heating and cooling with mini splits in the northeast...2014/10/23  · 2014 ba webinar mini splits...

49
© buildingscience.com Heating and Cooling with Mini Splits in the Northeast Kohta Ueno October 23, 2014

Upload: others

Post on 25-Jan-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • © buildingscience.com

    Heating and Cooling with Mini Splits in the Northeast

    Kohta Ueno

    October 23, 2014

  • 2014 BA Webinar Mini Splits in Northeast 2

    © buildingscience.com

    Background

  • 2014 BA Webinar Mini Splits in Northeast 3

    © buildingscience.com

    Overview Transformations, Inc.

    currently building net-zero homes in Massachusetts

    Mini split heat pumps (MSHPs) part of builder’s strategy: tradeoff package

    Single point of heating/ cooling on each floor

    BA study of temperatures throughout house, energy use of MSHPs

  • 2014 BA Webinar Mini Splits in Northeast 4

    © buildingscience.com

    Full Report Available 140 page brick of a report Reports has details,

    presentation is overview Currently in final review If taking notes… relax

  • 2014 BA Webinar Mini Splits in Northeast 5

    © buildingscience.com

    Transformations, Inc. Enclosure/Shell Triple glazed windows 1 ACH 50 typical

    High density spray foaminsulation

    4” concrete slab

    2” XPS rigid insulation

    10” x 20” concretefooting

    Compacted fill

    High density spray foaminsulation

    10” concrete�foundation wall

    Dampproofing below grade

    Free-drainingbackfill

    Capillary break: damp-proofing, cementitiouscoating, or membrane-applied to top of footing

    Filter fabric

    Gravel (no fines)

    Perforatedperimeter drain

    Capillary break applied to�top of foundation wall

    6 mil polyethylene

    8” min.

    (2) 2x6 P.T. sill

    2x10 rim joist

    2x4 P.T. studs @ 24” o.c.(optional)

    2x4 studs @ 16” o.c.

    Intumescent paint

    1/2" gypsum board (optional)

    ZIP System® roof sheathing

    18" cellulose�insulation

    Asphalt shingles

    Fully-adhered membrane

    Siding

    1/2" gypsum board

    ZIP System® wall sheathing

    1/2” gypsum board

    12” low density spray foamcavity insulation (R-47)

    2x4 studs @ 16” o.c.

    Low density spray foam atrim joist

    Baffle

  • 2014 BA Webinar Mini Splits in Northeast 6

    © buildingscience.com

    Mini-Split Heat Pumps (MSHPs) Installations in Asia/Europe for 40+ years More expensive per ton BUT if ductless… Mitsubishi equipment: full heat capacity @ -5ºF Rated to -13ºF, still operating at -20ºF (H2i/HyperHeat)

    Modulates to meet load Best performance @ part load (worst @ full load)

    COPs in 2.5-3 range in cold winter conditions

    0

    1

    2

    3

    4

    5

    0 10 20 30 40 50 60

    Coef

    ficie

    nt o

    f Per

    form

    ance

    [-]

    Outdoor Temperature (F)

    Maximum Capacity

    Rated Capacity

    Coefficient of Performance

  • 2014 BA Webinar Mini Splits in Northeast 7

    © buildingscience.com

    Builder’s MSHP Experience Low load houses: 10-18 kBtu/hour heating All production has MSHPs as single heat source

    (one per floor, ~1800 sf houses typical) Savings from mechanicals into enclosure ~$15,000 enclosure upgrade cost (Δ$) ~$5000 savings on simplified mechanicals (Δ$)

