Page 1: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HAMMERSMITH & FULHAM COUNCIL

hammersmith flyunder feasibility study

Page 2: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder
Page 3: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 1

Leader’s foreword ...................................... 3

Chapter 1

Champions summary .................. 5

Key findings and

recommendations .......................... 9

Chapter 2

Introduction ........................................ 1 1

Chapter 3

Local opinion ..................................... 1 5

Borough letters ............................... 2 5

Chapter 4

Option comparison ..................... 2 9

Funding .................................................... 4 3

Chapter 5

Summary ................................................ 4 7

Conclusions ......................................... 4 9

Principal author Nicholas Ruxton-Boyle

Contributing authors Neale Stevenson Thomas Cardis Rob Mansfield

TfL sponsor Tim Thomas

Proof reading By:design

Design By:design

Photos Dean Wendelborn

Artists impressions West London Link Design

Photomontage Hayes Davidson

3D mapping zmapping

Printing Hammerprint

Flyunder taskForceNeale Stevenson Flyunder Champion

Nicholas Ruxton-Boyle Thomas Cardis H&F Council

Jasper denBoeft Greater London Authority

Geoff Burrage James McCool Royal Borough of Kensington and Chelsea

Mark Frost London Borough of Hounslow

Ben Fryer London Borough of Richmond

David Condon Tim Thomas Transport for London

Tom Ryland Allan Baird West London Link Design

Patricia Bench Arun Sondhi Hammersmith BID

Peter Wright Halcrow

Page 4: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

Illustrative view looking west at potential new commercial quarter around the ‘Ark’.

Page 5: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 3

Since the emergency closure in December 2011, of Hammersmith’s ugly concrete flyover and the ensuing traffic chaos which affected swathes of west London, serious questions have been asked about the viability of the flyover.

This elevated concrete monster has divided our town centre for decades, magnifying traffic noise and polluting our air in the process. It scythes through the heart of Hammersmith like our very own Berlin Wall, creating an imposing physical barrier that gobbles up space, blocks light and cuts residents and visitors off from the river while limiting business and trade.

However, the escalating costs of maintenance and increased risk of failure focused minds on the alternatives to this decaying 50-year-old structure and, bizarrely, this divisive structure has had a unifying effect on West Londoners.

Local architects West London Link Design presented their ideas for a replacement tunnel, which could unleash a ‘chain of opportunities’ along the A4. This tunnel combined with

overwhelming public support for a ‘flyunder’, led the council to commission this feasibility study.

The report explores the benefits and challenges related to various tunnel options. World-renowned tunnel experts Halcrow, who were involved in the Channel Tunnel, tested the ground conditions and council transport planners have worked closely with Transport for London (TfL) officials and neighbouring boroughs to start the process of examining the options.

An independent ‘Flyunder Champion’ - Neale Stevenson - was appointed to bring all of the various stakeholders, who are interested in burying the Hammersmith Flyover, together. Local residents were at the heart of the debate with a series of stakeholder meetings - including a major flyunder summit and transport select committee informing our thinking.

The key findings show a tunnel replacement could take just three years to construct and could release up to a £1billion worth of former highway land and under-developed sites in the town centre to help pay for the works.

The alternatives vary from a one-mile tunnel to a 2.5-mile tunnel, which is likely to cost between £218million and £1.7billion. The shortest option

would involve digging a ‘cut and cover’ tunnel 15 metres beneath the surface, while the longer tunnel would involve using boring machines.

There is little doubt that some form of a tunnel would improve the quality of life for thousands of west Londoners and be a game changer for Hammersmith town centre. Meanwhile, traffic flows in and out of London would also be improved.

A new flyunder would enable Hammersmith’s great divider to be torn down and reconnect our town centre with the river, making our once beautiful town an even more attractive place to visit or do business.

This report is not an end point. It is a beginning. This is the council’s response to The Mayor of London’s Roads Task Force and it is now mainly for TfL, who own and manage the A4, to decide how to take the project forward.

Cllr Nicholas Botterill Leader Hammersmith & Fulham Council

LeADeR’S FoRWARDGoing underground - a vision for an a4 ‘flyunder’

Page 6: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

Illustrative view looking south from Lyric Square.

Page 7: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 5

BackgroundAt the request of H&F Council I have been overseeing a short study into the feasibility of replacing the Hammersmith Flyover with a tunnel. Professional leadership has come from Nicholas Ruxton-Boyle, the

H&F Transport and Development Manager, whose contribution has been superb.

The forced closure of the flyover for repair work in 2011 started a public debate on the options for replacement, which in turn excited the council’s ambition for the potential environmental improvement of central Hammersmith. The debate is as lively as ever as we endure a second phase of repair work.

Public support for the idea in principle was stunning, with 89 per cent of those consulted in local forums voicing their support. Interest in a better quality environment and an improved town centre and river access were highlighted as positives outcomes. Clearly there were concerns - most importantly the disruption caused by the build - but also in ensuring that any associated development was balanced.

CHAMPIoN’S SUMMARY

The bottom line is that there are feasible options to

replace the flyover with a tunnel - long or short.

We can prove to Transport for London that it can

be done. Technical reports suggest these ideas can be

executed, as planners outline a range of development

options that could help finance the project. We look

forward to hearing the Mayor of London’s response.

It is now down to the council, local residents and other

stakeholders to work with TfL to establish the optimal

solution - which will be the most acceptable trade-off

between cost and disruption and improvements to the

environmental and cultural life of the borough. I would

suggest that all of the options significantly enhance

Hammersmith Town Centre - while the most ambitious

transforms it.

Page 8: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

6 HammersmitH Flyunder Feasib il ity study

The optionsConsultation with the public, stakeholders and technical experts steered us to looking at both a short like-for-like replacement for the flyover, and a longer, more ambitious route. We tested two longer versions, each extending from Sutton Court Road in the west to either North end Road or earl’s Court Road in the east. In each instance we also tested the impact of junctions allowing traffic to join or leave the A4 rather than continue for the whole length of the tunnel.

CostsCosts range (depending on whether junctions are included) from approximately £200m for the short ‘cut and cover’ option to just under £2bn for the longer bored tunnels.

Impact on traffic flowData shows that half of the traffic travelling east on the A4 past the Hogarth roundabout in Chiswick, turns off before it reaches earl’s Court. This suggests that junctions at Shepherd’s Bush Road/Fulham Palace Road and North end Road might be needed to ensure that the new tunnel attracts enough traffic and doesn’t simply add to congestion on the existing local road network. Such junctions are, however, difficult to site in the

narrow network of the existing roads, and costs would be significantly higher.

A new HammersmithWhile earlier ideas of tunnelling the A4 through Hammersmith had focused on development opportunities along the Great West Road/Talgarth Road strip, master planning suggests that any redevelopment should be focused on the area currently in the shadow of the flyover. The master planning exercise suggests a radically improved town centre. The focal point would undoubtedly create a new cultural sector - with the Lyric Theatre linked to the Apollo, adjoining a new public space around St Paul’s Church - all linked to the river. Removing the flyover would release approximately 360,000sqm of residential and commercial space.

Ranking the choices - questions to resolveThe disruption caused by a tunnel’s construction is broadly similar for both the long and short tunnels. The only difference is that the disruption associated with the short route is heavily focused on the already busy Hammersmith town centre.

Therefore, decisions boil down to how well they each satisfy the primary objective of reinventing the town centre and how much they will cost.

As the long tunnel will only attract enough traffic if it has junctions - it is worth testing the public appetite to include junctions. However, we see the economic and environmental costs as considerable.

The short tunnel has the advantage of being a decision for Hammersmith & Fulham Council and TfL, without the need to consult with other boroughs.

However, the full realisation of a transformed town centre would need further detailed research on local traffic flows and a plan to ease the flow on the Hammersmith gyratory. our work suggests a north-south tunnel would not be the most efficient way to achieve this solution.

There may be a case for taking both long and short tunnel options further, with H&F Council and TfL working together on the concept for a short route, and with TfL exploring the strategic potential of the longer route. The work we have done to date has been greatly helped by close co-operation with our neighbouring boroughs. It may well be that under TfL sponsorship, the long route can be assessed in terms of how it also affects Hounslow’s ambitions for the A4 as it goes west, and how Kensington and Chelsea wish to resolve the north/south isues that affect the earl’s Court one-way system.

Page 9: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 7

While it was not in the remit of this study to recommend a specific solution, we have shown through public engagement that all options are technically feasible and displayed the relative affordability of each. We have also indicated what further work is needed and recommend that H&F Council and TfL work together to explore how this can be achieved.

The lower cost estimates are likely to be seen as affordable when set against the value of the land, released through development. The public will, however, have to be comfortable with three years of disruption to the A4 and the local road network as the tunnel is built, and be satisfied that this is an acceptable reality for their substantial long term gain.

We can show a path to a transformed Hammersmith town centre, with new public areas, a stronger cultural identity, new residential space in the heart of the town and an enhanced business and commercial offering. The environmental benefit of tunnelling and removing the flyover is compelling. In addition the tunnel would leave TfL with a more valuable asset, offering greater control on repair and maintenance budgets.

I would like to thank Halcrow for their expert advice, the planners for their input, the neighbouring boroughs for their support and

engagement and for the very constructive support offered by TfL. Most impressive, however, has been the engagement of the public in Hammersmith, who have shown strong support, detailed knowledge and have offered constructive criticism.

Local residents clearly want rid of this 1960s eyesore and to be able to reclaim their town centre. I believe they hold the key to how quickly this idea is adopted. If the public continue with their strong vocal support, supporting the concept of a flyunder will be an essential part of every candidate’s manifesto at the next Mayoral election, fast-tracking the adoption of the flyunder scheme. The future really is in the hands of Hammersmith residents and businesses.

Neale Stevenson Independent Flyunder Champion

Page 10: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

Illustrative view looking east from Furnivall Gardens.

Page 11: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 9

10 key findingsThese ten key findings are the result of the four elements of the feasibility study; engagement, traffic, geotechnical and masterplanning. It is recognised that further work is required to refine the estimates, approximations and assumptions made to allow the feasibility study to report:

There is a very high level of local support for burying the flyover;

There is sub-regional support for tunnelling the A4;

There are no known subterranean showstoppers;

The longer the tunnel, the more construction lorries will be needed. However, this can be significantly reduced if the river is used;

The longer the tunnel, the higher the construction cost will be. With the shorter option, the possibility of self-financing the scheme through releasing developable land in Hammersmith town centre is attractive;

The longer the tunnel, the more geographically spread out the 18 months of surface disruption would be during the three-year construction period;

Achieving a new Hammersmith town centre benefits from both the removal of the flyover and steps to address the Hammersmith Gyratory;

There is a high level of traffic dispersion along the A4 corridor between Chiswick and earl’s Court;

Significant environmental and economic issues could arise by linking a main tunnel to north-south routes; and

Both tunnel lengths have positive and negative issues meaning that further local and strategic work should be undertaken.

10 recommendationsThese ten recommendations are for TfL to consider as the road authority for the A4, the strategic traffic authority for London and the transport authority for London. They are also made to the membership of the flyunder taskforce recognising the sub-regional influence of the project and the wider implications beyond transport.

TfL endorses the vision set out in this feasibility study;

Terms of reference of a new strategic taskforce are established;

Strategic aspirations and concerns are sought;

A long term plan for the A4 corridor is developed;

An appraisal framework is established to fully evaluate large scale road investment;

River transport of tunnel dig spoil is investigated;

Traffic modelling is undertaken to explore the opportunities offered by the longer tunnel alignments;

The Hammersmith town centre masterplan is refined;

A surface road network is developed and tested to support the masterplan; and

Further geo-technical work is undertaken in order to improve confidence in the feasibility results.

KeY FINDINGS AND ReCoMMeNDATIoNS

Page 12: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder
Page 13: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

The vision and direction for London’s streets and roadsRoads Task ForceExecutive summary

Delivering the vision for London's streets and roads

Transport for London’s response to the Roads Task Force

July 2013

Transport for London

MAYOR OF LONDON

HammersmitH Flyunder Feasib il ity study 1 1

INTRoDUCTIoN

IntroductionThe Road Task Force (RTF) was set up by the Mayor of London in 2012 to consider the future challenges facing London’s roads and streets. It is an independent body, which brought together a wide range of interests and expertise. Its report, published in July 2013, sets out a new vision for London’s roads.

Transport for London (TfL) published their response to the RTF at the same time and sets out the approach TfL, as the strategic highway authority for London, will take to implement its recommendations.

This report is published as the London Borough of Hammersmith & Fulham’s response to both the RTF and TfL’s response to the RTF. The report concentrates on the opportunities identified in both documents for the A4 corridor in West London.

The RTF establishes a clear and compelling agenda for change in London. It identifies that while progress has been made in recent years, there are three pressing, and interrelated, challenges ahead:

• Tackling congestion by improving the efficient use of the network;

• Providing better and safer public spaces and streets; and

• Accommodating growing demands for more walking, cycling and public transport.

A4 corridorThe following text is taken directly from the RTF report of which the Great West Road (A4) was one of the case studies.

“The A4 is a major arterial road in west London carrying high volumes of traffic (more than 90,000 vehicles a day) between the M4 and central London.

Between Chiswick Roundabout and Hammersmith, the road causes severance and crossing opportunities are limited to subways. At Hammersmith, a flyover separates the arterial motorised traffic from the gyratory and town centre below. The flyover is visually intrusive and the high levels of motorised traffic generate noise and air pollution along the corridor. In the short term, further roll out of the split cycle offset optimisation technique (SCOOT) will improve journey time reliability, and improving subway conditions (the main crossing opportunities along the corridor) will help increase pedestrian safety and security.

However, to exploit the potential new surface developments and make greater use of Hammersmith’s established transport hub, longer-term proposals for providing alternative tunnelled routes for through traffic should be explored. This would have transformative effects on the town centre, greatly improving the quality of life for its residents, and reducing severance of communities along the corridor.

Proposed street type: Arterial”

TfL, in its response to the RTF and in particular to the concept of tunnelling, states:

“London does not have the wide boulevards of Paris or the extensive grid system of New York at its disposal to reallocate capacity to or from. And it’s clear that the public acceptability of any enhancements to the capability of London’s road network - including the creation of new facilities such as tunnels or underpasses to reduce the social and environmental impact of road traffic - will depend on their being tangible community and business benefits from such enhancements.

Page 14: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

West London Link Design in association with the Halcrow Group and Hammersmith BID

A TUNNEL TO REPLACE THE HAMMERSMITH FLYOVER:

A CHAIN OF OPPORTUNITIES

West London Link Design in association with the Halcrow Group and Hammersmith BID

A TUNNEL TO REPLACE THE HAMMERSMITH FLYOVER: A CHAIN OF OPPORTUNITIES

A4 closed for two plus years

creating widespread disruption.

DEMOLISH AND REBUILD

A4 can stay open during

construction. Requires demolition

of landmark structures.

Must be 20m below surface to

clear LUL tracks.Flyover must be demolished before

tunnel starts.

Deep bore tunnel.Clears surface structures below

A4,A4 stays open through most of

construction programme.

Deep bore tunnel.Surface level works only at end

portals.A4 can remain open during

construction.

No surface level works in Hammersmith.East portal to be integrated with

redevelopment of Earl’s Court

North and South reunited, Opportunities for sustainable regeneration and valuable development released along entire

stretch of route,

East end suffers same problems as

short tunnel option.Demolition of flyover necessary

before completion,

Reduced impact of construction.

A4 barrier eliminated from Chiswick

and west Hammersmith,

At east end gradient requires 400m to

rail cutting. At west, 200m to clear surface road

system. Prolonged construction period

and disruption. Benefits to

Hammersmith when complete.

Temporary works/site logistics:Furnivall GardensFilling station by the Ark

Temporary works/site logistics:Furnivall GardensFilling station by the Ark

A new structure, just like the old,

cutting through the Borough, with

no benefit to Hammersmith.

A new structure, just like the old,

with the loss of local landmarks. No

benefit to Hammersmith.

BUILD NEW FLYOVER(ALONGSIDE EXISTING)

SHORT TUNNEL (CUT AND COVER TUNNEL ON

EXISTING FLYOVER ROUTE)

TUNNEL (HOGARTH TO THE ARK)

LONG TUNNEL (HOGARTH TO EARL’S COURT)

West London Link Design in association with the Halcrow Group and Hammersmith BID

A TUNNEL TO REPLACE THE HAMMERSMITH FLYOVER: A CHAIN OF OPPORTUNITIES

THE GREAT WEST ROAD

ST PAULS CHURCH

KING STREET

HAMMERSMITH BRIDGE

ST PAULS CHURCH

ST PAULS CHURCH

ST PAULS CHURCH

1860

1949

1959

Map showing the impact of WWII bomb damage

A view on St Paul’s Church and Queen

Street from the Broadway, painted around

1835 by James Pollard. By the early 19th

Century Hammersmith was a major trans-

port centre for coach routes to and from

London.

Hammersmith Broadway c1914 Palmer’s

development store was founded in 1886

and demolished in the 1980’s.

Buildings destroyed by a V1 flying bomb on

24 July 1944. The area is now covered by

Furnivall Gardens.

The proposed route of the A4 Great West Road (Talgarth Road western extension) and Hammersmith Flyover (viaduct).

Hammersmith Broadway in the early

1950’s.

Newspaper photograph from the Daily

Telegraph, September 9 1955 showing

Furnivall Gardens and the Great West Road

under construction.

The Great West Road and the proposed flyover.

1 2 HammersmitH Flyunder Feasib il ity study

The RTF asserts the need for more radical measures to better balance the competing functions of the road network and to ultimately contribute to its vision of world-class streets, fit for the future. These measures includes different forms of suitably located and designed new or substitute infrastructure, such as floating roundabouts for cyclists and pedestrians, high quality bridges over arterial roads and opportunities for roofing or tunnelling under existing infrastructure at particular locations.

TfL will establish a rolling research and development programme, the component studies of which will:

• Review by mid-2014 possible locations for roofing over major roads, to minimise traffic impact, enable development and reduce community severance, especially to reduce community impacts in growth areas;

• Assess the potential for relocating strategic traffic from the surface and free up space for other uses by the end of 2014; and

• Assess, by mid-2015, the potential for ‘local’ re-located space (such as flyunders of floating roundabouts for cyclists) at particular pinch point locations on the network.”

BackgroundIn 2012, prior to the RTF and TfL’s response, a group of west London architects known as West London Link Design (WLLD), in association with Halcrow Group and Hammersmith BID, presented a report titled: ‘A Tunnel to Replace the Hammersmith Flyover: A Chain of opportunities’.

Page 15: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 1 3

This document is published in its entirety alongside this report and sets out high-level and conceptual options to replace the A4 between Chiswick and earl’s Court with a tunnel. It states that this tunnel can transform the city by:

• Reuniting north and south;

• Reuniting Hammersmith and Chiswick with the river;

• Rejuvenating the centre of Hammersmith;

• Replacing traffic arteries with boulevards and avenues; and

• Creating development opportunities for workplaces and homes.

WLLD were inspired to explore these opportunities due to the emergency structural works that TfL were required to undertake in 2011 to make the ageing structure safe. The full, and unplanned, closure of Hammersmith Flyover caused significant traffic problems in Hammersmith town centre as the A4 traffic was diverted around Hammersmith Gyratory which struggles to cope with peak traffic at present.

The flyover is currently undergoing a multimillion pound, 18-month refurbishment, running until 2015 to extend the life of the 50-year-old structure. These works are planned and as such

have less of an impact on the surrounding road network. It is inevitable, however, that further works will be required which could take many forms, including its full replacement over the next 50 years. WLLD recognise that now is the time to start thinking more ambitiously about its eventual replacement and that a major infrastructure project, like a tunnel, in a high-density town centre, will take years to plan, procure and build. The time we have is long enough to plan the best solution or short enough to be forced into a quick and dirty fix.

Feasibility studyIt is for these reasons that H&F Council decided to undertake a feasibility study into a flyunder, to respond to the RTF and TfL publications, and to build on the WLLD vision.

It was always recognised that TfL, as strategic highway authority for London, is ultimately responsible for the management and future planning of the A4. The feasibility project was designed in such a way that it would be prepared on TfL’s behalf to fill the gap between the aspirational RTF recommendations and the realistic TfL research and development programme.

Page 16: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder
Page 17: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 1 5

LoCAL oPINIoNIt was apparent from the events held by the WLLD group in 2012 that there was significant local interest and support for digging a tunnel for the A4. This feasibility study seeks to build on this support and explore how residents and businesses saw the potential benefits and disbenefits of a tunnel.

The feasibility study was designed with extensive community engagement forming the majority of the early work stages. This was in order to ensure that further local opinion is sought to establish how the technical work stages would be taken forward.

The below statement is taken directly from the feasibility study terms of reference:

To establish, at a preliminary level, the aspirations and any concerns of local residents and businesses.

This engagement was facilitated in a number of ways. First, a dedicated website was set up in order to provide a medium for communication with the wider community. This website received an unprecedented volume of traffic and received one of the highest number of posts the council has ever received. www.lbhf.gov.uk/flyunder

Second, a flyunder summit was held in Hammersmith Town Hall on 10 october 2013. This was an opportunity for the public to see and hear about the work done to date and the feasibility study on the flyunder concept. The flyunder champion hosted the summit and heard a number of presentations, including from WLLD and TfL.

