heavy duty hydrogen projects -...

26
Heavy duty hydrogen projects How to reach commercial business cases May 2019, Icelandic New Energy - 20year Jacob Krogsgaard, SVP Nel Hydrogen

Upload: others

Post on 26-Mar-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

Heavy duty hydrogen projectsHow to reach commercial business cases

May 2019, Icelandic New Energy - 20yearJacob Krogsgaard, SVP Nel Hydrogen

Page 2: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

Page 2 © 2019 Nel Hydrogen | www.nelhydrogen.com

One slide on Nel Hydrogen

● World’s largest pure-play hydrogen company

with a market cap of 1B USD.

● +270 employees in Denmark, Norway and USA

with world-class experience and skills.

● Offering hydrogen technology and solutions for

industrial, energy and transport applications.

● More than 3500 hydrogen solutions delivered

in 80 countries world wide since 1927, of which

60 are hydrogen fueling stations.

● World’s #1 on hydrogen electrolysers and

hydrogen fueling – unrivalled performance and

track-record.

HYDROGEN FUELING

Acquired in 2015

PEM ELECTROLYSERS

Acquired in 2017

ALKALINE ELECTROLYSERS

Dates back to 1927

Page 3: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

H2Station® variants

Compression and fast fueling of hydrogen

• Capacity up to 120kg/hour

• Fueling protocols: 3-5min(CARS) | down to 5min(BUS)

• Inlet pressure range 2-70MPa – Multiple H2 sources

• H2Station control of multiple storages

• Dimensions L: 3.3m W: 2.2m H: 3.6m | 17.5 ton

• Approvals PED – CE marked | UL listed | KGS

• Noise <60dB | no venting of hydrogen

• Multiple dispensers connections

www.nelhydrogen.com

Both 35/70MPa35MPa 70MPa

Page 4: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

Demonstration

- Get funding - Test vehicles (just a small fleet)- Test hydrogen fueling

Commercialization

- Increase volume of vehicles- Make a plan to replace your ICE fleet

with H2- Make standard fuel supply contracts

Valley of death

Think smartbusiness cases

Think BIG

Page 5: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

CONFIDENTIAL Page 5 © 2019 Nel Hydrogen | www.nelhydrogen.com

FUEL CELLS IN 2017 ARE WHERE SOLAR WAS IN 2002

● Solar at 0.3 $/W (2017) and keep dropping

● Low cost solar, wind → Low cost green hydrogen

FUEL CELL LEARNING RATE AT 25%

● Fuel cell learning rate similar to PV

● Much more dependent on volume than time

ACCELERATE COST DOWN

● Mass manufacturing of fuel cell and hydrogen technology

● Similar will be seen on H2 storage, electrolysers & H2Stations

NEL IS LEADING THE WAY TO REDUCE COSTS IN H2 INFRASTRUCTURE

● Factory in Denmark to manufacture up to 300 H2Stations/year

● Factory in Norway to manufacture up to 360MW Electrolyser/year5

Exponential cost reduction rate – Learning rate

Page 6: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

CONFIDENTIAL Page 6 © 2019 Nel Hydrogen | www.nelhydrogen.com

Green hydrogen today and future

Page 7: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

CONFIDENTIAL Page 7 © 2019 Nel Hydrogen | www.nelhydrogen.com

Green competitive hydrogen – at cost of diesel

• Nel Hydrogen solutions are developing sustainable business cases including FC buses

• If risk is managed and multiple parts of the supply chain are included in one SPV, H2 @ ~5€/kg is possible