    Trouble-free operation—few equipment callbacks

  • 2014 BA Webinar Mini Splits in Northeast 8

    © buildingscience.com

    Monitoring Overview

  • 2014 BA Webinar Mini Splits in Northeast 9

    © buildingscience.com

    Monitoring Timeline

    Eight houses, two sites Mixed monitoring package—various sensors

    (T/RH, doors, power) at different houses

    0

    500

    1000

    1500

    HDD

    Base

    65

    F

    ID Task Name20142010 2012 2013

    Oct Apr AugSep OctJunJan Feb Jun OctSepApr Jul DecDecOct Dec JulSepDec Jan

    1 Townsend-Mini Splits

    2 Devens Lot 3-Double Stud Moisture

    3 Devens Lot 3-Mini Splits

    4 Easthampton Lot 13-Mini Splits

    5 Easthampton Lot 17-Mini Splits

    6 Easthampton Lot 23-Mini Splits

    7 Easthampton Lot 30-Comfort Complaint

    Download Visit

    T/RHs; doors; no mini split monitoring

    T/RHs; doors; 1 of 2 mini splits monitored, later both

    T/RHs; doors; 1 of 2 mini splits monitored, later both

    T/RHs; both mini splits monitored

    T/RHs; doors; minimal mini split data

    8 Devens Lot 4-Mini Splits (NREL)

    9 Devens Lot 7-Mini Splits (NREL)

    10 Devens Lot 8-Mini Splits (NREL)

    2011

    AprJul Aug JanJanAug Jun

    T/RHs; doors; both mini splits monitored

    T/RHs; doors; both mini splits monitored

    T/RHs; doors; both mini splits monitored

    T/RHs; both mini splits monitored

    6360 HDD 5340 HDD 6058 HDD 5500 HDD (Partial)

    House sold (unoccupied prior)

    T/RH battery failures

  • 2014 BA Webinar Mini Splits in Northeast 10

    © buildingscience.com

    Monitoring Package

    Interior temperature/RH MSHP Electrical Use

    Door Open/Closed Status Door Open/Closed Status

  • 2014 BA Webinar Mini Splits in Northeast 11

    © buildingscience.com

    Monitoring Package: 8 Houses, 2 Sites

    Second floor head retrofitted August 2012

  • 2014 BA Webinar Mini Splits in Northeast 12

    © buildingscience.com

    Operating Patterns

  • 2014 BA Webinar Mini Splits in Northeast 13

    © buildingscience.com

    0

    500

    1000

    1500

    2000

    2500

    -20

    -10

    0

    10

    20

    30

    40

    50

    60

    70

    80

    11/2/12 11/22/12 12/12/12 1/1/13 1/21/13 2/10/13 3/2/13 3/22/13 4/11/13 5/1/13

    Hour

    ly E

    lect

    rical

    Use

    (Wh/

    hour

    )

    Tem

    pera

    ture

    (F)

    Exterior T First Floor T Second Hall T South Rear BR T Master BR (Front) TNorth BR T Bonus Rm T 1st Floor Wh 2nd Floor Wh

    Temperature & Power Use Plot

    Varying wattage draw-modulation (5 min data) First vs. second floor; comparison to max 2000 W

    0

    500

    1000

    1500

    2000

    2500

    -20

    -10

    0

    10

    20

    30

    40

    50

    60

    70

    80

    11/2/12 11/22/12 12/12/12 1/1/13 1/21/13 2/10/13 3/2/13 3/22/13 4/11/13 5/1/13

    Hour

    ly E

    lect

    rical

    Use

    (Wh/

    hour

    )

    Tem

    pera

    ture

    (F)

    Exterior T First Floor T Second Hall T South Rear BR T Master BR (Front) TNorth BR T Bonus Rm T 1st Floor Wh 2nd Floor Wh

    0

    500

    1000

    1500

    2000

    2500

    -20

    -10

    0

    10

    20

    30

    40

    50

    60

    70

    80

    11/2/12 11/22/12 12/12/12 1/1/13 1/21/13 2/10/13 3/2/13 3/22/13 4/11/13 5/1/13

    Hour

    ly E

    lect

    rical

    Use

    (Wh/

    hour

    )

    Tem

    pera

    ture

    (F)

    Exterior T First Floor T Second Hall T South Rear BR T Master BR (Front) TNorth BR T Bonus Rm T 1st Floor Wh 2nd Floor Wh

  • 2014 BA Webinar Mini Splits in Northeast 14

    © buildingscience.com

    Temperature & Power Use Plot-Cooling

    Second floor doing most of cooling Started running first floor unit—more even Ts?

