 LED lights in confrence room $9002,3 3 days 4 peopleHC26-18Taken

Install 10 LED lights in confrence room $9002,3 3 days 4 peopleHC26-19Taken

Install 10 LED lights in confrence room $9002,3 3 days 4 peopleHC26-20Taken

Install 6 LED lights in mens bathroom upstairs and 5 vanity lights

$1,0002,3 3 days 4 peopleHC26-21Taken

Install 10 LED lights in mens bunk area upstairs

$9002,3 3 days 4 peopleHC26-22Taken

Install 10 LED lights in mens bunk area upstairs

$9002,3 3 days 4 peopleHC26-23Taken

Install 7 LED lights in mens bunk area upstairs

$4502,3 2 days 4 peopleHC26-24Taken

Install 10 LED lights in womens bunk area upstairs

$9002,3 3 days 4 peopleHC26-25Taken

Install 10 LED lights in womens bunk area upstairs

$9002,3 3 days 4 peopleHC26-26Taken

Install 7 LED lights in womens bunk area upstairs

$4502,3 2 days 4 peopleHC26-27Taken

Install 6 LED lights in womens bathroom upstairs and 5 vanity lights

$1,0002,3 3 days 4 peopleHC26-28Taken

Install 2 LED lights in womens bathroom $1002,3 1 day 2 peopleHC26-29Taken

Install LED light in stairwell $502,3 1 day 2 peopleHC26-30Taken

Install 6 LED lights in front section of craft store

$5002,3 2 days 2 peopleHC26-31Taken

Install 9 LED lights in back section of craft store

$7502,3 3 days 4 peopleHC26-32Taken

Install 10 LED lights in mens bunk area down stairs

$9002,3 3 days 4 peopleHC26-33Taken

Install 10 LED lights in mens bunk area down stairs

$9002,3 3 days 4 peopleHC26-34Taken

Install 7 LED lights in mens bunk area down stairs

$4502,3 2 days 4 peopleHC26-35Taken

As of 4/8/2020

Page 18: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC26 MISSION DORMITORY

Project Description Skill Time/persons CostProj.Start

Install 10 LED lights in womens bunk area down stairs

$9002,3 3 days 4 peopleHC26-36Taken

Install 10 LED lights in womens bunk area down stairs

$9002,3 3 days 4 peopleHC26-37Taken

Install 7 LED lights in womens bunk area upstairs

$4502,3 2 days 4 peopleHC26-38Taken

Install 6 LED lights in mens bathroom down stairs and 5 vanity lights

$1,0002,3 3 days 4 peopleHC26-39Taken

Install 2 LED lights in mens bathroom down stairs

$1002,3 1 day 2 peopleHC26-40Taken

Install 1 LED light in cleaning closet $502,3 1 day 2 peopleHC26-41Taken

Text3:HC27 KITCHEN/DINING HALL

Project Description Skill Time/persons CostProj.Start

Clean and replant flower beds $501,2 1day 3 peopleHC27-1Taken

Replace (6) windows upstairs $1,0501,2,3 1 week 4 peopleHC27-2Taken

Install second half of drain pipe from dining hall to hwy 190

$5501,2,3. 3 days 4 peopleHC27-3Taken

Enclose window of west side mens bathroom

$1752,3 2 days 2 peopleHC27-4Taken

Gravel parking area at garbage house $7001,2,3 2 day 6HC27-5Taken

Repair some spots on roof of garbage house then cover with metal

$2001,2,3 2 days 4 peopleHC27-6Taken

Paint exterior freezer at back entrance $1251,2 1 day 3HC27-8Taken

Install gutter guards $4002,3 2 days 4 peopleHC27-9Taken

Wire and plumb room, install washer and dryer

$8002,3 2 day 3HC27-10Taken

Build wood walkway to connect existing walk to exterior pantry door

$2001,2,3 2 days 3 peopleHC27-11Taken

Build walls in, build handrail and replace door near cooler room going down steps at dining hall

$4502,3 2 day 2HC27-12Taken

Build wood support wall and fill with gravel at fire escape and freezer in back of dining hall

$6001,2,3 1 day 4HC27-13Taken

Pressure wash and water seal deck $3251,2 2 days 4 peopleHC27-15Taken

Replace 6 airflow vents upstairs and 1 downstairs

$1001,2 1 day 2HC27-19Taken

As of 4/8/2020

Page 19: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC27 KITCHEN/DINING HALL