The standing-room-only summit further confirmed the strong local interest, and saw a lively debate

Page 18: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

77%

12%

1%6%

4%

agree

indifferentdisagree

strongly disagree

strongly agree

Question 1Do you agree with the council that the Hammersmith Flyover

should be replaced with a flyunder?

1 6 HammersmitH Flyunder Feasib il ity study

on the aspirations and concerns of residents and businesses. Those attending were asked to complete an eight question survey designed to help develop the feasibility study work streams. The results from this questionnaire, alongside the web comments, were combined to form the basis for the study.

The results again confirmed the high level of support for a tunnel. However, it also established that there was a range of aspiration with regards to how long the tunnel should be and which routes it should connect to, if at all.

Four main concerns emerged in regards to both construction and operation of a tunnel. The options that were tested as part of the study were appraised using these aspirations and concerns in order to allow a comparison against the options.

The following pages summarise the early study engagement and helped establish the primary level local aspirations and concerns.

These results provided a suitable mandate for the feasibility study to proceed and validated the council’s resolution to work towards a tunnel replacement.

There was a variety of reasons as to why 10 per cent of respondents did not agree with a tunnel replacement.

These ranged from people not having enough information at this stage of the study to make an informed decision, to the flyover being a ‘beautiful structure’, or those that said that the money would be better spent on public transport.

Page 19: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

7% 39% 1% 6% 7% 7% 22% 1%3%4%

Hoga

rtH

roUn

daBo

Ut

M4 JU

nCtio

n 1

HaMM

ersM

itH

toWn

Hal

l

tHe a

rK

Baro

ns Co

Urt

nort

H en

d ro

ad

WarW

iCK

road

Hyde

ParK

Corn

er

M4 JU

nCtio

n 2

West

of

JUnC

tion

2

a4 great West road a4 great West roadC

CC

C

T

T

L

L

L

L

L

L

H

H

H

H

H

H

HH

H

H

H

E S

T H

A M

E RR I V

MERRIV THA ES

BATT

ERSEA

REACH

RIV

ER

WA

ND

LE

Chelsea

Harbour

GRAND

UN

ION

CANAL

FulhamBroadway

West Kensington

PutneyBridge

ParsonsGreen

Kensal Green

White City

Goldhawk

East Acton

Hammer-smith

ParkRavenscourt

StamfordBrook

Baron's Court

EarlsCourt

Latimer

Shepherd'sBush

Road

Road

Ham-mersmith

WillesdenJunction

Shepherd'sBush

Kensington(Olympia)

ImperialWharf

WestBrompton

TurnhamGreen

WoodLane

Market

Fulham

Hall

Town HallHammersmith

Town

National Rail

National R

ail

Distric

t Line

National R

ail

National R

ail

Hammersmith

& City

Line

Central line

District Line

District Line

TheQueen's

Club

GardensFurnivall

Brompton

Cemetery

EelBrook

Common

Park

South

Park

Hurlingham

Cemetery

Kensal Green

Cemetery

Little

Scrubs

ParkParkWormholt

Wormwood

Fulham

ParkRavenscourt

Bishops Park

Cemetery

CemeteryHammersmith

The Warren

Normand Park

Common

ParkCathnor

ParkWendell

St. Mary's

WORMWOOD SCRUBS

Hammersmith

ParsonsGreen

Shepherd's Bush

Chis

wic

k Eyo

t

S

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

REVO

R

RO

ST-

HA

RTS

WO

OD

JEDDO

KINNEAR RD

RDSWAINSON

TH

IRD

B R A Y B R O O KW U

L F S T A

N

ERCONWALD

FITZNEAL

RD

SOUTHFIELD

BLENHEIM RD

ADDISON GR

AB

ING

ER

FA

IRF

AX

PR

IOR

YA

V

WHELLOCKRD

BLANDFORD

WO

OD

STO

CK

RO

AD

RD

FLANDERS

BATH

RD

RO

MA

N

ROAD

RD

LON

SD

ALE

RO

AD

WENDELL

MA

PL

E

RD

RE

CH

T

MULTI

WARPLE

WAY

PK MSESSEX

BEECH

AV

AVE

HO

LL

EY

RD

LE

FR

OY

RD

MA

YF

IEL

D R

D

COBBOLD AY

LME

R

V A L E T T A

AG

NE

S

RD

RO

AD

CT

GLE

ND

UN

BR

OM

YA

RD

BOWES ROAD

RD

GLE

ND

UN

ASHFIELD

AV

EN

UE

TRINITY

OL

D O

AK

LAN

EN

OM

MO

C

MUIR

BRASSIE

FAIRWAY

DRIVE

RO

AD

BRASSIE

AV

KIN

GS

DO

WN

HO

YLA

KE

AVE AN

DR

EW

'SS

TR

OA

D

THE

LONG

MA

SH

IE

RD

GR

NT

AY

LO

R'S

BY

ET

HE

THE GREEN

SUNNINGDALE

AV

E

AVE

FOLIOT

WAY

MAY-

ROAD

MID

LAN

D

CHANDOS RD

TELFORD

BRUNEL RD

WE

LLS

HO

US

E R

D

WAY

EC

AR

RE

T

ROAD

AT

LA

S

STE

PH

EN

SO

N

ST

GO

OD

HA

LLST

NORTH POLE

WA

LLING

FOR

D

RDSNARSGATE

HIG

HLE

VE

R

CH

ES

TNU

T

ALLE

Y

MERTHYR

TER

TER

ROSEDEW

COLWITH

R A

N N

O C

H

ROAD

EV

ER

ING

TON

SEDLESCOMBERO

AD

RO

AD

CLO

SE

CR

AM

MO

ND

RO

AD

MU

LGR

AV

E

TAM

WO

RTH

ST

ROAD

RO

AD

RO

AD

R O

A D

WESTBRIDGE

BA

CRESCENT

ROAD

ROAD

MONTSERRAT

RO

AD

OX

FOR

D

ST

ESMOND

WIN

TH

OR

PE

RD

WA

DH

AM

RO

AD

ROAD

BE

PL

BE

CTI

VE

RD

BR

AN

DLE

HO

W

DR

LLIGL

EK

S

ROADPARKFAWE

NO

RT

HF

IELD

S

PL

EA

SA

NT

PO

INT

RO

AD

WA

Y

ENTERPRISE

OSIERS

CRESCENT

VIC

AR

AG

E

VICARAGE

GWYNNE

RO

AD

NO

TR

EVL

EY

RD

HA

RR

OW

AY

HOLMAN RD

LOM

BA

RD

RO

AD

ROAD

YO

RK

BR

IDG

ES

CO

UR

T

HOLGATE AVE

CLOSE

WAL

LIS

ST

HIBBERT

HO

PE

STREET

YORK

PLACE

PLAC

E

YORK

WAY

GAR

TON

S

CHATFIELD RD

MENDIPRD

ROAD WYNTER

STREET

USKRO

AD

CLOSE

NANTES

CLO

SE

GARRICK

CLOSE

CLO

SE

TUR

EN

E

CLO

SE

BA

RTH

OLO

ME

W

COLEFORD RD

ST

TON

SLE

Y

HILL

TON

SLE

Y

RO

AD

STM

OR

IES

TE

DG

EL

ST

EBNER RD

RD

BIR

DH

UR

ST

DE

MP

ST

ER

RD

SQMARRYAT

FU

LHA

M

RO

AD

SETTRINGTON

PLA

ST

CL

THO

RN

DIK

E

RO

AD

PETERBORO

UGH

CLOSE

PA

RK

GDS

VILLE

RO

BE

RTS

ST

ME

WS

SO

UTH

ST MARKS C

L

CRABTREE

CHILDERLEY

ST

KINGWOOD

STRODE

PARK

STREET

CREFIELD

CL

WO

OD

LAWN

GRESWELL STREET

RO

AD

DA

NE

ME

RE

RD

RO

SK

ELL

AS

HLO

NE

FE

ST

ING

ST

RO

AD

E M

B A

N K

M E

N T

RUVIGNY

BE

MIS

HFELSHAM

CH

AR

LWO

OD

RE

DG

RA

VE

RD

RD

BENDEMEER

JACKSON

HE

NR

Y

RD

SA

LVIN

RD

RO

TH

ER

WO

OD

RD

GLA

DW

YN

ST

GLE

ND

AR

VO

N

WE

ISS

RDR

OW

BIG

G'S

KINGS-

ST

WAT

ERM

AN

MA

SC

OT

TE

GW

ALI

OR

RD

RD

ROAD CLO

SEM

ER

E

GD

S

RD

RO

ELLERBY

DONERAILE

T H

E

RD

FINLAY

BISHOP'S

BISHO

P'S

CLONCURRY

RO

AD

STREET

STREET

NA

GE

ST

EV

E

LANGTHORNE

QUEENSMILL

WO

OD

LAW

N

LYSIA

LARNACH

NELLA

RO

AD

RO

AD

ETERNIT

WALK

CLO

SE

MILLS

HO

TT

CLOSEROWBERRY

WHEATSHEAF

MEADOWBANK

CLOSE

HO

LY

LANE

BOWFELLRDSKELWITH

RA

INV

ILLE

WINGRAVE

PE

TLE

Y

RD

RD

STREET

INGLETHORPE

HARBORD

KENYON

STREET

RO

AD

NITON

STREET

ROAD

STREET

STREET

STREET

STREET

STREETATALANTA

DELORME

AVERILL

ROAD

ROAD

SILVERTONELLALINE

R O

A D

ROAD

LANE

BOTHWELL

STREETHAW

KSMOOR

STREET

STREET

STREET ST

CLOSEADENEY

ANCILL

ROAD

ROAD

ALTHEA ST

STMEAD

RD

CAMBRIA

WANDON RD

FORD

ACKMAR R

D

ELTHIRON RD

BASUTO

WHITTINGSTALL

VERA RO

ADGOWAN

ROAD

RO

AD

ROAD

ROAD

LINV

ER

AT

NE

Y R

OA

D

DE

OD

ARFL

OR

IAN

RD

ROAD

FULH

AM

RDDURRELL

ROAD

CLOSE

STEEPLE

BU

RS

TO

CK

RD

ST

WEI

MAR

BR

EW

HO

US

E

DEODAR

ME

RIV

ALE

RO

AD

RO

AD

STH

IGH

WILLOWBANK

GATE

CHURCH

STVILLEGON-

RANELAGH

AP

PR

STATION

WALD

EMAR

EDGARLEY

TER

AVENUE

ROADCOLEHILL

GDNS

KIM

BE

LL GS

FIRTH

GS

CO

LEH

ILL

RIGAULT

BU

RLIN

GTO

N

BUER

RO

AD

PLACE

BURLINGTON

COMBERIN

GMERBURNFOOT

OXBER

RY

HORDER

RDD

OR

NC

LIFFE

AV

GARDENS

GDNS

HURLINGHAM

ED

EN

HU

RS

T

NA

PIE

RRA

NE

LAG

H

CROOKHAM ROAD

MIM

OSA STREET

LETT

ICE

LAUR

EL

RD

LANDRIDGE

FULH

AM

GD

HURLINGHAM

GR

IM

ELYSIUM

RD

RD

RD

PARK

FO

SK

ET

T

EWA

DO

LBY

AV

RD

EU

NE

VA

PK

RD

STR

EE

T

NS

DANCER ROAD

BETTRIDGE

CO

RT

AY

NE

ASHINGTO

NRO

AD

CR

ISTO

WE

BANK

RD RO

AD

ALD

ER

VILLE

ROAD

RD

HEATH

ED

DIS

CO

MB

E

DIONIS

RD

ST

ROAD

STREET

DORIA

GU

ION

RO

AD

ROAD

PERRYMS

TRE

ET

CT

DAISY

SULI

SULIVAN

LAN

E

CARNWATH

LANE

FORDM

OLES-

PE

TE

RB

OR

OU

GH

CO

NIG

ER

BR

OO

MH

OU

SE

MEWSBOROUGHPETER-

BR

OO

MH

OU

SE

RO

AD

RO

AD

IRENE

DELVIN

O

RD

DIN

GS

TON

E

ST

CLAN

STUDDRIDGE

RO

AD

ST

CARTY

ST

QU

AR

RE

ND

ON

BR

AD

BO

UR

NE

CHID

CRONDACEROAD

RD

CHIPS

RO

AD

RD

ROSEBURYSTE

PHEN

DALE

WOOLNEIGH

HUGON

SQPHILPOT

RO

AD

DYM

OC

K

ST

BR

EE

R

STR

EE

TS

TRE

ET

ROAD

ROAD

DEM

ORG

AN RD

HAMBLE

HAZLEBURY

SANDILANDS

INGDON

BELTRAN

STASHCOMBE

STNARBOROUGH

STFRISTON

ROAD

RD

RCH

RYECROFT

STREET

BO

WE

RD

EA

N S

T

EA

D

STR

EE

T

ST

OK

EN

ST

CHU

ST

BOV

RD

AC

FO

LD

RD

BROU

RDSNOWBURY

KBURY RD

CR

AN

BU

RY

RD

OA

ROAD

FU

RN

ES

S

GILSTEAD

PEARSCROFT

RDRD

COURT

RSCROFT

PEA-RD

CLOSE

WAITE

ROAD

SWIFT ST

FILM

ER

FERNHURST ROAD

ST

PETER'S

ESTCOURTPROTHEROMENDORA

ROAD CHALDON

AINTREEROADHANNELL

ROAD

RO

AD

SID

BU

RY

STLAMBROOK

WARDO

ST

TER

DANEHURST

WYFOLD

ALLESTREE ROADROWALLAN ROAD

ROADMABLETHORPEBRONSART ROAD

BR

ON

SA

RT

ROADKILMAINE ROAD

ROAD

REPORTON

AVENUE

AVENUE

STREET

BISHOP'S

LANE

ROAD

STOLAF'S

STREET

ORBAINSHERBROOKE

ROSALINE

VA

RN

A

ROADROAD

ROAD

RO

AD

BEDFORD PS

HU

MB

OLT

RO

AD

HUMBOLT ROAD

DISBROWE

WK

CAR

OLIN

EA

BB

EY

LAU

ND

RY

RD

RC

CL

PU

RC

ELL

RD

BA

YO

NN

E

BRECON RD

LAMPETER

GDNS

PE

LLAN

T

ROAD

MO

YLA

N R

OA

D

ROAD

BRECON

ROAD DELAFORD

TILTON

TOURNAY

ST. THOMAS'S W

AY

HA

RTIS

ME

RE

FA

BIA

N R

OA

D

ROAD

RO

AD

ROAD

OP'S

WIN

CH

END

ON

MIR

AB

EL R

OA

D

BLO

OM

PA

RK

TERMARVILLE

CH

ES

ILTON

RO

STR

EV

OR

FELD

EN

ROAD

RO

AD

RO

AD

MEW

S

RO

AD

RA

DIP

OLE

BISH

LILYV

ILLE

BROOKVILLEROSAVILLE

PARKVILLE

ROAD

LETTER-

STONE

RO

AD

RD

RO

AD

ROAD

ROAD

ROAD

RO

AD

DARLAN

RO

ADR

OA

DST M

AUR

ROAD

CLO

NM

EL

EPPLE

PLACEBRID

GES

CROSS

ROAD

ROAD

SHORROLDS

E RD

BURNTH

EPIRU

S

RO

AD

RY

LSTO

N

STREET

ROAD

ST

ROAD

COOMER PL

HALDANE

COOMER

MEWS

KEMPSON

AV

EHARW

OOD

MOORE

MSEPIRUS

FARM

CAMPANA

BA

RC

LAY

CL

JERDAN

NOVELLO

SHOTTENDANE

DOWN

HARBLE

RD

RDELMS RD

PLACE

FIELD

HECK-ROAD

ROAD

PULTON

BARCLAY

CASSIDYROAD

VANSTON

PARTHENIA

ST

RD

RD

RD

FAV

ROAD

RM

US

G

AR

GO

N

RD

MS

EFFIE

PLACE

BROADWAY

FULHAM

RD

ANSELM

EUSTACERD

ARMADALE

HALFORD

ROAD

ROAD

RACTON

RD

KN

IVE

TT

RD

WALHAM

ROADROAD

LANE

LANE

GROVE

FARM

RD

MIC

KLE

THW

AITE

STREET

BILLI

NG

RD

AVALON RD

HARWOOD

HILARY

RDTYRAW

LEY

BLAKE

CRES

RD

GDS

BOROUGH

PETER-

VILLA

S

ROAD

WANSDOWN

WA

TER

FOR

D

CE

DA

RN

E

RD

PLACE

BR

ITA

NN

IA

PARK

LOR

D

IMP

RO

WED

MICHAEL

TER

MELD

ON

CHERYLS

CL

CLOSE

ROAD

WAY

BRITANNIA

RO

AD

EMD

EN

SQ

RIALE

ST

SANDS END LANE

ITH

ST

RD

RUMBOLD RD

ROAD

WKLENODAN

WELL

MA

X

HOLMEAD RD

CR

ESCEN

T

PARK

BROMPTON

BILLING RD

PL

BILLI

NG

MO

RR

IS

EDENVALE ST

WILLIAM

ST

CHARLOW

CL

LANE

WATERMEADOW

PO

TTE

RS

STEPHENDALE

LINDROP ST

ST

QU

ER

RIN

BYAM

GLENROSA ST

RO

AD

KIL

RD

ST

ST

TYNEMOUTH ST

ELBE

RO

AD

RD

ST

ELSW

ICK

MAL

TIN

GS

STREET

RO

AD

WAY

Pier

Chelsea

Harbour

GR

OVE

ASHBURNHAM

STADIUM

GR

OVE

UP

CE

RN

E

TETC

OTTST

STFORD

SAND

-

REWELL

TETC

OTT

RD

RO

AD

LOTS

Chelsea

RO

AD

BURNABY

UV

ER

DA

LETA

DE

MA

RO

AD

RD

TERDAMER

FERN

SHAW

HO

RTEN

SIA

GU

NTER

EDITH TER

RDED

ITH

WharfChelsea

Creek

Wharf

ROAD

CREMORNE RD

RD

ST

Cremorne

AVENUE

HAR

BOU

R

HARBOUR DR

CH

ELSEA

SQUARE

ADMIRAL

THAMES AVE

PODMORE ROAD

ALM

A DIGHTONRD

BR

AM

FOR

D R

D

DA

LBY

RD

BA

LLAN

TIN

E S

T

YORK

ELTRINGHAM

PETERGATE

MARL RD

FERRIER ST

SMUGGLERS WAY

SMU

GG

LERS

OLD

YO

RK

RO

AD

MAYNARD C

L

GWYNCLOSE

JEW

SROW

ROAD

AVENUE

AVENUE

AVENUE

AV

EN

UE

AV

EN

UE

ROAD

HURLINGHAM

SQUARE

WILL

IAM

BURY

MS

R'S

ALLE

Y

WHEAT-

SHEAF

TERR

PALACEMEWS

CLARE

MWS

BROUGHTON

RD APPROACH

MU

STO

W

ST

ELYSIU

M P

L

MS

BR

AN

KS

EA

GRAN-

PLACE

MELBRAY

MS

LALOR ST

EXETER

MEW

S

JOHN

AVENUE

INGRAMMARGARET

CLOSE

PL

LEN

HU

GH

DALTON

AVE

HUGH

CL

GA

ITS

KE

LL

SW

AN

MS

WALK

BOLING

BROKE

LAN

E

SUNBU

ROAD

CHURCH

BA

TTE

RS

EA

ROAD

ST

RE

ET

HIG

H

ROAD

ELLI

VR

O

TCE

ROAD

ROAD

WORLIDGE ST

IMRE CL

ALDENSLEY

RD

LILY

ST

BROOK

HEM

OLD

CLOSEPARNELL

ELG

IN

AV

E

SIDE RDGREEN-

CREIGHTON

STREET

BEAUFORT

MS

TELEPHONE

PL

LANFREYPL

CHEESEMANS

ELSHAM

HOFLAND

UPPER ADDIS

ONLORNE

CRE

PL

Q U E E N S D A L E

GDS

MARY

ST ALBAN'SCHELMSFORD

ROAD

DN

OM

HCI

R

ROADROADANLEY RDS

YC

AM

OR

E

FIE

LD R

DL

EY

S-

WE

ST

VIL

LE R

OA

D

RY

LET

T

AS

HHURCHBASSEIN

PA

RK

CT

RAVENS-

LION

STAM

ME

RT

ON

AV

RD

GA

INS

BO

RO

UG

H

AV

EN

UE

RO

AD

BR

ITIS

H

AIR

ED

ALE

CL

EV

EL

AN

D A

V

NE

TH

ER

AV

ON

EV

OR

G

NOI

L

S'R

ET

EP

TS

SQ

UA

RE

QS

S'R

ET

EP

TS

ST PETER'S SQ

GS

MAL

L

GR

BRITISH

EY

OT

BERESTEDE

RD

GS

EY

OT

GS

TERHAMMERSMITH

VERBENA

LA

SQUARE

CROFT

SQ

MS

EV

OR

GBLACK LION

BR

OO

K

VAUGHAN AV

BROOKRDPALGRAVE

SOUTH

PR

EB

EN

D

FORD

PLE

YD

ELL

AV

SIDE

ST

AM

FO

RD

FL

MS

CO

S

BALMORAL

RO

AD

FO

BINDEN

CL

GDNS

STAMFORD

RA

VE

NS

CO

UR

T

OURT

AV

EN

UE

SQ

UA

RE

TERASHC

CRESCENT

ROAD

RD

RD

RO

AD

VILLA

SA

SH

CH

UR

CH

AMOR

RO

AD

KILMARSH

LONSDALE

RD

GLENTHAM

LILLIAN

ARUROAD

DR

S'A

DLI

H T

S

OADR

AV

RIVERVIEWCLAVE

GDNS

TR

UO

CS

NE

VA

R

UPPER

LA

NEST PETER'S

SO

UT

H

CO

UR

TR

DSAM

ELS PLACENAPIERLORD

LAN

EO

IL M

ILL

GDS

THERESA RHSI

DN

AT

S

ST

S'R

ET

EP

HAMLET

HA

ML

ET

GD

S

RO

VA

EB

PA

RK

RIV

ER

CO

UR

T

RO

AD

RO

AD

MALL

EC

AL

P

TR

UO

CN

EV

WE

LTJE

RA

VE

NS

-

AV

E

CO

UR

T

EN

AL

GO

HE

RIH

SP

MA

H

RAVENSCOURT

PLACE

SID

EE

N

RA

VE

NS

CO

UR

T

GARDENS

SQ

GR

.

