HARYANA POWER GENERATION CORPORATION LIMITED NIT FOR ENGAGEMENT OF CONSULTANT FIRM FOR PREPARATION AND FILING OF CAPITAL INVESTMENT PLAN, BUSINESS PLAN AND ARR PETITION OF HPGCL FOR THE 2 nd CONTROL PERIOD OF THREE YEARS/ FIVE YEARS (as per notification of HERC) w.e.f. FY‟s 2018 INCLUDING FILING OF TRUE UP TARIFF PETITION,MID YEAR REVIEW AND TARIFF DETERMINATION OF HPGCL EVERY YEAR SEPARATELY DURING THIS CONTROL PERIOD AS PER HERC MYT REGULATION . Controller Finance /HPGCL Urja Bhawan, Sector-6, Panchkula-134113

Upload: lydat

Post on 21-Mar-2018

217 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

HARYANA POWER GENERATION CORPORATION LIMITED

NIT

FOR

ENGAGEMENT OF CONSULTANT FIRM FOR PREPARATION AND FILING OF CAPITAL

INVESTMENT PLAN, BUSINESS PLAN AND ARR PETITION OF HPGCL FOR THE

2ndCONTROL PERIOD OF THREE YEARS/ FIVE YEARS (as per notification of HERC)

w.e.f. FY‟s 2018 INCLUDING FILING OF TRUE UP TARIFF PETITION,MID YEAR REVIEW

AND TARIFF DETERMINATION OF HPGCL EVERY YEAR SEPARATELY DURING THIS

CONTROL PERIOD AS PER HERC MYT REGULATION .

Controller Finance /HPGCL Urja Bhawan, Sector-6, Panchkula-134113

Page 2: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

0

Table of Content

Sr. no. Description Page no.

1. Invitation for NIT 4

2. Instructions to bidder on E-tendering System 5-7

3. Detailed document for NIT 8-13

4. Scope of Work 14-16

5. Annexure-1 Proposal Submission Form 17

Annexure-2 Team composition and task assignments 18

Annexure-3 Comments and suggestions of consultant on Scope of Work etc.

19

Annexure-4 Description of Methodology and Work Plan for performing the assignment

20

Annexure-5 Format of CV for proposed professional staff 21

Annexure-6 Statement of deviations from the tender document 22

Page 3: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

1

INTRODUCTION

Haryana Power Generation Corporation Ltd. came into existence on 14.08.98 after the restructuring of Haryana State Electricity Board into Haryana Power Generation Corporation Ltd. (HPGCL), Haryana Vidyut Prasaran Nigam Ltd. (HVPNL), Uttar Haryana Bijli Vidyut Nigam Ltd.(UHBVNL) & Dakshin Haryana Bijli Vidyut Nigam Ltd. (DHBVNL) under the Reform Programme.

The main objectives of HPGCL are as under: -

To generate power from its existing Generating Stations in the most efficient manner on commercial lines and to sell the same to distribution companies.

To set up new Power Generation Projects.

HPGCL owns & operates the following power plants in the state:

1. Panipat Thermal Power Station, Panipat - 920MW.

2. Rajiv Gandhi Thermal Power Project, Khedar, Hisar. – 1200 MW

3. Deen Bandhu Chhotu Ram Thermal Power Project, Yamuna Nagar - 600MW.

4. WYC Hydro Power Station, Yamuna Nagar – 62.4 MW

5. 10 MW Solar Plant ,PTPS Panipat

HPGCL is also coordinating the activities of following power project:

1. 1500MW Indira Gandhi Super Thermal Power (IGSTPP) Project, Jhajjar – The Project is

being executed by NTPC from concept to commissioning in Joint Venture with

Government of Delhi and Government of Haryana.

2. 1320 MW Mahatma Gandhi Thermal Power Project (MGTPP) in Jhajjar under Case-2

mechanism of Government of India.

Apart from the above power projects the State Govt. / Govt. of India has also sanctioned the following new projects to be set-up in the 12th/13th Plan:

1. Solar Plants of 10 MW capacity is proposed to be set-up on top of old ash dyke of FTPS, Faridabad. Feasibility Report of the above solar project has been prepared by the consultant M/s Gujarat Energy Research &Management Institute (GERMI), Gandhinagar, Gujarat. Further, the Board of Directors of HPGCL has also approved the formation of a Joint Venture (JV) company i.e. Saur Urja Nigam (SUN) Haryana with HSIIDC for development Solar Parks at various locations in Haryana.

2. 1x800 MW Thermal Unit based on Super Critical Technology at Yamuna Nagar as an extension project of the existing 2X300 MW DCRTPP Yamunanagar.

3. 1500 MW Gas based project planned at Faridabad. (Plans for this project are currently shelved due to non-availability of Gas allocation).

4. One Coal Block at Kalyanpur-Badalpara in Jharkhand with estimated reserves of about 102 Million Tonnes has been allocated to HPGCL for the proposed1X800 MW expansion Unit of DCRTPP Yamunanagar.. This coal block is spread over an area of 6 sq. Km. This coal block has been regionally explored by Geological Survey of India (GSI).

