2015 Draft Capital Works Budget
Heavy Construction AssociationMarch 25, 2015
Robert Sharon, Director of Infrastructure ServicesKen Brown, P.Eng., Manager of Public Works
Kit Woods, P. Eng., Manager of Environmental ServicesAllan Botham, P. Eng., Manager of Engineering Services
![Page 2: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ebb5503460f94bc2d9f/html5/thumbnails/2.jpg)
2015 Highlights- Investing $12.9 million in Infrastructure
• Replacement of streetlights with LED. $1.3 million• Phase 1 of a multi-use trail along CR 20 in cooperation with CWATS• Resurfacing and construction of a multi-use trail along
Mersea Road 3. $1.2 million• $1.8 million in watermain replacement• $1.4 million in our PCC• $750k in Drainage Capital Works
![Page 3: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ebb5503460f94bc2d9f/html5/thumbnails/3.jpg)
Environmental Services - PCC
TOTAL $1,400,000
HIGHLIGHTS• Install 4th Screw Pump $ 540,000• Install inspection manholes on sewer outfall $ 200,000 • Biosolids Upgrades $ 400,000
![Page 4: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ebb5503460f94bc2d9f/html5/thumbnails/4.jpg)
Environmental Services - Water
TOTAL $1,800,000
HIGHLIGHTS• Hazelton, Queens and Windsor Ave $530,000• White Street $130,000• Foundry, Clark, Ivan, Whitney $600,000• Melrose $375,000
![Page 5: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ebb5503460f94bc2d9f/html5/thumbnails/5.jpg)
Engineering – Roads, Traffic & Bridges
TOTAL $5,500,000
HIGHLIGHTS• Mersea Road 3 (Rehab and Trail) $ 1,200,000 • Erie - Oak to Askew Recon $ 1,300,000• CR 20 CWATS Trail $ 530,000• Bridge No. 8 on Mersea Road 11 (OCIF) $ 400,000• LED Street Light Conversion $ 1,300,000• Sidewalks $ 150,000• Traffic Signal Work $ 80,000• Various Road Resurfacing $ 500,000
![Page 6: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ebb5503460f94bc2d9f/html5/thumbnails/6.jpg)
Engineering – Sewers 2015
TOTAL $1,400,000
HIGHLIGHTS• Wilousa – Seneca Sewer Upgrade $ 180,000 • Erie South Storm Outfall $ 175,000 • Pelee Drive Sanitary (Engineering) $ 335,000• NE Trunk Sewer EA and Prelim Design $ 200,000
![Page 7: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ebb5503460f94bc2d9f/html5/thumbnails/7.jpg)
Engineering – Drainage 2015
TOTAL $ 750,000
HIGHLIGHTS• Engineer’s Reports – Development $ 180,000 • New Drains $ 160,000• Updated Engineer’s Reports $ 370,000• Other $ 40,000
![Page 8: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ebb5503460f94bc2d9f/html5/thumbnails/8.jpg)
Misc. 2015
• New Soccer Field House Facility $ 600,000• Leamington Transit $ 70,000
• Shelters• Pads• Benches
Future Years
• NE Trunk Sewer - Seacliff to Road 6 (2016-17)$ 10,000,000• Pelee Drive Sanitary Sewer (2017-19) $ 10,000,000