2015 Draft Capital Works Budget Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods, P. Eng., Manager of Environmental Services Allan Botham, P. Eng., Manager of Engineering Services

Upload: bertina-ball

Post on 31-Dec-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,

2015 Draft Capital Works Budget

Heavy Construction AssociationMarch 25, 2015

Robert Sharon, Director of Infrastructure ServicesKen Brown, P.Eng., Manager of Public Works

Kit Woods, P. Eng., Manager of Environmental ServicesAllan Botham, P. Eng., Manager of Engineering Services

Page 2: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,

2015 Highlights- Investing $12.9 million in Infrastructure

• Replacement of streetlights with LED. $1.3 million• Phase 1 of a multi-use trail along CR 20 in cooperation with CWATS• Resurfacing and construction of a multi-use trail along

Mersea Road 3. $1.2 million• $1.8 million in watermain replacement• $1.4 million in our PCC• $750k in Drainage Capital Works

Page 3: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,

Environmental Services - PCC

TOTAL $1,400,000

HIGHLIGHTS• Install 4th Screw Pump $ 540,000• Install inspection manholes on sewer outfall $ 200,000 • Biosolids Upgrades $ 400,000

Page 4: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,

Environmental Services - Water

TOTAL $1,800,000

HIGHLIGHTS• Hazelton, Queens and Windsor Ave $530,000• White Street $130,000• Foundry, Clark, Ivan, Whitney $600,000• Melrose $375,000

Page 5: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,

Engineering – Roads, Traffic & Bridges

TOTAL $5,500,000

HIGHLIGHTS• Mersea Road 3 (Rehab and Trail) $ 1,200,000 • Erie - Oak to Askew Recon $ 1,300,000• CR 20 CWATS Trail $ 530,000• Bridge No. 8 on Mersea Road 11 (OCIF) $ 400,000• LED Street Light Conversion $ 1,300,000• Sidewalks $ 150,000• Traffic Signal Work $ 80,000• Various Road Resurfacing $ 500,000

Page 6: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,

Engineering – Sewers 2015

TOTAL $1,400,000

HIGHLIGHTS• Wilousa – Seneca Sewer Upgrade $ 180,000 • Erie South Storm Outfall $ 175,000 • Pelee Drive Sanitary (Engineering) $ 335,000• NE Trunk Sewer EA and Prelim Design $ 200,000

Page 7: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,

Engineering – Drainage 2015

TOTAL $ 750,000

HIGHLIGHTS• Engineer’s Reports – Development $ 180,000 • New Drains $ 160,000• Updated Engineer’s Reports $ 370,000• Other $ 40,000

Page 8: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,

Misc. 2015

• New Soccer Field House Facility $ 600,000• Leamington Transit $ 70,000

• Shelters• Pads• Benches

Future Years

• NE Trunk Sewer - Seacliff to Road 6 (2016-17)$ 10,000,000• Pelee Drive Sanitary Sewer (2017-19) $ 10,000,000

Page 9: Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,

Thank You