5. HPGCL is also facilitating Nuclear Power Corporation of India Limited (NPCIL) in getting all the necessary clearances from the Govt. of Haryana for setting up 2800 MW (4X700 MW) Nuclear Power plant in Fatehabad district of Haryana. Land has been acquired, and work has started at site. The first two Units of 700 MW each are likely to be commissioned in 2021-22.

Page 4: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

2

NOTICE INVITING e-TENDER DATED:

E-tenders in two part as per qualifying criterion specified in Section ”A” of the tender documents are invited by the Controller of Finance, HPGCL , Panchkula as per schedule given as under:-

NIT No.

02/ Reg-

406/Fin/HPGCL

Description of work Last date &

time of bid

Submission

Amount of EMD

to be deposited

via RTGS/NEFT

through online

portal as per

conditions

mentioned in

the bidding

document (Rs.)

Cost of

tender

document

(Rs.)

e-

service

charges

(Rs.)

Dated:

27.04.2017

Engagement of consultants for undertaking consultancy job for preparation of Capital Investment Plan, Business plan & Multiyear ARR petition for the 2nd control period w.e.f 1st April, 2018 (3/5 Years as per notification of HERC) before the HERC as per HERC, MYT Regulation

17 .05.2017

11:00 hours

30,000 /- 1132/- 1,000/-

Note i. Cost of Tender documents and E-service charges of Rs.2132/- (1132 cost of tender documents

+1000/-e-service charges) are to be paid online through e-procurement portal https://harayanaeprocurement.gov.in.

ii. The details of above NIT/Bid documents, qualifying requirement and tender documents can be seen and downloaded from HPGCL website www.hpgcl.org.in.

Dy. Secy. /Tariff &Planning for Controller of Finance,

HPGCL, C-7, Urja Bhawan, Sector-6, Panchkula, Haryana

HARYANA POWER GENERATION CORPORATION LIMITED

Regd. Office – C-7, Urja Bhawan, Sector-6, Panchkula

Corporate Identity Number: U45207HR1997SGC033517

Website: www.hpgcl.org.in E-mail- [email protected]

Telephone No. 0172-5022412 Fax No. 0172-5022421

An ISO:9001,ISO:14001 & OHSAS:18001 CERTIFIED COMPANY

Page 5: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

3

INFORMATION REGARDING ONLINE PAYMENT OF TENDER DOCUMENT, E SERVICE

AND EMD FEES.

The Bidders can download the tender documents from the Portal:

https://haryanaeprocurement.gov.in.

The Bidders shall have to pay for the Tender documents, EMD Fees & eService Fee online by

using the service of secure electronic payment gateway. The secure electronic payments

gateway is an online interface between contractors and online payment authorization networks.

The Payment for Tender Document Fee and eService Fee is amounting to Rs. 2132/- (Rs. 1132

cost of tender documents + 1000/- e-service charges) can be made by eligible bidders/

contractors online directly through Debit Cards & Internet Banking Accounts and the

Payment for EMD amounting to Rs. 30,000/- (Rs. Thirty thousand only) can be made online

directly through RTGS / NEFT.

NOTE: If the tenders are cancelled or recalled on any grounds, the tender document fees & e-

service fee will not be refunded to the agency.

The Tenders can submit their tender documents (Online) as per the dates mentioned in the key

dates:-

Key Dates

Sr.

No. Department Stage Tenderer‟s Stage

Start date

and time

Expiry date

and time

1 ------

Downloading of Tender

Documents, Bid Preparation &

submissions

27.04.2017

11:00 Hours

17 .05.2017

11 :00 Hours

2 Technical Opening (Part-I) -

17 .05.2017

11 :30 Hours

---

Page 6: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

4

NIT is invited from consultancy firms for engagement in HARYANA POWER

GENERATION CORPORATION LIMITED Panchkula for undertaking consultancy job for

preparation of Capital Investment Plan, Business plan & Multiyear ARR petition for the 2nd

control period(3/5 Years as to be notified by HERC) before the HERC as per HERC, MYT

Regulation.

The NIT is open to the consultant firms who have the five years experience in

development of concept and structuring of tariffs for State Generation utility. The consultant firm

should have executed similar job of preparation of Capital Investment Plan & Business Plan of

Generation utilities & ARR under Multiyear tariff proposal of Generation business in at least

three different utilities for filing to SERC/CERC.

The Consultant should have sound knowledge and understanding of legal framework

governing the power sector, experience of Multi Year Tariff determination of public utilities,

financial analysis & accounting and should be well acquainted with the working of State

Electricity Board /Power Utilities and present regulatory framework in the power sector.

Interested firms are required to submit detail of their past experience, man power,

branches/locations, annual accounts of last 3 years and a write up on „mitigation‟ of regulatory

risks in power sector.

The detailed document for engagement of consultant firms can be downloaded from

HPGCL‟s website www.hpgcl.org.in .The due date for submission of bids is 17.05.2017 up to

11:00 hrs. and the NIT shall be opened on 17.05.2017 at 11:30 Hrs.