Project Description Skill Time/persons CostProj.Start

Replace 1 large airflow vent in hallway upstairs

$501,2 1 day 2HC27-20Taken

Install crown molding in rooms #7 and #8 and in lobby

$1502,3 1 day 2 peopleHC27-21Taken

Scrape and paint womens bathroom walls upstairs

$751,2 1 day 2 people 2HC27-22Taken

Scrape and paint hallway ceiling and ceiling of rooms #9 and #10 upstairs

$1001,2 2 days 2 peopleHC27-23Taken

Pressure wash back block wall $1251,2 1 day 2 peopleHC27-24Taken

Install down spout to gutter at deck $752,3 1 day 2 peopleHC27-25Taken

Water seal tables on back deck $751,2 1 day 4 peopleHC27-26Taken

Paint concrete back wall on dining hall $2501,2 1 day 6 peopleHC27-27Taken

Replace exterior door on small pantry room in dining hall

$2752,3 1 day 2 peopleHC27-28Taken

Repair some soffit on back of dining hall $2002,3 1 day 2 peopleHC27-29Taken

Install elbow to down spout over roof on small back porch at dining hall

$752,3 1 day 2 peopleHC27-30Taken

Remove and replace carpet with laminate on upstairs livingroom floor

$6001,2,3 3 days 4 peopleHC27-31Taken

Enlarge opening and install exterior door at cooler room

$2502,3 1 day 3 peopleHC27-32Taken

Replace mop sink $3502,3 1 day 2 peopleHC27-33Taken

Replace 2 bathroom toilets $3502,3 2 days 2 peopleHC27-34Taken

Install 10 LED lights in dining room $9002,3 3 days 4 peopleHC27-35Taken

Install 10 LED lights in dining room $9002,3 3 days 4 peopleHC27-36Taken

Install 10 LED lights in dining room $9002,3 3 days 4 peopleHC27-37Taken

Install 5 LED lights in dining room $4502,3 2 days 4 peopleHC27-38Taken

Install 2 LED lights in dishwasher room $1802,3 1 day 2 peopleHC27-39Taken

Install 8 LED lights in middle dining room $7002,3 2 days 4 peopleHC27-40Taken

Install 2 LED lights in bathroom $1002,3 1 day 2 peopleHC27-41Taken

Install 10 LED lights in food prep area $9002,3 3 days 4 peopleHC27-42Taken

Install 5 LED lights in dry storage area near back door

$4502,3 2 days 4 peopleHC27-43Taken

Install 2 LED lights in small kitchen $1502,3 1 day 2 peopleHC27-44Taken

Install 3 LED lights in dry storage $2752,3 2 days 2 peopleHC27-45Taken

Install 2 LED lights in mens and womens bathroom upstairs

$1802,3 1 day 2 peopleHC27-46Taken

As of 4/8/2020

Page 20: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC27 KITCHEN/DINING HALL

Project Description Skill Time/persons CostProj.Start

Text3:HC28 ALLEN HOUSE DUPLEX

Project Description Skill Time/persons CostProj.Start

Replace (5)windows in East duplex $1,0002,3 1 wk 4HC28-1Taken

Replace (5) windows in West duplex $1,0002,3 1 week 4 peopleHC28-2Taken

Install new sheeting to ceiling of small porch

$1751,2,3 2 day 4HC28-3Taken

Text3:HC29 VALLEY HOUSE 1

Project Description Skill Time/persons CostProj.Start

Install (2) storm doors $4002,3 2 days 2 peopleHC29-1Taken

Pressure was exterior of house $501,2 2 days 4 peoplHC29-2Taken

Text3:HC30 VALLEY HOUSE 2

Project Description Skill Time/persons CostProj.Start

Install back exterior door and storm door $4502,3 2 days 3 peopleHC30-1Taken

Replace front exterior door and storm door

$4502,3 2 days 3 peopleHC30-2Taken

Replace bathroom vanity and medicine cabinet

$6002,3 2 days 3 peopleHC30-3Taken

Install backsplash to wall over bathroom vanity and kitchen sink

$1502,3 1 day 2 peopleHC30-4Taken

Replace 5 interior doors $5002,3 2 days 3 peopleHC30-5Taken

Paint bathroom walls $1001,2 1 day 2 peopleHC30-6Taken

Remove and replace front steps and hand rail

$4501,2,3 2 days 3 peopleHC30-7Taken

Remove and replace side steps and hand rail

$4501,2,3 2 days 3 peopleHC30-8Taken

Scrape and paint ramp and front porch $3501,2 1 day 3 peopleHC30-9Taken

Pressure was exterior of house $501,2 2 days 4 peopleHC30-10Taken

Paint front porch and ramp on house $1751,2 2 days 4 peopleHC30-11Taken

Build gate on side porch on house $751,2,3 1 day 2 peopleHC30-12Taken

As of 4/8/2020

Page 21: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC33 MAINTENANCE BUILDING

