![Page 1: Health and Safety Executive Health and Safety Executive Progress with LPG Project in Scotland Alistair McNab Head of Operations East/North](https://reader036.vdocuments.site/reader036/viewer/2022062619/5515e43e550346d46f8b4e5d/html5/thumbnails/1.jpg)
Health and Safety Executive
Health and Safety Executive
Progress with LPG
Project in Scotland
Alistair McNab
Head of Operations East/North
![Page 2: Health and Safety Executive Health and Safety Executive Progress with LPG Project in Scotland Alistair McNab Head of Operations East/North](https://reader036.vdocuments.site/reader036/viewer/2022062619/5515e43e550346d46f8b4e5d/html5/thumbnails/2.jpg)
![Page 3: Health and Safety Executive Health and Safety Executive Progress with LPG Project in Scotland Alistair McNab Head of Operations East/North](https://reader036.vdocuments.site/reader036/viewer/2022062619/5515e43e550346d46f8b4e5d/html5/thumbnails/3.jpg)
![Page 4: Health and Safety Executive Health and Safety Executive Progress with LPG Project in Scotland Alistair McNab Head of Operations East/North](https://reader036.vdocuments.site/reader036/viewer/2022062619/5515e43e550346d46f8b4e5d/html5/thumbnails/4.jpg)
![Page 5: Health and Safety Executive Health and Safety Executive Progress with LPG Project in Scotland Alistair McNab Head of Operations East/North](https://reader036.vdocuments.site/reader036/viewer/2022062619/5515e43e550346d46f8b4e5d/html5/thumbnails/5.jpg)
Lord Gill recommended
… an action plan to identify sites with buried metallic LPG pipework, followed by its replacement, on a systematic and prioritised basis, by polyethylene.
![Page 6: Health and Safety Executive Health and Safety Executive Progress with LPG Project in Scotland Alistair McNab Head of Operations East/North](https://reader036.vdocuments.site/reader036/viewer/2022062619/5515e43e550346d46f8b4e5d/html5/thumbnails/6.jpg)
Project specification
• 4 year project to 2013;
• 500 sample (3,000 nationally) of high risk metal pipe in 2010;
• Commercial/industrial not domestic premises;
• Central approach to major employers (eg Vion)
![Page 7: Health and Safety Executive Health and Safety Executive Progress with LPG Project in Scotland Alistair McNab Head of Operations East/North](https://reader036.vdocuments.site/reader036/viewer/2022062619/5515e43e550346d46f8b4e5d/html5/thumbnails/7.jpg)
Enforcement strategy
• Pipework – if user proves replacement scheduled – OK and CV;– if clearly badly corroded or damaged – PN;– if no replacement
strategy/inspection/examination/maintenance – IN
• Bulk tanks– separation distances;– ventilation around tanks; – open drains;– vegetation;– security and impact protection.
![Page 8: Health and Safety Executive Health and Safety Executive Progress with LPG Project in Scotland Alistair McNab Head of Operations East/North](https://reader036.vdocuments.site/reader036/viewer/2022062619/5515e43e550346d46f8b4e5d/html5/thumbnails/8.jpg)
Supplier strategy
• Capacity of suppliers for pipe replacement
• LPGA CoP compliance evidence collected nationally including – risk assessment of siting;– initial integrity of pressure vessel;– separation distance;– information to user;– safe delivery;– driver checks prior to filling tank
• Meeting BP 30 July; Calor 1 September
![Page 9: Health and Safety Executive Health and Safety Executive Progress with LPG Project in Scotland Alistair McNab Head of Operations East/North](https://reader036.vdocuments.site/reader036/viewer/2022062619/5515e43e550346d46f8b4e5d/html5/thumbnails/9.jpg)
HSE/FOD Progress in Scotland (to August 2010)
• 350 premises list/150 sites list awaited;
• 200 inspections done;
• 170 Notices issued;
• 50:50 pipework/tanks;
• Tanks – separation, security, impact protection, vegetation.
![Page 10: Health and Safety Executive Health and Safety Executive Progress with LPG Project in Scotland Alistair McNab Head of Operations East/North](https://reader036.vdocuments.site/reader036/viewer/2022062619/5515e43e550346d46f8b4e5d/html5/thumbnails/10.jpg)
![Page 11: Health and Safety Executive Health and Safety Executive Progress with LPG Project in Scotland Alistair McNab Head of Operations East/North](https://reader036.vdocuments.site/reader036/viewer/2022062619/5515e43e550346d46f8b4e5d/html5/thumbnails/11.jpg)
![Page 12: Health and Safety Executive Health and Safety Executive Progress with LPG Project in Scotland Alistair McNab Head of Operations East/North](https://reader036.vdocuments.site/reader036/viewer/2022062619/5515e43e550346d46f8b4e5d/html5/thumbnails/12.jpg)
![Page 13: Health and Safety Executive Health and Safety Executive Progress with LPG Project in Scotland Alistair McNab Head of Operations East/North](https://reader036.vdocuments.site/reader036/viewer/2022062619/5515e43e550346d46f8b4e5d/html5/thumbnails/13.jpg)