ONTARIO QUARRIES Inc.
1177 Lonsdale Avenue Sudbury, Ontario Canada P3B1K3
tel.: (705) 688-6600 f 560-4846 fax: (705)524-9914
41I15SW0031 W9470.00014 PARKIN 010
SUBMISSION FOR ASSESSMENT CREDITFOR PHYSICAL AND MECHANICAL WORK
INVOLVING STRIPPING AND DRILLING
HARAMA MARBLE QUARRY
Parkin Twp District of Sudbury
January, 1994
PREFACE
This submission is for assessment credit for physical and mechanical work performed on claims
owned by Ontario Quarries Inc. in Parkin Township, District of Sudbury. The claims are the site of a
marble quarry which is currently under advanced exploration l development. Maps showing the site
and location of the work conducted are contained in Appendix B.
I hereby certify that I was present on days when the work was done and I can attest to the equipment
and labour that was present as reflected on the invoices presented by the contractor (copies enclosed in
Appendix A).
Rachel Prudhomme, M.Sc., P.Eng.
January 14,1994
INTRODUCTION
Ontario Quarries Inc. acquired a block of contiguous claims in Parkin Township north of Capreol, Ont. in
the fall of 1992 from Mr. John G. Brady. The claims contain a beautiful, competent and unique "marble"
according to the industrial definition of the term. Since the claims were acquired, there has been a
tremendous amount of physical, mechanical and research work conducted to determine the extent of the
marble deposit, the quality, consistency, colour and texture of the stone, the engineering properties of the
stone, its marketability in domestic and international markets and the potential environmental impact of a
quarry and the environmental baseline values for contaminants. In summary, it has been determined that
the deposit contains a stone that is highly desirable and unique in the dimension stone markets in America
and abroad and is very significant in terms of its volume. The stone has excellent physical properties as it
meets or exceeds all ASTM standards for marble dimension stone for exterior use. There is quite a
variation in colour, texture and pattern of stone within the same deposit. The deposit is workable in terms
of its accessibility, feasibility and environmental comparability.
A very large amount of the exploration and development work conducted on this block of claims in the
last year and several months has been supported by financial incentives from MNDM who have been
indispensable in continuing our work on this dimension stone project. MNDM has been very supportive
in encouraging us to continue in our efforts to develop a fully producing marble quarry. Financial
incentives received were in the form of a Norfund "pre-feasibility" project in the amount of S 164,400
(level of assistance: 575,000), a N.O.R.T. project of 5394,849 which is now 90 percent complete (level
of assistance: 5195,000), a 1993 O.M.I.P. project designation in the amount of 5509,250 (level of
assistance: 5152,775) and a Norfund project to purchase and operate two specially engineered diamond
wire saws in order to permit the proper extraction of full-sized test blocks for marketing and technical
studies (level of assistance: 550,000). The saws were purchased and imported from a manufacturer in
Italy as they are not available anywhere in North America.
Most of the work to date has focussed on 9 claims that were originally purchased by Ontario Quarries Inc.
The entire contiguous block presently owned by Ontario Quarries Inc. consists of 32 mining claims (31 in
Parkin Twp. and one in Hutton Twp.).
ONTARIO QUARRIES INC. l 1 994
SUMMARY OF MECHANICAL STRIPPING Si DRILLING CONDUCTED ON MINING CLAIMS FROM OCT. 3 1992 TO OCT. 18,1992
Mechanical stripping and exploration drilling for test blocks were conducted on claims S734218 and
S865266 between Oct. 3 and Oct. 18,1992. The purpose of this work was to determine the extent,
consistency, colour, quality, physical properties and trend of the Harama marble deposit which has
already been proven to have good commercial value and excellent potential for international export.
The stripping and exploration drilling effaces was followed by sampling for A.S.T.M. testing of
engineering properties for one type of marble as conducted by Ortech International of Mississauga, Ont.
in Dec. 1992 and Jan, 1993. The report and results of the A.S.T.M. testing conducted on samples from
the areas mechanically stripped and drilled were previously presented for assessment credit under work
report No. W9370.00047. Mechanical stripping and exploration drilling activity was also followed by
detailed geological mapping and deposit evaluation by an independent geological consultant (Norwin
Geological of Sudbury) in Nov. and Dec. 1992. The reports and maps produced by Norwin as a result
of the work were previously submitted for assessment credit under work report No. W9370.00048.
General maps showing the location of the mechanical stripping and the exploration drilling of faces and
blocks conducted are included in this work report. Detailed maps can be found in the previously
mentioned work reports. The reader can refer to those reports for details of the mapping, A.S.T.M.
testing, geological assessment and recommendations for future work on the deposit.
The contractor hired to supply equipment and labour for mechanical stripping and exploration drilliing
was: F.H.R. Construction Ltd.1290 Bancroft Dr., Suite F421 Sudbury, Ont. P3B 4G9 tel.: 560-9340 or 670-4444
All work was supervised by Ontario Quarries Inc., the registered owner of the claims. Rachel
Prudhomme P.Eng., a licensed professional mining engineer and President of Ontario Quarries Inc.,
attended the worksite to provide professional and technical guidance and direction for stripping, drilling
of faces, sampling and prospecting, while Frank Villano, Vice-President, conducted field supervision of
equipment and labour sent by F.H.R. Construction Ltd.
