helix z2 installation instructions - construction … z2 installation instructions congratulations!...
TRANSCRIPT
To download details, specs & photos visit www.c-sgroup.com/efsFor technical and design assistance call 800.233.8493© Copyright 2017 Construction Specialties, Inc.Construction Specialties, Inc. reserves the right to make design changes or withdraw any design without notice
Helix Z2 Installation Instructions
Congratulations! You have just purchased a high-quality, industry proven entrance flooring system. Proper installation is necessary to ensure that your warranty will be honored by Construction Specialties.
Important InformationPrior to the commencement of Installation, all materials MUST be inspected for damage. Any damage must be reported to Construction Specialties as soon as possible, so that replacement materials may be furnished without delay.
All work must be completed as per Architect’s Approved “Shop Drawings”, and in accordance with these Installation Instructions. When installation is complete, all materials must be protected from damage until the Architect’s FINAL INSPECTION.
All materials should be arranged in the order that they are to be installed. All hardware required for each portion of the work should be placed with the appropriate materials.
Please review all Approved Shop Drawings and this Document to familiarize yourself with all the details and components of this assembly.
Important: Read through all instructions prior to starting installation.
Do’s and Don’ts
Do’s 1. Do read and follow all Installation Instructions thoroughly prior to beginning Installation. 2. Do clean the Substrate to remove all dirt, oily films, and debris. 3. Do surround Helix with aluminum framing that is permanently fixed to substrate. 4. Do install all metal framing before laying the Helix. 5. Do make sure all male and female connectors are completely engaged. Helix may be turned upside down to engage connectors. 6. Do use a straight edge and utility knife to trim Helix. 7. Do trim perimeter tiles snug with the interior edge of framing. 8. Do trim any exposed female connectors. 9. Do install clips or metal U-channels to divide up space for units larger than 10’0” x 8’0”.
Don’ts 10. Don’t install Helix prior to the substantial completion of interior construction and significant reduction in Construction Traffic. 11. Don’t install Helix on any surface nor in any recess before removing dirt, oily films and debris. 12. Don’t place under rolling loads of greater than 600 lbs./wheel. 13. Don’t install Helix in any area with inadequate door clearance, i.e., < ½” clearance where applicable. 14. Don’t, in recessed applications, use base-leveling screeds that are not recommended by the Manufacturer.
To download details, specs & photos visit www.c-sgroup.com/efsFor technical and design assistance call 800.233.8493© Copyright 2017 Construction Specialties, Inc.Construction Specialties, Inc. reserves the right to make design changes or withdraw any design without notice
15. Don’t install Helix without the proper framing for the specified application, i.e., Tapered, Tapered Angle or Pipe Stem frames. 16. Don’t leave an exposed edge of more than 1/8” in height (tripping hazard). 17. Don’t install Helix tiles in less than a 3” width in any given direction. 18. Don’t glue Helix down to any substrate. 19. Don’t mechanically fasten Helix to any substrate. 20. Don’t mechanically fasten plan-ons (handrail, fixtures, etc.) on top of Helix Z1 or Z2 mat surface.
Helix Z2 Installation Instructions
To download details, specs & photos visit www.c-sgroup.com/efsFor technical and design assistance call 800.233.8493© Copyright 2017 Construction Specialties, Inc.Construction Specialties, Inc. reserves the right to make design changes or withdraw any design without notice
Helix Z2 Installation Instructions
A full box (60 pieces at 12” x 9”) of Helix Z1 will cover 5 square yards or 45 square feet. Factory pre-assembled modules are available to speed the site installation time. Each tile/module is 7/16” high. The Helix products are made from 100% recycleable PVC/NBR materials and are available in black, gray or brown frame colors.
Inspect and confirm:• Substrate is level and in good condition• Location is dry and free of debris• Center point of mat area• The scraping surface if the mat runs perpendicular to the traffic direction (see page 3)
4005 Royal Drive Suite 300 | Kennesaw, GA 30144 | 888-424-6287 | www.impactspecialties.com
Install Instructions
formerly
Helix Z1
Please see page 6 for framing options and care instructions.