Document & e-service charges as applicable are to be paid online through e-

procurement portal https://haryanaeprocurement.gov.in.

The NIT can also be viewed on HPGCL’s Website:http://www.hpgcl.org.in and e-procurement portal https://www.haryanaeprocurement.gov.in. For any clarification regarding Bid preparation and Bid submission, please contact: M/s Nextenders (India) Pvt. Ltd. O/o DS&D Haryana, SCO-09, IInd floor, Sector-16, Panchkula-134108.

E-mail: [email protected] Help Desk: 1800-180-2097 (Toll Free Number)

Dy. Secy./Tariff& Planning, for Controller Finance ,

HPGCL, Panchkula

HARYANA POWER GENERATION CORPORATION LIMITED

Urja Bhawan, Sector – 6, Panchkula

Notice Invite Tender

Page 7: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

5

HARYANA POWER GENERATION CORPORATION LIMITED

INSTRUCTION TO BIDDER ON ELECTRONIC TENDERING SYSTEM

These conditions will over-rule the conditions stated in the tender documents,

wherever relevant and applicable.

1. Registration of bidders on e-Procurement Portal:-

All the bidders intending to participate in the tenders processed online are required to

get registered on the centralized e-Procurement Portal i.e.

https://haryanaeprocurement.gov.in. Please visit the website for more details.

2. Obtaining a Digital Certificate:

2.1 The Bids submitted online should be encrypted and signed electronically with a

Digital Certificate to establish the identity of the bidder bidding online. These

Digital Certificates are issued by an Approved Certifying Authority, by the

Controller of Certifying Authorities, Government of India.

2.2 A Digital Certificate is issued upon receipt of mandatory identity (i.e. Applicant‟s

PAN Card) and Address proofs and verification form duly attested by the Bank

Manager / Post Master / Gazetted Officer. Only upon the receipt of the required

documents, a digital certificate can be issued. For more details please visit the

website – https://haryanaeprocurement.gov.in.

2.3 The bidders may obtain Class-II or III digital signature certificate from any

Certifying Authority or Sub-certifying Authority authorized by the Controller of

Certifying Authorities or may obtain information and application format and

documents required for the issue of digital certificate from:

M/s Nextenders (India) Pvt. Ltd.

O/o. DS&D Haryana,

SCO – 09, IInd Floor,

Sector – 16,

Panchkula – 134108

E - mail: [email protected]

Help Desk: 1800-180-2097 (Toll Free Number)

2.4 Bid for a particular tender must be submitted online using the digital certificate

(Encryption & Signing), which is used to encrypt the data and sign the hash

during the stage of bid preparation & hash submission. In case, during the

process of a particular tender, the user loses his digital certificate (due to virus

attack, hardware problem, operating system or any other problem) he will not be

Page 8: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

6

able to submit the bid online. Hence, the users are advised to keep a backup of

the certificate and also keep the copies at safe place under proper security (for

its use in case of emergencies).

2.5 In case of online tendering, if the digital certificate issued to the authorized user

of a firm is used for signing and submitting a bid, it will be considered equivalent

to a no-objection certificate/power of attorney /lawful authorization to that User.

The firm has to authorize a specific individual through an authorization certificate

signed by all partners to use the digital certificate as per Indian Information

Technology Act 2000. Unless the certificates are revoked, it will be assumed to

represent adequate authority of the user to bid on behalf of the firm in the

department tenders as per Information Technology Act 2000. The digital

signature of this authorized user will be binding on the firm.

2.6 In case of any change in the authorization, it shall be the responsibility of

management / partners of the firm to inform the certifying authority about the

change and to obtain the digital signatures of the new person / user on behalf of

the firm / company. The procedure for application of a digital certificate however

will remain the same for the new user.

2.7 The same procedure holds true for the authorized users in a private/Public

limited company. In this case, the authorization certificate will have to be signed

by the directors of the company.

3 Opening of an Electronic Payment Account:

Tender document can be downloaded online. Bidders are required to pay the tender

documents fees online using the electronic payments gateway service. For online

payments guidelines, please refer to the Home page of the e-tendering Portal

http://haryanaeprocurement.gov.in.

4 Pre-requisites for online bidding:

In order to bid online on the portal http://haryanaeprocurement.gov.in , the user machine

must be updated with the latest Java. The link for downloading latest java applet is

available on the Home page of the e-tendering Portal.

5 Online Viewing of Detailed Notice Inviting Tenders:

The bidders can view the detailed N.I.T and the time schedule (Key Dates) for all the

tenders floated through the single portal e-Procurement system on the Home Page at

http://haryanaeprocurement.gov.in

6 Download of Tender Documents:

The tender documents can be downloaded free of cost from the e-Procurement portal

http://haryanaeprocurement.gov.in

7 Key Dates:

The bidders are strictly advised to follow dates and times as indicated in the online

Notice Inviting Tenders. The date and time shall be binding on all bidders. All online

activities are time tracked and the system enforces time locks that ensure that no activity

Page 9: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

7

or transaction can take place outside the start and end dates and the time of the stage

as defined in the online Notice Inviting Tenders.