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    1800

    2000

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    5/1/13 5/21/13 6/10/13 6/30/13 7/20/13 8/9/13 8/29/13

    Hou

    rly

    Elec

    tric

    al U

    se (W

    h)

    Tem

    pera

    ture

    (F)

    Exterior T First Floor T Second Hall T Front BR T Mid BR T Master BR T 1st Floor Wh 2nd Floor Wh

  • 2014 BA Webinar Mini Splits in Northeast 15

    © buildingscience.com

    Equipment Capacity

  • 2014 BA Webinar Mini Splits in Northeast 16

    © buildingscience.com

    Did MSHPs Meet Setpoint? (Capacity) Heat pumps as a single source of heating in

    Massachusetts (Zone 5A) (design T +2, -2ºF) NREL testing (2011)—matches equipment specs Monitored data: no sign of low equipment

    capacity (i.e., long runtimes/high wattage and declining indoor temperature)—excess available

    Included winter 2013-2014 (“Polar vortex”): 6730 HDD 65ºF vs. 6220 HDD 65ºF normal

    When temperature was down, unit wasn’t running (or other issues)

  • 2014 BA Webinar Mini Splits in Northeast 17

    © buildingscience.com

    Equipment Sizing Oversizing provides heating capacity at low Ts Oversizing not as big of a problem with MSHPs—

    modulating.

    Location Lot A.G.

    Square Feet

    Heating Design Load kBtu/hr

    Installed Equipment Capacity kBtu/hr

    Oversizing Factor

    Devens 3 1728 16.8 25.0 149% Devens 4 1728 16.3 25.0 153% Devens 7 1952 18.2 37.5† 206% Devens 8 1524 13.0 25.0 192%

    Easthampton 13 1728 12.1 22.0 182% Easthampton 17 1239 11.0 11.0 [22.0]‡ 100% [200%] Easthampton 23 1132 10.0 11.0 [22.0]‡ 110% [220%] Easthampton 30 2266 18.1 22.0 [33.7]* 121% [186%]

    Original installed capacity [Retrofitted Equipment Capacity]

  • 2014 BA Webinar Mini Splits in Northeast 18

    © buildingscience.com

    Simplified (2-Point) Space Conditioning

  • 2014 BA Webinar Mini Splits in Northeast 19

    © buildingscience.com

    Simplified Space Conditioning Takes advantage of low heat loss enclosure

    (“superinsulated buildings”) Heat “filters through” interior (partitions, floors,

    open doorways, interior gains) as fast as is lost through exterior shell

    Previous work: best with smaller houses, bedroom doors open often, constant setpoint

    Being “completely safe”—with a fully ducted system—you still see temperature variations between spaces (but it is “standard practice”!)

  • 2014 BA Webinar Mini Splits in Northeast 20

    © buildingscience.com

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    0

    5000

    10000

    15000

    20000

    25000

    0-1 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9-10 10+

    Cum

    ulat

    ive

    %

    Freq

    uenc

    y (#

    Hou

    rs)

    Maximum ΔT Between Rooms

    Frequency Cumulative %

    ACCA Manual RS (4ºF Difference) Highest - lowest temperature Omitted bonus room and basements

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    0

    5000

    10000

    15000

    20000

    25000

    0-1 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9-10 10+

    Cum

    ulat

    ive

    %

    Freq

    uenc

    y (#

    Hou

    rs)

    Maximum ΔT Between Rooms

    Frequency

    Cumulative %

    96% of hours below 4ºF requirement

  • 2014 BA Webinar Mini Splits in Northeast 21

    © buildingscience.com

    Simplified Space Conditioning Location Lot Square Feet % Under 4°F Sub-Case Devens 3 67%

    73% 19% 91% 96%

    Full data set; bonus room omitted Winter 2012-2013, MSHP on Winter 2013-2014, MSHP on

    Summer 2013 Summer 2012

    Easthampton 13 1795 96% Full data set Easthampton 17 1348 86%

    95% Full data set

    After 2nd MSHP retrofitted Easthampton 23† 1620 75%

    82% Full data set

    After 2nd MSHP retrofitted Easthampton 30 2151 - Not analyzed (1 head per bedroom) Many houses 70%+ under 4ºF, complaints rare Devens 4, 7, 8 not analyzed—missing data Summer performance better than winter—BUT

    low SHGC, glazing ratios

  • 2014 BA Webinar Mini Splits in Northeast 22

    © buildingscience.com

    Two Stories, One MSHP

  • 2014 BA Webinar Mini Splits in Northeast 23

    © buildingscience.com

    One Mini Split, Two Floors? Design Heating & Cooling Loads: 11 kBtu/hr heating (left); 10 kBtu/hr heating (right) 12.5 kBtu/hr mini split heating capacity at 5 F

    Second floor unit rarely runs (20 F days) Design: single mini-split head on first floor

  • 2014 BA Webinar Mini Splits in Northeast 24

    © buildingscience.com

    One Mini Split, Two Floors?