• Electrolyser can operate ON/OFF depending on renewable electricity input

40 €/MWh ~5 €/kgLarge scale

central production

+ 10MW

High capacitydistribution

+ 1.000kg / truck

Down to 5min fillredundant dispensing

40-80 bus station

99,9% availability

Page 8: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

Three game changing projects…

1 2 3

Page 9: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

CONFIDENTIAL Page 9 © 2019 Nel Hydrogen | www.nelhydrogen.com

Efficient centralized H2 production

● 100% green hydrogen production by

centralized electrolysis plant situated

near Heide, in Schleswig-Holstein

● Produced via local renewable energy

● 7-10 T/day supply for 56 Trains

Flexible distribution setup

● Pre-compressed hydrogen distributed by

truck in 50/70MPa swap containers –

flexible logistics ready for further scale

Compact fueling equipment at stations

● State-of-the art hydrogen fueling

equipment located at train stations in

Husum, Kiel, Neumünster and Lübeck

Heide

KielHusum

Lübeck Neumünster

Hydrogen train opportunity in North Germany1

Page 10: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

Number one by nature

FREE HEAVY-DUTY LONG-HAUL TRUCKS2

Page 11: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

Page 12: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

12

Page 13: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

CONFIDENTIAL Page 13 © 2019 Nel Hydrogen | www.nelhydrogen.com

SolarWind

NEL + NIKOLA: Zero emission – Zero compromise

● Solution for green hydrogen production and fast refueling of hydrogen at MEGA stations

● Zero emission fuel and freight based on renewable energy: same convenience and higher performance

ElectrolysersHydrogen production

A-3880 - 8T/day

H2Station®Hydrogen fueling

80 kg / 10 min

© Nikola Corporation

Page 14: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

H2Bus Europe3

Page 15: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

CONFIDENTIAL Page 15 © 2019 Nel Hydrogen | www.nelhydrogen.com

H2Bus Europe – H2Bus TCOAssumptions – H2Bus Europe targets

28.440

021.398

0

24.455

018.231

015.952

0

30.376

0

21.250

0

25.500

0

25.500

0

28.263

0

18.700

0

25.500

0

203.894

0

203.894

0

203.894

0

203.894

0

224.284

0

203.894

0

21.500

0

25.263

0

25.263

0

31.175

0

40.000

0

36.500

0

7.525

0

12.631

0

12.631

0

10.911

0

14.000

0

12.250

0

-

0

25.000

0

25.000

0

-

0

12.000

0

-

0Diesel CNG Biogas Diesel Hybrid Battery (opp

charging)FCEB

TCO comparission

Annual fuel cost ex. VAT Service and maintenance ex. VAT Driver cost Annual depreciation Annual Interest Infrastructure investment (incl maintenance)

Page 16: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

CONFIDENTIAL Page 16 © 2019 Nel Hydrogen | www.nelhydrogen.com

H2Bus Europe – location of hubs

DK

500km radius

200kmradius

LT

UK

Page 17: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

CONFIDENTIAL Page 17 © 2019 Nel Hydrogen | www.nelhydrogen.com

~50% wind power production in DK 201831% wind power consumption in DK 2018 BEB

FCB

~31% wind power

Charge every night

Electrolyser operating when wind power is available

~100% wind power

Fill every night

Hydrogen storageweek fuel storage

Hydrogen: The true renewable fuel

Fluctuating wind power production(example one week)

Fixed charging patternWind + fossil electricity

Page 18: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

CONFIDENTIAL Page 18 © 2019 Nel Hydrogen | www.nelhydrogen.com

Fuel Cell buses are ready

18

FUEL CELL BUS PERFORMANCE ✓

MAINTENANCE ✓

H2STATION RELIABILITY ✓

COST OF FC BUS (@ SCALE)

COST OF MAINTENANCE (@ SCALE)

COST OF HYDROGEN FUEL (@ SCALE)*CHIC: http://chic-project.eu/ / *3Emotion: http://www.3emotion.eu/ / *JIVE2: Upcoming*JIVE: http://www.fch.europa.eu/project/joint-initiative-hydrogen-vehicles-across-europe

demonstration commercialization

Page 19: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

CONFIDENTIAL Page 19 © 2019 Nel Hydrogen | www.nelhydrogen.com

Small stations – services up to 20 buses at ~140 m2

6,5 m

~10 m

~4 m

H2-trailer parking

H2Station®

LP Duplex

Nel Hydrogen® LP Duplex

Daily operations:

• One trailer, connected to trailer panel, integrated with H2Station®

• Intelligent controls and reloading between H2Station and trailers

• Once a trailer is depleted, it is easily replaced by the arrival of a new, full trailer