A detailed summary of the cost of the mechanical stripping and exploration drilling work is included on
the following page. Copies of invoices from F.H.R. Construction Ltd. for this work are also included.
ONTARIO QUARRIES INC. ; 1994
ME
CH
AN
ICA
L S
TRIP
PIN
G A
ND
EX
PLO
RA
TIO
N D
RIL
LIN
G C
OS
TS
--
CLA
IM 8
6526
6
DAT
E
Oct
. 3
792
Oct
. 3
/92
Oct
. 4
792
Oct
. 4
792
Oct
. 5
792
Oct
. 5
792
Sub
tota
l
Invo
ice
#
58
51
n/a
58
52
n7a
58
53
n/a
EQ
UIP
ME
NT
7 LA
BO
UR
850
Cas
e B
ulld
ozer
H-
Ope
rato
r22
0 C
ase
Exc
avat
or +
Ope
rato
rFl
oat
(2 m
oves
)Fo
rem
an
Ont
ario
Qua
rrie
s Fi
eld
Sup
ervi
sion
Eng
inee
r /
pros
pect
or
850
Cas
e B
ulld
ozer
+ O
pera
tor
71 0
Joh
n D
eere
Bac
khoe
+ O
pera
tor
W30
Cas
e P
aylo
ader
+ O
pera
tor
220
Cas
e E
xcav
ator
+ O
pera
tor
Floa
t (3
mov
es)
Fore
man
Ont
ario
Qua
rrie
s Fi
eld
Sup
ervi
sion
Eng
inee
r /
pros
pect
or
850
Cas
e B
ulld
ozer
+ O
pera
tor
71 0
Joh
n D
eere
Bac
khoe
+ O
pera
tor
W30
Cas
e P
aylo
ader
+ O
pera
tor
220
Cas
e E
xcav
ator
+ O
pera
tor
Com
pres
sor
Gas
ope
rate
d pu
mp
81 ho
ses
Labo
urer
s (2
)Fo
rem
anse
rvic
e tr
ucks
Ont
ario
Qua
rrie
s Fi
eld
Sup
ervi
sion
Eng
inee
r /
pros
pect
or
HO
UR
S
1 1 7 1 0
10 2 1 1 8 8 9 1 1
1 0 3 1 1
1 1
1 1
1 1
1 da
y1
day
22 1 1
1 1 2
RAT
E
38
0/h
r3
12
0/h
r36
50 e
a.340/h
r
34
0/h
r31
00
38
0/h
r3
80
/hr
380/h
r3120/h
r36
50 e
a.340/h
r
34
0/h
r3
10
0/h
r
380/h
r3
80
/hr
38
0/h
r3
12
0/h
r3250/d
ay
3107/d
ay
320/h
r3
40
/hr
34
0/h
r3100/h
r
DET
AILS
claim
865266
N
M
H
(t
H
It
II
mob
iliza
tion
of e
quip
men
tcl
aim
86
5266
GST supe
rvis
e fie
ld w
ork
tech
nica
l di
rect
ion
claim
865266
H
H
II
fi
II
H
M
H
H
H
M
M
M
II
mob
iliza
tion
of e
quip
men
tcl
aim
86
5266
GST
supe
rvis
e fie
ld w
ork
tech
nica
l di
rect
ion
cla
im
865266
fi
II
H
H
M
H
II
H
II
II
II
H
H
M
mis
cella
neou
s si
te t
rips
G3T
supe
rvis
e fie
ld w
ork
tech
nica
l di
rect
ion
TOTA
L
3880.0
0S
840.
008
1,3
00
.00
S40
0.00
S23
9.40
S40
0.00
S20
0.00
3880.0
03640.0
0S
640.