8 Bid Preparation (Technical & Financial) Online Payment of Tender Document Fee,

eService fee, EMD fees and Submission of Bid Seal (Hash) of online Bids:

8.1 The online payment for Tender document fee, e-Service Fee & EMD can be done

using the secure electronic payment gateway. The Payment for Tender

Document Fee and eService Fee can be made by eligible bidders/ contractors

online directly through Debit Cards & Internet Banking Accounts and the Payment

for EMD can be made online directly through RTGS / NEFT.

The secure electronic payments gateway is an online interface between

contractors and Debit card / online payment authorization networks.

8.2 The bidders shall upload their technical offer containing documents, qualifying

criteria, technical specification, schedule of deliveries, and all other terms and

conditions except the rates (price bid).

The bidders shall quote the prices in price bid format.

8.3 Submission of bids will be preceded by submission of the digitally signed& sealed

bid (Hash) as stated in the time schedule (Key Dates) of the Tender.

NOTE:-

(A) If bidder fails to complete the Online Bid Submission stage on the stipulated

date and time. His/hers bid will be considered as bid not submitted, and hence

not appear during tender opening stage.

(B) Bidders participating in online tenders shall check the validity of his/her Digital

Signature Certificate before participating in the online Tenders at the portal

https://haryanaeprocurement.gov.in .

(C) For help manual please refer to the „Home Page‟ of the e-Procurement website

at https://haryanaeprocurement.gov.in, and click on the available link “How

to…?” to download the file.

Page 10: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

8

DETAILED DOCUMENTS/INSTRUCTIONS FOR NOTICE INVITING TENDER

FOR ENGAGEMENT OF CONSULTANT FIRM

Notice Inviting Tender (NIT) is invited by Controller Finance, HPGCL, Panchkula on behalf

of HPGCL, for engagement of consultancy firm in HARYANA POWER GENERATION

CORPORATION LIMITED Panchkula for undertaking consultancy job for preparation of Capital

Investment Plan, Business plan & Multiyear ARR petition for the 2nd control period w.e.f 1st

April, 2018 (3/5 Years as to be notified by HERC) before the HERC as per HERC, MYT

Regulation.

1. Scope of work

Scope of work shall be as per attached with this document.

2. The pre-qualification requirements as consultant/instructions to bidders for preparation

and filing of Capital Investment Plan, Business Plan and MYT ARR petition of 2nd control

period w.e.f 1st April, 2018 before HERC as per MYT Regulation are as under:-

(i) Bidder will submit copies of the document showing 5 year experience as consultant

firm in development of concept and structuring of tariff for State Generation Utility.

(ii) Bidder shall submit the documentary proof of executing similar job of preparation of

Capital Investment Plan & Business Plan of Generation utilities & ARR under

Multiyear tariff proposal of Generation business in three utilities for filing to

SERC/CERC over the last six years reckoned from 31.03.2017

(iii) The consultant/ consulting organization should have at least one single order( in one

year) of similar nature work in hand, valued not less than 12,00,000/- or, two orders

of the value not less than Rs. 7,50,000/- each or , three orders of the value not less

than Rs. 6,00,000/- each of Hydro power station / coal / lignite / gas based thermal

power projects, located in India during the last 5 years reckoned from 31.03.2017

3. Bidder shall submit details of their past experience, manpower, branches /locations,

Annual accounts of last three years and a write up on „mitigation‟ of Regulatory risks in

Power sectors.

4. The bidder to supply the detailed profile of its Technical & Financial competency with

their application along with supporting documents.

5. The bidder must have capability to depute technically qualified & well conversant

personnel (with similar-job) to carry out the requisite work/assignment. The Technical

detail so submitted shall clearly indicate the names, qualifications, experience and

designations of the persons who shall carry out the required assignment and senior

consultant who will guide this team. They shall list the main disciplines of the

Assignment/job, the key expert responsible, and proposed technical and support staff.

The team leader should have qualification of CA/ICWA or MBA with 6 year experience

and assisted by technical personnel.

HPGCL shall require an assurance that the staff mentioned in the technical detail will be

actually available and deployed for this assignment. HPGCL will not consider

substitutions during the contract period except in cases of genuine hardship subject to

Page 11: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

9

the satisfaction of the HPGCL. The CV of professional substituting earlier professional

should be better than the replaced one.

HPGCL may hold review meetings at various stages, with the firm during which

senior/key personnel of firm shall be present.

6. The applicable MYT Regulations for 2nd Control Period are yet to be notified by the

Hon‟ble HERC. The tariff order of HPGCL is available on the official website of the HERC

i.e. www.herc.gov.in. All the requirement of work /assignment to be done by the

consultant firm as per MYT Regulations for 2nd control period shall be binding on the

consultant. An undertaking in this regard shall be furnished by the bidder along with

technical bid.

