Haltenbanken Village 2015 NTNU – Experts in Team 14.01.2015 2013-12-20 Classification: Internal

Upload: others

Post on 18-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Haltenbanken Village 2015 NTNU – Experts in Team 14.01.2015 2013-12-20 Classification: Internal

Who we are … … and who are you?

2013-12-20 2 Classification: Internal

Scope • Introduction

• Statoil – Introduction

• Facts about the Heidrun field

• Coffee break

• Presentation of the Haltenbanken Village Assignments

• Task A: Integration of data for improved reservoir management

• LUNCH

• Group sessions – Questions from students about the assignments

• End

2013-12-20 3 Classification: Internal

Statoil Norway – Norwegian Continental Shelf

• World largest Offshore operator

− 44 Fields in operation

− 9 000 Employees

− Statoil’s Production at NCS 1,335 mboe/d in 2012

• About 50% of Statoil's resource base

• About 70% of Statoil's production

Bergen

Stavanger

Stjørdal Trondheim

Harstad

Our Strategy: Safe and efficient operations Maximize potential

2013-12-20 5 Classification: Internal

35 km – 30 min

Værnes airport

NTNU Gløshaugen

Statoil Rotvoll

Statoil Stjørdal

Stjørdal vs. Rotvoll Office in Statoil ROTVOLL – ca 650 employees

• Research, Development and Innovation

STJØRDAL – ca 900 employees

• Operations Mid-Norway

• Modifications

• Operations & Maintenance Technology

• Field development Mid-Norway

2013-12-20 6 Classification: Internal

One of the wells drilled on Haltenbanken projected on Kristiansund

• Total length 7282 m

• Total number of meter drilled into the reservoir: 6709 m.

• We hit targets with uncertainty of about ± 25 m horizontally

• The vertical uncertainty is less.

2012-09-17 7

A-1AY2H A-1AY1H A1-H

Operations Mid-Norway

Heidrun

Åsgard

Kristin

Njord

Introdution to Heidrun

2013-12-20 9 Classification: Internal

- Andre -

Haltenbanken Village assignments

• The project is divided into two parts:

− Assignment A Delivery 4th of February

− Assignment B Delivery End of April

• Assignment A is the same for all groups

− Challenge: Integration of data for improved management

− Prepare a presentation

• Assignment B is different for almost all groups (four challenges)

− Decide on challenge (B) to work on during the day

− Detailed presentations the 4th of February when visiting Statoil in Stjørdal

2013-12-20 11 Classification: Internal

B1 – EOR Development Project

2013-12-20 12 Classification: Internal

• To aim for highest recovery from Heidrun, possibilities for enhanced oil recovery (EOR) projects are being pursued.

• You will study the effect of low salinity water flooding and polymer flooding using an 1-D numerical simulation model.

• The group also needs to get familiar with the geological setting and discuss geological impacts on the sweep efficiency.

• Use the provided block model of the Heidrun field and try to improve the oil recovery in the sector using EOR.

• Create a feasible business case based on provided financial assumptions.

B2 – Production Optimization

2013-12-20 13 Classification: Internal

• The Heidrun field has a high number of actice wells Some wells need to be automatically controlled.

• The group will first get familiar with production optimization, involved constraints, available data and reservoir aspects.

• Involved risks will be investigated and mitigating measures will have to be discussed.

• The flow line capacity for the D-line & the gas lift capacity for a specific well will be simulated.

• An injector-producer system will be modelled.

B3 – Increase HC Production and Recovery at Heidrun by Subsea Boosting

2013-12-20 14 Classification: Internal

• As part of the evaluation process of the North Flank project (NFL), the use of subsea booster pumps shall be evaluated.

• The students are ask to explain how subsea booster pumps work and to make them familiar with the different available types and their area of application.

• The main constraints/capacities of subsea booster pumps shall be discussed and the most suitable pump for expected production profiles shall be evaluated.

• Using Prosper & Eclipse the group is asked to create a network model to identify the best locations to boost production.

• Are there benefits in terms of added reserves or increased production?

B4 – Future Well Solutions

2013-12-20 15 Classification: Internal

• Wells drilled according to todays practices and technologies might not be sufficient to profitable drain more difficult reserves in the future.

• The group is therefore asked to investigate suitable well solutions for producing a heterogeneous reservoir like the Åre 5.1 on Heidrun.

• Get familiar with the geological setting of the Åre formations 5.3 to 5.1 and how heterogeneity is linked to production aspects.

• Evaluate few completion solutions to optimize production.

• Use the reservoir segment model to evaluate the production potential for various well realisations.

• Conclude on how to best produce the Åre 5.1 formation in combination with the layers above.

Haltenbanken Village – Milestones

2013-12-20 16 Classification: Internal

Contact with Statoil during project

2013-12-20

Project manager: Rita Helen Sveen [email protected] Mob: 414 11 653

Assignment A: Andre Strupstad [email protected]

Assignment B1: Wouter Jacob de Bruin [email protected]

Assignment B2: Andre Strupstad [email protected]

Assignment B3: Thomas Knoff [email protected]

Assignment B4: Lars Inge Berge [email protected]

Drilling & well engineer: Kristoffer Evensen [email protected]

Geologist: Martin Bartenbach [email protected]

Geologist: Judith van Hagen [email protected]

Operational geology: Rune Langlo Pedersen [email protected]

Production engineer: Markus Sauer [email protected] All questions can be sent directly to Rita Helen Sveen, but you are allowed to ask questions to the supervisors directly. We prefer you send an e-mail such that we can answer when available.

17 Classification: Internal

2013-12-20 18 Classification: Internal

Haltenbanken Village 2014 Rita Helen Sveen Project Manager EiT – Statoil [email protected] Tel: +47 41411653 www.statoil.com

2013-12-20 19 Classification: Internal

Whatever day you will have during project work …

…it is important to go home with your head held high !