Project Description Skill Time/persons CostProj.Start

Repair leaks in roof and apply sheeting to ceiling in furniture room storage

$8001,2,3 1 wk 8HC33-1Taken

Build form and pour small concrete slab at furniture room

$8001,2,3 2 days 6 peopleHC33-2Taken

Water seal all wood on gazebo $1001,2 1 days 2 peopleHC33-3Taken

Apply louan to upstairs wall and paint then build shelves

$3001,2,3 3 days 3 peopleHC33-4Taken

Install gutter guards $3002,3 1 day 4 peopleHC33-5Taken

Replace skylight panels on part of building

$1002,3 1 day 3 peopleHC33-6Taken

Build small retaining wall around back of work camp shop

$1,0001,2,3 1 week 8 peopleHC33-7Taken

Build storage shelves in back shed on maintenance side

$4501,2,3 1 day 3 peopleHC33-8Taken

Build storage shelves over R room in maintenance side

$2501,2,3 1 day 2 peopleHC33-9Taken

Apply ferring strips and metal over old metal on new tool room

$4501,2,3 2 days 3 peopleHC33-10Taken

Text3:HC35 MISCELLANEOUS

Project Description Skill Time/persons CostProj.Start

Apply furring strips and metal over shingles on grounds equipment shed

$1,0001,2,3 3 days 6 peopleHC35-1Taken

Apply insulation board and vinyl siding to gables of grounds equipment shed

$2501,2,3 2 days 4 peopleHC35-2Taken

Apply insulation board and luan to ceiling of grounds equipment shed

$5001,2,3 2 days 4 peopleHC35-3Taken

Replace gutters on grounds shed $1001,2,3 1 day 3 peopleHC35-4Taken

Pressure wash and water seal deck at Vespers point

$1001,2 2 day 2 peopleHC35-5Taken

Install electric line in ground to light cross on hill

$2001,2,3 2 day 2 peopleHC35-6Taken

Text3:HC36 PARTIN RESIDENCE

Project Description Skill Time/persons CostProj.Start

Paint hallway and bathroom $1001,2 2 day 2HC36-Taken

As of 4/8/2020

Page 22: Henderson Settlement...Apr 09, 2020  · Pressure wash exterior of large building and garage Taken HC08-7 1,2 2 days 3 people $50 Replace 5 lights with LED lights in garage Taken HC08-8

Henderson SettlementHenderson Settlement Campus Work Areas

As of 4/8/2020

Text3:HC36 PARTIN RESIDENCE

Project Description Skill Time/persons CostProj.Start

Install gutter guards $2002,3 1 day 4 peopleHC36-1Taken

Pressure wash and water seal decks and ramp

$2001,2 2 days 3 peopleHC36-2Taken

Pressure wash exterior of house $501,2 1 day 3 peopleHC36-3Taken

Text3:HC37 GARDEN HOUSE

Project Description Skill Time/persons CostProj.Start

Pressure wash exterior of house $501,2 1 day 3 peopleHC37-1Taken

Pressure wash and water seal all decks and ramps

$1001,2 2 days 4 peopleHC37-2Taken

Text3:HC38 SOWER COTTAGE

Project Description Skill Time/persons CostProj.Start

Apply trim to exterior of door on lower section

$752,3 1 day 2 peopleHC38-1Taken

Build small retaining wall below cottages for walkway

$1,2001,2 1 wk 6HC38-2Taken

Pressure wash and water seal steps along side of building

$1001,2 2 days 3 peopleHC38-3Taken

Pressure wash exterior of house $501,2 1 day 3 peopleHC38-4Taken

Text3:HC39 BRANDON COTTAGE

Project Description Skill Time/persons CostProj.Start

Rake ground between cottages and spread pea gravel for sitting area

$8001,2,3 2 days 6 peopleHC39-1Taken

Pressure wash exterior of house $501,2 1 day 3 peopleHC39-2Taken