003
1,0
80
.00
31
,95
0.0
03440.0
03394.1
0
3400.0
03300.0
0
3880.0
03880.0
03880.0
03
1,3
20
.00
3250.0
03107.0
03440.0
03440.0
0no
cha
rge
3363
.79
3440.0
03200.0
0
S1 7
,1 8
4.29
ON
TA
RIO
QU
AR
RIE
S In
c.,
1994
ME
CH
AN
ICA
L S
TR
IPP
ING
AN
D E
XP
LOR
ATI
ON
DR
ILLI
NG
CO
ST
S -
C
LAIM
734
218
DAT
E
Oct
. 6
792
Oct
. 6
792
Oct
. 7
792
Oct
. 7
792
Sub
tota
l
Invo
ice
#
58
54
n/a
58
55
EQ
UIP
ME
NT
7 LA
BO
UR
850
Cas
e B
ulld
ozer
* O
pera
tor
710
John
Dee
re B
ackh
oe *
Ope
rato
rW
30 C
ase
Pay
load
er +
Ope
rato
r22
0 C
ase
Exc
avat
or +
Ope
rato
rC
ompr
esso
rG
as o
pera
ted
pum
p A
hose
sLa
bour
ers
(2)
Fore
man
serv
ice
truck
s
Ont
ario
Qua
rrie
s Fi
eld
Sup
ervi
sion
Eng
inee
r 7
pros
pect
or
850
Cas
e B
ulld
ozer
+ O
pera
tor
71 0
Joh
n D
eere
Bac
khoe
+ O
pera
tor
W30
Cas
e P
aylo
ader
+ O
pera
tor
220
Cas
e E
xcav
ator
+ O
pera
tor
Com
pres
sor
Gas
ope
rate
d pu
mp
b ho
ses
Labo
urer
s (3
)Fo
rem
anse
rvic
e tru
cks
Ont
ario
Qua
rrie
s Fi
eld
Sup
ervi
sion
Eng
inee
r 7
pros
pect
or
HOUR
S
11 11 1 1
1 1
1 da
y1
day
22 1 1
1 1 2 1 1
1 1
1 1
1 1
1 da
y1
day
33 1 1
1 1 2
RAT
E
580/h
r580/h
r580/h
r5
12
0/h
r5250/d
ay
5107
/day
520/h
r540/h
r
540/h
r5
10
0/h
r
580/h
r580/h
r580/h
r5
12
0/h
r5250/d
ay
5107
/day
520/h
r540/h
r
540/h
r5100/h
r
DET
AILS
claim
73
4218
II
II
II
H
II
II
H
mis
cella
neou
s si
te t
rips
GST
supe
rvis
e fie
ld w
ork
tech
nica
l di
rect
ion
claim
73
4218
mis
cella
neou
s si
te t
rips
GST
supe
rvis
e fie
ld w
ork
tech
nica
l di
rect
ion
TOTA
L
3880
.00
3880.0
0S
880.
003
1,3
20
.00
3250.0
031
07.0
03440.0
03440.0
0no
cha
rge
3363
.79
3440.0
052
00.0
0
3880
.00
3880.0
03880.0
03
1,3
20
.00
3250.0
051
07.0
03660.0
054
40.0
0no
cha
rge
5379
.19
5440
.00
5200
.00
312,
636.
98
ON
TA
RIO
QU
AR
RIE
S In
c.,
1994
ME
CH
AN
ICA
L S
TRIP
PIN
G A
ND
EX
PLO
RA
TIO
N D
RIL
LIN
G C
OS
TS
--
CLA
IM 7
3421
8
DAT
E
Oct
. 8/
92
Oct
. 8
792
Oct
. 9
792
Oct
. 9
/92
Sub
tota
l
Invo
ice
#
5856
n/a
5857
EQ
UIP
ME
NT
1 LA
BO
UR
850
Cas
e B
ulld
ozer
+ O
pera
tor
710
John
Dee
re B
ackh
oe +
Ope
rato
r12
80 C
ase
Exa
/hyd
r. d
rill
+ O
pera
tor
220
Cas
e E
xcav
ator
+ O
pera
tor
Com
pres
sor
Gas
ope
rate
d pu
mp
b ho
ses
Floa
t (1
m
ove
for
hydr
. dr
ill 1
exc
av.)
Labo
urer
s (2
)Fo
rem
anse
rvic
e tr
ucks
Ont
ario
Qua
rrie
s Fi
eld
Sup
ervi
sion
Eng
inee
r 1
pros
pect
or
850
Cas
e B
ulld
ozer
+ O
pera
tor
71 0
Joh
n D
eere
Bac
khoe
+ O
pera
tor
1280
Cas
e E
xcV
hydr
. dr
ill +
Ope
rato
r22
0 C
ase
Exc
avat
or +
Ope
rato
rC
ompr
esso
rG
as o
pera
ted
pum
p S
hose
sLa
bour
ers
(2)
Fore
man
serv
ice
truc
ks
Ont
ario
Qua
rrie
s Fi
eld
Sup
ervi
sion
Eng
inee
r 1
pros
pect
or
HOUR
S
1 1
1 1 7 1 1
1 da
y1
day
22 1 1
1 1 2 1 1
1 1
1 1
1 1
1 da
y1
day
22 1 1
1 1 2
RAT
E
380/h
r3
80
/hr
34
25
/hr
3120/h
r3250/d
ay
3107/d
ay
3700
ea.
32
0/h
r3
40
/hr
34
0/h
r3100/h
r
380/h
r380/h
r3
42
5/h
r3120/h
r3250/d
ay
3107/d
av
320/h
r340/h
r
34
0/h
r3100/h
r
DET
AILS
cla
im
8652
66
H
M
II
M
H
H
H
mob
iliza
tion
of
exca
v./d
rill
M
H
II
II
fi
H
ft
mis
cella
neou
s si
te t
rips
GST
supe
rvis
e fie
ld w
ork
tech
nica
l di
rect
ion
cla
im
8652
66
M
If
H
II
II
M
H
mis
cella
neou
s si
te t
rips
GST
supe
rvis
e fie
ld w
ork
tech
nica
l di
rect
ion
TOTA
L
3880.0
038
80.0
03
2,9
75
.00
S1,
32
0.0
0S
250.