    Comfort problems even with “redistribution fan” (continuous exhaust fan from MSHP to master bedroom, ~40 CFM)

    Redistribution fan—edge cases vs. bad cases

    0

    500

    1000

    1500

    2000

    2500

    20

    30

    40

    50

    60

    70

    80

    90

    100

    5/6 5/26 6/15 7/5 7/25 8/14 9/3 9/23

    Hour

    ly E

    lect

    rical

    Use

    (Wh/

    hour

    )

    Tem

    pera

    ture

    (F)

    Exterior T First Floor T Stairs T Kids BR (Up) T Master BR (Up) T 1st Floor Wh 2nd Floor Wh

    2nd floor MSHP added

  • 2014 BA Webinar Mini Splits in Northeast 25

    © buildingscience.com

    Retrofitted MSHPs on 2nd Floor

    Thermal buoyancy matters for distribution, even in very airtight houses (~1.0 ACH 50)!

    1 MSHP & 2 floors = choose heating or cooling Or a really big redistribution system!

  • 2014 BA Webinar Mini Splits in Northeast 26

    © buildingscience.com

    Bonus Room Geometry

  • 2014 BA Webinar Mini Splits in Northeast 27

    © buildingscience.com

    Comfort Complaint Many superinsulated/airtight houses running

    successfully with two mini split heads Comfort complaint in Central MA house Custom house plan (first floor bump out, bonus rm)

    View from Southeast View from Northeast

  • 2014 BA Webinar Mini Splits in Northeast 28

    © buildingscience.com

    Comfort Complaint Downstairs Ts even Constant setpoint Front BR warmest Rear BR colder Bonus room ~50 F

    (homeowner) Worse w. garage open BR doors open/closed ~300 CFM 50 (0.8 ACH 50) Not capacity problem: 2nd floor = 6200 Btu/hour load

    View from East (front)

  • 2014 BA Webinar Mini Splits in Northeast 29

    © buildingscience.com

    Comfort Complaint

    Mini split head

    2.3:1 exterior: interior

    4:1 exterior: interior

    Can calculate room relative heat loss/gain at various outdoor temperatures (SWA work)

  • 2014 BA Webinar Mini Splits in Northeast 30

    © buildingscience.com

    Temperature & Door Status Monitoring

    But open door data—many hours within 4F of hallway—but warmer exterior temperatures

    0

    20

    40

    60

    80

    100

    120

    140

    0

    10

    20

    30

    40

    50

    60

    70

    80

    2/14 2/19 2/24 3/1 3/6 3/11

    Tem

    pera

    ture

    (F)

    Exterior T First Floor T Front BR T Second Hall T Rear Bedroom (MBR) T

    Bonus Room T Front BR Door Rear BR (MBR) Door Bonus Room Door

    Bonus Room Rear bedroom

  • 2014 BA Webinar Mini Splits in Northeast 31

    © buildingscience.com

    Bonus Room Not Always Problem Comfort complaint → bonus room ≠

    Bonus room → comfort complaint!

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    -10

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    12/1/13 12/6/13 12/11/13 12/16/13 12/21/13 12/26/13 12/31/13 1/5/14 1/10/14 1/15/14

    Hour

    ly E

    lect

    rical

    Use

    (Wh/

    hour

    )

    Tem

    pera

    ture

    (F)

    Exterior T First Floor T Second Hall T South Rear BR T Master BR (Front) TNorth BR T Bonus Rm T 1st Floor Wh 2nd Floor Wh

  • 2014 BA Webinar Mini Splits in Northeast 32

    © buildingscience.com

    On-Off Temperature Control/Setbacks

  • 2014 BA Webinar Mini Splits in Northeast 33

    © buildingscience.com

    Constant-Setpoint Operation

    MSHP works at best efficiency—no big “slug of heat” required (max ~1000 W)

