handling for cbu import machine (draft after meeting)
TRANSCRIPT
-
7/31/2019 Handling for CBU Import Machine (Draft After Meeting)
1/5
-
7/31/2019 Handling for CBU Import Machine (Draft After Meeting)
2/5
-
7/31/2019 Handling for CBU Import Machine (Draft After Meeting)
3/5
Prod
Di
Produc
-
7/31/2019 Handling for CBU Import Machine (Draft After Meeting)
4/5
-
7/31/2019 Handling for CBU Import Machine (Draft After Meeting)
5/5
PT Komatsu IndonesiaMaterial Control Section
HANDLING FOR CBU IMPORT MACHINE
Port Assy Plant UT Cakung MSA KI Depo
PPCPIB AND CUSTOM CLEARANCE DIRECT SHIPMENT FLOW CHART
Sales Import Control Direct shipmentKI Depo
Allocation at
KI-Depo is
Material Control included :
Sales Import Control Direct Shipmenthanya perlu SPByg ditandatanganiJAKARTA
Material Control
PPC Sub Assy by KI JAKARTA ?
Purchasing Assy by UT ?
Material Control SIC : Cek kontrak ?
Assembling
Penambahan di KI Depo/UT ?
Material Control SIC : Cek kontrak
(Legal Section)
Inspection
Storage at
KI-Depo is
included :
Material Control
Inspection
Material Control
Sales Import Control
Material Control
Inspection
PPC
Notes :
PDS : Process Design Sheet
RIR : Receiving Inspection Report
SPB : Surat Pengiriman Barang
PDIS : Part Delivery Inspection Sheet
Issued : 31-May-11
LocationSection in charge
Spec OKYES
NO
- PDS- Spec (KI-MANIS)- Check Sheet
- Modify- Install Attachment- Painting
Refill Fuel & Oil- Check List
- KI-MANIS- Check List
Bench & SippingInspection
Cargo ReadyKI-MANIS
Transfer Owner - SPB- RIR
- SPB & PDIS- Accessories
List
Allocation
- Check Sheet
- Spec (KI-MANIS)
Storage & Control for Maintenance of CBU
- Check Sheet- MANIS
- SPB & PDIS- Accessories
List
Unloading &Alocation Plan
- Packing List- Surat Jalan
- Packing List- Completeness
Check Sheet
Joint Survey &Custom
Clearance
CBU MachineArrival
Packing List
Inspection
-Check Sheet
-Packing List
A
B
C
D
E
F