head office (mumbal) national insurance building, puronit · sidbi's management is responsible...

3
Head Office (Mumbal) : National Insurance Building, 204, Dadabhoy Naoroji Road, Fort, Mumbai - 400 001. Dath o Puronit Tel. : 2207 7941 * Telefax : 2207 4260 C HA RT ER ED ACCOUNTANTS E-mail : [email protected] Website: www.batliboipurohit.com INDEPENDENT AUDITORS' REPORT To, Chief General Manager SIDBI (Credit Vertical) Report on the Project Financial Statements for the period April 2015 to March 2016 We have audited the accompanying Project Financial Statements of the MSME Growth Innovation and Inclusive Finance Project under Loan No. 1 (the Project) for the year ended on March 31 st, 2016 which comprises Interim Unaudited Financial Results (IUFR) for the period April 2015 to February 2016. Management's Responsibility for the Financial Statements SIDBI's Management is responsible for the fair presentation of the project financial statements in accordance with the guidelines issued by the World Bank, and they confirm, to the best of their knowledge and belief, the following representations made to us during the course of our audit: i. The project financial statements are free of material misstatements, including omissions. ii. The proceeds of the Loan provided by the World Bank have been used only for the purposes for which they were granted, with due attention to considerations of economy and efficiency and without regard to political or other non-economic influences or considerations. iii. Project expenditures are eligible for financing under the Loan Agreement. iv. There have been no irregularities involving management or employees who have a significant role in internal control or that could have a material effect on the project financial statements. v. Procurement has been done as per the agreed procedures based on commercial practices. vi. Management has made available to us all supporting documentation relating to the project for our audit. BRANCHES: NAVI MUMBAI: 302/ 304 Arenja Corner, Sector 17, Vashi, Navi Mumbai -400 703. * Tel. : +91-22-2766 6478 DELHI: A-97, Jagat Pur, Delhi -110 051. * Cel : +91-98107 30767 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 31-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Head Office (Mumbal) National Insurance Building, Puronit · SIDBI's Management is responsible for the fair presentation of the project financial statements in accordance with the

Head Office (Mumbal) : National Insurance Building,204, Dadabhoy Naoroji Road, Fort, Mumbai -400 001.

Dath o Puronit Tel. : 2207 7941 * Telefax : 2207 4260C HA RT E R E D ACCOUNTANTS E-mail : [email protected]

Website: www.batliboipurohit.com

INDEPENDENT AUDITORS' REPORT

To,Chief General ManagerSIDBI (Credit Vertical)

Report on the Project Financial Statements for the period April 2015 to March2016

We have audited the accompanying Project Financial Statements of the MSMEGrowth Innovation and Inclusive Finance Project under Loan No. 1 (the Project)for the year ended on March 31st, 2016 which comprises Interim Unaudited FinancialResults (IUFR) for the period April 2015 to February 2016.

Management's Responsibility for the Financial Statements

SIDBI's Management is responsible for the fair presentation of the project financialstatements in accordance with the guidelines issued by the World Bank, and theyconfirm, to the best of their knowledge and belief, the following representations madeto us during the course of our audit:i. The project financial statements are free of material misstatements, including

omissions.

ii. The proceeds of the Loan provided by the World Bank have been used only for

the purposes for which they were granted, with due attention to considerations of

economy and efficiency and without regard to political or other non-economic

influences or considerations.

iii. Project expenditures are eligible for financing under the Loan Agreement.

iv. There have been no irregularities involving management or employees who have

a significant role in internal control or that could have a material effect on the

project financial statements.

v. Procurement has been done as per the agreed procedures based on commercial

practices.

vi. Management has made available to us all supporting documentation relating to

the project for our audit.

BRANCHES:NAVI MUMBAI: 302/ 304 Arenja Corner, Sector 17, Vashi, Navi Mumbai -400 703. * Tel. : +91-22-2766 6478

DELHI: A-97, Jagat Pur, Delhi -110 051. * Cel : +91-98107 30767

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: Head Office (Mumbal) National Insurance Building, Puronit · SIDBI's Management is responsible for the fair presentation of the project financial statements in accordance with the

Batiboi PurohitCHARTERED ACCOUNTANTS

Auditors' Responsibility

Our responsibility is to express an opinion on these project financial statementsbased on our audit. We conducted our audit in accordance with the Standards onAuditing issued by the Institute of Chartered Accountants of India (ICAI). ThoseStandards require that we comply with ethical requirements and plan and performthe audit to obtain reasonable assurance about whether the project financialstatements are free from material misstatements.

An audit involves performing procedures to obtain audit evidence about the amountsand the disclosures in the financial statements. The procedures selected depend onthe auditor's judgment, including the assessment of the risks of materialmisstatement of the financial statements, whether due to fraud or error. In makingthose risk assessments, the auditor considers internal financial control relevant tothe SIDBI's preparation of the IUFR that give a true and fair view in order to designaudit procedures that are appropriate in the circumstances. An audit also includesevaluating the appropriateness of the accounting policies used and thereasonableness of the accounting estimates made by the management, as well asevaluating the overall presentation of the financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate toprovide a basis for our audit opinion on the project financial statements.

OpinionIn our opinion and to the best of our information and according to the explanationsgiven to us, the aforesaid project financial statements give the information sorequired and give a true and fair view in conformity with the accounting principlesgenerally accepted in India.

Report on other matters:

i. the PFS give a true and fair view of the Project expenditure incurred during the

period under audit and of the sources and applications of the Project funds for

that period;

i. The Project funds were utilized for the purposes for which they were provided;

ii. Expenditures shown in the PFS eligible for financing under the legal agreements

are recorded in the books of account of SIDBI and no other sources of funds

have been received by SIDBI for meeting these expenditures.

iv. The IUFRs submitted during the period under audit are supported by adequate

detailed documentation maintained in SIDBI's offices/branches and can be relied

upon as a basis for reimbursement.

Page 3: Head Office (Mumbal) National Insurance Building, Puronit · SIDBI's Management is responsible for the fair presentation of the project financial statements in accordance with the

Batliboi PurohitCHARTERED ACCOUNTANTS

v. Procurement done by MSMEs using loan proceeds were in line with established

commercial practices as have been documented in the POM and that the system

for review of compliance instituted by SIDBI is adequate.

vi. The accounting and internal control systems underlying the Project, including

material compliance with the POM for the Project, and oversight over the Project

funds were adequate and maintained throughout the audit period.

For BATLIBOI & UROHITChartered Accou tantsFirm Reg. No. 101 48W

R an HangekarPlace : Mumbai PartnerDate : 20th December, 2016 Membership No: 030615