Full Box (60 pieces @ 12” x 9”) of Helix Z1 will cover 5 SQ. YDS. or 45 SQ. FT. Factory pre-assembled modules are available to speed the site installation time. Height of each tile/module is 7/16”. The Helix products are PVC/NBR materials (100% recyclable) available in black, dark gray or brown colors.
• Substrate is level and in good condition. (Repair if necessary)• Location is dry and free of debris. (Clean properly)• Center point of mat area. (Use diagonals form mat corners to establish).• direction (See page 3)
Step 6:A. Repeat step 2B & 2C
working to the right and downward until the largest rectangle that
created.
Step 5:A. Repeat step 2B & 2C
working downward.
Step 4:A. Repeat step 2B & 2C
working downward.
Step 3:A. Repeat step 2B & 2C
working left to right.
Step 2:A. Piece the next assembly
on the right.B. Use a water misting bottle
to lubricate the visible lugs.
C. Place hidden connection pins over the visible lugs and secure by using a rubber mallet to lock together.
Step 1:A. Begin all assembly work
in upper left cornet of the mat area.
B. Orient the tile/module with the hidden connecting pin edges placed along the left and the top frame inside edges.
C. The visible connecting pin lugs face to the right and downward.
Tile Installation
Step 1:A. Begin all assembly work in upper left corner of mat area.B. Orient the tile/module with the hidden connecting pin edges placed along the left and the top frame inside edges.C. The visible connecting pin lugs face to the right and downward.
Step 2:A. Piece the next assembly on the right.B. Use a water mistine bottle to lubricate the visible lugs.C. Place hidden connection pins over the visible lugs and secure by using a rubber mallet to lock together.
Step 3:A. Repeat step 2B and 2C working left to right.
Step 4:A. Repeat step 2B and 2C working downward.
4005 Royal Drive Suite 300 | Kennesaw, GA 30144 | 888-424-6287 | www.impactspecialties.com
Install Instructions
formerly
Helix Z1
Please see page 6 for framing options and care instructions.
Full Box (60 pieces @ 12” x 9”) of Helix Z1 will cover 5 SQ. YDS. or 45 SQ. FT. Factory pre-assembled modules are available to speed the site installation time. Height of each tile/module is 7/16”. The Helix products are PVC/NBR materials (100% recyclable) available in black, dark gray or brown colors.
• Substrate is level and in good condition. (Repair if necessary)• Location is dry and free of debris. (Clean properly)• Center point of mat area. (Use diagonals form mat corners to establish).• direction (See page 3)
Step 6:A. Repeat step 2B & 2C
working to the right and downward until the largest rectangle that
created.
Step 5:A. Repeat step 2B & 2C
working downward.
Step 4:A. Repeat step 2B & 2C
working downward.
Step 3:A. Repeat step 2B & 2C
working left to right.
Step 2:A. Piece the next assembly
on the right.B. Use a water misting bottle
to lubricate the visible lugs.
C. Place hidden connection pins over the visible lugs and secure by using a rubber mallet to lock together.
Step 1:A. Begin all assembly work
in upper left cornet of the mat area.
B. Orient the tile/module with the hidden connecting pin edges placed along the left and the top frame inside edges.
C. The visible connecting pin lugs face to the right and downward.
Tile Installation
4005 Royal Drive Suite 300 | Kennesaw, GA 30144 | 888-424-6287 | www.impactspecialties.com
Install Instructions
formerly
Helix Z1
Please see page 6 for framing options and care instructions.
Full Box (60 pieces @ 12” x 9”) of Helix Z1 will cover 5 SQ. YDS. or 45 SQ. FT. Factory pre-assembled modules are available to speed the site installation time. Height of each tile/module is 7/16”. The Helix products are PVC/NBR materials (100% recyclable) available in black, dark gray or brown colors.