7. The firm should submit authentic supporting documents for proving its credential. Original

documents may be asked for verification at the time of finalizing the tender. A certificate

to the effect that the tenderer is not black listed from any Public Sector Undertakings of

Central Govt./State Govt./SEBs/Corporations/any other reputed thermal/Hydel plant etc.

may also be provided. In case of any wrong declaration, the firm shall be liable for the

consequences arising thereof viz rejection of bid or as deemed fit by the Nigam.

8. Bid Prices: Bidders shall quote the rate as per price bid only so that price covers all the

contract obligations mentioned in Scope of Services. The calculation of L-I bidder will be

carried out by considering the control period of 3 Years. Price quoted by the bidder shall

be fixed and not subject to adjustment during the performance of the contract.

9. The successful bidder shall furnish a “Performance Bank Guarantee” on prescribed

Performa equal to 10% of the value of contract within one month of award of contract,

which shall be valid for 180 days after the completion of contract failing which Earnest

Money Deposit shall be forfeited.

10. The rate negotiations could be held up to L3 bidder, if the difference between the L1

quoted rates and those quoted by L2 and L3 is within 5% of the L1 quoted rates. In case

where the L1 bidder refuses to further reduce his offered price and the L2 or L3 bidders

come forward to offer a price which is better than the price offered by L1 bidder, the

bidder whose price is accepted becomes L1 bidder. However, in such a situation, the

original L1 bidder shall be given one more opportunity to match the discounted price. In

case of acceptance, he would be treated as L1 bidder.

11. Controller Finance/HPGCL, Panchkula reserves the right to cancel the NIT or to

change qualifying requirement or to reject any or all the tenders so received without

assigning any reason

12. In case, no deviation is found in Part-I (Technical bid) of all the qualified firms, then

Price Bid tender of all the eligible participants shall be opened with the approval of

Controller Finance/HPGCL, Panchkula on subsequent date.

13. No interest shall be paid on EMD / Security Deposit for the period it remains deposited

with HPGCL.

14. Bidders are required to furnish the desired information and documents as are required in

this document in English only.

15. HPGCL reserves the rights to modify the document by issuing amendment/ clarifications

before the due date. Such amendment(s)/clarification(s) will be intimated to the Bidders.

16. In the event of rejection of the bid on any ground, HPGCL reserves the right to forfeit the

earnest money furnished by such Bidders.

17. Submission of Correct Bid proposal is the Bidder's responsibility. There will be no

consideration for errors and omissions on part of the bidders.

Page 12: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

10

18. In addition to submit the bid (Technical as well price) online, the Tenders have to submit

a hard copy of TECHNICAL BID ONLY in the office of Controller Finance/HPGCL, C-7, Urja

Bhawan Panchkula before or on last date & Time of the NIT.

19. No deviation shall be allowed. However, in case of deviation of taxes etc., the same be

loaded for comparison purpose.

20. The bidders / contractors shall observe the highest standards of ethics during the

submission of tender and execution of the contract. In case of evidence of cartel formation

by the bidder(s) EMD is liable to be forfeited.

21. The bidder shall bear all costs including bank charges, if any, associated with the

preparation and submission of the bid and the HPGCL in no case will be responsible or

liable for those costs, regardless of the conduct or outcome of the bidding process.

22. Applicable Tax will be paid extra if same is claimed by the firm. The applicable

admissible tax will be paid against the documentary evidence.

GENERAL TERMS AND CONDITIONS OF THE CONTRACT

The terms and conditions of the contract shall prevail and shall be binding on the firm and any

change or variation expressed or impressed how so ever made shall be inoperative unless

expressly approved by HPGCL. The firm shall be deemed to have fully informed himself and to

have specific knowledge of the provisions of Terms and Conditions of the contract mentioned

here under:-

1. PERIOD OF CONTRACT: The period of the contract shall be for the completion of the

assignment for 2nd control period of 3/5 years (as to be notified by HERC).w.e.f 1st April,

2018

2. RULE AND REGULATIONS: The assigned job shall be carried out under the rules and

regulations in force and further guidelines/instructions issued by the HERC and HPGCL

from time to time in this regard.

3. TERMS OF PAYMENT DURING THE CONTRACT PERIOD: The payment shall be made

from the office of Sr. Accounts Officer /EAD, HPGCL, Panchkula after the acceptance of

the bills verified by the Controller Finance Office along with the work done report.

Break up of annual payment shall be 60% on filling of Tariff Petition with HERC, 20% on

Tariff order by HERC and remaining 20 % after successful completion of all activities for

relevant financial year.

4. OUT OF POCKET EXPENSES: The boarding /lodging and conveyance for consultant‟s

representatives required for the purpose of execution shall be to the account of the firm.

Reasonable office space with furniture (if available) shall be provided by Nigam for

delivering the job on demand by consulting firm. The firm shall use their own computers,

internet, printer & other appliances. The consulting firm is supposed to deliver two hard &

soft copies along with source, formula etc. of documents prepared by them. The

remaining copies shall be prepared by the Nigam.

