heliophysics division update · 2020-04-28 · heliophysics division update heliophysics...

11
Heliophysics Division Update Heliophysics Subcommittee 08 August 2016 Steven W. Clarke, Director

Upload: others

Post on 09-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Heliophysics Division Update · 2020-04-28 · Heliophysics Division Update Heliophysics Subcommittee ... Still no response from B. Project plan forward accepted by HQ 6/13. on 6/15

Heliophysics DivisionUpdateHeliophysics Subcommittee08August2016StevenW.Clarke,Director

Page 2: Heliophysics Division Update · 2020-04-28 · Heliophysics Division Update Heliophysics Subcommittee ... Still no response from B. Project plan forward accepted by HQ 6/13. on 6/15

2

UpdateTopics

• WelcomeandOpeningRemarks

• BudgetUpdate

• ProgramOverview

• Research&Analysis

• DivisionAssignmentChanges

• InternationalPartnerships

• FACA

Page 3: Heliophysics Division Update · 2020-04-28 · Heliophysics Division Update Heliophysics Subcommittee ... Still no response from B. Project plan forward accepted by HQ 6/13. on 6/15

Heliophysics Budget

3

Development*54%**

Prime*5%*

Opera3ng**Missions*12%*

Research*11%*

Suborbital*11%*

Mgmt*and*Other*4%*

Data*Systems*3%*

Research 68,658 11%Development 352,466 54%Prime(MMS) 30,138 5%OperatingMissions 78,170 12%ManagementandOther 26,424 4%DataSystems 19,890 3%Suborbital 71,420 11%Total 647,166 100%

FY2016Heliophysics Budget

Page 4: Heliophysics Division Update · 2020-04-28 · Heliophysics Division Update Heliophysics Subcommittee ... Still no response from B. Project plan forward accepted by HQ 6/13. on 6/15

Heliophysics Budget

4

$M FY15 FY16 FY17 FY18 FY19 FY20 FY21Enacted

Heliophysics 636.1 647.2 698.7 684.0 698.3 714.8 723.9

• MissionsindevelopmentfullyfundedØ SpaceEnvironmentsTestbed-1(SET-1)– NETMarch2017Ø Ionospheric CONnection Explorer(ICON)– October2017Ø GlobalObservationoftheLimbandDisk(GOLD)– April2018Ø SolarProbePlus(SPP)– July2018Ø SolarOrbiterCollaboration(SOC)– October2018

• Futuremissionfundingü ReleaseExplorermissionAO/MoO inFY16Ø ReleaseSTP-5(IMAP)missionAO/MoO inFY17Ø ReleaseLWS-7(GDC)missionAO/MoO inFY18

• OMBMandatorySpending(FY2017only):– +$10.0MforHeliophysics/Cubesat program– +$10.0MforHeliophysics/SpaceweatherresearchinsupportoftheSpaceWeather

ActionPlan– +$5.0MforResearch&Analysis

Page 5: Heliophysics Division Update · 2020-04-28 · Heliophysics Division Update Heliophysics Subcommittee ... Still no response from B. Project plan forward accepted by HQ 6/13. on 6/15

OperatingMissions

Mission Launch Phase Extension to (*)Geotail 7/24/1992 Extended 12/31/2016STEREO 10/25/2006 Extended 9/30/2018THEMIS+Artemis 2/17/2007 Extended 9/30/2018AIM 4/25/2007 Extended 9/30/2018Hinode 9/23/2006 Extended 9/30/2018ACE 8/27/1997 Extended 9/30/2018RHESSI 2/5/2002 Extended 9/30/2018SOHO 12/2/1995 Extended 9/30/2018TIMED 12/7/2001 Extended 9/30/2018Voyager 1 + 2 8/20/1977 Extended 9/30/2018TWINS A + B 6/2006 & 3/2008 Extended 9/30/2018IBEX 10/19/2008 Extended 9/30/2018Wind 11/1/1994 Extended 9/30/2018SDO 2/11/2010 Extended 9/30/2018Van Allen 8/30/2012 Extended 9/30/2018IRIS 6/27/2013 Extended 9/30/2018MMS 3/12/2015 Prime 9/1/2017

Remarks

Still no response from B. Project plan forward accepted by HQ 6/13.on 6/15 D lost of data: 7/2 A lost 31h of data. Both antenna issues.

Star tracker issue resolved.

Star Tracker issues should be closed soon.Star tracker issue resolved.

(*) Extended mission end dates subject to upcoming Senior Reviews. (+) Terminates at date.

requirements 5

M-3 Oct M-2 M-1 Cur. M.