00S1
07.
00S
700.
00
S44
0.00
S44
0.00
no c
harg
e35
59.4
4
S44
0.00
S20
0.00
S88
0.00
S88
0.00
S4,
675.
00S
1. 3
20
.00
S25
0.00
S1 0
7.00
3440.0
03440.0
0no
cha
rge
3629
.44
3440.0
03200.0
0
$1
9,4
52
.88
ON
TA
RIO
QU
AR
RIE
S I
nc.,
1994
ME
CH
AN
ICA
L S
TR
IPP
ING
AN
D E
XP
LOR
ATI
ON
DR
ILLI
NG
CO
ST
S -
- C
LAIM
865
266
DAT
E
Oct
. 17/9
2
Oct
. 17/9
2
Oct
. 18
/92
Sub
tota
l
Invo
ice
#
5858
n/a
5859
EQ
UIP
ME
NT
/LA
BO
UR
710
John
Dee
re B
ackh
oe +
Ope
rato
r12
80 C
ase
Exc
^hyd
r. dr
ill +
Ope
rato
rC
ompr
esso
rLa
bour
ers
(2)
Fore
man
serv
ice
truck
s
Ont
ario
Qua
rrie
s Fi
eld
Sup
ervi
sion
Eng
inee
r /
pros
pect
or
71 0
Joh
n D
eere
Bac
khoe
+ O
pera
tor
1280
Cas
e E
xc^h
ydr.
drill
+ O
pera
tor
Com
pres
sor
Labo
urer
(1
)Fo
rem
anse
rvic
e tr
ucks
Ont
ario
Qua
rrie
s Fi
eld
Sup
ervi
sion
Eng
inee
r /
pros
pect
or
HOUR
S
1 1
1 1
1 da
y22 1
1
1 1 4 10 10 1
day
10 10 10 1
RATE
SB
O/h
r8425/h
rS
250^a
y8
20
/hr
34
0/h
r
34
0/h
r8100/h
r
38
0/h
r3425/h
rS
250A
Jav
S20^r
34
0/h
r
340/h
rS
lOO
/hr
DET
AILS
claim
86
5266
mis
cella
neou
s si
te t
rips
GST
supe
rvis
e fie
ld w
ork
tech
nica
l di
rect
ion
claim
86
5266
mis
cella
neou
s si
te t
rips
GST supe
rvis
e fie
ld w
ork
tech
nica
l di
rect
ion
TOTA
L
S88
0.00
84
.67
5.0
0S
250.
003440.0
0S
440.
00no
cha
rge
S46
7.95
S44
0.00
S40
0.00
ssoo
.oo
S4,2
50.0
0S
250.
00S
200.
00S
400.
00no
cha
rge
S41
3.00
S40
0.00
S1 0
0.0
0
$14,8
05.9
5
ON
TA
RIO
QU
AR
RIE
S I
nc.,
1994
SUMMARY OF DIRECT STRIPPING AND DRILLING COSTS
CLAIM No. DATES TOTAL DIRECT COSTS
S865266 Oct. 3,4, 5, 8,9,17 A 18 (1992) S 51,443.12
S734218 Oct. 6 A l ( 1992) $ 1 2,636.98
TOTAL S64,080.10
ONTARIO QUARRIES Inc. 11994
APPENDIX A Copies of Contractor's Invoices
PHONE 673-5171
rCONSTRLCnONl CO. LTU
SEWER AND WATER — INSTALLATION 6. REPAIR EXCAVATING CONTRACTOR — SNOW REMOVAL
439 PINE STREET — SUDBURY, ONTARIO P3C 1Y3
DATE O C
NAME
MAILING ADDRESS
JOB l-M/te r C4
Type of Equipment Time Rate Amount
BULLDOZER g S" 0
BACKHQE 510, 580
PAYLOADER
BACKHQE 780, 680
BACKHOE/SHOVELS*?!^ o oFROST BREAKER
COMPRESSOR
TRUCK Single
TRUCK Tandem
FLOAT
FQIK M ii ^ - 00
LABOUR
HO
Customer's Signature
Operator's Signature
5851
PHONE 673-5171
'CONSTRUCTONl CO. LTD
SEWER AND WATER — INSTALLATION 4 REPAIR EXCAVATING CONTRACTOR — SNOW REMOVAL
439 PINE STREET — SUDBURY, ONTARIO P3C 1Y3
ofu A (2 1. ( e, t M
MAILING ADDRESS .