CH

UR

CH

GD

SK

ELM

SC

OT

T

RO

AD

DO

RV

ILLE

WIN

GA

TE

WELLESLEY

AV

RD

CR

LAM

ING

TO

N

REDMORE RD

RO

AD

CA

MB

RID

GE

GLENTHORNE

LOWER

RIVERSIDE

NIG

EL

GDS

MS

ET

AGL

EF

NIG

EL

PLA

YFA

IR

EV

A RI

AF

YAL

P

VA

LLE

WM

OR

C

ALBION

PL

HO

L-

ST

CO

MB

E

DR

MEWS

AV

E

BR

IDG

E

MA

CB

ET

H

GAR

DENS

MALL

GVE

RUTLAND

MA

LLR

D

WEI

VE

GDI

RB

PLACE

GR

OV

E

AR

GY

LEP

L

DOWN

AS

PE

NP

LD

IME

S

ST

RE

ET

LE

AM

OR

E S

TR

EE

T

BRACKENBURY

BENBOW

BA

NIM

PERRERS

RAYNHAM

ATWOOD

RD

FURBER

DA

LLIN

G ST

RE

ET

ST

BR

AD

MO

RE

PK

RD

RO

AD

ST

RE

ET

RO

AD

CA

RD

RO

SS

NA

SM

YT

H

AD

RO

AD

CA

RT

HE

WB

RA

CK

EN

BU

RY

HEBRON

RO

BA

T

RO

AD

RO

AD

ROAD

SO

UT

HE

RT

ON

IFF

LEY

RD

ADIE

MARCO

RD

RD

IFF

LEY

CARTHEW

COULTER

VILLAS

GDNS

BEAUCLERC

ROAD

AG

AT

E

RD

GS

ROAD

ST JAMES

BERYL

PARFREY STREET

ST DUNSTAN'S

CHANCELLOR'SST

RD

LOCHALINE

WINSLOW

DIS

TILLER

Y R

D

ROAD

STP

LAY

FAIR

CLA

YB

RO

OK

MAR

GR

AVINE

ROADASPENLEA

GASTEIN

CLAXTON

RDLU

RG

AN

AV

RD

GROVE

CLOSE

BROOK

STERNDALE

DEWHURST

NETHERWOOD

BISCAYYELDHAM

LUX

EM

BU

RG

GARDENS

WA

LK

CHANCELLORS

TERRIVER

CRISP ST

BLACK'S

AN

GE

L

RO

AD

RO

AD

ROAD

ROAD

BU

TE

MELROSE

BATOUM

LENA

TRUSSLEY

OV

ER

ST

ON

E

RD

RD

ST

RE

ET

ME

WS

GR

OV

E

MS

AS

TR

OP

TCEASTROP

RD

SU

LGR

AV

E

RD

TCE

MS

ROAD

BA

RB

HSUB S'DREHPEHS

CROMWELL

GARDENS

RD

GDNS

LOR

IS

ME

LRO

SE

GR

GDNS

GREEN

GREAT CHURCH

ROAD

RO

WA

NTE

RR

AC

E

GA

RD

EN

SN

OTR

EVL

OW

RO

WA

N

SH

OR

T L

AN

DS

MARGRAVINE

SN

ED

RA

G T

EL

OCCLOSE

WATERHOUSE

MORE CLOSE

WINDSOR

CAITHNESS

DAN

IRVING

BLYTHE

BOLINGBROKE

US

TIN

E

GA

RD

EN

S

HAARLEMRD

BROOK

DU

NS

AN

Y

AU

G

GREEN

GREEN

RO

AD

APPLEGARTH

GART

H

ROAD

RO

AD

RD

LAKESIDE

RO

AD

ROAD

RE

FAR

OE

CE

YLO

N

MA

SB

RO

'

RO

AD

GIR

DLERS

AYN

HO

EROAD

SOU

L-ROADDERN

ROAD

MILSON

FIELDING

VA

LE T

ER

SP

RIN

G-

STREET

ROAD

RD

MILSON

RO

AD

RO

AD

RDROAD

PRIMULA

LIL

CU

STREET

RD

COURT

ASKHAM

PL

CU

RW

EN

VESPAN

THE

ARMSTRONG

ROAD

RD

CO

WLE

Y R

DA

V

SE

CO

ND

AS

KH

AM

ASKEW

ST ELMO

RD

FIE

LDO

LD

-

BECKLOW

ST

RO

NS

A

GAYFORD

R O A D

ELIZ

AB

ET

HD

AV

IS

GDS

AV

ST

ELM

OR

D

RD

ROAD

PARK

RY

LET

T

ROAD

RD

ROAD

ROAD

ROAD

MS

LAU EN

CE

R

LANDOR

HADYN

WK

OLLGAR CLOSE

CLIFTON

CR

ASKEW

AV CR

ES

RO

AD

WALLFLO

YEW

L O

C K

STEVENTON

ROAD

AV

EN

UE

FIR

ST

ROAD

ST

HILARY

WAY

FOXGLOVE

SQTAMARIS

K

H E M

RD

RO

AD

AYCLIFFE

URNE

S A W L E Y

ALDBO

RO

AD

ST

SE

DG

EF

OR

D

ROAD

CLEMATIS

TREE

R O

A D

DAFFODIL

WER

VIOLASQ

SUN

DEWSTREET

MELLITUS

NORBROKE

WA

LK

ST

STREET

S T R

E E

T

STREET

CA

CT

US

STREET

HIL

AR

Y

WK

ON

IA

STREET

HEN

CH

MAN

STOSMUND

S T

R E

E T

BE

G-

QU

AR

TE

RS

WE

ST

STREET

BENNELONG

ROAD

STANLAKE VILLAS

AVEN

UE

RD

AUSTRALIA

ROAD

GR

OV

E

GR

OV

E

GR

OV

E

RO

AD

RO

AD

BATSON

FINDON

ROAD

ST

AR

FIE

LD

DA

VIS

VIL

LE

PARK

ROXWELL

RO

AD

RO

AD

RO

AD

PE

RC

YP

ER

CY

RO

AD

ROAD

LYCETT

KEITH

RO

AD

GR

OV

E

CL

WE

ST

-

ROAD

RO

AD

GOODWIN

ST

RO

AD

RD

LEFFERN

RD

ELL

ING

HA

M

ROAD

CA

TH

NO

R

ME

LINA

RD

RO

AD

BO

S

HAM

CONING-

ROAD

VA

LEW

ILLOW

DUNRAVEN

GR

AV

ES

EN

D

WO

RM

HO

LT

ROAD

ROAD

TH

OR

PE

BA

NK

GA

LLOW

AY

RD

ST

PA

N

ST

BRYONY

ORCH ID

AC

RVE

ST

THE

CU

GD

S

SY

RVE

MILF

OIL

R O A D

AD

ELA

IDE

OA

KL

AN

DS

OR

MIS

TO

N

HALSBURY

ROAD

ST

ER

ICA

ROAD

BLO

EM

FO

NT

EIN D

AO

R

THORNFIELD

SCOTT'S

RO

RO

AD

RO

AD

ROAD

HE

TLE

Y

S'N

EH

PE

TS

TS

GO

DO

LPH

INR

DLL

OS

RE

GNI

RD

AR

MIN

GE

R

RO

AD

RO

AD

ROAD

G'HK

AV

EN

UE

RO

AD

TITMUSS

ROAD

DE

VO

NP

OR

T

WA

RB

EC

K

DA

OR

CO

VE

RD

ALE

DA

OR

RO

AD

ROAD

C O M M O N W E A L T H A V E

ROAD

ELLERSLIE

AVE

SOUTH

RD

ETHELDEN

WA

Y

COMMON-

AUSTRALIA

IND

IA

CA

NA

DA

AFRICA

EL

AD

BA

SU

TF

OL

CLOSE

BATMAN

STAN

SWINDON ST

SIN

UT

ROAD

WA

Y

RO

AD

AU

ST

RA

LIA

DORANDO

CLOSE

BENTWORTH

AR

TIL

LE

RY

LA

NE

STREET HEATHSTAN

MA

UR

ICE

ST

ST

TE

RR

ICK

MEWS

RD

SHALFLEET DR

Y E

L M

A R

B

WESTWICK

MINFORD

ST

TADMOR

SILV

ER

RO

AD

EN

AL

RA

FC

AM

WO

OD

-

MA

RK

ET

GR

OV

E

SH

EP

HE

RD

'S

RIC

HF

OR

D

BU

SH

WE

LLS

GER

RO

AD

EMI

L

SN

ED

RA

G

PE

NN

AR

D

ST

HOPG

OO

D

RD

ROAD

BA

MB

-

POPLAR

GDS

GROVE

BULWERST

ST

INE

ALD

NO

TX

AC

RD

FR

ITH

VILLE

OSEC

L

WHITE CITY

EXHIBITION

CLOSE

RE

LA

Y R

OA

D

ARIEL

WAY

RD

CHARECROFT WAY

RO

CK

LEY

GDNS

GARDENS

ROAD

STSTERNE

GDNS

SINCLAIR

WO

OD

STOC

K

YA

W

GR

OH

AN

SA

RD

ME

WS

NO

RLA

ND

CLE

AR

WA

TER

YA

L

TCE

RO

CR

RO

YA

L

MS

VILLA

S

AN

N'S

R O

A D

OLA

F

ST

F R

E S

T O

N

BA

RD

STEVESHAM

RD

COMBE

SW

AN

S-

MORTIMER

RDSQ

WILSHAM

ST

PLSTONELEIGH

STO

NE

LEIG

H

TREADGOLD

AN

SLE

IGH

AN

N'S

PL

ST

ST

WHITCHURCH RD

SIR

DA

R

ALED

AV

ON

BOMORE

LLE

FN

ER

G

ST

L A

T I M

E R

SHINFIELD

CAV

EYNH

AM

NASCOT

GLEN

STWALL

STST

ROY

ERS-

ST

RO

AD

ST

OXFORD

KINGSBRIDGE

RO

AD

LATIMER

R O

A D

PL

KELFIELD

RD

R O

A D

BASSETT RD

GARDENS

DARFIELD

WAYNFLETE

WAY

SQ

FINS

TOC

K

GARDENS

AV

EN

UE

RD

HE

LEN

'S

GD

NS

CAMBRIDGE GDNS

STREET

BLECHYNDEN

KINGS

SILCHESTER

YE

LE

MA

RB

DA

OR

RD

CLOSE

CR

ROAD

CL

CLBELLAM

Y

STANIER

THAXTON

RO

GD

NS

PE

MB

RO

KE

PEMBROKE

DENS

ROAD

CH

A

GLE

DS

TAN

ES CHARLEVILLE

CLUB

FAIRHOLME

RO

AD

SP

EN

CE

RM

S

TER

FIELD

TAS

SO

RD

KIN

NO

UL

GARDENS

QU

EE

N'S

CLU

B

ST

MU

SA

RD

ANDREW'S

QUEEN'S

GDS

RDPERHAM

RO

AD

CHESSON

RO

AD

RD

CHESSON

BRAMBER

RDARCHEL

NO

RM

AN

D

TURNE-

VILLE

RD

ROAD

TU

RN

EV

ILLER

D

RD

ARCHEL

SQ

EC

AL

P

ROAD

ROAD

ROAD

STFANE

MARCHBANK

FRANKLIN

EU

NE

VA

NAPIER

CASTLETOWN

ROAD

ADDISON BR

MORE

ROAD

ROAD

GORLESTON

SOU

TH-

COMERAGHBARTON ROAD

VERNON

AVEFITZ-

EDITH

RO

AD

DENSGAR

PA

LLISE

R R

OA

D

BARON'S

AUR

IOL

NO

DDI

LG

ED

ITH

RO

AD

CLOSE

ROAD

GUNTERSTONE

MU

ND

EN

ST

COM

BE ST

DR

GL

AZ

BU

RY

COURT

GWENDWRRD

VE

RE

KE

R

MS

ST

AVEFITZJAMES

ROADTR

EV

AN

ION

GDS

RUSSELL

ROAD

GR

ATT

ON

HA

ZLI

TT

ROAD

BLYTHE

WAY

RO

AD

WALK

LYO

NS

MACLISE

BEAC

ONSF

IELD

ROAD

TERR

ACE

RUSSELL GARDENS MEWS

RD

RD

PO

RT

EN

RD

RD

SIN

CLA

IR

ROAD

RD

RD

RUSSELL

BISHOP KING'SROAD

EA

RS

BY PLA

CE

ADDISON

SON

GDSLANDHO

L-

R O

A D

ADD

I

CRES

ROAD

ROAD

CH

ALLO

NE

RS

T

ROAD

CR

CR

LLO

NE

R

BE

AU

MO

NT

MONT

BEAU

LIS

EDITH VILLAS

NOR

CR

ESE

ND

RDSTO

NOR

STANWICK

AV

RD

MORNINGTON

ROAD

MAT

HES

ON

AVONMORE

MUND ST

TT

AVI

AV

AIS

GILL

CLOSE

BECKFORD

WARW

ICK

HOLLAND PK RD

NA

PIE

R P

L

ROADRO

AD

RADNOR

TER

RD

OAKWOOD COURT

ADD

ISONRD

MELBURY

EDW

ARD

ESPLA

BB

OT'S

ST M

AR

Y

PEMBROKE

GDS

GAR

SQ

REDCLIFFE SQ

CO

LEHER

NE

F I N

B O

R

CR

ES

ON

GAR

PL

ROAD

RICKETT

HILDYARD

SE

AG

RA

VE

YDLILLIE

RDMERRINGTON

RD

RESS

EM

P-

ST

PLROXBY

IFIELD

REDCLIFFE SQ

TERW

ESTGATE

U G

H

MS

O

RO

AD

REDCLIFFE S

T

EARL'S

PENYWERN R

OAD

LOGAN PLACE

CR

OM

WELL

GARD

SQ

NEVERN

LONGRIDGE

ROAD

CLUNY

PH

ILC

RES

NEVERN

NEVERN ROAD

TREBO

VIR R

OAD

GD

NS

EA

RD

LEY

KE

M

NEVER

N SQ

NEVERN

SQ

SQ

CLO

SE

RD

PE

MB

RO

KE

CO

LEHER

NE

EARL'S COURT SQ

COURT

MS

KR

AM

ER ST

WHARFEDALE

QU

EE

NS

DA

LE

R O A D

AD

DIS

ON

V I L

L A

SS

Q

H O

L L

A N

D

ENT

GDNS

PL

ADDISON

SC

GD

NS

HO

LLAN

D P

K

DA

LE

AV

EN

UE

QU

EE

NS

-WK

NO

RLA

ND

PO

TTER

Y

RO

AD

RO

AD

STREET

GARDENSDARNLEY

RO

AD

PENZANCE

PRINCES

PENZANCE ST

PR

INC

ED

ALE

RUNCORNPA

RKP

AR

KP

LG

OR

HA

M

PL

PL

PLHESKETHR

OA

DT

HR

ES

HE

RS

PL

AV

ON

DA

LE

RD

WA

LME

R

CLA

RE

ND

ON

PO

RT

RO

AD

PL

RO

AD

LANE

PLA

CE

STDULFORD

HammersmithPier

NEW ZEALAND

WAY

ROAD

ROAD

ROAD

ROAD

DISTILLERY

LANE

MAN

B

CUMBERLAND

AVE

QU

EE

NS

CR

ES

EN

T

KIN

GS

DA

LE

GA

RD

EN

S

OLYM

PIA

WAY

STO

WE

BRITI

SH

MUL-

BERRY

PL

MILLER'SCT

GROV

E

STH

AITEN

PL

NO

BM

AH

C

PL

NORTH

SUSSEXPL

ALBION

MS

MS

FORGE

MEWS

BECKLOW

MEW

S

ED

AN

SCT

GR

AN

SD

EN

RD

CO

LLING

BO

UR

NE

RO

AD

NIE

TN

OF

ME

OLB

YA

W

PEONY

GDS

STOKESLE

Y ST

PIONEERCLOSE

EK

AL

NA

TS

POPL

AR MS

MILLER'S

WAY

OS

MA

N

RD

BLYTHEMS

BE

RG

-M

S

MS

OXFORD

GATE

MER

CERS

PLAC

E

CHARLOTTE

MEW

S

CHALK HILL

ROAD

COM

ME

WS

NORMAND

MS

Frank

Banfield

Park

ORCHARD

SQ

LANGTRY PL

PRINCE'S

MEWS

GS

VER-

NTHBENA

CHISWICK

BR

AD

ING

TCE

CT

AUGUSTUS

CLOSE

GA

INS

BO

RO

UG

HC

OU

RT

CL

APP

STATION

RUCKLIDGE

AVENUE

SALTER STREET

STA

TION

CLIFTON

H Y T H ER D

Trading EstateGateway

CREWEPL

ENTER

ST

FORTUNE

WA

Y

BUCKINGHAM

RD

HONEYWOOD

RD

RO

AD

BRAC

EWELL R

D

WOODMANS

Industrial Park

Mitre Bridge

MITR

E

HILL FARM RD

OAKWORTH ROAD

S T Q U I N T I N A V E N U E

CA

LD-

AV

E

PLERO

N

BARLBY

DALGARNO

D A L G A R N O

BREW

STER G

DS

NO

TT

US

HIG

HLE

VE

R

QU

INTIN

RD

GDNS

WA

Y

WA

Y

SU

TT

ON

WA

YP

AN

GB

OU

RN

E

G A R D E N S

ROAD

PURVES

HAZEL RD

R O A DH Y T H E

LETCHFORD

VALLIERE

RIGELEY

WALDO

GD

NS

LET

CH

FO

RD

KE

NM

ON

T

RD

MS

RD

GD

NS

P A L E R M O

LEGHO

RN

RD

FURNESS

ROAD RD

ODESSAWROTTE

R O A D

GD

NS

TRE

NM

AR

VICTOR

GD

NS

HO

LBE

RT

ON

ROAD

PONSARD RD

NAPIER RD

RO

AD R

OA

DR

AV

EN

SW

OR

TH

FE

LIX

TO

WE

RO

AD

PLACE

ALMA

GR

EY

HO

UN

D R

OA

D

BATHURST GDNS

RO

AD

ASHBURNHAMROAD

BURROWSROAD

EG

ELL

OC

RAINHAM RD

WAKEMAN RD

MORTIMER ROAD

Hythe RoadIndustrial

Estate

GW

ALI

OR

RD

LIF

FO

RD

RD

LACYRD

CARDINALRD

BANGA

BLA

CK

ET

T

ST

AN

BR

IDG

E

FA

RLO

W

RD

WY

MO

ND

WOL

TN

EP

NO

TF

ES

RD

ST

ST

ST

ST

ST

DA

FU

RS

T

DR

YA

DS

T

CLOSE

STOCKHURST

ELA

DN

OM

MO

C

WAY

HORNE WAY

SO

ME

RV

ILLE

AVBRASENOSE

DVE

OR

IEL

DVE

CH

UR

CH

ROAD

CART

WRI

GHT

WAY

WYATT

DR

IVE

EV

DW

YA

TT

TRINITY

HEIDEGGERCRES

EDMUNDS

SQ

SAINTCA

STE

LNA

U

GLE

NT

HA

MG

DN

S

LON

SDAL

E

ROAD

HOWSMANROAD

NOWELL ROAD

KILMING

TON RO

ADVE

RD

UN

RO

AD

FERRYLANE

CHISW

ICK

MALL

NETHERAVEN

RD

CORNWALL GVEBALFERNGVEASH

GROVE

WILTONAVE

BROOK

RD BEVERLEY

ROAD

HO

ME

FIE

LDR

OA

D

KCI

WSI

HC

LAN

E

EN

NIS

MO

RE

AV

UP

HA

MP

AR

K

TH

OR

NT

ON

AV

RA

VE

NS

ME

DE

WA

Y

STH

RO

AD

LANESOUTH

WO

OD

STO

CK

RD

QU

EE

N

RUPERT RD

AN

NE

'SG

DN

S

TH

EA

VE

NU

E

GREENEND

RD

RUGBYRD

SALTCOATS

RDHAMILT

ONRD

HA

WK

S-

RD

ST

.

