heidelberg, 3 march1998 pnos-suppliers technical interfaces p619 improvements of pno-supplier...
TRANSCRIPT
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
P619
IMPROVEMENTS OF
PNO-SUPPLIER TECHNICAL INTERFACES
Ola Espvik
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
Harmonise
SP Suppliers
SPService Providers/PNOs
SPSupplier
SP
Customer
Customer
Customer
Customer
Customer
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
P619 EIRUS
SPICE
TRILLIUM
EuromethodEuropean Directives
ITU ETSI
IEC
P227 P307T5
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
P227 Software Quality Assurance
P227 D1
Part I, PNOs Assessment Documentation
Part II, Suppliers Assessment Documentation
Part III, General Survey of Software Quality Assurance
P227 D3
Part A, Recommendation for Quality Assurance of Telecommunications Software
Part B, Technologies for Quality Assurance of Telecommunications SoftwareVol. 1: Guidelines for Software MeasurementVol. 2: Process QualityVol. 3: ReliabilityVol. 4: MaintainabilityVol. 5: MetricsVol. 6: Technical Reports and Survey Reports
P227 D4 Buy IT
Recommended Practices for Procurement of Telecommunication Software
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
D2: Update of the P227 Deliverables
• Identification of those parts of the final deliverable of P227 that had to be changed and how the update has been made to provide a basis for developing a software quality measurement program within each PNO.
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
• Task 1: Overall Reliability Model
• Task 2: Estimating the Impact of Software upon Telecommunication System Dependability
• Task 3: Methods for Handling and Prevention of Failures in CCS# 7
• Task 4: RQMS in Europe
P307 Reliability Engineering
S26
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
• EIRUS: E-IPQM and E-RQMS Users
• E-IPQM: European In-Process Quality Metrics
• E-RQMS: European Reliability and Quality Measurements for telecommunications Systems
EIRUS
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
ObjectiveImprove Quality Management
•-------------------
•-------------------
•------------------- •Quality Assurance
Technical Interfaces
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
Task2
Technical Interfaces
RequirementSpecification
Supplier Qualification and
Supplier Monitoring
QualityMeasurement
Task43
Task
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
Requirement Specification
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
Technical Interfaces
RequirementSpecification
Supplier Qualification and
Supplier Monitoring
QualityMeasurement
FunctionalRequirements
QualityRequirements
Hardware Traceability
D1 D1 D5
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
D1: Guidelines on Requirements Specification
Guidelines and a checklist for the preparation of product and process requirements throughout the entire life-cycle of each of the three product types (innovative products, known products, and off-the-shelf products), taking into account whether the product consists of hardware, software, or services.
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
D5: Guidelines on Hardware Traceability
• Guidelines on how hardware traceability for telecommunication equipment can be carried out. Conditions and procedures for hardware traceability are studied, hardware identity and data formats, possibilities of hardware coding, marking codes, and data management are described.
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
Supplier Qualification andSupplier Monitoring
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
Technical Interfaces
RequirementSpecification
Supplier Qualification and
Supplier Monitoring
QualityMeasurement
Supplier Qualification
SupplierMonitoring
D3 D3
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
D3: Guidelines on Suppliers Qualification and Suppliers Monitoring
• Guidelines for choosing the best tool for qualification and monitoring of suppliers, based on objective criteria, together with general guidelines and recommendations for qualification and monitoring of suppliers.
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
Quality Measurement
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
Technical Interfaces
RequirementSpecification
Supplier Qualification and
Supplier Monitoring
QualityMeasurement
DevelopmentProcess
Management
Product andMaintenanceMeasurement
D4 D4
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
D4: European Quality Measurements: Overview of
E-IPQM and E-RQMS Version 2
• A definition of the relationship between the European Quality Measurement systems E-IPQM and E-RQMS with the Bellcore systems RQMS and IPQM, and a mechanism on how to establish common targets for measurement data and dissemination of data among PNOs.
Heidelberg, 3 March1998
PNOs-Suppliers Technical Interfaces
D6: Recommendations to Improve the Technical Interfaces between PNO and
Suppliers
Overall Report