JOB \-\A l? A 1M rt I) P, bo l — ±ntt d fJ'T"
Type of Equipment Time Rate Amount
BULLDOZER eso 11BACKHOE ^40*00PAYLOADER "i O
BACKHOE 780, 680
BACKHOE/SHOVEL^'i^
FROST BREAKER
COMPRESSOR
TRUCK Single
TRUCK Tandem
FLOAT
LABOUR
Customer's Signature
Operator's Signature
/l /l
5852
PHONE 673-5171
NAME Q
SEWER AND WATER — INSTALLATION 6. REPAIR
EXCAVATING CONTRACTOR - SNOW REMOVAL
439 PINE STREET — SUDBURY, ONTARIO P3C 1Y3
DATE O CT - ft S*
(lift 1^0 A gfci F ^
MAILING ADDRESS
T T) 12
Type of Equipment Time Rate Amount
BULLDOZERS* 0 h
BACKHOE t #0-00HW :80-00
BACKHOE 780, 680
BACKHOE/SHOVE liFROST BREAKER
COMPRESSOR i
TRUCK Tandem
FLOAT 0-00
MA hi 1 \ \7. 00
LABOUR
73-Ul- . 79
Customer's Signature .
Operator's Signature .
/l /J
5853
PHONE 673-5171
CO. LTD ,
SEWER AND WATER — INSTALLATION 4 REPAIR l 3 l 2- l O
EXCAVATING CONTRACTOR — SNOW REMOVAL
439 PINE STREET — SUDBURY, ONTARIO P3C 1Y3
DATE OCT .19
NAME \ M e.MAILING ADDRESS .
MAIA ivJOBType of Equipment Time Rate Amount
BULLDOZER fiBACKHOE li • 00PAYLOADER 1 •t^ 80-'BACKHOE 780, 680
BACKHOE/SHOVEL K toFROST BREAKER
COMPRESSOR
0!TRUCK Tandem
FLOAT
•^9,0.00 . 0 0
fV) 1 1 . on*r7. oo
LABOUR 3B. 7?. 7?-
Customer's Signature
Operator's Signature
5854
PHONE 673-5171
v CQ LTD. J
SEWER AND WATER — INSTALLATION 4 REPAIR EXCAVATING CONTRACTOR — SNOW REMOVAL
439 PINE STREET SUDBURY, ONTARIO P3C 1Y3
9 l*-
PATE*7
.19
ft M -m a iMAILING ADDRESS
JOB M a fi AM A HAtLbkt tbEfros/'r— CA\Xt\Ql*-Qtfl
Type of Equipment Time Rate Amount
BULLDOZER
BACKHOE ft ,flf)PAYLOADER -i J? j? o-doBACKHOE 780, 680
BACKHOE/SHOVELJ? JJ,g 3 A 0 - 0FROST BREAKER
COMPRESSOR
f 0*7-TRUCK Tandem
FLOAT
II i\ q 0*00
3LABOUR
Customer's Signature
Operator's Signature
5855
PHONE 673-5171
CONSTRUCTION]OQ IJD ^
SEWER AND WATER — INSTALLATION 4 REPAIR O l C. ' "T.L L EXCAVATING CONTRACTOR — SNOW REMOVAL C? v -^ "^ ̂ ^439 PINE STREET — SUDBURY, ONTARIO
P3C 1Y3
DATEoe-T
NAME (V fO TM g i Q CfeU A l /Z i gj t /OMAILING ADDRESS .
ftType of Equipment Time Rate Amount
BULLDOZER ^ S^ O ^SO-ObBACKHOE 510, Seiof/0 t IMS #90.60
3.3 7BACKHOE 780, 680
3AQo?t i.;"? aFROST BREAKER
COMPRESSOR t±t 07-60
TRUCK Tandem
H O ve wt -7 oo-oow A
5.0.00^0*00
7?92. 00LABOUR 55- 9^* yy
oWiCustomer's Signature
Operator's Signature
5856
PHONE 673-5171
SEWER AND WATER — INSTALLATION 4 REPAIR EXCAVATING CONTRACTOR — SNOW REMOVAL
439 PINE STREET — SUDBURY, ONTARIO P3C 1Y3
DATE
NAME
oer S 9 Yj A /? fi ii j- .g
O.19 7
MAILING ADDRESS .