RD

RD

AL

EX

AN

DR

A

GE

OR

GE

S

HATFIELD

ROAD

HE

AD

RD

CANHAM RD

ST

AN

LEY

GA

RD

EN

S

BRADFORD

RD

OAKWAY

SY

CA

MO

RE

CLS

EAST

ACTON

LANE

CA

RLI

SLE

AV

EN

UE

THE

TEE

SHAF

GD

NS

SCHOOL RD

BETHUNE RD

BASHLEY

RD

ST.

LEONARD'SRD

HARLEY RD

CAPLE

RDRANELAGH

RD

AVENUERD

BUCKINGHAMM

WS

SPEZIA RD

SUNBEAMCR

SHREWSBURY ST

SHREWSBURYST

ST.

TEMPLETO

N PLAC

E

RED

CLIFFE

GARDENS

CATHCART RD

FAWCETT S

T

REDCLIFFE

PL

SLA

IDB

UR

N S

T

BLA

ST

ST

NA

VIL

US

CT

PL

CASS

PLA

CE

CLPL

TH

AM

ES

PL

RUVIGNYCL

LOWERRICHMOND

RD

MUNSTER CT

LANCAS

COURT

ACCESS

ROAD

BURFORD WK

OAK

LEY WK

PAYNES

WK

FRE

EM

AN

SMITH

SR

ET

UH

S

SQVINE

SQ

SU

N

RD

INGTON

HALL

GDS

KENS-

DIEPPE

CLO

SE

MAY ST

AISGILL

AV

SQ

FARNELL

MS

STH EDWARDES

SQ

ST MARY ABBOTS TCE

STRANGW

AYS

TCE

RD

ILCHESTER

AB

BO

TSB

UR

YRD

AB

BO

TSB

UR

YC

L

OAKWOOD

LN

SOM

ERSE

T

SQ

RO

AD

ST

AVONMORE

VERNON

HAZLITT

BROO

K

BLA

CK

LAN

E

GA

RD

EN

S

ROAD

RD

FIELDINGRD

CRESSY

RO

AD

RO

AD

SU

LGR

AV

EGD

S

D'PORT

MS

LAR

CH

AV

DU

CR

OS

RD

EMLYN

GNS

ST

MARKETAPP

VERITYCL

CHARLOTTE

MS

RD

NO

RLA

ND

SQ

NORLAND

PL

CLO

SE

PO

RTLA

ND

RD

POR

TLAND

RD

HU

DS

ON

KC

OLE

VA

H

CL C

L

COMMONWEALTH

AVE

TEMPLEMEAD CL

CROW RD

MYLNECL

BLA

CK

PASS

RD

AD

AM

WK

WESTVIEW

CL

ST

NURSERY

LANE

BLAKESCL

ME

TH

WO

LD R

D

ST

AB

LE W

AY

WAY

WE

BB

CL

WENDOVER

RD

ROAD

CU

MB

ER

LAN

D P

K

STM

ARK'S

RD

PARSONS

RD

RD

TES

THORNE

DOWN

FIELD

IDY ROAD

TER

WEALTH

GO

ATE

LAKE

GIR

ON

D

SALIS-

CH

GR

E

TH

BE

TONE

ACHENS

GAR

TERRACE

MEWS

BR

IDG

E

TTERSEA

RY

KIE

GHTON

ENSCRAV

LD R

D

WEST

STO

N

ST

CRAN-

CTI

BOU

VE

RNE

ND

ELRING

MU

R

RE

RD

DO

STREET

CO

MB

E

PS

F

LANE

OR

D

RD

AD

TEAD

NTY

HESTER

RE

PUR

SERS

MANS

ART

VAN

CRES

CE

FUL-

CHIS

RO

AD

BUCHANAN

GDNS

PRISE

WAY

CLOSEDGE

BARTLE

ROAD

CO

WLIN

G

CLO

SE

LAN

D

BELL'S AL

SOTHERON

PL

GREEN

MO

NSO

N

LUS

HIN

G-

TON

RD

ALL

SO

ULS

'

ROAD

BRI

RD

DEPOT ROAD

CL

MA

CK

EN

ZIE

WHITE CITY

CL

LAU

RE

NC

E

RING

ST JAMES'S

ROAD

TER

ROAD

HIPPO

DR

OM

E

WESTVILLE

SW

EM

HIPPO-

PLACE

RICH-

CLARE-

ST

CROSS

FORD

ORO

UGH

MEW

S

KIN

GH

AM

DROME

HO

LLAN

D P

K

NDON

ST

HOLLAND

LANS-

GARDENS

ELG

INC

R

BLE

NH

EIM

CO

RN

WA

LL

OAKWOOD

SO

UTH

FIELD

COURT

ADDISON RD

RD

PETER'S

WO

RC

E-

DR

PETER'S

STER

ST ST

BLENHEIM RD

VILLAS

AVE

AP

PLE

-RO

AD

ROAD

SAM

UEL'

SCL

OSE

CRS

AVON-

ROAD

PE

MB

RO

KE

VILLA

S

FENELON

PL

MEWS

NEVERNPLACE

SQUARE

EARL'S

CO

UR

TR

OAD

DORCHESTER GVE

MAWSON

LANE

BO

ILE

AU

RO

AD

EVERDON

ROAD

PLACEKEBLE

Riverside

Studios

SQ

COOMER

ROAD

RD

SU

NR

D

SUN

MAY

ST

JOHN'S

WALHAM

YARD

ST MARKSGROVE

LANGTON ST

REDCLIFFE MEWS

AD

EFFIE

CLOSE

MARINEFIELD

MALTINGS PL

PARKHAM

STREET

GR

AN

FIELD

STR

EE

T

TROTT

ST

WHISTLERS AV

THOR NEY

CRES

FLOSSST

EP

RO

HT

NA

FS

T

WA

LKE

RP

L

HOTHAM ROAD

BO

RN

EO

ST

WES

THO

RPE

RD

LORE

STR

EE

T

DE

OD

OR

RO

AD

TERRACE

PIER

NE

WC

OM

EN

RD

PLO

UG

H R

OA

D

NORTH PASSAGE

SU

DLO

W

RO

AD

FIELD

BRAMBLE

GARDENS

JEDDO

MEWS

CR

CR

DOWNE

RISE

PK

PLACE

JOHN'S

GDNS

RD

BA

LLIOL R

D

BURY

AVE

SLEY

GEORGE

WICK

PO

RT

GLADETHE

INV

ER

ME

AD

CLO

SE

-H

CR

AT

C E

LA

D

CROWTHER

CLOSE

ELGIN CL

EMPRESS

APPROACH

GURNEYRD

HARWOOD

MEWS

IMPERIAL

CRESCENT

LE

RR

Y C

L

TE

KR

AM

LAN

E

MUNSTER

MEW

S

NORFOLK

TERR

ROSEWOOD

SQUARE

WA

LHA

M G

RE

EN

CO

UR

T

S'N

OSL

IW

DA

OR

SALT

ER

GA

LEN

A

GR

EE

NRODA

ANRD

DALE

SUNDEWCLOSE

JOSLINGSCLOSE

AS

KE

W C

RE

S

SOU

THW

AY

CLO

SE

TN

UH

CLOSE

QUEENSDALE

CRES

CASTLE CLOSE

BARBARA

RDJERVIS

PALEMEAD

CLOSE

THE

LEN

SB

UR

Y A

VE

NU

E

BOULEVARD

MILLSYARD

CROWN YD

CL

DAIRY CL

PLOUGH CLOSE

AMBER

WAY

S'DREHPEHS

ECALP HSUB

BOURBON

LANE

DERE CL

ERIN

CL

R O A D

LAN

E

CHISWICK

V A L E

EM

LYN

RO

AD

LAR

DE

N

AVE

T H E

WEST

VICT

ROAD

OLD

OAK

L A N

EO

L D

C O

M M

O N

O A

K

R O

A D

BAG

LANE

BRID

GE

R O

A D

SW

STER

MUN

RO

AD

GR

EE

NL

AN

E

PA

RS

ON

S

HO

ME

STE

AD

KELVEDO

N

RD

BAGLEY'S

LANE

PUTN

EY

RICHMOND

ROAD

ROAD

PUTNEY

HIGH

BRIDGE

WAY

P A L

R O A D

F U L H

A M

L I L L I E

BR

IDG

EW

AN

DS

WO

RTH

F U

R O

RO

AD

K I N

G 'S

STREET

PUTN

EY

BRID

GE

PUTN

EY

APPR

OACH

N E W

R O A D

FULHAM

FULHAMHIG

H

R O A D

ROAD

N E W

K I N G ' S

RO

AD

TOWNMEAD

BR

IDG

E

WA

ND

SW

OR

TH

DAWES

R O A

D

DAWES

L I L L I E

MU

NS

F U L H A M

ROAD

R O A D

ROAD

K I N G

' S

IMPERIAL

RO

AD

TO

WN

ME

AD

ROAD

RO

AD

R O

LOTS

RO

AD

CHEYNE

BR

IDG

EN

DR

OA

D

TRIN

ITY R

OA

D

STRE

ET

TALGARTH

ROAD

SH

EP

HE

K I N G

K I N G

ROAD

U X B R I D G ER O

WELL

D O

O W

ROAD

RO

AD

STU

DLA

ND

ST

GREYHOUND

BLYTHE

GDNS

ADDISON

ROAD

BECKLOW

ROAD

CO

NIN

GH

AM

RO

AD

HOUNDGREY

ROAD

ROAD

STAR

RO

AD

RD

LOWER ADDISON

ADD

AD

DIS

ON

PADD

H O L L A N D

H O L L A N D

W E S T W A Y

HIGH ROAD

RO

AD

H A M

M E R

S M I T H

HAM

MER

SMIT

H

BRID

GE

HAM

MER

SMIT

H

S T R

G R E A T W E S T

GOLD

WICK

ROAD

ENS

R O A D

GLENTHORNE

D A

L L

I N

G

ROAD

D A O

R

P A L A

BRIDGE

QUEEN

CARO

LINE

BEADONROAD

ROAD

TEERTS

F

HAMMERSMITH

BUTTERWICK

G R O

V E

HS

UB

RO

AD

H A M M E R S M I T HA S K E W

O L D

R O

A D

O A

K

R O

WO

OD

B L O

E M

F O

N T

E I N

U X B R

R O A D

D A

O R

C A N ED U

R O A D

SHEPHERD'S

BUSH

E N

A L

GREEN

A 3 2 2 0

LAN

E

L I L L I E

R O A D

ROAD

NORTH

END

RO

AD

R O A D

R O A D

W A R W

I C K

NO

RTH

WEST

RO

AD

EN

D

CROM

KENSINGTON

HIGHSTREET

OLDBROMPTON

R O A D

WESTCROMWELL ROAD

W A R W I C K

R O A D

ROAD

A V E N U E

S T R E E T

P A R K

NIGHT

RD

HARLESDEN

TUBBS ROAD

HIGH

STREET

SCR

UBS

LANE

HARROW

SC

RU

BS

LAN

E

ROAD

ROADHAR

S'D

REHPE

HSBU

SHDA

OR

O L D

O A

KC

O M

M O

NL A

N E

HAMMERFLYOVER

NO

RTH

RO

AD

EN

D

ERN

I D G EA D

ROW

ORIA

A M

ISON

TE

R

A C E

A D

LEY'S

E E T

DON

AN

HAWK

RD

'S

W A YW E S T

SMITH

A D

NUE

WALK

A D

L H

ROAD

INGALE

GARDENS

GDNS

ADDISON

A S K E WBROADWAY

PA

RS

ON

S

LOWER

GO

LDH

AWK

GR

EE

N

U LH A

M

C E

of BrentLondon Borough

Estate

EstateClem Attlee

GardensFlora

House

Ow

enR

obert

GreenEstate

Burne JonesHouse

LinacreCourt

Guinness

PeabodyEstate

Est

ate

Quee

n C

aroline

Em

lyn

Gardens

Woodford

Court

CourtBush

Gibbs

MARCUSGARVEYPARK

SwanWharf WillowbankWharf

eg

dirbt

oo

F

CarraraBank Wharf

HospitalLouise

Princess

HospitalHammersmith

Charing

Hospital

Cross

TheRavenscourt Park

Hospital

Chelsea

Ground

Football

Stadium

Linford

Q P RFootballGround

Fulham

Football

Ground

Christie

CentreBroadway

Earls CourtExhibitionBuilding

Empress

Building

Olympia

PALACEFULHAM

BBCTelevisionCentre

Scrubs

Old Oak

Sidings

Sidings

North Pole International Depot

Old Oak Common

H.M. Prison

Wormwood

Apollo

Kings Mall

SulivanEnterprise Centre

FulhamPools

State

ThamesWaterTower

LyricSquare

WestfieldLondon

CHISWICK HIGH ROAD

G R E AT W E S T R O A D

WELLESLEY ROAD

option 1

option 2

option 3

HammersmitH Flyunder Feasib il ity study 1 7

The start and end of a tunnel is known as a portal and it is at these portal locations that construction and operational matters are felt. Portals require a section of cutting, approximately 200m in length, followed by a structure to house ventilation equipment. This structure could be made integral to any redevelopment as has been the case in other tunnels.

There was a clear preference for the western portal at Hogarth roundabout and the eastern portal

at Warwick Road. A tunnel linking these two sites would be over two miles long and bypass a number of north-south routes that currently link to the A4. There was relatively low support for a short tunnel starting

Question 2If you support a tunnel replacement, or ‘flyunder’, where do you think it should start and end?

and ending in a similar manner to the current flyover. Despite this low support, a tunnel based on these start and end points was tested as it was likely to be the least expensive and disruptive.

Page 20: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

32%

25% 8%

11%16%8%

sHeP

Herd

s BUs

H ro

ad

HaMM

ersM

itH ro

ad

Cast

lena

U roa

d

grea

t CHe

rtse

y roa

d

fUlH

aM Pa

laCe

roa

d

WarWiCK road

a4 great West road a4 great West road

1 8 HammersmitH Flyunder Feasib il ity study

Very few tunnels have junctions with other routes. An example an exception is the Limehouse Link tunnel in east London that has a underground junction to allow eastbound traffic to turn off to Canary Wharf and for Canary Wharf traffic to join the westbound flow.

one of the feasibility study terms of reference was to examine the implications of linking the main A4 tunnel to north-south routes. only a small selection of these were offered in the multiple choice question including those around Hammersmith Gyratory which would likely become the mid-point of the tunnel and north-south routes at both western and eastern portal locations.

Two different approaches were taken to junction testing as part of the feasibility study. This was based on both the feedback above and the subsequent traffic analysis that was carried out under another of the study’s terms of reference.

Question 3Should the flyunder connect to any north-south links?

Page 21: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

LBHF

A4 Flyunder

PAGE 17

Chapter

Meters ±North

0 100m 250m 500m 1km

Figure 14: Masterplanning - Reconnecting Hammersmith

New direct north - south routes

Linking two public spaces

02Masterplanning - Reconnecting Hammersmith

Current route A4 layout changes

LBHF

A4 Flyunder

PAGE 17

Chapter

Meters ±North

0 100m 250m 500m 1km

Figure 14: Masterplanning - Reconnecting Hammersmith

New direct north - south routes

Linking two public spaces

02Masterplanning - Reconnecting Hammersmith

Current route A4 layout changes

Current one-way routes returning to two-way traffic

new direct north-south routes

new east-west connections

agree

20%strongly disagree

9%

disagree

10%

indifferent

36%strongly

agree

26%

one of the WLLD objectives for creating a tunnel for the A4 is to improve the urban environment in Hammersmith town centre. Given that currently two traffic systems dominate the town centre - the flyover and the gyratory - this question sought to establish what importance they play in the degradation of the town centre.

As can be seen from the results, almost half of respondents believed that the gyratory should work in two directions if possible. However, the remaining respondents did not consider this to be a priority.

The Hammersmith Gyratory performs a complex function in the local

and strategic road network and surrounds the key public transport interchange requiring a number of crossings which delay both traffic and pedestrian movement.

TfL, over the last few years, has removed similar gyratory systems to the benefit of all road users, returning

them to two-way working. Their current work programme includes gyratories in Wandsworth and Vauxhall Cross, as well as new studies for Stoke Newington, Swiss Cottage, Aldgate and Archway.

Question 4Do you think opportunities should be exploited to return Hammersmith Gyratory to two-way working?

Page 22: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

MALL

noise

18%

river severenCe

20%

visUal intrUsion

20%

toWn Centre severenCe

16%

otHer

6%air qUality

19%

2 0 HammersmitH Flyunder Feasib il ity study

The five options provided as answers to this question were taken directly from the RTF and WLLD reports. It should be noted that network performance (i.e. congestion and subsequent delay) is not listed as one of the current problems. TfL data shows that this stretch of strategic road performs better than most.

of the five options offered there was a balanced response with equal support for the resolution of the problems of air quality, noise, visual intrusion, town centre severance and river severance.

For the other responses a lack of housing was seen as a problem that a tunnel could overcome, as was neighbourhood connectivity and local road congestion.

The manner to which a number of tunnel alignments can address these problems is compared later in this report. It is apparent that some of these problems can be reduced, whereas others could be replaced or relocated.

Question 5What are the current problems that you would like to see the flyunder overcome?

Page 23: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

otHer 12%

Cost 20%

a4 ClosUre dUring ConstrUCtion 19%

ConstrUCtion lorry traffiC

15%traffiC diverting to loCal roads 34%

£

HammersmitH Flyunder Feasib il ity study 2 1

Four major concerns, based on the experience of other major road and infrastructure projects, were considered to be relevant to a tunnel replacement along the A4. These related to both the construction period of the tunnel and its subsequent opening and operation.

The biggest concern was the issue of traffic not using a tunnel and diverting onto other routes. This is likely to have been due to the existing congestion and delay on the borough’s local road network. This issue is explored in more detail in this report as are the other concerns which are all functions of the tunnel’s construction.

Cost was the next biggest concern which is understandable given the figures quoted in the evening Standard newspaper, which were reported as running into the ‘hundreds of millions’. The disruption caused to the A4 itself during construction and the number of lorries required were as much of a concern and the study has attempted to assign scales of impact based on various tunnel lengths and construction methodologies.

Question 6What are your main concerns for a flyunder?

other concerns range from overrunning construction cost and time, the underground cutting, how to deal with car breakdowns and exhaust fumes, the perception that it will never happen and that’s it is too ambitious as a scheme.

Page 24: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

West London Link Design in association with the Halcrow Group and Hammersmith BID

A TUNNEL TO REPLACE THE HAMMERSMITH FLYOVER: A CHAIN OF OPPORTUNITIES

We can transform a six lane swathe of tarmac into a site for housing, community buildings and workplaces, linking previously severed riverside streets to the rest of the Borough.

There is opportunity to repair the townscape with buildings sympathetic to their environment and turn the highway into a linear suburb.

FROM TARMAC TO TOWNSCAPE

Proposed View of the A4

CHISWICK

HAMMERSMITH

EARLS COURT

Current View

CHISWICK HAMMERSMITH EARL’S COURT

MA MALLLL22%

22%21%

7%7%

7%

14%

oPen sP

aCe

ConneCtions to tHe riverrelief road for

King stree tsHoP

s

HoUsing

offiCes

leisUre and

CoMMUnity Use s

2 2 HammersmitH Flyunder Feasib il ity study

Question 7What should any land freed up by the removal of the flyover be used for?

one of the terms of reference for the study was

To consider the nature, extent and potential value of any released surface land, bearing in mind existing planning policies and any potential from varied planning policies.

With the flyover removed, land would be released for a variety of uses, some that would generate

value to possibly fund the construction of the tunnel. The stated preference to this question was for the land to be kept public, rather than to be developed, which formed the basis of the WLLD work. The masterplan work done as part of the study utilised the responses to this question to generate a suitable development scheme and therefore income balanced against the need and request for additional urban open space in Hammersmith town centre and along the A4 corridor.

Page 25: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

taXation nationWide

21%

taXation london-Wide

17%

taXation H&f residents

5%

otHer

3%

User toll

19%

oversite develoPMent

35%

HammersmitH Flyunder Feasib il ity study 2 3

Question 8How should the flyunder be paid for?

Any tunnel project would require a substantial, innovative and multi-source financing model. This question was designed to tease out the local appetite for a number of financing methods. A third of respondents supported oversite development to fund the tunnel which supports the masterplan work done as part of the study.

Almost half of respondents supported taxation as a method for collecting funding, with half of those considering a national tax as the most suitable idea. This confirms the opinion of the strategic nature of this project and of the next stages of feasibility study.

Surprisingly 19 per cent of respondents supported a user toll on the tunnel to help finance the project. While this is a common feature in europe, toll roads in the UK are limited to the central London congestion charge zone, the M6 and a few tunnels and bridges. There are a number of economic, environmental and political issues around toll roads which are touched upon in the funding section of this report.

