hall a daq meeting january 12 th 2015. summary summary gmp /dvcs bcm / unser raster summary compton...

16
Hall A DAQ meeting January 12 th 2015

Upload: roland-potter

Post on 17-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus

Hall A DAQ meeting

January 12th 2015

Page 2: Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus

Summary• summary GMp /DVCS• BCM / Unser • Raster• Summary Compton • EDTM • F1 TDC• Halo monitor • Gas Cerenkov

• SBS Fastbus• SBS GEM readout• FADC/ARS test stand• BigBite DAQ

Page 4: Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus

BCM / unser

• UNSER

• New BCM– Not count at 0 current (might be negative offset )– Saturate at 30 uA ( Optimize for DVCS or GMp)

Page 5: Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus

Raster

• Overall works– Need check saturation ( double blob )– Spikes– Should be ok for DVCS and GMp ( issue for He3)

• https://logbooks.jlab.org/entry/3313730

Page 6: Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus

Raster current plots

Page 7: Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus

Rasterhttps://logbooks/entry/3314862

Page 8: Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus

Compton

• Integrated DAQ being worked• Counting DAQ photon ?

• Edet : – Plan stand/ semi standalone DAQ– Need BPM, cavity power – Could fit in CMU crate or use separate crate– Need setup EPICS : motion and detector– Replace detector and survey

Page 9: Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus

EDTM

• Working in LHRS• Need automatic start• Need adjust priority• Change to ROC DP server ?• External script driving EDTM

Page 10: Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus

F1 TDC

• Need tested spares• Duplicate signal for important signal ?• Cabling clean-up

• Power / heating

Page 11: Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus

Halo monitor (GMp)

• Proposal– 4 fingers ( scintillator or quartz )– Fast electronics group discrimiator ( 3 K$ 16

channels)– EPICS readout

• Most likely halo will be fine if it can go through Compton

Page 12: Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus

Gas Cerenkov

• Mysterious inefficiency for bad runs– Photons ?

• Do we want to put 1 FADC for readout ?

Page 13: Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus

SBS Fastbus

• 3 FB crates• V1495 ready• New TI

• Test flipping and sync with 3 new TI• Could test with 6 crates ( 3 TI master + 3 TI

slave )– Need setup 6 crates– Order optical fibers

Page 14: Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus

SBS GEM

• 1 VXS crate UVA• Bryan working on MPD ( 1 month depending on

priority )• INFN software working

• Need– Start development optical link / SSP readout

• SRS : readout UDP packet, need decoding program

Page 15: Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus

FADC/ARS test stand

• 2nd floor counting house• FADC , CTP, SSP, new TI• Intel CPU• Need CODA setup and cabling

Page 16: Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus

Bigbite DAQ

• 2 FB crate• Computer srcdaq setup• Portserver• CPU booted• Need setup FB readout and TS crate

• Need setup GEM crate