Type of Equipment Time Rate Amount
BULLDOZER
BACKHOE l/PAYLQADER
BACKHOE ^ toli-ttw
BACKHOE/SHOVE l/.Mrr ^tkFROST BREAKER
COMPRESSOR
107-0* •i . oTRUCK Tandem
FLOAT
St- /At *1 0-00
. M
5T9 ?2LABOUR
Customer's Signature
Operator's Signature
5857
PHONE 673-5171
SEWER AND WATER — INSTALLATION S, REPAIREXCAVATING CONTRACTOR — SNOW REMOVAL
439 PINE STREET — SUDBURY, ONTARIOP3C 1Y3
DATE Q er \iNAME G
MAILING ADDRESS ——
JOB kliJllSJtfLA.Type of Equipment Time Rate Amount
BULLDOZER
BACKHOE f/to-tg 8^0.00PAYLOADER
BACKHOE 780, 680
MFROST BREAKER
COMPRESSOR 1 TTRUCK Single
TRUCK Tandem
FLOAT
A /\J
LABOUR
7 IS t.Customer's Signature .
Operator's Signature J(. i
5858
PHONE 673-5171
SEWER AND WATER — INSTALLATION 4 REPAIR EXCAVATING CONTRACTOR — SNOW REMOVAL
439 PINE STREET — SUDBURY, ONTARIO P3C 1Y3
DATE ..9
NAME
MAILING ADDRESS ——
iHflg/i MdJOB j
Type of Equipment Time Rate Amount
BULLDOZER
BACKHOE f O H (iPAYLOADER
BACKHOE 780, 680
BACKHOE/SHQVELyl lff(
FROST BREAKER
COMPRESSOR \ D -Qfi-
TRUCK Single
TRUCK Tandem
FLOAT
l a00*00
. ooLABOUR . oo
Customer's Signature
Operator's Signature (
5859
APPENDIX B Maps Showing Location of Work
MILNET, ONTARIO(Edition 3)
Scale 1:50,000Contour Interval s 50 ft
1179! 91l 9 2 x ' , ' '' * M' ) ^~*^ i , W t— — —— — —
- -- -, -g J. - - -VI *Z ±^- . -.4^11^65268-•"" l .' l - - \.\ .. . •S.-..^^xw^ , e VJ \ M L l \-.
Xfer4- -*/ 1 i' /A. r^"y*T"i ,'i'i ^t*****- i^- ;-^\ - ±J™"Ms /i \\fafifi*s8p--\V**- \ - 8*4**fr i 1/^7 \ 03^^ l ' ;|"-y.jjlllrf3l4.'"-|
^ Of?. i(
U-, -i-B4-H.-?..--11*4^: S V '9Jj^ f. , *"~" ; ' i' ' * i j ^ S !7 l/tiorvAA /^-A ' L--""N 'H-' S
It l l k i W74t.';' i l Si7X\\ ' \ ~~ ^--^~~ -' .^ ,,
®' ^^K^li— — . ~' ~ ~" * *'"/ ^- , -. l TTfr~~fi^'3\W!--
Ministry ofNorthern Developmentand Mines
Ontario
Report of Work Conducted After Recording Claim
Mining Act
Transaction Number
Personal information collected on this form Is obtained under the authority of the Mli this collection should be directed to the Provincial Manager, Mining Lands. Mlnii Sudbury, Ontario, P3E 6A5, telephone (70S) 670-7264.
Instructions: - Please type or print and submit in duplicate. 4i,i 5swoo3i- Refer to the Mining Act and Regulations for requirements or imny
Recorder.- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form in duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form.
900
Recorded Holder(s)
rDw~TY\^to Q\iAR.ft.iisS IMC..Address
1 \~~7~7 UotosDAL-c:, StxDBu ft.v P3B \K-3Mining Division '
^^*. i i ^*\ fs i \ jQ V/^nJj ^^fc *ix ^j xJ 1^— 7
Dates . Work From: /*S — . •J l G. ~* Performed CxC-T - J X T 2.
Township/AreaPAR-IOKV Mt^-r-ro/vJ
Client No.
Telephone No.
560-H84kM or G Plan No.
G. 'ZA \STot /^*N x~ T* 1 C? l G *^N (^^ t _ ̂ \ *- l O l | ^
Work Performed (Check One Work Group Only)Work Group
l/
Geotechnical Survey
'Physical Work, Including Drilling
Rehabilitation
Other Authorized Work
Assays
Assignment from Reserve
Type
Me~cHflfoicAt- STR vfPiMGiy E.x.pL.oR.iaci\cn^ D fttuuM**, pouje^UJASH/wtj ^ BL.OCO (NJQ FA^feS OP N\ARfeL.e- DEPOSIT
1
Total Assessment Work Claimed on the Attached Statement of Costs $ u? J 7 1 4 l ' 2.
REuuRDED.
J AN 20 1994
Rpreipf
O
Note: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.
Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name Address
F"" W R . CoioSTRu.c-aoKJ l— TD ,li-?-? P3&IK3
R. r RvxDrtorAH.e
(attach a schedule if necessary)
Certification of Beneficial Interest * See Note No. 1 on reverse side1 certify that at the time the work was performed, the claims covered in this work report were recorded in the current holder's name or held under a beneficial interest by the current recorded holder.
Date
JAM,
Certification of Work Report
DBURYJNINGDIV
For Office Use Onlyrota) Value Cr. Recorded Date Recorded ETV E
Deemed Approval Date
0241 (03/91)
Total Number of Claims en^
-^
-C
^
UN
s-
j:K
U)
(A
^
#
)0
W
OD
P
?
—
c/)
xp00
- —
, l isSsfjolaj|
li A 3
iH
i*ia-
!^ If
^T-TOo
X5OD 0 O
^Sk
O0
^
H o0
^
C30O 0
\hx^
-Cx.
— .l0
--ftOb
b00
,iihifia
""
m
|
1i|
P0o
s"^-t-
M O
'
5x00
p
p0) 0 0
o"
0?
Ob
bCO
1*^O9(5';rI3 i g
V"" — ^3)|||iBS?"