Page 26: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder
Page 27: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 2 5

BoRoUGH LeTTeRS

Page 28: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

Brendon Walsh Regeneration, Economic Development and Environment Department

Dear Cllr Botterill,

London Borough of Hounslow (LBH) welcomes the London Borough of Hammersmith & Fulhamʼs (LBH&F) bold and transformative vision for a ʻflyunderʼ in order to remove the severance caused by the Transport for London (TfL) road network around Hammersmith and Chiswick. The part of the A4 considered forms a perceptual and physical barrier between Chiswick High Road and the important amenity and heritage sites of the Thames, Dukes Meadows and Chiswick House & Gardens. It is also responsible for significant noise and air pollution, reducing the quality of life for those living nearby and depressing property values; opportunity for investment and development; and the local economy.

We therefore whole-heartedly support the principle of taking the main east-west artery underground and replacing it at surface with a local network, using the space freed for enabling development which is both imaginative and sympathetic in style and scope to integrate with the existing built form.

We now discuss the technical solution and the enabling development issues in turn.

In regards to the technical solution, we note that you have investigated various options for achieving this outcome, from a straight ʻcut & coverʼ replacement for the existing flyover in your borough and just into our borough east of Hogarth roundabout, to something more ambitious, involving a longer bored tunnel linking Chiswick to the vicinity of Earls Court. Clearly a longer bored tunnel helps spread the benefits of the project and it is tempting for us to push for such a tunnel to be taken even further west to replace the M4 elevated section through Brentford. However we understand that a large proportion of traffic using these roads is local. Without a series of complicated ramps and ʻportalsʼ providing access to a new underground highway - structures that would result in loss of property (some likely to be listed or of conservation value) and land area and act to simply displace severance - this traffic is likely to be re-diverted onto the existing network (or the proposed replacement streets). The benefits of the scheme, and indeed the total number of users, may therefore be insufficient to warrant the huge cost.

Cllr Nicholas Botterill London Borough of Hammersmith & FulhamTown Hall King StreetLondon W6 9JU

Regeneration, Economic Development and Environment Department Civic CentreLampton RoadHounslow TW3 4DN Your contact: Mark Frost Direct Line: 020 8583 5037 E-Mail: [email protected]

Our ref: Hammersmith FlyunderDate: 28 February 2014

At this stage, and based on the assessments provided to date, we remain 'solution blind' as long as our objectives for reducing severance, improving amenity and protecting heritage in Chiswick are observed.

On the face of it would seem that a ʻcut & coverʼ like for like replacement of the flyover extending to Hogarth roundabout may provide the best business case. Should this project be formally taken up by LBH&F or TfL to investigate further we would also like the assessment to give due consideration to whether such a structure could be extended as far as the Hogarth roundabout, or indeed further towards Sutton Court Road, assuming there was a technical solution to ensure appropriate connectivity with traffic coming from the A316 was retained. We note that if this connectivity is not provided, based on the current traffic data presented, it is likely that the replacement local network on the surface would still need to be of a relatively high capacity to deal with vehicles from the A316 which may negate the benefit of the whole scheme.

In regards to enabling development we are broadly speaking in favour of the quantumʼs you suggest within our borough, however much work would need to be done to ensure the design is of a high quality and complements the existing built form and urban grain. The Council has recently completed extensive Context and Character studies which will be useful in assisting the assessment of potential.

Yours sincerely,

Cllr Steve Curran Lead Member for planning, property, regeneration and housing

Cllr Ed Mayne, Lead Member Community Safety and Regulatory Services London Borough of Hounslow

2 6 HammersmitH Flyunder Feasib il ity study

Page 29: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 2 7

Illustrative view looking view looking east to St. Paul’s Green.

Page 30: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder
Page 31: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

C

CC

C

T

T

L

L

L

L

L

L

H

H

H

H

H

H

HH

H

H

H

E S

T H

A M

E RR I V

MERRIV THA ES

BATT

ERSEA

REACH

RIV

ER

WA

ND

LE

Chelsea

Harbour

GRAND

UN

ION

CANAL

FulhamBroadway

West Kensington

PutneyBridge

ParsonsGreen

Kensal Green

White City

Goldhawk

East Acton

Hammer-smith

ParkRavenscourt

StamfordBrook

Baron's Court

EarlsCourt

Latimer

Shepherd'sBush

Road

Road

Ham-mersmith

WillesdenJunction

Shepherd'sBush

Kensington(Olympia)

