2, boulevard de l’Industrie - B.P. 20059 - 28509 Vernouillet cedex - France Telephone: (33) 02 37 38 95 95 - Fax: (33) 02 37 38 95 99 Internet : www.verlinde.com Ref: 02 04 465 UGB Handling system for windmills Product Line: Electric chain hoist for windmill application P aris Cypr yprus u ypru rus T T aiwan T T Indonesia nd es ia i Malaysia Thailand India Iran Turkey ong o China Singapor Si pore ore nam Vietn Viet V Viet tn tna Korea a Kore Kor 2, boulevard de l’Industrie - B.P. 20059 - 28509 Vernouillet cedex - France Telephone: (33) 02 37 38 95 95 - Fax: (33) 02 37 38 95 99 Internet : www.verlinde.com Ref: 02 04 465 UGB Imprimé en France - R.C. Dreux 456 501 519 - Crédit photo : Verlinde VERLINDE is: • The leading French manufacturer and exporter of lifting and handling equipment. • The energy brought forth by our 5,000 employees. • An unbroken range of 30 lifting products. • ISO 9001 Quality Assurance Certification. • Representatives to serve you in over 80 countries. The world Offices in Germany, Holland, Belgium, Italy and distributors in Germany, Argentina, Austria, Brazil, Chile, Ireland, Spain, Portugal, United Kingdom, Sweden, Norway, Denmark, China, Thailand, Indonesia, Malaysia, United States, Vietnam, etc. In France 9 Sales offices, 24 after-sales service locations, 11 manufacturing plants for EUROPONT travelling cranes, and a single distribution network. Type of hoist Capacity (kg) Group (FEM) Height of lift (m) Lifting speed(m/min) VLA 5 1624 b1 160 FEM 1 Bm 16 to 80 m 24 and 6 m/mn VLA 5 2516 b1 250 FEM 1 Bm 16 and 4 m/mn VLA 10 3232 b1 320 FEM 1 Bm 32 and 8 m/mn VLA 10 5016 b1 500 FEM 1 Bm 16 and 4 m/mn VLA 16 1016 b1 1000 FEM 1 Bm 16 and 4 m/mn Product Line: Electric winches for windmill application Type of winch Capacity (kg) Motor type Group (FEM) Height of lift (m) Lifting speed (m/min) TCA 1 250 Three-phase FEM 1 Bm Up to 80 m 25 m /mn TCA 2 250 Three-phase FEM 1 Bm 6/25 m /mn TCA 3 250 Single-phase FEM 1 Bm 25 m /mn TCA 4 250 Single phase FEM 1 Bm 25 m /mn TCA 5 250 Three-phase FEM 1 Bm 25 m /mn

Upload: buihanh

Post on 19-May-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

2, boulevard de l’Industrie - B.P. 20059 - 28509 Vernouillet cedex - FranceTelephone: (33) 02 37 38 95 95 - Fax: (33) 02 37 38 95 99

Internet : www.verlinde.comRef: 02 04 465 UGB

Handling systemfor windmills

Product Line: Electric chain hoist for windmill application

ParisCypryprusuyprurus

TTaiwanTaiwanT

Indonesiand esiaiMalaysia

ThailandIndia

Iran

Turkey

ongo

China

SingaporSi poreore

namVietnVietVViettnatna

KoreaaKoreKor

2, boulevard de l’Industrie - B.P. 20059 - 28509 Vernouillet cedex - FranceTelephone: (33) 02 37 38 95 95 - Fax: (33) 02 37 38 95 99

Internet : www.verlinde.comRef: 02 04 465 UGB

Impr

imé

en F

ranc

e -

R.C

. Dre

ux 4

56 5

01 5

19 -

Cré

dit

phot

o :

Verli

nde

VERLINDE is:• The leading French manufacturer and exporter of lifting and handling equipment.• The energy brought forth by our 5,000 employees.• An unbroken range of 30 lifting products.• ISO 9001 Quality Assurance Certifi cation.• Representatives to serve you in over 80 countries.

The worldOffi ces in Germany, Holland, Belgium, Italy and distributors in Germany, Argentina, Austria, Brazil, Chile, Ireland, Spain, Portugal, United Kingdom, Sweden, Norway, Denmark, China, Thailand, Indonesia, Malaysia, United States, Vietnam, etc.

In France9 Sales offi ces, 24 after-sales service locations, 11 manufacturing plants for EUROPONT travelling cranes, and a single distribution network.