5. PENALTY: In case of delay in execution of assignment, the HPGCL reserves the right to

recover a penalty @5% (Five percent) per week or part thereof, subject to maximum of

10%of the order value.

6. RECOVERY OF THE LOSS: In case any loss is sustained to the HPGCL due to fraud/

Page 13: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

11

embezzlement/ misappropriation committed by the employees of the firm which could

have been detected during the normal course of work but remains undetected, the firm

shall be liable to pay the same to HPGCL.

7. FALL BACK ARRANGEMENTS: In the event of the failure of the firm to fulfill its

obligations, as per the contract, the HPGCL shall have the right to resort to fall back

arrangement. The HPGCL shall take charge of all facilities and systems whether in

operation or under execution, after giving suitable notice and can recover from the

performance BG the losses suffered due to such failure. If the security deposit is un-

sufficient, the firm shall have to pay the difference to the HPGCL, failing which the

HPGCL will have the right to recover the same through legal or other means. Where

necessary, the case of consultant illegally backing out of the commitment, should also

be put up to the MD/ H P G C L for consideration and to decide for black- listing of the

firm and damages, if any, to be recovered.

8. HANDING OVER ON TERMINATION: Immediately after termination of the contract

agreement the firm will cooperate in handing over back all the facilities and record in good

working order to the HPGCL. Upon termination of the contract/agreement, the authority of the

Agency to act as Agent of the HPGCL in the area shall immediately cease.

9. GOVERNING LAW AND JURISDICTION: The agreement shall be governed under Indian

law. Only appropriate courts in Panchkula shall have exclusive court jurisdiction to deal with any

matter arising out of or relating to the agreement or otherwise.

10. LIEN: In case of any lien or claim pertaining to the work and responsibility of the firm for which

the HPGCL might have been made liable, the HPGCL shall have the right to recover such claim

amount from the firm.

11. ARBITRATION: All matter questions, disputes, differences and / or claims arising relating to this

contract shall be referred to the Sole Arbitration of the M.D. HPGCL or an Officer appointed by

the M.D. HPGCL as his nominee. The provisions of the Arbitration & Conciliation Act, 1996 and

the Rules there under any statutory modifications thereof for the time being in force, shall be

deemed to apply to the Arbitration proceedings under this clause.

12. COMPLIANCE OF LAW: The firm shall be responsible a n d liable for carrying out of all

of its activities within the rules and laws in force .The HPGCL shall not be responsible for

any of the un- lawful activity committed by the firm.

13. RESPONSIBILITY FOR RECORD/DOCUMENTS: The firm shall be fully responsible for

upkeep, maintenance and safety of the record and documents supplied by the HPGCL

and also for the record/documents generated by the firm. On completion of the

contract/job the firm will return all the documents supplied to it by the HPGCL and shall

also handover all the record/ documents generated by it for the purpose of completion of

Page 14: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

12

the assigned work. The firm shall also be responsible to make the loss good if suffered

by the HPGCL, due to act of the firm.

14. CONDUCT OF STAFF OF FIRM/REPLACEMENT OF STAFF: If any of the employee of

the firm is found guilty of any misconduct or incompetence or negligence and then if so

directed by the HPGCL, the firm shall at once remove such employee and replace him

with a qualified and competent substitute ,Further ,the deployed staff/consultant can only

be replaced by the mutual consent of the participating firm and HPGCL.

15. The Firm shall not utilize or publish or disclose or part with any statistics, data or

information collected f rom HPGCL, without written consent of the HPGCL.

16. Financial Proposal: The bidder shall submit their financial bid/proposal as per the

prescribed Performa given as under:-

Sr. No.

Description of Job Rates quoted (In Rs.)

Tax as applicable (in

Rs.)

1.

2.

Charges for preparation, finalization & filing of

the Capital Investment Plan, Business Plan,

MYT Tariff Petition etc. before the HERC and

other related works for the 2nd control period

of 3/5 years (as per notification of HERC )

w.e.f FY 2018 -19 as Scope of work / MYT

Regulation and preparation, finalization &

filing of the true up Tariff Petition, midyear

performance review and Tariff Determination

for FY 2018-19

Charges for preparation, finalization & filing of

the true up Tariff Petition, midyear

performance review and Tariff Determination

for each FY wef FY2019-20

17. The offers shall remain valid for a period of 180 days from date of opening of price bid.

18. The calculation of L-I bidder will be carried out by considering the control period of 3

Years.

19. Tenders not submitted on prescribed forms/without earnest money are liable to be

rejected. Furnishing of wrong information and false documents will make Agency liable to

be barred/ black listed from participation in future contracts of the Nigam.

Nigam reserves the right to accept / reject the request of any firm/ agency regarding

acceptance of application without assigning any reason.

Page 15: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

13

Scope of work

This filling of ARR and tariff proposal for the 2nd control period of 3/5 Years as per notification of

HERC will incorporate the following main features to be undertaken by the Consultant firm.