    Single point works best @ constant—heat “filters out” to exterior rooms from the core

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    1800

    2000

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2/1 2/3 2/5 2/7 2/9 2/11 2/13 2/15

    Hour

    ly E

    lect

    rical

    Use

    (Wh)

    Tem

    pera

    ture

    (F)

    Exterior T

    First Floor T

    Second Hall T

    Front BR T

    Mid BR T

    Master BR T

    1st Floor Wh

    2nd Floor Wh

  • 2014 BA Webinar Mini Splits in Northeast 34

    © buildingscience.com

    On-Off Setpoint Operation

    Temperature swings between 60 and 70 F System turned off, “coasting” down, then max

    capacity Many hours near maximum capacity (2000 W)

    0

    500

    1000

    1500

    2000

    2500

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2/1 2/3 2/5 2/7 2/9 2/11 2/13 2/15

    Min

    i Spl

    it El

    ectr

    ical

    Use

    (kW

    h)

    Tem

    pera

    ture

    (F)

    Exterior T

    First Floor-Liv Rm T

    First Floor-Closet T

    Master Bedrm T

    First Flr BR T

    Mini Split 1st

    Mini Split 2nd

  • 2014 BA Webinar Mini Splits in Northeast 35

    © buildingscience.com

    On-Off vs. Constant Setpoint Energy Use

    Hourly kWh vs. outdoor temperature Constant setpoint—max ~1500 W for hour On-off—many hours 2000 W+ Little relationship with outdoor T

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    -20 0 20 40 60 80 100 120

    Hour

    ly k

    Wh

    Sum

    (Avg

    kW

    )

    Outdoor T (F)

    1st Floor kWh

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    -20 0 20 40 60 80 100 120

    Hour

    ly k

    Wh

    Sum

    (Avg

    kW

    )

    Outdoor T (F)

    1st Floor kWhConstant Setpoint On-Off Setpoint

  • 2014 BA Webinar Mini Splits in Northeast 36

    © buildingscience.com

    On-Off vs. Constant Setpoint Energy Use Setbacks and on/off usually “done to save energy” Superinsulation + airtightness → less benefit from

    setback (less energy lost during “off” cycle) MSHP → recovery from setback (max capacity) is

    lowest efficiency operation, at worst time of day Winter 2012-2013 heating use: 1200 sf constant setpoint = 1385 kWh 1100 sf on-off operation = 2561 kWh On off operation—worst outlier vs. REM/Rate

    prediction (157% of prediction)

  • 2014 BA Webinar Mini Splits in Northeast 37

    © buildingscience.com

    Other Items

  • 2014 BA Webinar Mini Splits in Northeast 38

    © buildingscience.com

    MSHP Heads per Square Foot Square footage sizing methods are suspect But square footage per head—provided for

    reference Not intended as “general guidance”

    Model AG Square Feet # MSHPs sf/MSHP Victorian 1728 2 864

    Farmhouse 1728 2 864 Custom Saltbox 1952 3 651

    Ranch 1524 2 762 Farmhouse 1728 2 864

    Small Saltbox 1239 1 [2] 1239 [620] Cottage 1132 1 [2] 1132 [566]

    Custom Home 2266 2 [4] 1133 [567] Original installed capacity [Retrofitted Equipment Capacity]

  • 2014 BA Webinar Mini Splits in Northeast 39

    © buildingscience.com

    Snow Blockage Heat pumps: risks of snow blockage of outdoor

    unit cutting heating capacity in winter No evidence of issues at two Zone 5A sites Riser blocks or wall brackets recommended

  • 2014 BA Webinar Mini Splits in Northeast 40

    © buildingscience.com

    Summer Dehumidification MSHPs modulate → size matched to house load,

    less oversizing causing humidity problems # hours over 60% RH inside measured Summer hours over 60% RH 10-20%; 15-25%; 2-10% for various houses

    MSHPs not a panacea for controlling RH BUT: Data not compared with 1 or 2 speed ducted systems No complaints No sign if used MSHP “dry mode” Northeast window opening/night cooling