Credits you are claiming in this report may be cut back. In order to minimize the adverse effects of such deletions, please indicate from which claims you wish to priorize the deletion of credits. Please mark (^) one of the following:
1. S/Credits are to be cut back starting with the claim listed last, working backwards.2. D Credits are to be cut back equally over all claims contained in this report of work.3. D Credits are to be cut back as priorized on the attached appendix.
In the event that you have not specified your choice of priority, option one will be implemented.
Note 1 : Examples of beneficial Interest are unrecorded transfers, option agreements, memorandum of agreements, etc. , with respect to the mining claims.
Note 2: If work has been performed on patented or leased land, please complete the following:___ ____________ .;'-.-. ;. g ^a.^. ( ______ B ________ f J V^W'/'V- "" "l
l certify that the recorded holder had a benofidal interest In the patented or leased land at the time the work was performed.
Date
Ontario
Ministry ofNorthern Developmentsnd Mines
Ministers du Developpemenl du Nord et des mines
Statement of Costs for Assessment CreditIztat des coQts aux fins du credit devaluation
Mining Act/Loi sur les mines
Transaction No./N" de transaction
Personal information collected on this form is obtained under the authority of the M ining Act. This information will be used to maintain a record and ongoing status of the mining claim(s). Questions about this collection should be directed to the Provincial Manager, Minings Lands, Ministry of Northern Development and Mines, 4th Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (705) 670-7264.
Les renseignements personnels contenus dans la presente formule sont recueillis en vertu de la Lol sur les mines et serviront a tenir a jour un registre des concessions minieres. Adresser toute quesiton sur la collece de ces renseignements au chef provincial des terrains miniers, ministere du DeVeloppement du Nord et des Mines, 159, rue Cedar, 4e etage, Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264.
1. Direct Costs/CoOts directs
Type
Wages Salalres
Contractor's and Consultant's Fees Orolts de ('entrepreneur et de I'expert- consell
Supplies Used Fournltures utlllsees
Equipment Rental Location de materiel
Description
Labour Main-d'oeuvreField Supervision Supervision sur le terrain
TypeP W . (t CoKiSTduC-TICwU)
R.PRuDHoMMe P.^NCt-
Type
Type
Amount Montant
38Ho5^?zHO'lo
2. , Ooo -
Total Direct Costs Total des couts directs
Totals Total global
38HO
^OfiHO'lo
,, : ;..*5#ifc;i:X-•, , ."KtZ: ." . ,. ;
.6^.08**
2. Indirect Costs/CoOts indirects** Note: When claiming Rehabilitation work Indirect costs are not
allowable as assessment work.Pour le remboursement des travaux de rehabilitation, les couts indirects ne sont pas admissibles en tant que travaux d'evaluation.
Type
Transportation Transport
Food and Lodging Nourrlture et hebergementMobilization and Demobilization Mobilisation et demobilisation
Description
Type
18 TR\PS
MeAu-S
Amount Montant
Gil- lo
M5o
Sub Total of Indirect Costs Total partiel des couts Indirects
Amount Allowable (not greater than 20H of Direct Costs) Montant admissible (n'excedant pas 20 H des coats directs)
Total Value of Assessment Credit Valeur totale du credit (Total of Direct and Allowable d'evaluation Indirect costa) (Total de* coOts direct*
Totals Total global
6IMO
tf^O'Oo
l,0t,l.|0
tfteiobSjIHI-lO
et Indirect* admissible*
Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.
Note : Le titulaire enregistre sera tenu de verifier les defenses demandees dans le present etat des couts dans les 30 jours suivant une demande a cet effet. Si la verification n'est pas effectuee, le ministre peut rejeter tout ou une partie des travaux devaluation presented.
Filing Discounts Remises pour depdt
1. Work filed within two years of completion is claimed at 1000yb of the above Total Value of Assessment Credit.
1. Les travaux deposes dans les deux ans suivant leur achievement sont rembourses a 100 "to de la valeur totale susmentionnee du credit d'evaluation.
2. Work filed three, four or five years after completion is claimed at SO1?* of the above Total Value of Assessment Credit. See calculations below:
Total Value of Assessment Credit Total Assessment Claimed
x 0.50
2. Les travaux deposes trois, quatre ou cinq ans apres leur achievement sont rembourses a 50 "to de la valeur totale du credit d'evaluation susmentionne. Voir les calculs ci-dessous.
Valeur totale du credit d'evaluationx 0,50
Evaluation totale demandee
Certification Verifying Statement of Costs
l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.
that as(Recorded Holder, Agent, Position in Company)
to make this certification
Attestation de l'etat des coQtsi
J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses ont ete engagees pour effectuer les travaux d'evaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.
^ l am authorized Et qu'a litre de je suis autorise(titulaire enregistre, representant, poste occup6 dans la compagnie)
a faire cette attestation.