ImperialWharf

WestBrompton

TurnhamGreen

WoodLane

Market

Fulham

Hall

Town HallHammersmith

Town

National Rail

National R

ail

Distric

t Line

National R

ail

National R

ail

Hammersmith

& City

Line

Central line

District Line

District Line

TheQueen's

Club

GardensFurnivall

Brompton

Cemetery

EelBrook

Common

Park

South

Park

Hurlingham

Cemetery

Kensal Green

Cemetery

Little

Scrubs

ParkParkWormholt

Wormwood

Fulham

ParkRavenscourt

Bishops Park

Cemetery

CemeteryHammersmith

The Warren

Normand Park

Common

ParkCathnor

ParkWendell

St. Mary's

WORMWOOD SCRUBS

Hammersmith

ParsonsGreen

Shepherd's Bush

Chis

wic

k Eyo

t

S

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

REVO

R

RO

ST-

HA

RTS

WO

OD

JEDDO

KINNEAR RD

RDSWAINSON

TH

IRD

B R A Y B R O O KW U

L F S T A

N

ERCONWALD

FITZNEAL

RD

SOUTHFIELD

BLENHEIM RD

ADDISON GR

AB

ING

ER

FA

IRF

AX

PR

IOR

YA

V

WHELLOCKRD

BLANDFORD

WO

OD

STO

CK

RO

AD

RD

FLANDERS

BATH

RD

RO

MA

N

ROAD

RD

LON

SD

ALE

RO

AD

WENDELL

MA

PL

E

RD

RE

CH

T

MULTI

WARPLE

WAY

PK MSESSEX

BEECH

AV

AVE

HO

LL

EY

RD

LE

FR

OY

RD

MA

YF

IEL

D R

D

COBBOLD AY

LME

R

V A L E T T A

AG

NE

S

RD

RO

AD

CT

GLE

ND

UN

BR

OM

YA

RD

BOWES ROAD

RD

GLE

ND

UN

ASHFIELD

AV

EN

UE

TRINITY

OL

D O

AK

LAN

EN

OM

MO

C

MUIR

BRASSIE

FAIRWAY

DRIVE

RO

AD

BRASSIE

AV

KIN

GS

DO

WN

HO

YLA

KE

AVE AN

DR

EW

'SS

TR

OA

D

THE

LONG

MA

SH

IE

RD

GR

NT

AY

LO

R'S

BY

ET

HE

THE GREEN

SUNNINGDALE

AV

E

AVE

FOLIOT

WAY

MAY-

ROAD

MID

LAN

D

CHANDOS RD

TELFORD

BRUNEL RD

WE

LLS

HO

US

E R

D

WAY

EC

AR

RE

T

ROAD

AT

LA

S

STE

PH

EN

SO

N

ST

GO

OD

HA

LLST

NORTH POLE

WA

LLING

FOR

D

RDSNARSGATE

HIG

HLE

VE

R

CH

ES

TNU

T

ALLE

Y

MERTHYR

TER

TER

ROSEDEW

COLWITH

R A

N N

O C

H

ROAD

EV

ER

ING

TON

SEDLESCOMBERO

AD

RO

AD

CLO

SE

CR

AM

MO

ND

RO

AD

MU

LGR

AV

E

TAM

WO

RTH

ST

ROAD

RO

AD

RO

AD

R O

A D

WESTBRIDGE

BA

CRESCENT

ROAD

ROAD

MONTSERRAT

RO

AD

OX

FOR

D

ST

ESMOND

WIN

TH

OR

PE

RD

WA

DH

AM

RO

AD

ROAD

BE

PL

BE

CTI

VE

RD

BR

AN

DLE

HO

W

DR

LLIGL

EK

S

ROADPARKFAWE

NO

RT

HF

IELD

S

PL

EA

SA

NT

PO

INT

RO

AD

WA

Y

ENTERPRISE

OSIERS

CRESCENT

VIC

AR

AG

E

VICARAGE

GWYNNE

RO

AD

NO

TR

EVL

EY

RD

HA

RR

OW

AY

HOLMAN RD

LOM

BA

RD

RO

AD

ROAD

YO

RK

BR

IDG

ES

CO

UR

T

HOLGATE AVE

CLOSE

WAL

LIS

ST

HIBBERT

HO

PE

STREET

YORK

PLACE

PLAC

E

YORK

WAY

GAR

TON

S

CHATFIELD RD

MENDIPRD

ROAD WYNTER

STREET

USKRO

AD

CLOSE

NANTES

CLO

SE

GARRICK

CLOSE

CLO

SE

TUR

EN

E

CLO

SE

BA

RTH

OLO

ME

W

COLEFORD RD

ST

TON

SLE

Y

HILL

TON

SLE

Y

RO

AD

STM

OR

IES

TE

DG

EL

ST

EBNER RD

RD

BIR

DH

UR

ST

DE

MP

ST

ER

RD

SQMARRYAT

FU

LHA

M

RO

AD

SETTRINGTON

PLA

ST

CL

THO

RN

DIK

E

RO

AD

PETERBORO

UGH

CLOSE

PA

RK

GDS

VILLE

RO

BE

RTS

ST

ME

WS

SO

UTH

ST MARKS C

L

CRABTREE

CHILDERLEY

ST

KINGWOOD

STRODE

PARK

STREET

CREFIELD

CL

WO

OD

LAWN

GRESWELL STREET

RO

AD

DA

NE

ME

RE

RD

RO

SK

ELL

AS

HLO

NE

FE

ST

ING

ST

RO

AD

E M

B A

N K

M E

N T

RUVIGNY

BE

MIS

HFELSHAM

CH

AR

LWO

OD

RE

DG

RA

VE

RD

RD

BENDEMEER

JACKSON

HE

NR

Y

RD

SA

LVIN

RD

RO

TH

ER

WO

OD

RD

GLA

DW

YN

ST

GLE

ND

AR

VO

N

WE

ISS

RDR

OW

BIG

G'S

KINGS-

ST

WAT

ERM

AN

MA

SC

OT

TE

GW

ALI

OR

RD

RD

ROAD CLO

SEM

ER

E

GD

S

RD

RO

ELLERBY

DONERAILE

T H

E

RD

FINLAY

BISHOP'S

BISHO

P'S

CLONCURRY

RO

AD

STREET

STREET

NA

GE

ST

EV

E

LANGTHORNE

QUEENSMILL

WO

OD

LAW

N

LYSIA

LARNACH

NELLA

RO

AD

RO

AD

ETERNIT

WALK

CLO

SE

MILLS

HO

TT

CLOSEROWBERRY

WHEATSHEAF

MEADOWBANK

CLOSE

HO

LY

LANE

BOWFELLRDSKELWITH

RA

INV

ILLE

WINGRAVE

PE

TLE

Y

RD

RD

STREET

INGLETHORPE

HARBORD

KENYON

STREET

RO

AD

NITON

STREET

ROAD

STREET

STREET

STREET

STREET

STREETATALANTA

DELORME

AVERILL

ROAD

ROAD

SILVERTONELLALINE

R O

A D

ROAD

LANE

BOTHWELL

STREETHAW

KSMOOR

STREET

STREET

STREET ST

CLOSEADENEY

ANCILL

ROAD

ROAD

ALTHEA ST

STMEAD

RD

CAMBRIA

WANDON RD

FORD

ACKMAR R

D

ELTHIRON RD

BASUTO

WHITTINGSTALL

VERA RO

ADGOWAN

ROAD

RO

AD

ROAD

ROAD

LINV

ER

AT

NE

Y R

OA

D

DE

OD

ARFL

OR

IAN

RD

ROAD

FULH

AM

RDDURRELL

ROAD

CLOSE

STEEPLE

BU

RS

TO

CK

RD

ST

WEI

MAR

BR

EW

HO

US

E

DEODAR

ME

RIV

ALE

RO

AD

RO

AD

STH

IGH

WILLOWBANK

GATE

CHURCH

STVILLEGON-

RANELAGH

AP

PR

STATION

WALD

EMAR

EDGARLEY

TER

AVENUE

ROADCOLEHILL

GDNS

KIM

BE

LL GS

FIRTH

GS

CO

LEH

ILL

RIGAULT

BU

RLIN

GTO

N

BUER

RO

AD

PLACE

BURLINGTON

COMBERIN

GMERBURNFOOT

OXBER

RY

HORDER

RDD

OR

NC

LIFFE

AV

GARDENS

GDNS

HURLINGHAM

ED

EN

HU

RS

T

NA

PIE

RRA

NE

LAG

H

CROOKHAM ROAD

MIM

OSA STREET

LETT

ICE

LAUR

EL

RD

LANDRIDGE

FULH

AM

GD

HURLINGHAM

GR

IM

ELYSIUM

RD

RD

RD

PARK

FO

SK

ET

T

EWA

DO

LBY

AV

RD

EU

NE

VA

PK

RD

STR

EE

T

NS

DANCER ROAD

BETTRIDGE

CO

RT

AY

NE

ASHINGTO

NRO

AD

CR

ISTO

WE

BANK

RD RO

AD

ALD

ER

VILLE

ROAD

RD

HEATH

ED

DIS

CO

MB

E

DIONIS

RD

ST

ROAD

STREET

DORIA

GU

ION

RO

AD

ROAD

PERRYMS

TRE

ET

CT

DAISY

SULI

SULIVAN

LAN

E

CARNWATH

LANE

FORDM

OLES-

PE

TE

RB

OR

OU

GH

CO

NIG

ER

BR

OO

MH

OU

SE

MEWSBOROUGHPETER-

BR

OO

MH

OU

SE

RO

AD

RO

AD

IRENE

DELVIN

O

RD

DIN

GS

TON

E

ST

CLAN

STUDDRIDGE

RO

AD

ST

CARTY

ST

QU

AR

RE

ND

ON

BR

AD

BO

UR

NE

CHID

CRONDACEROAD

RD

CHIPS

RO

AD

RD

ROSEBURYSTE

PHEN

DALE

WOOLNEIGH

HUGON

SQPHILPOT

RO

AD

DYM

OC

K

ST

BR

EE

R

STR

EE

TS

TRE

ET

ROAD

ROAD

DEM

ORG

AN RD

HAMBLE

HAZLEBURY

SANDILANDS

INGDON

BELTRAN

STASHCOMBE

STNARBOROUGH

STFRISTON

ROAD

RD

RCH

RYECROFT

STREET

BO

WE

RD

EA

N S

T

EA

D

STR

EE

T

ST

OK

EN

ST

CHU

ST

BOV

RD

AC

FO

LD

RD

BROU

RDSNOWBURY

KBURY RD

CR

AN

BU

RY

RD

OA

ROAD

FU

RN

ES

S

GILSTEAD

PEARSCROFT

RDRD

COURT

RSCROFT

PEA-RD

CLOSE

WAITE

ROAD

SWIFT ST

FILM

ER

FERNHURST ROAD

ST

PETER'S

ESTCOURTPROTHEROMENDORA

ROAD CHALDON

AINTREEROADHANNELL

ROAD

RO

AD

SID

BU

RY

STLAMBROOK

WARDO

ST

TER

DANEHURST

WYFOLD

ALLESTREE ROADROWALLAN ROAD

ROADMABLETHORPEBRONSART ROAD

BR

ON

SA

RT

ROADKILMAINE ROAD

ROAD

REPORTON

AVENUE

AVENUE

STREET

BISHOP'S

LANE

ROAD

STOLAF'S

STREET

ORBAINSHERBROOKE

ROSALINE

VA

RN

A

ROADROAD

ROAD

RO

AD

BEDFORD PS

HU

MB

OLT

RO

AD

HUMBOLT ROAD

DISBROWE

WK

CAR

OLIN

EA

BB

EY

LAU

ND

RY

RD

RC

CL

PU

RC

ELL

RD

BA

YO

NN

E

BRECON RD

LAMPETER

GDNS

PE

LLAN

T

ROAD

MO

YLA

N R

OA

D

ROAD

BRECON

ROAD DELAFORD

TILTON

TOURNAY

ST. THOMAS'S W

AY

HA

RTIS

ME

RE

FA

BIA

N R

OA

D

ROAD

RO

AD

ROAD

OP'S

WIN

CH

END

ON

MIR

AB

EL R

OA

D

BLO

OM

PA

RK

TERMARVILLE

CH

ES

ILTON

RO

STR

EV

OR

FELD

EN

ROAD

RO

AD

RO

AD

MEW

S

RO

AD

RA

DIP

OLE

BISH

LILYV

ILLE

BROOKVILLEROSAVILLE

PARKVILLE

ROAD

LETTER-

STONE

RO

AD

RD

RO

AD

ROAD

ROAD

ROAD

RO

AD

DARLAN

RO

ADR

OA

DST M

AUR

ROAD

CLO

NM

EL

EPPLE

PLACEBRID

GES

CROSS

ROAD

ROAD

SHORROLDS

E RD

BURNTH

EPIRU

S

RO

AD

RY

LSTO

N

STREET

ROAD

ST

ROAD

COOMER PL

HALDANE

COOMER

MEWS

KEMPSON

AV

EHARW

OOD

MOORE

MSEPIRUS

FARM

CAMPANA

BA

RC

LAY

CL

JERDAN

NOVELLO

SHOTTENDANE

DOWN

HARBLE

RD

RDELMS RD

PLACE

FIELD

HECK-ROAD

ROAD

PULTON

BARCLAY

CASSIDYROAD

VANSTON

PARTHENIA

ST

RD

RD

RD

FAV

ROAD

RM

US

G

AR

GO

N

RD

MS

EFFIE

PLACE

BROADWAY

FULHAM

RD

ANSELM

EUSTACERD

ARMADALE

HALFORD

ROAD

ROAD

RACTON

RD

KN

IVE

TT

RD

WALHAM

ROADROAD

LANE

LANE

GROVE

FARM

RD

MIC

KLE

THW

AITE

STREET

BILLI

NG

RD

AVALON RD

HARWOOD

HILARY

RDTYRAW

LEY

BLAKE

CRES

RD

GDS

BOROUGH

PETER-

VILLA

S

ROAD

WANSDOWN

WA

TER

FOR

D

CE

DA

RN

E

RD

PLACE

BR

ITA

NN

IA

PARK

LOR

D

IMP

RO

WED

MICHAEL

TER

MELD

ON

CHERYLS

CL

CLOSE

ROAD

WAY

BRITANNIA

RO

AD

EMD

EN

SQ

RIALE

ST

SANDS END LANE

ITH

ST

RD

RUMBOLD RD

ROAD

WKLENODAN

WELL

MA

X

HOLMEAD RD

CR

ESCEN

T

PARK

BROMPTON

BILLING RD

PL

BILLI

NG

MO

RR

IS

EDENVALE ST

WILLIAM

ST

CHARLOW

CL

LANE

WATERMEADOW

PO

TTE

RS

STEPHENDALE

LINDROP ST

ST

QU

ER

RIN

BYAM

GLENROSA ST

RO

AD

KIL

RD

ST

ST

TYNEMOUTH ST

ELBE

RO

AD

RD

ST

ELSW

ICK

MAL

TIN

GS

STREET

RO

AD

WAY

Pier

Chelsea

Harbour

GR

OVE

ASHBURNHAM

STADIUM

GR

OVE

UP

CE

RN

E

TETC

OTTST

STFORD

SAND

-

REWELL

TETC

OTT

RD

RO

AD

LOTS

Chelsea

RO

AD

BURNABY

UV

ER

DA

LETA

DE

MA

RO

AD

RD

TERDAMER

FERN

SHAW

HO

RTEN

SIA

GU

NTER

EDITH TER

RDED

ITH

WharfChelsea

Creek

Wharf

ROAD

CREMORNE RD

RD

ST

Cremorne

AVENUE

HAR

BOU

R

HARBOUR DR

CH

ELSEA

SQUARE

ADMIRAL

THAMES AVE

PODMORE ROAD

ALM

A DIGHTONRD

BR

AM

FOR

D R

D

DA

LBY

RD

BA

LLAN

TIN

E S

T

YORK

ELTRINGHAM

PETERGATE

MARL RD

FERRIER ST

SMUGGLERS WAY

SMU

GG

LERS

OLD

YO

RK

RO

AD

MAYNARD C

L

GWYNCLOSE

JEW

SROW

ROAD

AVENUE

AVENUE

AVENUE

AV

EN

UE

AV

EN

UE

ROAD

HURLINGHAM

SQUARE

WILL

IAM

BURY

MS

R'S

ALLE

Y

WHEAT-

SHEAF

TERR

PALACEMEWS

CLARE

MWS

BROUGHTON

RD APPROACH

MU

STO

W

ST

ELYSIU

M P

L

MS

BR

AN

KS

EA

GRAN-

PLACE

MELBRAY

MS

LALOR ST

EXETER

MEW

S

JOHN

AVENUE

INGRAMMARGARET

CLOSE

PL

LEN

HU

GH

DALTON

AVE

HUGH

CL

GA

ITS

KE

LL

SW

AN

MS

WALK

BOLING

BROKE

LAN

E

SUNBU

ROAD

CHURCH

BA

TTE

RS

EA

ROAD

ST

RE

ET

HIG

H

ROAD

ELLI

VR

O

TCE

ROAD

ROAD

WORLIDGE ST

IMRE CL

ALDENSLEY

RD

LILY

ST

BROOK

HEM

OLD

CLOSEPARNELL

ELG

IN

AV

E

SIDE RDGREEN-

CREIGHTON

STREET

BEAUFORT

MS

TELEPHONE

PL

LANFREYPL

CHEESEMANS

ELSHAM

HOFLAND

UPPER ADDIS

ONLORNE

CRE

PL

Q U E E N S D A L E

GDS

MARY

ST ALBAN'SCHELMSFORD

ROAD

DN

OM

HCI

R

ROADROADANLEY RDS

YC

AM

OR

E

FIE

LD R

DL

EY

S-

WE

ST

VIL

LE R

OA

D

RY

LET

T

AS

HHURCHBASSEIN

PA

RK

CT

RAVENS-

LION

STAM

ME

RT

ON

AV

RD

GA

INS

BO

RO

UG

H

AV

EN

UE

RO

AD

BR

ITIS

H

AIR

ED

ALE

CL

EV

EL

AN

D A

V

NE

TH

ER

AV

ON

EV

OR

G

NOI

L

S'R

ET

EP

TS

SQ

UA

RE

QS

S'R

ET

EP

TS

ST PETER'S SQ

GS

MAL

L

GR

BRITISH

EY

OT

BERESTEDE

RD

GS

EY

OT

GS

TERHAMMERSMITH

VERBENA

LA

SQUARE

CROFT

SQ

MS

EV

OR

GBLACK LION

BR

OO

K

VAUGHAN AV

BROOKRDPALGRAVE

SOUTH

PR

EB

EN

D

FORD

PLE

YD

ELL

AV

SIDE

ST

AM

FO

RD

FL

MS

CO

S

BALMORAL

RO

AD

FO

BINDEN

CL

GDNS

STAMFORD

RA

VE

NS

CO

UR

T

OURT

AV

EN

UE

SQ

UA

RE

TERASHC

CRESCENT

ROAD

RD

RD

RO

AD

VILLA

SA

SH

CH

UR

CH

AMOR

RO

AD

KILMARSH

LONSDALE

RD

GLENTHAM

LILLIAN

ARUROAD

DR

S'A

DLI

H T

S

OADR

AV

RIVERVIEWCLAVE

GDNS

TR

UO

CS

NE

VA

R

UPPER

LA

NEST PETER'S

SO

UT

H

CO

UR

TR

DSAM

ELS PLACENAPIERLORD

LAN

EO

IL M

ILL

GDS

THERESA RHSI

DN

AT

S

ST

S'R

ET

EP

HAMLET

HA

ML

ET

GD

S

RO

VA

EB

PA

RK

RIV

ER

CO

UR

T

RO

AD

RO

AD

MALL

EC

AL

P

TR

UO

CN

EV

WE

LTJE

RA

VE

NS

-

AV

E

CO

UR

TE

NA

L G

OH

ERI

HS

PM

AH

RAVENSCOURT

PLACE

SID

EE

N

RA

VE

NS

CO

UR

T

GARDENS

SQ

GR

.

CH

UR

CH

GD

SK

ELM

SC

OT

T

RO

AD

DO

RV

ILLE

WIN

GA

TE

WELLESLEY

AV

RD

CR

LAM

ING

TO

N

REDMORE RD

RO

AD

CA

MB

RID

GE

GLENTHORNE

LOWER

RIVERSIDE

NIG

EL

GDS

MS

ET

AGL

EF

NIG

EL

PLA

YFA

IR

EV

A RI

AF

YAL

P

VA

LLE

WM

OR

C

ALBION

PL

HO

L-

ST

CO

MB

E

DR

MEWS

AV

E

BR

IDG

E

MA

CB

ET

H

GAR

DENS

MALL

GVE

RUTLAND

MA

LLR

D

WEI

VE

GDI

RB

PLACE

GR

OV

E

AR

GY

LEP

L

DOWN

AS

PE

NP

LD

IME

S

ST

RE

ET

LE

AM

OR

E S

TR

EE

T

BRACKENBURY

BENBOW

BA

NIM

PERRERS

RAYNHAM

ATWOOD

RD

FURBER

DA

LLIN

G ST

RE

ET

ST

BR

AD

MO

RE

PK

RD

RO

AD

ST

RE

ET

RO

AD

CA

RD

RO

SS

NA

SM

YT

H

AD

RO

AD

CA

RT

HE

WB

RA

CK

EN

BU

RY

HEBRON

RO

BA

T

RO

AD

RO

AD

ROAD

SO

UT

HE

RT

ON

IFF

LEY

RD

ADIE

MARCO

RD

RD

IFF

LEY

CARTHEW

COULTER

VILLAS

GDNS

BEAUCLERC

ROAD

AG

AT

E

RD

GS

ROAD

ST JAMES

BERYL

PARFREY STREET

ST DUNSTAN'S

CHANCELLOR'SST

RD

LOCHALINE

WINSLOW

DIS

TILLER

Y R

D

ROAD

STP

LAY

FAIR

CLA

YB

RO

OK

MAR

GR

AVINE

ROADASPENLEA

GASTEIN

CLAXTON

RDLU

RG

AN

AV

RD

GROVE

CLOSE

BROOK

STERNDALE

DEWHURST

NETHERWOOD

BISCAYYELDHAM

LUX

EM

BU

RG

GARDENS

WA

LKCHANCELLORS

TERRIVER

CRISP ST

BLACK'S

AN

GE

L

RO

AD

RO

AD

ROAD

ROAD

BU

TE

MELROSE

BATOUM

LENA

TRUSSLEY

OV

ER

ST

ON

E

RD

RD

ST

RE

ET

ME

WS

GR

OV

E

MS

AS

TR

OP

TCEASTROP

RD

SU

LGR

AV

E

RD

TCE

MS

ROAD

BA

RB

HSUB S'DREHPEHS

CROMWELL

GARDENS

RD

GDNS

LOR

IS

ME

LRO

SE

GR

GDNS

GREEN

GREAT CHURCH

ROAD

RO

WA

NTE

RR

AC

E

GA

RD

EN

SN

OTR

EVL

OW

RO

WA

N

SH

OR

T L

AN

DS

MARGRAVINE

SN

ED

RA

G T

EL

OCCLOSE

WATERHOUSE

MORE CLOSE

WINDSOR

CAITHNESS

DAN

IRVING

BLYTHE

BOLINGBROKE

US

TIN

E

GA

RD

EN

S

HAARLEMRD

BROOK

DU

NS

AN

Y

AU

G

GREEN

GREEN

RO

AD

APPLEGARTH

GART

H

ROAD

RO

AD

RD

LAKESIDE

RO

AD

ROAD

RE

FAR

OE

CE

YLO

N

MA

SB

RO

'

RO

AD

GIR

DLERS

AYN

HO

EROAD

SOU

L-ROADDERN

ROAD

MILSON

FIELDING

VA

LE T

ER

SP

RIN

G-

STREET

ROAD

RD

MILSON

RO

AD

RO

AD

RDROAD

PRIMULA

LIL

CU

STREET

RD

COURT

ASKHAM

PL

CU

RW

EN

VESPAN

THE

ARMSTRONG

ROAD

RD

CO

WLE

Y R

DA

V

SE

CO

ND

AS

KH

AM

ASKEW

ST ELMO

RD

FIE

LDO

LD

-

BECKLOW

ST

RO

NS

A

GAYFORD

R O A D

ELIZ

AB

ET

HD

AV

IS

GDS

AV

ST

ELM

OR

D

RD

ROAD

PARK

RY

LET

T

ROAD

RD

ROAD

ROAD

ROAD

MS

LAU EN

CE

R

LANDOR

HADYN

WK

OLLGAR CLOSE

CLIFTON

CR

ASKEW

AV CR

ES

RO

AD

WALLFLO

YEW

L O

C K

STEVENTON

ROAD

AV

EN

UE

FIR

ST

ROAD

ST

HILARY

WAY

FOXGLOVE

SQTAMARIS

K

H E M

RD

RO

AD

AYCLIFFE

URNE

S A W L E Y

ALDBO

RO

AD

ST

SE

DG

EF

OR

D

ROAD

CLEMATIS

TREE

R O

A D

DAFFODIL

WER

VIOLASQ

SUN

DEWSTREET

MELLITUS

NORBROKE

WA

LK

ST

STREET

S T R

E E

T

STREET

CA

CT

US

STREET

HIL

AR

Y

WK

ON

IA

STREET

HEN

CH

MAN

STOSMUND

S T

R E

E T

BE

G-

QU

AR

TE

RS

WE

ST

STREET

BENNELONG

ROAD

STANLAKE VILLAS

AVEN

UE

RD

AUSTRALIA

ROAD

GR

OV

E

GR

OV

E

GR

OV

E

RO

AD

RO

AD

BATSON

FINDON

ROAD

ST

AR

FIE

LD

DA

VIS

VIL

LE

PARK

ROXWELL

RO

AD

RO

AD

RO

AD

PE

RC

YP

ER

CY

RO

AD

ROAD

LYCETT

KEITH

RO

AD

GR

OV

E

CL

WE

ST

-

ROAD

RO

AD

GOODWIN

ST

RO

AD

RD

LEFFERN

RD

ELL

ING

HA

M

ROAD

CA

TH

NO

R

ME

LINA

RD

RO

AD

BO

S

HAM

CONING-

ROAD

VA

LEW

ILLOW

DUNRAVEN

GR

AV

ES

EN

D

WO

RM

HO

LT

ROAD

ROAD

TH

OR

PE

BA

NK

GA

LLOW

AY

RD

ST

PA

N

ST

BRYONY

ORCH ID

AC

RVE

ST

THE

CU

GD

S

SY

RVE

MILF

OIL

R O A D

AD

ELA

IDE

OA

KL

AN

DS

OR

MIS

TO

N

HALSBURY

ROAD

ST

ER

ICA

ROAD

BLO

EM

FO

NT

EIN D

AO

R

THORNFIELD

SCOTT'S

RO

RO

AD

RO

AD

ROAD

HE

TLE

Y

S'N

EH

PE

TS

TS

GO

DO

LPH

INR

DLL

OS

RE

GNI

RD

AR

MIN

GE

R

RO

AD

RO

AD

ROAD

G'HK

AV

EN

UE

RO

AD

TITMUSS

ROAD

DE

VO

NP

OR

T

WA

RB

EC

K

DA

OR

CO

VE

RD

ALE

DA

OR

RO

AD

ROAD

C O M M O N W E A L T H A V E

ROAD

ELLERSLIE

AVE

SOUTH

RD

ETHELDEN

WA

Y

COMMON-

AUSTRALIA

IND

IA

CA

NA

DA

AFRICA

EL

AD

BA

SU

TF

OL

CLOSE

BATMAN

STAN

SWINDON ST

SIN

UT

ROAD

WA

Y

RO

AD

AU

ST

RA

LIA

DORANDO

CLOSE

BENTWORTH

AR

TIL

LE

RY

LA

NE

STREET HEATHSTAN

MA

UR

ICE

ST

ST

TE

RR

ICK

MEWS

RD

SHALFLEET DR

Y E

L M

A R

B

WESTWICK

MINFORD

ST

TADMOR

SILV

ER

RO

AD

EN

AL

RA

FC

AM

WO

OD

-

MA

RK

ET

GR

OV

E

SH

EP

HE

RD

'S

RIC

HF

OR

D

BU

SH

WE

LLS

GER

RO

AD

EMI

L

SN

ED

RA

G

PE

NN

AR

D

ST

HOPG

OO

D

RD

ROAD

BA

MB

-

POPLAR

GDS

GROVE

BULWERST

ST

INE

ALD

NO

TX

AC

RD

FR

ITH

VILLE

OSEC

L

WHITE CITY

EXHIBITION

CLOSE

RE

LA

Y R

OA

D

ARIEL

WAY

RD

CHARECROFT WAY

RO

CK

LEY

GDNS

GARDENS

ROAD

STSTERNE

GDNS

SINCLAIR

WO

OD

STOC

K

YA

W

GR

OH

AN

SA

RD

ME

WS

NO

RLA

ND

CLE

AR

WA

TER

YA

L

TCE

RO

CR

RO

YA

L

MS

VILLA

S

AN

N'S

R O

A D

OLA

F

ST

F R

E S

T O

N

BA

RD

STEVESHAM

RD

COMBE

SW

AN

S-

MORTIMER

RDSQ

WILSHAM

ST

PLSTONELEIGH

STO

NE

LEIG

H

TREADGOLD

AN

SLE

IGH

AN

N'S

PL

ST

ST

WHITCHURCH RD

SIR

DA

R

ALED

AV

ON

BOMORE

LLE

FN

ER

G

ST

L A

T I M

E R

SHINFIELD

CAV

EYNH

AM

NASCOT

GLEN

STWALL

STST

ROY

ERS-

ST

RO

AD

ST

OXFORD

KINGSBRIDGE

RO

AD

LATIMER

R O

A D

PL

KELFIELD

RD

R O

A D

BASSETT RD

GARDENS

DARFIELD

WAYNFLETE

WAY

SQ

FINS

TOC

K

GARDENS

AV

EN

UE

RD

HE

LEN

'S

GD

NS

CAMBRIDGE GDNS

STREET

BLECHYNDEN

KINGS

SILCHESTER

YE

LE

MA

RB

DA

OR

RD

CLOSE

CR

ROAD

CL

CLBELLAM

Y

STANIER

THAXTON

RO

GD

NS

PE

MB

RO

KE

PEMBROKE

DENS

ROAD

CH

A

GLE

DS

TAN

ES CHARLEVILLE

CLUB

FAIRHOLME

RO

AD

SP

EN

CE

RM

S

TER

FIELD

TAS

SO

RD

KIN

NO

UL

GARDENS

QU

EE

N'S

CLU

B

ST

MU

SA

RD

ANDREW'S

QUEEN'S

GDS

RDPERHAM

RO

AD

CHESSON

RO

AD

RD

CHESSON

BRAMBER

RDARCHEL

NO

RM

AN

D

TURNE-

VILLE

RD

ROAD

TU

RN

EV

ILLER

D

RD

ARCHEL

SQ

EC

AL

P

ROAD

ROAD

ROAD

STFANE

MARCHBANK

FRANKLIN

EU

NE

VA

NAPIER

CASTLETOWN

ROAD

ADDISON BR

MORE

ROAD

ROAD

GORLESTON

SOU

TH-

COMERAGHBARTON ROAD

VERNON

AVEFITZ-

EDITH

RO

AD

DENSGAR

PA

LLISE

R R

OA

D

BARON'S

AUR

IOL

NO

DDI

LG

ED

ITH

RO

AD

CLOSE

ROAD

GUNTERSTONE

MU

ND

EN

ST

COM

BE ST

DR

GL

AZ

BU

RY

COURT

GWENDWRRD

VE

RE

KE

R

MS

ST

AVEFITZJAMES

ROADTR

EV

AN

ION

GDS

RUSSELL

ROAD

GR

AT

TO

N

HA

ZLI

TT

ROAD

BLYTHE

WAY

RO

AD

WALK

LYO

NS

MACLISE

BEAC

ONSF

IELD

ROAD

TERR

ACE

RUSSELL GARDENS MEWS

RD

RD

PO

RT

EN

RD

RD

SIN

CLA

IR

ROAD

RDRD

RUSSELL

BISHOP KING'SROAD

EA

RS

BY PLA

CE

ADDISON

SON

GDSLANDHO

L-R

O A

D

ADD

I

CRES

ROAD

ROAD

CH

ALLO

NE

RS

T

ROAD

CR

CR

LLO

NE

R

BE

AU

MO

NT

MONT

BEAU

LIS

EDITH VILLAS

NOR

CR

ESE

ND

RDSTO

NOR

STANWICK

AV

RD

MORNINGTON

ROAD

MAT

HES

ON

AVONMORE

MUND ST

TT

AVI

AV

AIS

GILL

CLOSE

BECKFORD

WARW

ICK

HOLLAND PK RD

NA

PIE

R P

L

ROADRO

AD

RADNOR

TER

RD

OAKWOOD COURT

ADD

ISONRD

MELBURY

EDW

ARD

ESPLA

BB

OT'S

ST M

AR

Y

PEMBROKE

GDS

GAR

SQ

REDCLIFFE SQ

CO

LEHER

NE

F I N

B O

R

CR

ES

ON

GAR

PL

ROAD

RICKETT

HILDYARD

SE

AG

RA

VE

YDLILLIE

RDMERRINGTON

RD

RESS

EM

P-

ST

PLROXBY

IFIELD

REDCLIFFE SQ

TERW

ESTGATE

U G

H

MS

O

RO

AD

REDCLIFFE S

T

EARL'S

PENYWERN R

OAD

LOGAN PLACE

CR

OM

WELL

GARD

SQ

NEVERN

LONGRIDGE

ROAD

CLUNY

PH

ILC

RES

NEVERN

NEVERN ROAD

TREBO

VIR R

OAD

GD

NS

EA

RD

LEY

KE

M

NEVER

N SQ

NEVERN

SQ

SQ

CLO

SE

RD

PE

MB

RO

KE

CO

LEHER

NE

EARL'S COURT SQ

COURT

MS

KR

AM

ER ST

WHARFEDALE

QU

EE

NS

DA

LE

R O A D

AD

DIS

ON

V I L

L A

SS

Q

H O

L L

A N

D

ENT

GDNS

PL

ADDISON

SC

GD

NS

HO

LLAN

D P

K

DA

LE

AV

EN

UE

QU

EE

NS

-WK

NO

RLA

ND

PO

TTER

Y

RO

AD

RO

AD

STREET

GARDENSDARNLEY

RO

AD

PENZANCE

PRINCES

PENZANCE ST

PR

INC

ED

ALE

RUNCORNPA

RKP

AR

KP

LG

OR

HA

M

PL

PL

PLHESKETHR

OA

DT

HR

ES

HE

RS

PL

AV

ON

DA

LE

RD

WA

LME

R

CLA

RE

ND

ON

PO

RT

RO

AD

PL

RO

AD

LANE

PLA

CE

STDULFORD

HammersmithPier

NEW ZEALAND

WAY

ROAD

ROAD

ROAD

ROAD

DISTILLERY

LANE

MAN

B

CUMBERLAND

AVE

QU

EE

NS

CR

ES

EN

T

KIN

GS

DA

LE

GA

RD

EN

S

OLYM

PIA

WAY

STO

WE

BRITI

SH

MUL-

BERRY

PL

MILLER'SCT

GROV

E

STH

AITEN

PL

NO

BM

AH

C

PL

NORTH

SUSSEXPL

ALBION

MS

MS

FORGE

MEWS

BECKLOW

MEW

S

ED

AN

SCT

GR

AN

SD

EN

RD

CO

LLING

BO

UR

NE

RO

AD

NIE

TN

OF

ME

OLB

YA

W

PEONY

GDS

STOKESLE

Y ST

PIONEERCLOSE

EK

AL

NA

TS

POPL

AR MS

MILLER'S

WAY

OS

MA

N

RD

BLYTHEMS

BE

RG

-M

S

MS

OXFORD

GATE

MER

CERS

PLAC

E

CHARLOTTE

MEW

S

CHALK HILL

ROAD

COM

ME

WS

NORMAND

MS

Frank

Banfield

Park

ORCHARD

SQ

LANGTRY PL

PRINCE'S

MEWS

GS

VER-

NTHBENA

CHISWICK

BR

AD

ING

TCE

CT

AUGUSTUS

CLOSE

GA

INS

BO

RO

UG

HC

OU

RT

CL

APP

STATION

RUCKLIDGE

AVENUE

SALTER STREET

STA

TION

CLIFTON

H Y T H ER D

Trading EstateGateway

CREWEPL

ENTER

ST

FORTUNE

WA

Y

BUCKINGHAM

RD

HONEYWOOD

RD

RO

AD

BRAC

EWELL R

D

WOODMANS

Industrial Park

Mitre Bridge

MITR

E

HILL FARM RD

OAKWORTH ROAD

S T Q U I N T I N A V E N U E

CA

LD-

AV

E

PLERO

N

BARLBY

DALGARNO

D A L G A R N O

BREW

STER G

DS

NO

TT

US

HIG

HLE

VE

R

QU

INTIN

RD

GDNS

WA

Y

WA

Y

SU

TT

ON

WA

YP

AN

GB

OU

RN

E

G A R D E N S

ROAD

PURVES

HAZEL RD

R O A DH Y T H E

LETCHFORD

VALLIERE

RIGELEY

WALDO

GD

NS

LET

CH

FO

RD

KE

NM

ON

T

RD

MS

RD

GD

NS

P A L E R M O

LEGHO

RN

RD

FURNESS

ROAD RD

ODESSAWROTTE

R O A D

GD

NS

TRE

NM

AR

VICTOR

GD

NS

HO

LBE

RT

ON

ROAD

PONSARD RD

NAPIER RD

RO

AD R

OA

DR

AV

EN

SW

OR

TH

FE

LIX

TO

WE

RO

AD

PLACE

ALMA

GR

EY

HO

UN

D R

OA

D

BATHURST GDNS

RO

AD

ASHBURNHAMROAD

BURROWSROAD

EG

ELL

OC

RAINHAM RD

WAKEMAN RD

MORTIMER ROAD

Hythe RoadIndustrial

Estate

GW

ALI

OR

RD

LIF

FO

RD

RD

LACYRD

CARDINALRD

BANGA

BLA

CK

ET

T

ST

AN

BR

IDG

E

FA

RLO

W

RD

WY

MO

ND

WOL

TN

EP

NO

TF

ES

RD

ST

ST

ST

ST

ST

DA

FU

RS

T

DR

YA

DS

T

CLOSE

STOCKHURST

ELA

DN

OM

MO

C

WAY

HORNE WAY

SO

ME

RV

ILLE

AVBRASENOSE

DVE

OR

IEL

DVE

CH

UR

CH

ROAD

CART

WRI

GHT

WAY

WYATT

DR

IVE

EV

DW

YA

TT

TRINITY

HEIDEGGERCRES

EDMUNDS

SQ

SAINTCA

STE

LNA

U

GLE

NT

HA

MG

DN

S

LON

SDAL

E

ROAD

HOWSMANROAD

NOWELL ROAD

KILMING

TON RO

ADVE

RD

UN

RO

AD

FERRYLANE

CHISW

ICK

MALL

NETHERAVEN

RD

CORNWALL GVEBALFERNGVEASH

GROVE

WILTONAVE

BROOK

RD BEVERLEY

ROAD

HO

ME

FIE

LDR

OA

D

KCI

WSI

HC

LAN

E

EN

NIS

MO

RE

AV

UP

HA

MP

AR

K

TH

OR

NT

ON

AV

RA

VE

NS

ME

DE

WA

Y

STH

RO

AD

LANESOUTH

WO

OD

STO

CK

RD

QU

EE

N

RUPERT RD

AN

NE

'SG

DN

S

TH

EA

VE

NU

E

GREENEND

RD

RUGBYRD

SALTCOATS

RDHAMILT

ONRD

HA

WK

S-

RD

ST

.