  • 2014 BA Webinar Mini Splits in Northeast 41

    © buildingscience.com

    Future Work With Transformations At Easthampton, change to 3:1 indoor: outdoor

    MSHPs on 2nd floor More costly equipment (+50%), less efficient Loss of Massachusetts energy incentive ~$5750/house

    Small ducted air handler in second floor hallway

  • 2014 BA Webinar Mini Splits in Northeast 42

    © buildingscience.com

    Conclusions MSHPs as single heating source in Zone 5A Two-point heating works great in many cases, but

    problems cases included: Problem geometries (exterior conditions on 5 sides) Single point in two-story houses Extended bedroom door closures Setbacks and on/off cycling (worse energy use too!)

    ~1100+ sf/head were the problem cases Oversizing MSHPs for heating okay strategy Use of small air handler on second floor—door

    closures no longer a concern

  • 2014 BA Webinar Mini Splits in Northeast 43

    © buildingscience.com

    Questions? Kohta Ueno kohta [at] buildingscience [dot] com

  • 2014 BA Webinar Mini Splits in Northeast 44

    © buildingscience.com

    Single Floor Distribution Issues

  • 2014 BA Webinar Mini Splits in Northeast 45

    © buildingscience.com

    Single Floor Distribution

    Temperature/RH Sensor Door Closure Sensor

    41 CFM 11 CFM

    N

    First Floor T Stairs T

    First Floor Bathroom

    First Floor BR

  • 2014 BA Webinar Mini Splits in Northeast 46

    © buildingscience.com

    Single Floor Distribution

    Think about the path that thermally buoyant or denser/cooled air will take!

    In general, open floor plans had few problems—point air leak issue instead

  • 2014 BA Webinar Mini Splits in Northeast 47

    © buildingscience.com

    Monthly Energy Use

    First winter—basement uninsulated First floor vs. second floor unit

    0

    200

    400

    600

    800

    1000

    1200

    Dec

    Jan

    Feb

    Mar Ap

    rM

    ay Jun Jul

    Aug

    Sep

    Oct

    Nov De

    cJa

    nFe

    bM

    ar Apr

    May Jun Jul

    Aug

    Sep

    Oct

    Nov De

    cJa

    nFe

    bM

    ar

    2011 2012 2013 2014

    kWh/

    mon

    th

    Sum of 2nd Floor kWh

    Sum of 1st Floor kWh

    Values

  • 2014 BA Webinar Mini Splits in Northeast 48

    © buildingscience.com

    Hourly Power Use vs. Temperature

    Win

    ter d

    esig

    n T Su

    mm

    er d

    esig

    n T

    Spare Capacity @ Design

  • 2014 BA Webinar Mini Splits in Northeast 49

    © buildingscience.com

    Mini split “blowing into open door?”

    Heating and Cooling with Mini SplitsBackgroundOverviewFull Report AvailableTransformations, Inc. Enclosure/ShellMini-Split Heat Pumps (MSHPs)Builder’s MSHP ExperienceMonitoring OverviewMonitoring TimelineMonitoring PackageMonitoring Package: 8 Houses, 2 SitesOperating PatternsTemperature & Power Use PlotTemperature & Power Use Plot-CoolingEquipment CapacityDid MSHPs Meet Setpoint? (Capacity)Equipment SizingSimplified (2-Point) Space ConditioningSimplified Space ConditioningACCA Manual RS (4ºF Difference)Simplified Space ConditioningTwo Stories, �One MSHPOne Mini Split, Two Floors?One Mini Split, Two Floors?Retrofitted MSHPs on 2nd FloorBonus Room GeometryComfort ComplaintComfort ComplaintComfort ComplaintTemperature & Door Status MonitoringBonus Room Not Always ProblemOn-Off Temperature Control/SetbacksConstant-Setpoint OperationOn-Off Setpoint OperationOn-Off vs. Constant Setpoint Energy UseOn-Off vs. Constant Setpoint Energy UseOther ItemsMSHP Heads per Square FootSnow BlockageSummer DehumidificationFuture Work With TransformationsConclusionsSlide Number 43Single Floor Distribution IssuesSingle Floor DistributionSingle Floor DistributionMonthly Energy UseHourly Power Use vs. TemperatureMini split “blowing into open door?”