Type of hoist Capacity(kg) Group (FEM) Height of lift (m) Lifting speed(m/min)

VLA 5 1624 b1 160 FEM 1 Bm

16 to 80 m

24 and 6 m/mn

VLA 5 2516 b1 250 FEM 1 Bm 16 and 4 m/mn

VLA 10 3232 b1 320 FEM 1 Bm 32 and 8 m/mn

VLA 10 5016 b1 500 FEM 1 Bm 16 and 4 m/mn

VLA 16 1016 b1 1000 FEM 1 Bm 16 and 4 m/mn

Product Line: Electric winches for windmill application

Typeof winch

Capacity(kg)

Motortype Group (FEM) Height

of lift (m)Lifting speed

(m/min)

TCA 1 250 Three-phase FEM 1 Bm

Up to 80 m

25 m /mn

TCA 2 250 Three-phase FEM 1 Bm 6/25 m /mn

TCA 3 250 Single-phase FEM 1 Bm 25 m /mn

TCA 4 250 Single phase FEM 1 Bm 25 m /mn

TCA 5 250 Three-phase FEM 1 Bm 25 m /mn

Electric chain hoistsfor windmills applications

Operating dataLoad capacity: from 160 to 1000 kgWide range of lifting speeds:16 and 4 m/min,24 & 6 m/min and 32 & 8 m/min Lifting height: up to 80 metersFEM group* for operation: 1 BmPower supply: Wide range of power supply up to 690 V

Lifting safety devicesLifting: Friction torque limiterUpper and lower electric limit switchesHook: Upper hook (detachable)and lower hook complies to DIN standardMotor: Thermal protection Brake system: DC electro-magneticdisk brake made to last as long as thehoist itself.

Lifting motorOperation: 40 % EDProtection: IP 55Insulation class: FSafety devices: Thermal protection of the motor

Reducer - Body of hoistLubrication: GreaseSpeed ratio: 1/4 Body of hoist: injection molded aluminumSurface treatment: 80-micron epoxy paint

Control devicesLow-voltage control: 48 VoltsInterface: Standard handling type button box(2 lifting speeds and emergency “punch” stop)Length of control cable: 3 metersInsulation class: IP 65

Lifting chainType: EN 818 - 800 N/mm2

Safety: safety coeffi cient 5Manufactured: especially for VERLINDETreatment: electro-galvanizedStorage: detachable 900-denier fabric chain tray,set of small chain and snap-hooksto hold the tray against the structure

Environmental dataWorking temperature required: -20°C to +40°CProtection class: IP55 as standardSide pull angle: 3 degrees maximum*Noise level: 70 decibels

MaintenanceReducer: life lubricatedBrake clutch system: DC electro-magnetic disk brake made to last as long as the hoist itself.*According to FEM regulation.

Electric wire rope winchesfor windmills applications

Operating dataLoad capacity: from 160 to 1000 kgLoad capacity: 250 kgWide range of lifting speeds: single speed 25 m/mnor dual speed 6/25 m/mnLifting height: Up to 80 metersRope outlet: A modular and evolutional under-frame allowing many directions for wire rope outlets fromthe drum.FEM group* for operation: 1 BmPower supply: 400-690V/50Hz three-phaseor 230V/50Hzsingle phase

Lifting safety devicesLifting: Limit switch with cam (optional)Brake system: DC electro-magnetic disk motoroperated brake designed to last as long as the hoist itself.Type of control: Low-voltage 48 Volts or Direct controlLifting wire rope safety coeffi cient: 5

Lifting motorProtection: IP 55Insulation class: FSafety devices: Thermal protection of the motor

Control devicesLow-voltage control: 48 VoltsInterface: Standard handling type button box(2 lifting speeds and emergency “punch” stop)or wall mouted control boxLength of control cable: 3 metersInsulation class: IP 65

Lifting wire ropeSafety: coeffi cient 5Storage: Mutiple layer on drum

Environmental dataTemperature required: -20°C to +40°CProtection class: IP55 as standardSide pull angle: 3 degrees maximum*Noise level: 65 decibels

MaintenanceBrake system: Disk brake made to last as long as the hoist itself.Use: this winch is designed to be heavy-duty toprovide very long durability and low maintenanceto its owner.

Quietreduction unit containing a gear system with 3 geartrains, carved helicoidal teeth, ground andhardened for extremely quiet running. *According to FEM regulation.

Low Maintenance

Compact SizeIn order to subsist, all Countries need stable and adequate sources of energy. This condition poses environmental needs on a global scale:• The worldwide demand for energy is

growing faster than the supply.• Fossil fuels are a limited resource, which

makes their price very unpredictable and volatile.

• The CO2 emission levels often reach levels above those acceptable.

Wind-generated electricity.Worldwide energy use continues to rise, so it is imperative for this evolution to cause the least possible damage to our environment.An unlimited source of energy that is relatively easy to exploit and transform, today this technology already supplies a signifi cant part of the energy we use, and the windmill farms that have been set up in adequate locations are now able to compete with conventional power plants.

VERLINDE offers innovative solutionsfor lifting and handling operations that involve the use of windmill hubs.As a result of the vast experience we have acquired by manufacturing a wide range of hoists and winches that are currently being used throughout the whole world, this product range has implemented the most up-to-date

technology available in lifting equipment.

An ergonomic solution.We study the confi guration

of your windmill hubs in great detail in order to achieve

a user-friendly work environment. We implement the layout, adaptation to the space available, accessibility, etc. in order to facilitate all service and inspection interventions. In this way VERLINDE offers its customers lifting equipment systems that are perfectly adapted to the windmill crib and its components (compact size, low weight, detachable parts, low maintenance).

A very safe control system.This product line includes a relatively large number of safety devices to monitor lifting operations. This product range also complies with the strictest health and safety regulations that apply to maintenance and repair operations.As a result, we offer optimum safety, increased productivity and substantially lower operating costs.

Quiet

Lighter weight