• Substrate is level and in good condition. (Repair if necessary)• Location is dry and free of debris. (Clean properly)• Center point of mat area. (Use diagonals form mat corners to establish).• direction (See page 3)
Step 6:A. Repeat step 2B & 2C
working to the right and downward until the largest rectangle that
created.
Step 5:A. Repeat step 2B & 2C
working downward.
Step 4:A. Repeat step 2B & 2C
working downward.
Step 3:A. Repeat step 2B & 2C
working left to right.
Step 2:A. Piece the next assembly
on the right.B. Use a water misting bottle
to lubricate the visible lugs.
C. Place hidden connection pins over the visible lugs and secure by using a rubber mallet to lock together.
Step 1:A. Begin all assembly work
in upper left cornet of the mat area.
B. Orient the tile/module with the hidden connecting pin edges placed along the left and the top frame inside edges.
C. The visible connecting pin lugs face to the right and downward.
Tile Installation
Step 5:A. Repeat step 2B and 2C working downward.
4005 Royal Drive Suite 300 | Kennesaw, GA 30144 | 888-424-6287 | www.impactspecialties.com
Install Instructions
formerly
Helix Z1
Please see page 6 for framing options and care instructions.
Full Box (60 pieces @ 12” x 9”) of Helix Z1 will cover 5 SQ. YDS. or 45 SQ. FT. Factory pre-assembled modules are available to speed the site installation time. Height of each tile/module is 7/16”. The Helix products are PVC/NBR materials (100% recyclable) available in black, dark gray or brown colors.
• Substrate is level and in good condition. (Repair if necessary)• Location is dry and free of debris. (Clean properly)• Center point of mat area. (Use diagonals form mat corners to establish).• direction (See page 3)
Step 6:A. Repeat step 2B & 2C
working to the right and downward until the largest rectangle that
created.
Step 5:A. Repeat step 2B & 2C
working downward.
Step 4:A. Repeat step 2B & 2C
working downward.
Step 3:A. Repeat step 2B & 2C
working left to right.
Step 2:A. Piece the next assembly
on the right.B. Use a water misting bottle
to lubricate the visible lugs.
C. Place hidden connection pins over the visible lugs and secure by using a rubber mallet to lock together.
Step 1:A. Begin all assembly work
in upper left cornet of the mat area.
B. Orient the tile/module with the hidden connecting pin edges placed along the left and the top frame inside edges.
C. The visible connecting pin lugs face to the right and downward.
Tile Installation
Step 6:A. Repeat step 2B and 2C working to the right and downward until the largest rectangle that will fit all frames is created.
4005 Royal Drive Suite 300 | Kennesaw, GA 30144 | 888-424-6287 | www.impactspecialties.com
Install Instructions
formerly
Helix Z1
Please see page 6 for framing options and care instructions.
Full Box (60 pieces @ 12” x 9”) of Helix Z1 will cover 5 SQ. YDS. or 45 SQ. FT. Factory pre-assembled modules are available to speed the site installation time. Height of each tile/module is 7/16”. The Helix products are PVC/NBR materials (100% recyclable) available in black, dark gray or brown colors.
• Substrate is level and in good condition. (Repair if necessary)• Location is dry and free of debris. (Clean properly)• Center point of mat area. (Use diagonals form mat corners to establish).• direction (See page 3)
Step 6:A. Repeat step 2B & 2C
working to the right and downward until the largest rectangle that
created.
Step 5:A. Repeat step 2B & 2C
working downward.
Step 4:A. Repeat step 2B & 2C
working downward.
Step 3:A. Repeat step 2B & 2C
working left to right.
Step 2:A. Piece the next assembly
on the right.B. Use a water misting bottle
to lubricate the visible lugs.
C. Place hidden connection pins over the visible lugs and secure by using a rubber mallet to lock together.
Step 1:A. Begin all assembly work
in upper left cornet of the mat area.