RD

RD

AL

EX

AN

DR

A

GE

OR

GE

S

HATFIELD

ROAD

HE

AD

RD

CANHAM RD

ST

AN

LEY

GA

RD

EN

S

BRADFORD

RD

OAKWAY

SY

CA

MO

RE

CLS

EAST

ACTON

LANE

CA

RLI

SLE

AV

EN

UE

THE

TEE

SHAF

GD

NS

SCHOOL RD

BETHUNE RD

BASHLEY

RD

ST.

LEONARD'SRD

HARLEY RD

CAPLE

RDRANELAGH

RD

AVENUERD

BUCKINGHAMM

WS

SPEZIA RD

SUNBEAMCR

SHREWSBURY ST

SHREWSBURYST

ST.

TEMPLETO

N PLAC

E

RED

CLIFFE

GARDENS

CATHCART RD

FAWCETT S

T

REDCLIFFE

PL

SLA

IDB

UR

N S

T

BLA

ST

ST

NA

VIL

US

CT

PL

CASS

PLA

CE

CLPL

TH

AM

ES

PL

RUVIGNYCL

LOWERRICHMOND

RD

MUNSTER CT

LANCAS

COURT

ACCESS

ROAD

BURFORD WK

OAK

LEY WK

PAYNES

WK

FRE

EM

AN

SMITH

SR

ET

UH

S

SQVINE

SQ

SU

N

RD

INGTON

HALL

GDS

KENS-

DIEPPE

CLO

SE

MAY ST

AISGILL

AV

SQ

FARNELL

MS

STH EDWARDES

SQ

ST MARY ABBOTS TCE

STRANGW

AYS

TCE

RD

ILCHESTER

AB

BO

TSB

UR

YRD

AB

BO

TSB

UR

YC

L

OAKWOOD

LN

SOM

ERSE

T

SQ

RO

AD

ST

AVONMORE

VERNON

HAZLITT

BROO

K

BLA

CK

LAN

E

GA

RD

EN

S

ROAD

RD

FIELDINGRD

CRESSY

RO

AD

RO

AD

SU

LGR

AV

EGD

S

D'PORT

MS

LAR

CH

AV

DU

CR

OS

RD

EMLYN

GNS

ST

MARKETAPP

VERITYCL

CHARLOTTE

MS

RD

NO

RLA

ND

SQ

NORLAND

PL

CLO

SE

PO

RTLA

ND

RD

POR

TLAND

RD

HU

DS

ON

KC

OLE

VA

H

CL C

L

COMMONWEALTH

AVE

TEMPLEMEAD CL

CROW RD

MYLNECL

BLA

CK

PASS

RD

AD

AM

WK

WESTVIEW

CL

ST

NURSERY

LANE

BLAKESCL

ME

TH

WO

LD R

D

ST

AB

LE W

AY

WAY

WE

BB

CL

WENDOVER

RD

ROAD

CU

MB

ER

LAN

D P

K

STM

ARK'S

RD

PARSONS

RD

RD

TES

THORNE

DOWN

FIELD

IDY ROAD

TER

WEALTH

GO

ATE

LAKE

GIR

ON

D

SALIS-

CH

GR

E

TH

BE

TONE

ACHENS

GAR

TERRACE

MEWS

BR

IDG

E

TTERSEA

RY

KIE

GHTON

ENSCRAV

LD R

D

WEST

STO

N

ST

CRAN-

CTI

BOU

VE

RNE

ND

ELRING

MU

R

RE

RD

DO

STREET

CO

MB

E

PS

F

LANE

OR

D

RD

AD

TEAD

NTY

HESTER

RE

PUR

SERS

MANS

ART

VAN

CRES

CE

FUL-

CHIS

RO

AD

BUCHANAN

GDNS

PRISE

WAY

CLOSEDGE

BARTLE

ROAD

CO

WLIN

G

CLO

SE

LAN

D

BELL'S AL

SOTHERON

PL

GREEN

MO

NSO

N

LUS

HIN

G-

TON

RD

ALL

SO

ULS

'

ROAD

BRI

RD

DEPOT ROAD

CL

MA

CK

EN

ZIE

WHITE CITY

CL

LAU

RE

NC

E

RING

ST JAMES'S

ROAD

TER

ROAD

HIPPO

DR

OM

E

WESTVILLE

SW

EM

HIPPO-

PLACE

RICH-

CLARE-

ST

CROSS

FORD

ORO

UGH

MEW

S

KIN

GH

AM

DROME

HO

LLAN

D P

K

NDON

ST

HOLLAND

LANS-

GARDENS

ELG

INC

R

BLE

NH

EIM

CO

RN

WA

LL

OAKWOOD

SO

UTH

FIELD

COURT

ADDISON RD

RD

PETER'S

WO

RC

E-

DR

PETER'S

STER

ST ST

BLENHEIM RD

VILLAS

AVE

AP

PLE

-RO

AD

ROAD

SAM

UEL'

SCL

OSE

CRS

AVON-

ROAD

PE

MB

RO

KE

VILLA

S

FENELON

PL

MEWS

NEVERNPLACE

SQUARE

EARL'S

CO

UR

TR

OAD

DORCHESTER GVE

MAWSON

LANE

BO

ILE

AU

RO

AD

EVERDON

ROAD

PLACEKEBLE

Riverside

Studios

SQ

COOMER

ROAD

RD

SU

NR

D

SUN

MAY

ST

JOHN'S

WALHAM

YARD

ST MARKSGROVE

LANGTON ST

REDCLIFFE MEWS

AD

EFFIE

CLOSE

MARINEFIELD

MALTINGS PL

PARKHAM

STREET

GR

AN

FIELD

STR

EE

T

TROTT

ST

WHISTLERS AV

THOR NEY

CRES

FLOSSST

EP

RO

HT

NA

FS

T

WA

LKE

RP

L

HOTHAM ROAD

BO

RN

EO

ST

WES

THO

RPE

RD

LORE

STR

EE

T

DE

OD

OR

RO

AD

TERRACE

PIER

NE

WC

OM

EN

RD

PLO

UG

H R

OA

D

NORTH PASSAGE

SU

DLO

W

RO

AD

FIELD

BRAMBLE

GARDENS

JEDDO

MEWS

CR

CR

DOWNE

RISE

PK

PLACE

JOHN'S

GDNS

RD

BA

LLIOL R

D

BURY

AVE

SLEY

GEORGE

WICK

PO

RT

GLADETHE

INV

ER

ME

AD

CLO

SE

-H

CR

AT

C E

LA

D

CROWTHER

CLOSE

ELGIN CL

EMPRESS

APPROACH

GURNEYRD

HARWOOD

MEWS

IMPERIAL

CRESCENT

LE

RR

Y C

L

TE

KR

AM

LAN

E

MUNSTER

MEW

S

NORFOLK

TERR

ROSEWOOD

SQUARE

WA

LHA

M G

RE

EN

CO

UR

T

S'N

OSL

IW

DA

OR

SALT

ER

GA

LEN

A

GR

EE

NRODA

ANRD

DALE

SUNDEWCLOSE

JOSLINGSCLOSE

AS

KE

W C

RE

SSO

UTH

WAY

CLO

SE

TN

UH

CLOSE

QUEENSDALE

CRES

CASTLE CLOSE

BARBARA

RDJERVIS

PALEMEAD

CLOSE

THE

LEN

SB

UR

Y A

VE

NU

E

BOULEVARD

MILLSYARD

CROWN YD

CL

DAIRY CL

PLOUGH CLOSE

AMBER

WAY

S'DREHPEHS

ECALP HSUB

BOURBON

LANE

DERE CL

ERIN

CL

R O A D

LAN

E

CHISWICK

V A L E

EM

LYN

RO

AD

LAR

DE

N

AVE

T H E

WEST

VICT

ROAD

OLD

OAK

L A N

EO

L D

C O

M M

O N

O A

K

R O

A D

BAG

LANE

BRID

GE

R O

A D

SW

STER

MUN

RO

AD

GR

EE

NL

AN

E

PA

RS

ON

S

HO

ME

STE

AD

KELVEDO

N

RD

BAGLEY'S

LANE

PUTN

EY

RICHMOND

ROAD

ROAD

PUTNEY

HIGH

BRIDGE

WAY

P A L

R O A D

F U L H

A M

L I L L I E

BR

IDG

EW

AN

DS

WO

RTH

F U

R O

RO

AD

K I N

G 'S

STREET

PUTN

EY

BRID

GE

PUTN

EY

APPR

OACH

N E W

R O A D

FULHAM

FULHAMHIG

H

R O A D

ROAD

N E W

K I N G ' S

RO

AD

TOWNMEAD

BR

IDG

E

WA

ND

SW

OR

TH

DAWES

R O A

D

DAWES

L I L L I E

MU

NS

F U L H A M

ROAD

R O A D

ROAD

K I N G

' S

IMPERIAL

RO

AD

TO

WN

ME

AD

ROAD

RO

AD

R O

LOTS

RO

AD

CHEYNE

BR

IDG

EN

DR

OA

D

TRIN

ITY R

OA

D

STRE

ET

TALGARTH

ROAD

SH

EP

HE

K I N G

K I N G

ROAD

U X B R I D G ER O

WELL

D O

O W

ROAD

RO

AD

STU

DLA

ND

ST

GREYHOUND

BLYTHE

GDNS

ADDISON

ROAD

BECKLOW

ROAD

CO

NIN

GH

AM

RO

AD

HOUNDGREY

ROAD

ROAD

STAR

RO

AD

RD

LOWER ADDISON

ADD

AD

DIS

ON

PADD

H O L L A N D

H O L L A N D

W E S T W A Y

HIGH ROAD

RO

AD

H A M

M E R

S M I T H

HAM

MER

SMIT

H

BRID

GE

HAM

MER

SMIT

H

S T R

G R E A T W E S T

GOLD

WICK

ROAD

ENS

R O A D

GLENTHORNE

D A

L L

I N

G

ROAD

D A O

R

P A L A

BRIDGE

QUEEN

CARO

LINE

BEADONROAD

ROAD

TEERTS

F

HAMMERSMITH

BUTTERWICK

G R O

V E

HS

UB

RO

AD

H A M M E R S M I T H

A S K E W

O L D

R O

A D

O A

K

R O

WO

OD

B L O

E M

F O

N T

E I N

U X B R

R O A D

D A

O R

C A N ED U

R O A D

SHEPHERD'S

BUSH

E N

A L

GREEN

A 3 2 2 0

LAN

E

L I L L I E

R O A D

ROAD

NORTH

END

RO

AD

R O A D

R O A D

W A R W

I C K

NO

RTH

WEST

RO

AD

EN

D

CROM

KENSINGTON

HIGHSTREET

OLDBROMPTON

R O A D

WESTCROMWELL ROAD

W A R W I C K

R O A D

ROAD

A V E N U E

S T R E E T

P A R K

NIGHT

RD

HARLESDEN

TUBBS ROAD

HIGH

STREET

SCR

UBS

LANE

HARROW

SC

RU

BS

LAN

E

ROAD

ROADHAR

S'D

REHPE

HSBU

SHDA

OR

O L D

O A

KC

O M

M O

NL A

N E

HAMMERFLYOVER

NO

RTH

RO

AD

EN

D

ERN

I D G EA D

ROW

ORIA

A M

ISON

TE

R

A C E

A D

LEY'S

E E T

DON

AN

HAWK

RD

'S

W A YW E S T

SMITH

A D

NUE

WALK

A D

L H

ROAD

INGALE

GARDENS

GDNS

ADDISON

A S K E W

BROADWAY

PA

RS

ON

S

LOWER

GO

LDH

AWK

GR

EE

N

U LH A

M

C E

of BrentLondon Borough

Estate

EstateClem Attlee

GardensFlora

House

Ow

enR

obert

GreenEstate

Burne JonesHouse

LinacreCourt

Guinness

PeabodyEstate

Est

ate

Quee

n C

aroline

Em

lyn

Gardens

Woodford

Court

CourtBush

Gibbs

MARCUSGARVEYPARK

SwanWharf WillowbankWharf

eg

dirbt

oo

F

CarraraBank Wharf

HospitalLouise

Princess

HospitalHammersmith

Charing

Hospital

Cross

TheRavenscourt Park

Hospital

Chelsea

Ground

Football

Stadium

Linford

Q P RFootballGround

Fulham

Football

Ground

Christie

CentreBroadway

Earls CourtExhibitionBuilding

Empress

Building

Olympia

PALACEFULHAM

BBCTelevisionCentre

Scrubs

Old Oak

Sidings

Sidings

North Pole International Depot

Old Oak Common

H.M. Prison

Wormwood

Apollo

Kings Mall

SulivanEnterprise Centre

FulhamPools

State

ThamesWaterTower

LyricSquare

WestfieldLondon

CHISWICK HIGH ROAD

G R E AT W E S T R O A D

WELLESLEY ROAD

HammersmitH Flyunder Feasib il ity study 2 9

oPTIoN CoMPARISoNTwo tunnel options have been appraised in this feasibility report, a short option and a long option. This was based on the extensive public engagement carried out, assumed economic and environmental factors and engineering judgement. Six options were tested through the geo-technical study, one short, two long and all three options with ‘junctions’. The two options selected to be

compared and reported are a short option (1a in the Halcrow report) and a long option (3a in the Halcrow report). The image below shows the indicative portal locations and alignment of options 1a, 2a and 3a in the Halcrow report. For the purposes of this appraisal, the short option is 1, (the green line) and the long option is 3, (the blue line). The red line is a variation of the long option.

Page 32: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

step 1 step 3

step 2 step 4

3 0 HammersmitH Flyunder Feasib il ity study

short optionThe short option is essentially a replacement of Hammersmith Flyover and follows the same alignment as the A4 and the flyover. The western portal starts at Hammersmith Town Hall and the eastern portal at ealing, Hammersmith and West London College. The tunnel is approximately one mile in length and would be constructed

using a cut-and-cover method to a depth of approximately 15m in order to pass safely under the London Underground cutting. The figure (below left) shows the construction steps of the top down cut and cover method. other similar cut and cover constructions have been completed in London and the flyover can be underpinned while excavation work is carried out below.

The figure on the page opposite shows the detailed alignment and longitudinal profile of the short option. It shows the 230m open cut sections at the portal sites, the gradient of the ramps and known subterranean obstructions, such as the London Underground cutting and existing/planned Thames Water utilities.

Page 33: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 3 1

long optionThe long option is a two-and-a-half-mile twin tunnel between Chiswick and earl’s Court. The western portal is at the junction with Sutton Court Road in the London Borough of Hounslow, which is considerably further west than first anticipated due to the need for the tunnel to pass safely under the Thames. The eastern portal is between Warwick Road and earl’s Court Road in the Royal Borough of Kensington and Chelsea. Below is an indicative longitudinal section of a portal showing the open cut approach ramp which is a common feature to both types of construction.The main tunnel would be constructed using a tunnel boring machine (TBM) with an outer diameter of 12.8m - which is about 50 per cent bigger than the Crossrail tunnel. The portals would be constructed using the cut-and-cover method described earlier. The tunnel would be twin bore in that it would have a separate tunnel for each direction of traffic, which doubles the length of tunnel required to be excavated to approximately five miles.

The figure below shows the different alignment of the two bores and the longitudinal profile as the bores pass below the Thames and two London Underground cuttings and above the proposed Thames Tideway Tunnel. The open ramp and

Page 34: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

approach ramp (Cutting)

Cut and cover section

Bored tunnel and cut and cover connection

3 2 HammersmitH Flyunder Feasib il ity study

cut-and-cover ramp are similar in nature to those of the short tunnel.

Both tunnels have been designed to carry two lanes of traffic in each direction (based on forecast traffic flow and nature of the flyover). Ventilation and fire safety systems have been built into both options.

We recognise that these are only two options and a tunnel could take any number of alignments, depths, lengths and portal locations. These two options were designed to start the debate about the benefits and drawbacks of the principle of tunnelling and to be used as a baseline for assessing and appraising any future options.

Open cut, cut and cover, SCL and bored tunnel section.

Page 35: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 3 3

option construction method

total tunnel lenGth

construction cost* (2013 prices)

short Cut-and-cover 1.6km/ 1 mile £218m

Long Tunnel boring machine

8.2km/5.1 miles £1,297m

construction drawbacks

CostThe cost of the construction alone (not including land acquisition, governance or mitigation) is a function of the length of the tunnel and construction methods. The different construction methodologies between the long and short options affect their construction cost. The longer tunnel options are twin bore which increases total tunnel length cost. A single bore was considered, with traffic stacked inside, however the tunnel boring machine required to build such a tunnel would be the largest in the world at 20m in diameter.

Notwithstanding other influences, the longer the tunnel, the more expensive the construction cost.

To put these figures into context, the recently completed skyscraper, The Shard in London Bridge, cost £450m to construct.

These costs also do not include the removal of the flyover or any highway realignment required along the A4 or local road network. These costs will be comparable across both options and are at this stage unknown.

Traffic disruptionThe two options considered as part of this study take broadly the same time to construct at three years. Again this is down to their length and different construction methodologies. Traffic flow along the A4 is assumed to be disrupted for approximately half the construction time. Disruption to the A4 is likely to entail lane closures, tidal flow and night-time and weekend closures.

The following table compares construction and disruption time. It also established another fundamental difference in the long and short tunnels, namely the location of the disruption. There are four areas of surface disruption: the western portal, the eastern portal, the main tunnel excavation and the flyover removal.

For the short option, the four sites will all be in Hammersmith, limiting the construction disruption to Hammersmith Town Centre. However, for the longer tunnel, the construction will be spread along the A4 corridor.

Both options have a broadly similar disruptive impact on the operation of the A4 however this disruption is located in different places.

*These cost estimates are based on a high level feasibility study and include a 30 per cent contingency uplift. TfL standards suggest a 45 per cent uplift and this range has been used in the financial appraisal in later chapters.

Page 36: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

option construction time

a4 disruption location oF main disruption

short 3 years 18 months Hammersmith town centre

long 3 years 18 months Portal locations, drive site and Hammersmith town centre

3 4 HammersmitH Flyunder Feasib il ity study

Construction lorriesThe amount of construction traffic created by any subterranean construction is a function of the material removed and the construction methodology.

The longer the tunnel, the more spoil removed and more construction material required, which therefore creates more construction traffic. This, however, does not take into account the opportunity for river transport of certain materials that a tunnel project adjacent to the river could explore. This could reduce lorry movements significantly.

Translating the volume of material created and required for a tunnelling project into likely lorry movements is not straightforward. In addition, the location of this traffic will be concentrated at different times and locations over the multi-year construction period. For the short option this is Hammersmith town centre as it is the location for the four main construction areas: the two portals, the main tunnel and the removal of the flyover.

The potential use of the river could reduce the number of surface lorry movements and would have different levels of reduction for the different construction locations, as above. At Hammersmith,

for example, the use of conveyor belts and catenary systems could potentially move spoil the short distance to the river without any significant use of road vehicles - although such a method would create its own environmental impact issues. It is also possible that the great majority of the necessary lorry movements, for all options, would be via the A4 itself, thereby minimising the wider environment of the impact.