• Different H2-trailers and pressure ratings may be applied

1 x H2Station® Module

Dispenser 35MPaThroughput: Up to 120kg/hr

~14 m

Trailer panel

Trench pipes

Trailer bay block walls

Tra

iler

ba

y b

lock

wa

lls

Trench pipelines to HD dispenser(s)(Up to 50 m. distance)

Up to 50m

Mobile Storages +30MPa

H2Station®

LP Duplex

Page 20: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

CONFIDENTIAL Page 20 © 2019 Nel Hydrogen | www.nelhydrogen.com

Medium stations – services up to 50 buses at ~200 m2

6,5 m

~14 m

~4 m

H2-trailer parking

~14 m

Trailer panel

Trench pipes

Trailer bay block walls

Tra

iler

ba

y b

lock

wa

lls

H2-trailer parking

Trailer panel

Trench pipelines to HD dispenser(s)(Up to 50 m. distance)

H2Station®

LP Duplex

H2Station®

LP Duplex

Nel Hydrogen® LP Duplex

Daily operations:

• One trailer, connected to trailer panel, integrated with H2Station®

• Intelligent controls and reloading between H2Station and trailers

• Once a trailer is depleted, it is easily replaced by the arrival of a new, full trailer

• Different H2-trailers and pressure ratings may be applied

Mobile Storages +30MPa

2 x H2Station® Module

Trailer bay #2 Dispenser 35MPa

Throughput: 120kg/hr

Up to 50m

Up to 50m

Page 21: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

CONFIDENTIAL Page 21 © 2019 Nel Hydrogen | www.nelhydrogen.com

Large stations – services up to 100 buses at ~240 m2

6,5 m

~17 m

~4 m

H2-trailer parking

Nel Hydrogen® LP Duplex

Daily operations:

• Three trailers, connected to trailer panel, integrated

with H2Station

• Intelligent controls and pressure consolidation

between H2Station and trailers

• Once a trailer is depleted, it is easily replaced by a

new, full trailer arriving

• Different H2-trailers and pressure ratings may be

applied~14 m

Trailer panel

Trench pipes

Trailer bay block walls

Tra

iler

ba

y b

lock

wa

lls

H2-trailer parking

Trailer panel

Trench pipelines to HD dispenser(s)(Up to 50 m. distance)

H2-trailer parking

Trailer panel

H2Station®

LP Duplex

H2Station®

LP Duplex

H2Station®

LP DuplexMobile Storages +30MPa

+2 x H2Station® Module

Trailer bay #2

Dispenser 35MPaThroughput: 120kg/hr

Up to 50m

Trailer bay #2

Up to 50m

Page 22: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

CONFIDENTIAL Page 22 © 2019 Nel Hydrogen | www.nelhydrogen.com

Example hydrogen prices

Price examples for different fleet sizes** Prices are dependent on local factors

10 buses

H2 price: 8.5 EUR/kg

50 buses

H2 price: 6 EUR/kg

100 buses

H2 price: 5 EUR/kg

Page 23: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

Heavy duty IcelandThe next phase in Iceland?

Page 24: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

CONFIDENTIAL Page 24 © 2019 Nel Hydrogen | www.nelhydrogen.com

IF ALL VEHICLES ARE INTENSIVELY USED:

● 370Ton/day ~ 740MW Electrolyser

● 370MW Electrolyser if many vehicles are old or used less.

● 20MW project will be enough to make a case work.

● 100 city buses

● 100 trucks

● 200 taxies

Heavy duty vehicles – Iceland numbers

2.221 buses

20 kg/day

40 Ton/day

7.843 trucks

20 kg/day

150 Ton/day

22.371 vans

3 kg/day

67 Ton/day

589 taxies

3 kg/day

1,7 Ton/day

222.729 cars

0,5 kg/day

111 Ton/day

Page 25: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

Number one by nature

Who is ready to move?..to make hydrogen business commercial

… let’s go big

Page 26: Heavy duty hydrogen projects - newenergy.isnewenergy.is/wp-content/uploads/2019/05/3-Jacob-Krogsgaard-Hydrogen... · Heavy duty hydrogen projects How to reach commercial business

number one by nature