Mission proceeding to Area of concern - possible Significant problem –meet science reduction in capability possible or probable loss of mission

Page 6: Heliophysics Division Update · 2020-04-28 · Heliophysics Division Update Heliophysics Subcommittee ... Still no response from B. Project plan forward accepted by HQ 6/13. on 6/15

Heliophysics Program 2015-2024artSa

h tiW

ng

viLi

srerolpEx

margoPr hcraes

Re

March 2015

MagnetosphericMultiscale (MMS)

Interstellar Mapping Probe (IMAP) (STP #5)

2023*

HeliophysicsMO

2023*

Space EnvironmentTestbeds (SET)NET March 2017

Solar Probe PlusJuly 2018

seboPr lairtserreT ral

So

SolarOrbiter Collaboration

(with ESA)October 2018

Geospace Dynamics Constellation

(GDC)(LWS #4)2024*

IonosphericConnection

Explorer (ICON)October 2017

Global-scaleObservations of the

Limb and Disk (GOLD)April 2018

Heliophysics MO2020*

HeliophysicsSMEX2022*

HeliophysicsMO

2022*

HeliophysicsMIDEX2024*

HeliophysicsMO

2024*

Ongoing

Heliophysics MissionsAstrophysics MissionsPlanetary Missions

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024*Notional 6

Solar/Heliospheric - June 2016Solar/Heliospheric - July 2016Solar/Heliospheric - August 2016

GRIPS - January 2016

BARREL- August 2016

Page 7: Heliophysics Division Update · 2020-04-28 · Heliophysics Division Update Heliophysics Subcommittee ... Still no response from B. Project plan forward accepted by HQ 6/13. on 6/15

HPD2015ROSESComplete

ELEMENT STEP1PROPOSALS

STEP2PROPOSALS

AWARDS YEAR1($M)

B.2H-SR 343 251 46 5.5

B.3H-TIDeS 135 106 12 4.7

B.4 H-GI 204 149 22 2.9

B.6 H-LWS 103 92 20 3.5

B.7H-IDEE 15 14 8 0.5

TOTALS 799 612 108 17.1

17

ROSES15AverageSuccessRate(vs.FullProposals):18%

Page 8: Heliophysics Division Update · 2020-04-28 · Heliophysics Division Update Heliophysics Subcommittee ... Still no response from B. Project plan forward accepted by HQ 6/13. on 6/15

.

Page 9: Heliophysics Division Update · 2020-04-28 · Heliophysics Division Update Heliophysics Subcommittee ... Still no response from B. Project plan forward accepted by HQ 6/13. on 6/15

InternationalCollaborationUpdate

9

• KoreaAstronomyandSpaceScienceInstitute(KASI)– WorkinggroupchartersignedatKASIon25May– Finalmembershipandkickoffmeetingisscheduledfor21September– Potentialcollaborationareasincludedataanalysis,modelingandflight

projects

• JapanAerospaceExplorationAgency(JAXA)/EuropeanSpaceAgency(ESA)– Multilateralscienceobjectivesteamestablishedtostudythenextgeneration

solarphysicsmissionusingtheSolar-Cconceptaspointofdeparture– 3co-chairs(NASA,JAXA,ESA)– 12membersfromtheUS,JapanandEurope(4each)– Kickoffmeetingheldon13July– Draftreportduein9months(April2017);finalreportdueinJuly2017

• IndianSpaceResearchOrganisation (ISRO)– WorkinggroupcharterInapprovalreviewbyNASAandISRO– Proposedareasofcollaborationinclude:

• Modelingofsolaractivity• Jointobservationsanddataanalysis• Ground-basedobservations

Page 10: Heliophysics Division Update · 2020-04-28 · Heliophysics Division Update Heliophysics Subcommittee ... Still no response from B. Project plan forward accepted by HQ 6/13. on 6/15

EvolutionoftheHeliophysicsSubcommittee

• NASAhasdecidedtoapplyforFACAchartersforthefourscienceadvisorysubcommittees,includingtheHeliophysics Subcommittee.

• Manycommunity-basedstudies(e.g.,SeniorReviews,ScienceandTechnologyDefinitionTeams)requireacharteredFederalAdvisoryCommitteetowhichtoreport.

• Oncechartered,thisHeliophysics Subcommittee(HPS)willbereplacedbytheHeliophysics AdvisoryCommittee(HPAC).

– AllcurrentHPSmemberswillbeappointedtotheHPAC.– Meetingscheduleandmemberexpectationswillbeunchanged.

• TheHeliophysics AdvisoryCommitteewillreporttotheDirectoroftheHeliophysics Division.

• TheHPACChairwillcontinuetoserveasamemberoftheNACScienceCommittee.

• OncetheHeliophysics AdvisoryCommitteeischartered,thentheDirectoroftheHeliophysics Divisionwillestablishsubordinategroups,suchas:

– SeniorReviews– FutureScienceandTechnologyDefinitionTeams(STDT)(e.g.,GDC)

10

Page 11: Heliophysics Division Update · 2020-04-28 · Heliophysics Division Update Heliophysics Subcommittee ... Still no response from B. Project plan forward accepted by HQ 6/13. on 6/15

.

Questions?