B. Orient the tile/module with the hidden connecting pin edges placed along the left and the top frame inside edges.
C. The visible connecting pin lugs face to the right and downward.
Tile Installation
To download details, specs & photos visit www.c-sgroup.com/efsFor technical and design assistance call 800.233.8493© Copyright 2017 Construction Specialties, Inc.Construction Specialties, Inc. reserves the right to make design changes or withdraw any design without notice
Step 7:A. Center mat assembly within the frames.B. Attach the anchor clips using supplied masonry anchors to the pit at all four corners (see details above).C. For a Helix system of any size, use the sizes below as a guideline when installing anchor clips. - 16 ft2 = 4 clips - 32 ft2 = 6 clips - 48 ft2 = 8 clips
Note: When Helix Z2 assembly does not work out to a full tile increment, Helix Z1 tiles will be provided for perimeter of assembly. Helix Z1 tiles should be trimmed to specific size (see step 8). After all tiles are assembled, all female connectors on both Helix Z1 & Z2 tiles should be trimmed.
Attention:If end pieces are less than 3” add tile to assembly width, recenter and trim ends. This will ensure that the end pieces will be greater than 3”.
Step 8:A. Cut tile pieces equal distances from lug/pin to the alum. frame. Make sure that the appropriate side of the tile is being cut. Male/female connectors must align.
Step 9:A. Repeat step 2B & 2C and start installing the cut tiles.B. Cut pieces of the tile to fit into the corners edges.
Attention:Do not leave exposed female connectors at any time.
Step 10:A. Finish Helix Z2 mat.
Helix Z2 Installation Instructions
To download details, specs & photos visit www.c-sgroup.com/efsFor technical and design assistance call 800.233.8493© Copyright 2017 Construction Specialties, Inc.Construction Specialties, Inc. reserves the right to make design changes or withdraw any design without notice
Helix Z2 Installation Instructions
4005 Royal Drive Suite 300 | Kennesaw, GA 30144 | 888-424-6287 | www.impactspecialties.com
Install Instructions
formerly
Helix Z1
Item # Item #Helix Z1 (Tile) MUOV18I001XXX Helix Anchor Clip 18I007XXXTapered Vinyl Frame FABRI18V50XXXX #8 S/S Screw (1-1/2” L) 90198A279Tapered Alum. Frame (Taped) CSMFALTAM #8 Poly. Screw Anchor (9/16” L) 97065A220Pipe Stem Frame (Taped) CSMFALPSM Installation Instruction 18H1/2” Door Threshold Frame (Taped) CSMFALTHM
Framing Options
Care and Maintenance
Alternative transitional frames
• Daily mopping as required• Periodic removal of the grid to clean recess as required• Periodic high pressure wash of grid system as required• If tiles are damages, replace damaged tile with new components. Replacement components can be purchased to renew
the look and function of your grid system for a fraction of the cost of replacing the entire unit. Please call us at (888) 424-6287 and our customer service group will assist you with pricing, color selection and installation instructions.
Framing Options
Alternative Transitional Frames
Specified Component Item # Specified Component Item #Helix Z2 (tile) MOUV18I004XXX Helix Anchor Clip 18I007XXXTapered Vinyl Frame FABRI18V50XXXX #8 S/S Screw (1-1/2” L) 90198A279Tapered Alum. Frame (Taped) CSMFALTAM #8 Poly. Screw Anchor (9/16” L) 97065A220Pipe Stem Frame (Taped) CSMFALPSM Installation Instruction 18L1/2” Door Threshold Frame (Taped) CSMFALTHM
Care and Maintenance• Daily mopping as required• Periodic removal of the grid to clean recess as required• Periodic high pressure wash of grid system as required• If tiles are damanged, replace damaged tiles with new components. Replacement components can be purchased to renew the look and function of your grid system for a fraction of the cost of replacing the entire unit.