The table below shows the total volume of spoil for each option that would need be removed and an approximation of the daily lorry equivalent movements this spoil, and incoming material, creates without using the river. Use of the river could greatly reduce these figures. Ninety per cent of the main tunnel’s excavated material, tunnel lining precast segments and concrete aggregates could be transported by barge.

Page 37: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 3 5

option total tunnel lenGth

Volume oF spoil to be disposed (m3)

aVeraGe daily lorry equiValents with no riVer use

aVeraGe daily lorry equiValents assuminG use oF riVer

short 1.6km/1 mile 430,000 150 28

long 8.2km/5.1 miles 1,140,000 375 61

construction beneFits

A wider appraisal of other benefits of construction has yet to be undertaken for either option. However, there are a number of environmental and economic benefits within this major construction project.

The number (and range) of jobs that would be created by this project would be significant. It is likely that many of these jobs would be made available to local residents, and opportunities for local businesses (such as Halcrow and WLLD) would also be significant.

There is a well-documented concept known as traffic evaporation that suggests that when highway capacity is reduced, traffic flow reduces accordingly - or it appears to evaporate. Most examples of this are based on permanent reductions in capacity. If the A4 was required to have its capacity reduced during construction for a substantially long time, the same concept is likely to apply. This reduction in traffic flow would likely result in reductions in traffic noise and improvements in air quality. However it would need to be considered alongside the air quality and noise implications of the construction activity itself.

Page 38: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

option percentaGe oF east-west traFFic likely to use tunnel

short 100%

long 50%

3 6 HammersmitH Flyunder Feasib il ity study

traffic redistributionThe traffic analysis that was carried out as part of this feasibility study is detailed below, along with its limitations and assumptions. Traffic redistribution varies based on the length of a tunnel and its start and end points. In this instance, the longer the tunnel, the less traffic would be generated. As such, opportunities to remove or reduce the existing surface road network diminish as tunnel length increases, primarily down to the current traffic distribution and proportion of through traffic.

Smaller side road junction tunnels can provide opportunities for the main tunnel to pick up and distribute more traffic. However this is one area in which much further and more detailed strategic analysis is required. Further traffic modelling could also forecast the wider sub-regional impact, such as local and strategic redistribution based on a new network.

Essentially the longer the tunnel, the less opportunity traffic has to turn on and off, and hence it will carry less traffic.

operational drawbacks

The traffic analysis was carried out using TfL data including traffic counts and outputs from their strategic traffic model for West London. Both current, actual and modelled traffic flows were reviewed from this data alongside forecasts for 2031 traffic flows based on the growth in jobs and population in the current London Plan and the planned transport network (without factoring in a tunnel).

The traffic analysis was carried out to understand how much traffic would be likely to use the various tunnel options - which in turn, has influenced tunnel dimensions - and what surface network would be required. The traffic analysis was developed during the project to include investigating the Hammersmith Gyratory, the impacts on the various options and to explore opportunities to reduce the severance caused by the current one-way system. This could include returning the gyratory to two-way working, which has been achieved at other similar gyratory systems in London.

All quoted modelled data uses the rounded average evening peak traffic flow only. Flows in the inter-peak, weekend and morning peak periods are likely to be different.

In 2031, it is forecast that approximately 2,500 vehicles an hour will use the flyover in either

direction, an increase in 14 per cent on the current flow. Traffic flow to the east of the flyover is of a lesser magnitude and to the west is considerably higher at 3,500 per hour. There is a similar volume of traffic travelling around Hammersmith Gyratory which shows a similar increase over current flow. As the A4 travels into central London traffic flow generally decreases, which is representative of a radial traffic corridor. Likewise as the A4 travels out of central London, traffic flow increases.

As the A4 passes through Hounslow, Hammersmith & Fulham and Kensington and Chelsea it has junctions with a number of side roads. Vehicles both join and leave the A4 to continue their journeys. over the length of option 3 (Sutton Court Road to earl’s Court) more than half of the traffic travelling east leaves the A4. A similar profile is found travelling westbound with traffic doubling in volume over the same stretch.

This is a fundamental finding as traffic that joins the A4 between the start and end points of a tunnel between Chiswick and Earl’s Court will have to use a surface network. Should the flyover be removed, it would be diverted around the Hammersmith Gyratory.

The short tunnel is determined to have no impact on traffic flow as it is a straight replacement of the

Page 39: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 3 7

flyover with a tunnel. All traffic that currently uses the flyover could use the tunnel and traffic leaving or joining the A4 via Hammersmith Gyratory would do so as it does currently. Traffic flow around the gyratory would be unaffected.

Both longer tunnels would require a surface road network to cater for up to 50 per cent of the current A4 flow. option 2 would allow slightly more traffic to join and leave a long tunnel alignment, and hence a slightly higher percentage of traffic would use the tunnel than would be the case for the longer option 3. This could allow for a narrowing of the A4. However, if the flyover were to be removed (this being the primary objective of this study), this traffic would be diverted through the Hammersmith Gyratory. Any capacity increases that can be achieved at the Hammersmith Gyratory, even if possible, would not be consistent with the vision for the improved town centre.

Given the importance of the Hammersmith Gyratory, an additional tunnel scoping exercise was undertaken to see how traffic flow could be reduced. The main north-south route from Shepherds Bush Road to Fulham Palace Road was considered as an additional route for a tunnel. It was found that, again, this could feasibly be constructed - but not without significant environmental and economic impacts. In addition, basic traffic analysis was undertaken and found

Page 40: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

Hammersmith Flyover traffic origin and destination.

3 8 HammersmitH Flyunder Feasib il ity study

that the beneficial impact on traffic flow around the gyratory would not be sufficient to reallocate capacity.

Further analysis of the operation of the gyratory would need to be undertaken to support both the regeneration of the town centre and any A4 tunnel solution.

The longer the tunnel, the less likely traffic would be to use it. If a tunnel only served a proportion of the corridor movement the remaining movement would be redistributed onto the surface network which would need sufficient capacity to function effectively.

Page 41: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 3 9

The public support for the flyunder is very much driven by the opportunity to rebuild public access across Hammersmith Broadway, and to reunite Hammersmith with the river. Relinking the centre, north-south, and east-west routes are also consistent with the Mayor of London’s Roads Task Force criteria for the future of strategic road improvements.

In the most ambitious scenarios not only would the flyover be removed, but the road would also be removed from the western side of the gyratory with the eastern side reverting to two-way working. This is dependent on finding an answer to addressing the traffic flow through the gyratory.

The economic opportunity for redevelopment is dealt with in detail in the masterplan (published alongside this feasibility report) and summarised later in this chapter.

operational beneFits a re-imaGined hammersmith town centre

But there is much public interest in the benefits of new green spaces and new pedestrian access corridors linking the town centre’s key cultural buildings. A new town green would be created to the west of St Paul’s Church. This would also be the focal point of a new walkway linking the Lyric Theatre to the north, and the eventim Apollo, and on to the river to the south.

It could be possible to increase the size of Furnivall Gardens, but most importantly create a landscaped pedestrian route from there to the town centre and new civic campus (the redeveloped town hall and adjacent site).

The commercial campus created around the Ark and possible portal location would start a long stretch of green space along the current flyover alignment, conceptually known as Riverline Park.

There are two areas of public benefit arising from the work proposed for the flyunder and the gyratory and a redesigned Hammersmith Town Centre. It would create a significant improvement to the environment, and unlock an economic boost to the land released by demolishing the flyover, and that surrounding it.

Illustrative view looking west along King Street.

Page 42: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

4 0 HammersmitH Flyunder Feasib il ity study

siGniFicant enVironmental improVement

Another major public interest was improved noise and air quality issues in the central Hammersmith area. The Hammersmith BID (a not-for-profit organisation representing the interests of local business in the central Hammersmith area) has produced a Strategic Impact Assessment published alongside this study and covers these elements in greater detail.

Their report compares a tunnel carrying the traffic underground (almost silently) through the centre of Hammersmith with the current 90,000 vehicles per day, noting that a car travelling at 65mph at a distance of 25ft generates 77dB of noise - well above what is considered loud by many people.

They also note that Government targets for nitrogen dioxide have been missed at

Hammersmith Broadway for five years, with traffic on the flyover being a large contributor to this excess. While the tunnel would significantly improve the air quality in the town centre, the air quality implications around the tunnel portals would need to be investigated further. However, with adequate tunnel ventilation and existing technology, much can be done to mitigate these impacts.

The BID also sees the redevelopment of the town centre allowing for walking and cycling to be more of a choice for residents and workers in the area. This would allow for a significantly improved journey quality and is consistent with current local, regional and national transport and planning policies.

Page 43: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 4 1

While it was not in the remit of this study to model the wider economic benefits of a flyunder, it is clear that the creation of thousands of badly needed new residential units will add economic dynamism to the town centre. It is easy to imagine that the new pedestrian access to established cultural landmarks is likely to attract an improved café and small restaurant offering. The removal of the flyover and the increased amount of public space must lift the value of the town centre and the adjoining areas.

The BID cites many examples of tunnel building or public realm improvements which foster a positive economic effect for their area. Tunnelling the A3 at Hindhead was cited by Knight Frank as a reason for a dramatic lift in the demand and price of houses in the area. Major improvements to the centre of Sheffield and its public spaces delivered an increased footfall of visitors, additional spending per visit, and increase in leisure-related spending, rental uplift and improved yield.

the waVe eFFect

4 1 HammersmitH Flyunder Feasib il ity study

Illustrative view looking east of re-imagined St. Paul’s Green.

Page 44: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder
Page 45: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 4 3

introductionThis Feasibility Study is supported by a Masterplan and Development Value Study, which is published alongside this report. The purpose of the study was:

1. To provide an illustrative masterplan, indicating how development could be brought forward on the land freed up by the A4 and flyover.

2. To generate an indicative floorspace from the masterplan to assess the potential value from redevelopment that could go towards funding the A4 tunnel.

masterplanThe masterplan section of the study looks at approximately 14 hectares of land between Hogarth Roundabout in the west and Baron’s Court Road in the east. Between Baron’s Court Road and North end Road, the existing properties sit close to the A4, dramatically reducing the development potential and further east, Capital and Counties (Capco), have approval for a masterplan for the land which includes land up to the edge of the current A4. It is envisaged that any land freed up here could not provide any additional development potential. For these

FUNDING

reasons, the land to the east of Baron’s Court Road has not been included within the illustrative masterplan.

The illustrative masterplan is informed by a number of overarching principles:

• optimise development. The illustrative masterplan, as well as showing development on land freed up by the removal of the A4, also shows opportunities to bring forward development on neighbouring parcels of land. This includes Hammersmith Bus Station, part of the southern side of King Street, Landmark House and the West London Magistrates Court.

• Reconnect Hammersmith Town Centre to the River Thames. This could be facilitated by reconnecting the streets severed by the original construction of the A4 and through improvements to the public realm around Hammersmith Town Centre.

• Provide a new series of public and civic spaces connecting the south side of King Street, to St. Paul’s Green, the Hammersmith Apollo, Furnivall Gardens and the River Thames. Critical to achieving this aspiration would be the design and landscaping of the connecting street between St. Paul’s Green and Furnivall Gardens.

• Respect the form and scale of adjacent buildings. Where Victorian streets have been severed by the A4, the aspiration is that redevelopment should re-knit together these streets through design that is sensitive to the scale, massing and architecture of adjacent properties.

• Respect heritage assets. This is particularly the case for the Grade II* listed St. Paul’s Church, St. Peter’s Church and Hammersmith Apollo. Development adjacent to these buildings has been set back in order to give these structures prominence. It is proposed that the Hop Holes public house is retained when creating a new pedestrian connection between Lyric Square and St. Paul’s Green.

The illustrative masterplan shows that redevelopment could generate approximately 350,000sqm of development floorspace. In addition, Hammersmith could be reconnected to the River Thames and Furnivall Gardens. St. Paul’s Green could be expanded and enhanced and a new pedestrian and cycle-friendly boulevard could be created, connecting the two green spaces. Streets that were severed by the original construction of the A4 could be re-linked together, and almost 3,000 new homes could be delivered through redevelopment and new retail, leisure and community facilities could be provided.

masterplan and deVelopment Value

Page 46: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

West London Link Design in association with the Halcrow Group and Hammersmith BID

A TUNNEL TO REPLACE THE HAMMERSMITH FLYOVER: A CHAIN OF OPPORTUNITIES

Currently the traffic isolates Hammersmith Broadway from the town centre. The bus station occupies a prime site.

Our scheme would allow local traffic to be re-routed away from the Broadway. This would reunite the Broadway with the rest of the town centre

The proposals present the opportunity to build a new covered bus station on Butterwick Road and create a new mixed use development on the current bus station site.

BROADWAY AND THE BUS STATION: MIXED USE HUB

Proposed View of the Bus Station

Current View

CHISWICK

HAMMERSMITH

EARLS COURT

CHISWICK HAMMERSMITH EARL’S COURT

lBHf/tfl freehold lBHf/tfl part-freehold part-private land Private land

4 4 HammersmitH Flyunder Feasib il ity study

development ValueThe development value section of the study takes the floorspace generated from the illustrative masterplan and tests what value could be generated from redevelopment and how this could help to finance the tunnelling of the A4. The illustrative masterplan covers both public and private land. For the private land, Section 106 receipts, Community Infrastructure Levy (CIL) receipts, council tax, business rates and New Homes Bonus are all considered as mechanisms for accessing finance for the tunnel. For the public land, three scenarios for developing the land are investigated:

1. A 50/50 joint venture. In this scenario, the public sector land is developed in partnership between the public sector and a private developer and profits are shared equally between both parties.

2. A 25/75 joint venture. This is the same as the first scenario but with a greater weighting of profits to the private developer. This option recognises the complexity of accessing finance for a project of this size, which might preclude the viability and deliverability of Scenario 1.

3. Sell the land. This scenario assumes that the public sector sell the land to a private developer. This option has the lowest risk but would not provide as great a return as Scenarios 1 and 2.

The development value study is also split between the feasibility options. option 1 only looks at the development potential from Baron’s Court Road in the east to the eastern edge of Furnivall Gardens in the west, whereas options 2 and 3 look at the entire illustrative masterplan.

Page 47: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

tunnel option initial deVelopment appraisal - based on options 2 and 3

1 (cut and coVer short lenGth tunnel)

2 (deep bore medium lenGth tunnel)

3 deep bore medium lenGth tunnel

Element/scenario - Development Vehicle

H&F Development Joint Venture Joint Venture Joint Venture

Public Residential Units 2,187 788 1,484 1,484

Private Residential Units 2,653 1,306 1,306 1,306

Total Residential units 4,840 2,094 2,790 2,790

Public Commercial Floorspace 0 (Not Assumed) 30,000 30,000 30,000

Private Commercial Floorspace 0 (Not Assumed) 76,400 76,400 76,400

Total Commercial Floor Space SQM

0 106,400 106,400 106,400

Financial Appraisal £m £m £m £m

Public Development Receipt 1,000 250 454 454

Private Development Receipt 125 23 23 23

Other Receipts 0 51 52 52

Total Development Receipts 1,125 323 528 528

less

Tunnel cost range (30% - 45% contingency)

1,297-1,446 218-251 1,210 * 1,297 *

Net Benefit/Cost -172 to -321 72 -105 -682 -769

All assumptions in this table are based upon a 50% Joint Venture scenario* These sums are based on the Halcrow 30% contingency only

HammersmitH Flyunder Feasib il ity study 4 5

Option 1For option 1 (short cut-and-cover tunnel), the illustrative masterplan shows that redevelopment could create approximately 2,000 residential units and 106,000sqm of commercial floorspace. The table below indicates the sort of returns that development in this option could deliver. Development of the public land within a 50/50 joint venture would offer the greatest returns and could finance 129 per cent of the tunnel’s costs.

Options 2 and 3options 2 and 3 are for a deep bore tunnel from Sutton Court Road (Chiswick, London Borough of Hounslow) to North end Road (option 2) or a tunnel from Sutton Court Road (Chiswick, London Borough of Hounslow) to earl’s Court Road (option 3). For both options, the illustrative masterplan shows that redevelop could deliver approximately 2,800 residential units and 106,000sqm of commercial floorspace. The table below indicates the sort of returns that development in these options could deliver. Development of the public land within a 50/50 joint venture would offer the greatest returns. For option 2 it could finance 44 per cent of the tunnel’s costs. For option 3 it could finance 41 per cent of the tunnel’s costs.

Page 48: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder
Page 49: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 4 7

To establish, at a preliminary level, the aspirations and any concerns of local residents and businesses.

extensive local engagement revealed a high level of support from both local residents and businesses for a flyunder. Aspirations ranged from a simple flyover replacement to a longer tunnel linking Chiswick to earls Court. A number of concerns were raised including cost, construction disruption and traffic redistribution.

To establish current traffic patterns to best understand this route in its wider traffic network context. This will mean liaising with other local traffic authorities in adjoining boroughs and with TfL.

Traffic counts and traffic modelling outputs were provided by TfL which helped to establish the fundamental finding of the project in that there is a high level of traffic dispersion along the A4 corridor between Chiswick and earl’s Court.

To establish the best available information including projections for future traffic volumes which are relevant to a new structure.

Traffic modelling data for 2031 was analysed to advise the size of the tunnel options tested, which showed an increase in traffic flow across the A4 corridor. This is despite traffic volumes in London decreasing over the last 10 years.

To establish the best available information including future projections of the cost of maintaining the current flyover structure over a suitably long period.

The current round of flyover repairs are costing £60m and have been reported to provide a number of decades worth of use to the flyover. This along with the multimillion pound emergency repairs in 2011 have been the only major maintenance expenditure on this structure during its 60-year existence. To rebuild the flyover, should it be necessary, would be likely to cost hundreds of millions of pounds.

SUMMARY

This feasibility study was carried out in order to illustrate the council’s ambition to replace Hammersmith flyover with a tunnel. The study terms of reference below recognise that as a local authority there were limits to what could be achieved with a study of this nature and that further work would be required by those best suited to undertake them, namely Transport for London.

Feasibility proJect terms oF reFerence

Page 50: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

4 8 HammersmitH Flyunder Feasib il ity study

To establish very approximate costs for various tunnel options, noting the variables which will affect confidence in such estimates.

Construction costs, based on today’s prices and feasibility stage estimations, reveal that a short cut-and-cover tunnel would cost approximately £250m (+/- 50 per cent) to build, and a longer bored tunnel construction would cost £1.2bn. The addition of junctions could add £500m to the longer tunnel estimate.

To review options for meeting the construction costs including, but not limited to:

• Future maintenance liability funding for the existing flyover redeployed

• Capital funding from TfL

• Capital funding from local councils

• Captured value from developable land released

• The possibility of modest user charges to contribute to any gap funding.

At this feasibility stage only limited work has been undertaken on a financing package. Captured

land value can raise £1bn and TfL maintenance liability has been assumed to be broadly similar for a tunnel as it is for the flyover. Given the scale of investment, a public-private arrangement is likely to be the most viable option. User charges were explored and other examples suggest that this would not be compatible with the project objectives by reducing the amount of traffic that would use the tunnel.

To report at interim stage by March 2014:

• On local aspirations and concerns

• On broad route options

• On whether the tunnel must have junctions with other routes

• On the preliminary views of neighbouring councils

• On the geo-technical feasibility of a tunnel (analysing other underground uses).

This report is one of three documents covering the above requirements. The second is a masterplan report and the third is a geo-technical report produced by Halcrow.

To consider options for a replacement tunnel, considering the length, depth, width and start and end points, liaising with adjoining boroughs as appropriate. In particular to examine the implications of a flyunder with or without junctions to north-south routes.

Three tunnel options were tested, a short option and two variations of a long option. The longer the tunnel, the more environmental and economic issues would have to be overcome. Junctions to north-south routes exacerbated these economic and environmental factors.

To consider the nature, extent and potential value of any released surface land, considering existing planning policies and any potential threat from varied planning policies.

The land released was found to be located mostly in Hammersmith town centre. It was determined that to achieve the full re-creation of the town centre both the gyratory and flyover need to be removed. estimations suggest that the value released from the blend of public and private land in the town centre could raise £1bn.

Page 51: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

HammersmitH Flyunder Feasib il ity study 4 9

No matter how many expensive repairs are conducted, the flyover won’t last forever. over the next 20 years London will continue to grow with more jobs being created and houses built. Whether or not this results in significant increases in traffic on our road network is unclear. What is clear is that a plan for the future of the A4 corridor is required and that tunnelling under Hammersmith is possible. The council has taken the initiative in producing this feasibility report and now is the time for others to take this investigation forward. There are some significant environmental and economic challenges to overcome. However, as we have seen, the resulting reimagination of Hammersmith town centre could be momentous.

CoNCLUSIoNS

Page 52: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder
Page 53: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder
Page 54: hammersmith flyunder feasibility study - LBHF · HammersmitH Flyunder Feasibility study 1 Leader’s foreword..... 3 Chapter 1 Champions summary ... Printing Hammerprint Flyunder

If you would like any part of this document produced in large print or Braille please call 020 8753 3069

© By:design - March 2014. By:design 020 8753 3926 Ref:16_13ccPrinted by Hammerprint 020 8753 2235