0212 (04/91) Nota : Dans cette formule, lorsqu'il designe des personnes, le masculin est utilise au sens neutre
FRALE TOWNSIHP
r-rr - ~
6 53 8 5
l- -J'L - -L.- - ...li,
,,, 983984 ' 963951^ ,
LV.,' . ("
1 1042969. ll l
__ __ ^ __ - -—
865267 ' 869269
75421* ' 73424BW' 7*4Ztt
7\i^U*Jl\
-~- l 6 48926
~ ~ i - ~ ~ ~ ~ •'T "~ c. ~S-1 rr ~ ~ ~" hl 7S4708 y 7 *4710
I042BB4 ' 7*4208| 648327
l ' --\
M )tl 7 )
994723 i,'l y; \j
—•L l ~ **
98436^1/6484601^^48328 l VMIfl^ ' t*T*66
9 662229 682226 .J B429l •-" — \ l
J
,; f ' j 847603
--•^f"
894699 i 8947001 l 984354 ' 984355
' \ M (*\ \ m-V *-l- -*tM~..—— —t—— !—— . —— -,-\r i?1 T"- -- )'. ^ /
7(f l 5401 l J \,f!B4SO 647601C82277 , *68276/! 68^275, i f
J|^ -/4 -r,a - - ^a, ' "~ l/Mt , r' f,
IM7463 ^ ""464
|S .' i ,
T.;L---.-"LfS'\- ' l l l l l ^V-l V
4^ - .-L-. *-u-(fe*1 r i ^K^C82282 6B22BI "7664 1/17683.
NOR M AW TOWNSHIP
_ Resources and Mines Ontario ^.^
PUT INTO SERVICE MARCH 16, 1994 jfa
INDEX IV LAND DISPOSITION
PUN
G-2915TOWNSHIP '
PARKIN
-"S~ssv(
-* **
M.N.R. ADMINISTRATIVE DISTRICT
SUDBURYMINING UuiSION
SUDBURYUN( -,sLES7REGISTRY DIVISION
SUDBURY
Seal* 1:20 000
looo 1000 2000IMm
1000 1000 2000 3000 4000 WOO MOO 7000 MOO MOO 10MO
Contour Interval 10 Metres
SYMBOLSBnij.idary
Township. Meridian, Baseline
Road allowance, surveyed
shoreline
Lot/Concession, surveyed
unsi'rveycd
Parcel, surveyed
unsurveyed
Right-of-way, road
railway
utility
Reservation
Cliff, Pit, Pile
Contour
interpolated
Approximate
Dep, ." ion
C ntrol point (horizontal)
Flooded land
Mine head frame
Pipeline (above ground)
Railway, single track
double track
abandoned
Road, highway, county, township
access
trail, bush
S!~ ^'Dline (original)
Transmission line
Wooded area
DISPOSmON OF CROWN U^DS3atent
f urtac'3 i Mining Rights
Mining Rights Only
Lease3- Jaco S Mining Rights
Surface Righ'-, Only
Mining Rights Onlv
! MCn of Occupation
Order-m-Council
Cancoi.ed
reservation
Sand 4 Gravel
e e
HnT
OC
Map base and land disposition drafting by Surveys and Mapping Branch, Ministry of Natural Resources
AREAS WITHDRAWN FROM DISPOSITION
MRO- M ining Rights Only
SRO- Surface Rights Only
M t- S - Mining and Surface Rights
SEC U/00
OntorNo
•.7/iJ
DM*
7/4/83 M 4 S
FM*
I1B95S
THF INFOHMA1ION THAT APPEARS ON THIS MAP MAS BEEN COMPILED FROM VARIOUS SOURCES. AND ACCURACY IS NOT GUARANTEED THOSE WISHING TO STAKF MIN ING CLAIMS SHOULD CON SULT WITH THF MINING RECORDER, MINISTRY OF NORTHERN DEVFLOP MENT AND MINF.S, FOR AD DITIONAL INFORMATION ON THE STATUS OF THF LANDS SHOWN HERFON
NOTE TOWNSHIP SUBDIVISION PARTIALLY
ANNULLEDMarch 8, 1949
IN AREA MARKED THUS f //// S T AKING ALLOWED
AS IN UNSUBDIVIDEJ} TOWNSHIP
The disposition of land, location of lot fabric and parcel boundaries on this index was compiled for administrative purposes only
JQ
OJrouo
41I15SW0031 W9470 00014 PARKIN 200
M
O
O C
DD
O Ui o o
o -k r, r O
(D ro rv)
D
O)
Cu OJ4
- r\) (X*
(T)
OD Cu
o sD
ON
TAR
IO Q
UAR
RIE
S IN
C.
HA
RA
MA
MA
RB
LE P
RO
PE
RTY
PAR
KIN
TO
WN
SHIP
O
NTA
RIO
GE
NE
RA
L LO
CA
TIO
N M
AP
BY:
NO
RW
IN G
EOLO
GIC
AL L
TD.
PREP
ARED
BY:
E.S
D
RAW
N B
Y: E
.P.
SC
ALE
: l
: 2500
DAT
E:
NO
V.,
1993
5010
015
0 l
MET
RES
200
300