1. Preparation and submission of Capital Investment Plan, Business Plan and Multi-year ARR

petition of HPGCL for the 2nd control period of 3/5 Years as per notification of HERC w.e.f

1st April, 2018 and preparation, finalization & filing of the true up Tariff Petition, midyear

performance review and Tariff Determination for FY 2018-19 in accordance to the HERC

Page 16: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

14

MYT tariff regulation and get it approved by the State Commission. The presently time limit

as per 1st control period for filing of Capital Investment Plan, Business Plan and Multiyear

ARR before HERC is up to 1st August & 30th November respectively.

2. Preparation and submission of HPGCL Petition Mid-Year (Performance) Review for the

current FY & Generation Tariff for next FYs wef FY 2019-20 along with a copy of PPT also .

3. Preparation and submission of Final true up of ARR of the years for which audited accounts

are available.

4. Collection and Preparation of base date for preparation of Capital Investment Plan,

Business Plan and Multi-years ARR and tariff petition.

5. Preparation of year –wise Income and expenditure estimates for control period.

6. Preparation of estimates for year-wise investment and financing plans for the control period.

7. Validate the data before the HERC as and when required.

8. Timely response to queries raised by the HPGCL or commission.

9. To attend public hearing and reply to the objections/ suggestions received on the proposal

of ARR and tariff petition.

10. Preparation of report on compliance of directives issued by the Commission in its earlier

tariff orders.

11. Any other work incidental to the filing and approval of ARR, True-up and tariff proposal.

12. Analysis /examination of tariff order of the Commission for apprising the Company regarding

financial and other implications of the order of Commission and recommendations for

adoption of filing of review petition or appeal and also provides necessary assistance in filing

of review petition or appeal. If required.

13. Any expert/ legal opinion on the issues related to filing and determination of tariff for the

satisfaction of commission shall be arranged by the executing agency/consultant at its cost.

14. Any other appeal/petition to be filled before HERC as per requirement of HPGCL along with

a copy of PPT.

15. Monthly analysis of Performance parameters, preparation of cost sheet, SOP formats in

respect of HPGCL's various power stations/projects.

Note:

1. All the requirement of work /assignment to be done by the consultant firm as per HERC,

MYT Regulations for 2nd control period shall be binding on the consultant.

2. (i) The above Scope of Work for the proposed consultancy assignment for HPGCL is as

per the terms of reference made in MYT Regulation for 1st control period as under:-

(a) Separate capital investment plan and a business plan for a period not less than the

control period to be submitted by HPGCL for their respective businesses prior to the

start of the control period;

(b) The forecast for each year of the control period of the various financial and operational

parameters of ARR, based on reasonable assumptions, to be filed by the HPGCL for

their respective businesses;

(c) The trajectory for specific variables as may be stipulated by the Commission, where the

performance of the HPGCL for the businesses is sought to be improved through

incentive and penalty framework;

(d) The annual performance review vis-à-vis the approved forecast and variations in

performance of controllable and uncontrollable items;

(e) The mechanism for sharing approved gains or losses on account of controllable items;

(f) The mechanism for pass through of approval gains or loss on the a/c of uncontrollable

terms.

(ii )Preparation of Business Plan for Control Period:

Page 17: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

15

The business plan for HPGCL shall be based on planned generation capacity growth and

shall contain among other things the following (i) generation forecasts; (ii) future performance

targets; (iii) proposed efficiency improvement measures; (iv) saving in operating costs; (v)

Plan for reduction in per unit/per MW cost of generation (vi) financial statements (which

include balance sheet, profit and loss statement and cash flow statement) - current and

projected (at least for the control period duration) along with basis of projections; (vii) any

other new measure to be initiated by the Generating Company e.g. IT initiatives, third party

energy audit etc.

(viii) Any other factor specific to Nigam and/ or notified by HERC.

(iii)Preparation of Capital investment Plan for control Period:

The capital investment plan shall be project/ scheme wise and for each scheme/ project shall

include;-

a) Purpose of investment (b) Capital Structure (c) Capitalization Scheduled (d) financing Plan

including identified sources of investment (e) Details of physical parameters/ targets (f) Cost-

benefit analysis and payback period (g) Envisaged reduction in O&M cost/ losses

(h) Ongoing projects that will spill into the year under review and new projects (along with

justification) that will commence but may be completed within or beyond the control period.

Purpose of investment shall include: generation capacity growth, replacement of assets,

renovation and modernization, reduction in average per unit cost of generation etc;

(iv)Mid-year Performance Review support.

The scope of the mid-year performance review shall be a comparison of the performance of

the licensees for the relevant financial year with the approved forecast of ARR for their

respective businesses and the performance targets specified by the Commission, Upon

completion of the mid-year performance review and truing up as per regulation, the

Commission shall pass an order recording:

(a) The revised approved ARR for such financial year including approved modifications, if

any,

(b) The approved aggregate gain or loss on account of controllable items and sharing of

such gains or losses;

(c) Truing up or pass through of uncontrollable items of ARR of previous year (s);

(d) Pass through of variations in controllable items due to force majeure events, if any.

(e) Pass through of variations in controllable items attributable to uncontrollable factors.

(f) Tariff applicable for each business for the ensuing year.

The constituting firm shall deliver all the activities relating to above and as mentioned in

MYT regulation including methodology, work plan soft copy of all the documents along

with the source code.

Other Issues: The above description of scope of consultancy is purely indicative and not

exhaustive. The work which are not expressed/ mentioned in the scope of work but are to be

performed as per MYT Regulation for 2nd control period relating to Tariff Petition shall also be

undertaken. Changes/ additions can be made by HPGCL as a better understanding to enhance

the value of the study, without changing its basis nature.

Page 18: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

16

Annexure-1

PROPOSAL SUBMISSION FORM

To

Controller Finance.

HPGCL, Urja Bhawan

Sector-6, Panchkula

No.

Page 19: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

17

Date

Subject: Engagement of Consultant Firm/Agencies for providing Consultancy Services.

Please refer to your E-Tender Enquiry regarding the engagement of consultant firm

for preparation and filing of Capital Investment Plan, Business Plan and MYT ARR Petition of

HPGCL for the 2nd Control Period including filing of true up, Midyear & determination of Tariff for

next FY petition of HPGCL every year separately during this control period as per MYT

Regulation.

In this context it is intimated that our firm M/s____________________ is

providing consultancy services for the above mentioned similar job _______________________

from the last _________ years in Government/private sectors such as ______________.

The following documents as required/mentioned in the E-tender Enquiry are being

enclosed for your ready reference and possible use.

1. _____________________________

2. _____________________________

3. _____________________________

4. ______________________________ (any other relevant document).

It is hereby affirmed that the enclosed documents are genuine and any

discrepancy in the statement / document, if found at any stage, shall be responsibility of

our firm and we shall be liable for all the consequences arising thereof.

You are requested to consider our request regarding engagement of our firm for

preparation and filing of Capital Investment Plan, Business Plan and MYT ARR Petition of

HPGCL for the 2nd Control Period of including filing of true up, Midyear & determination of Tariff

for next FY petition of HPGCL every year separately during this control period as per MYT

Regulation.

Thanking you. DA/As above

Yours Sincerely,

(Name, Designation & Signature of Authorized Signatory)

M/s________________________________

Annexure-2

TEAM COMPOSITIONANDTASKASSIGNMENTS

I: Technical/Managerial Staff

Name Position Task

Page 20: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

18

II: Support Staff

Name Position Task

(Name, Designation & Signature

of Authorized Signatory)

M/s________________________________

__________________________________

Page 21: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

19

Annexure-3

COMMENTS ANDSUGGESTIONS OF CONSULTANTS ON THE SCOPE OF WORK AND

ON DATA, SERVICES AND FACILITIES TO BE PROVIDED BY THE CLIENT

A. On Scope of work

1.

2.

3.

4.

5.

B. On the data, services and facilities to be provided by the client

1.

2.

3.

4.

5.

(Name, Designation & Signature of Authorized Signatory)

M/s ________________________ _________________________

Page 22: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

20

Annexure-4

DESCRIPTION OF THE METHODOLOGY AND WORK PLAN FOR PERFORMING THE ASSIGNMENT

(Name, Designation & Signature of Authorized Signatory)

M/s________________________________

__________________________________

Page 23: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

21

Annexure-5

FORMATOF CURRICULUMVITAE(CV)

FOR PROPOSED PROFESSIONAL STAFF

Proposed Position:

Name of Firm:

Name of Staff:

Profession:

Date of Birth:

Years with Firm/entity:

Nationality:

Membership in Professional Societies:

Detailed Tasks Assigned

Key Qualifications:

[Give an outline of staff members experience and training most pertinent to tasks on

assignment. Describe degree of responsibility held by staff member on relevant previous

assignments and give dates and locations.]

Education

[Summarize college / university and other specialized education of staff member, giving

names of schools, dates attended, and degrees obtained.]

Employment Record:

[starting with present position, list in reverse order every employment held. List all positions

held by staff member since graduation, giving dates ,names of employing organizations, titles

of positions held, and locations of assignments. For experience in last ten years, also give

types of activities performed and client reference, where appropriate.

Languages:

[For each language indicate proficiency, excellent, good, fair, or poor in speaking, reading

,and writing]

Certification:

I, undersigned, certify that to the best of my knowledge and belief, these data

correctly describe me, my qualifications, and my experience.

Date:

[Signature of staff member and authorized representative of the Firm]Day/Month/Year

Full Name of staff member :

Full name of authorized representation :

Page 24: HARYANA POWER GENERATION CORPORATION …hpgcl.org.in/docfiles/HPGCL84061.pdf4 NIT is invited from consultancy firms for engagement in HARYANA POWER GENERATION CORPORATION LIMITED Panchkula

22

Annexure-6

Statement of deviations from the tender document

(Name, Designation & Signature of Authorized Signatory)

M/s________________________________

________________________________