![Page 1: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/1.jpg)
HAJXY& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Boring NO. DP00066
File No.: 32486 - Sheet No.: 1 of 3 Start: August 31,2005 Finish: September 2, 2005
Sampler
G
1 314
Push
TY Pe
Inside Diameter (in.)
Hammer Weight (Ib.:
Hammer Fall (in.)
Barrel Drilling Equipment and Procedures Driller: Casing
- -
T Thin Wall Tube
U Undisturbed Sample
Rig Make & Model: GeoProbe Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoisUHammer: Hydraulic
H&A Rep.: C. Canfield Elevation Datum Location N - E -
E g g
. s ? f i a
2 2
-
a E,
3 CH
Visual-Manual Identification and Description
(Density,wnsistency, color, GROUP NAME, max. particle sire'*, structure, odor moisture, optional descriptions, geologic interpretation)
NOTE: 8 in. concrete above start of boring at 0 ft.
b
Field Test
s 8
- 0
Gravel
3 8 +
5 s
100
Sand
=
q - S E * -
2 ND
r s
.g F a
n : h G 8 +
m b:
$ 5 ' ' 0
- c B % ! a c
5 000
, o i i , e e E ? $ 5
2 +
- a s
5 8 0.0 - 0.3
f +
![Page 2: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/2.jpg)
![Page 3: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/3.jpg)
![Page 4: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/4.jpg)
![Page 5: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/5.jpg)
Drilling Equipment and Procedures
Bit Type: Cutting Head
T Thin Wall Tube
U Undisturbed Sample
![Page 6: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/6.jpg)
Bit Type: Cutting Head --
Borehole filled with bentonite chips upon completion.
![Page 7: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/7.jpg)
: September 7, 2005
T Thin Wall Tube
U Undisturbed Sample
![Page 8: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/8.jpg)
TEST BORING REPORT Boring No. DP00071
![Page 9: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/9.jpg)
g Equipment and Procedu
Inside Diameter (in.)
Borehole filled with bentonite chips upon completion.
T Thin Wall Tube
![Page 10: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/10.jpg)
![Page 11: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/11.jpg)
HALEY& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Boring No. DP00075
File No.: 32486 - Sheet No.: 1 of 1 Start: September 7, 2005
TY pe
Inside Diameter (in.)
Hammer Weight (Ib.:
Hammer Fall (in.)
Gravel Sand Field Test A , 0 Z ? Visual-Manual Identification and Description
- 0 I
poO.01 0.0 - 0.3 ML Dark brown, SILT, moist, no odor, no stain. 100
T Thin Wall Tube
U Undisturbed Sample
Finish: September 7, 2005 Barrel Drilling Equipment and Procedures Driller: Casing
-
-
Sampler
G
1 314
Push
Rig Make & Model: GeoProbe
Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoisUHammer: Hydraulic
1 H a Rep.: C. Canfield Elevation Datum Location N - E -
![Page 12: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/12.jpg)
Boring No. DP00076
File No.: 32486 - Sheet No.: 1 of 1 Start: September 7, 2005 Finish: September 7, 2005 Driller:
HALm& TEST BORING REPORT ALDRK~H Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Casing
TY Pe
Inside Diameter (in.)
Hammer Weight (Ib.; Hammer Fall (in.)
Sampler
Gravel Sand Visual-Manual Identification and Description
- 0 I
Xl0.01 0.0 - 0.3 ML Dark brown, SILT, moist, no odor, no stain, no structure
T Thin Wall Tube
U Undisturbed Sample
G
1 314
Push
Barrel -
Drilling Equipment and Procedures
- -
Rig Make & Model: GeoProbe
Bit Type: Cutting Head Drill Mud:
Casing: Macrocore HoistIHammer: Hydraulic
H&A Rep.: C. Canfield - Elevation Datum Location N - E -
![Page 13: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/13.jpg)
![Page 14: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/14.jpg)
=& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Boring NO. DP00078
File No.: 32486 - Sheet No.: 1 of 1 Start: September 7, 2005 Finish: September 7, 2005
TY pe
Inside Diameter (in.)
Hammer Weight (Ib.:
Hammer Fall (in.)
Sampler
G
1 314
Push
Casing Barrel Drilling Equipment and Procedures Driller:
- -
I
Gravel
a E g g a ,
3 E,
T -
Rig Make & Model: GeoProbe
Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoisUHammer: Hydraulic
Sand
% S Visual-Manual Identification and Description
H&A Rep.: C. Canfield Elevation Datum Location N - E -
Field Test U) z 0
; g 0" 0 . 2
ML
= 2 a ,
- 0
3 (Densitylconsistency, color, GROUP NAME, max. particle size",
structure, odor, moisture, optional descriptions, geologic interpretation)
Medium stiff to soft, dark brown to brown, SILT with trace SAND, moist to dry, no odor, no structure.
3 1
o c - a t j 6 I
g g r ' . g 5 s
O.*
2 I
6 s
a
E g g v,
000
cn a 2- C L T
a0
0.0 - 0.3
5.*s.8$8 i s -
10 90
![Page 15: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/15.jpg)
Boring NO. DP00079
File No.: 32486 - Sheet No.: 1 of 1 Start: September 9, 2005 Finish: September 9, 2005 Driller:
HALEY& TEST BORING REPORT ALDRISH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Casing
TY pe
Inside Diameter (in.)
Hammer Weight (Ib.:
Hammer Fall (in.)
Sampler
~ravel l Sand , Field Test - - -. Visual-Manual Identification and Description I
- 0 0.0 - 0.4 SM Medium dense, dark brown, silty fine SAND, moist, no odor, no
stain.
NOTE: Borehole filled with bentonite chips upon completion.
T Thin Wall Tube
U Undisturbed Sample
G
1 314
Push
Barrel Drilling Equipment and Procedures
- -
Rig Make & Model: GeoProbe
Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoistIHammer: Hydraulic
H&A Rep.: C. Canfield
Elevation Datum Location N - E -
![Page 16: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/16.jpg)
H.ALE'Y& TEST BORING REPORT Boring NO. DP00080 ALMUCH Project: Former Anaheim Battery Operations 1201 N. Magnolia File No.: 32486 - Client: Delphi Corporation Sheet No.: 1 of 1 Contractor: Interphase Start: August 31, 2005
Finish: August 31, 2005 Casing Sampler Barrel Drilling Equipment and Procedures Driller:
TY pe G Rig Make & Model: GeoProbe H&A Rep.: C. CanfieId
Inside Diameter (in.) 1 314 Bit Type: Cutting Head Elevation Drill Mud: Datum
Hammer Weight (Ib.: Push - Casing: Macrocore Location Hammer Fall (in.) N - - HoistIHammer: Hydraulic E -
E g x Gravel Sand , Field Test ,- 0 z " Visual-Manual Identification and Description $ 5
$ a 5 . u s S U)
Z ~ Q Q ~ s e * (Densitylwnsistency. color. GROUP NAME, max. particle size", $ , E $ r , ~ , f $'! $ + j , , 0 % , , 3 cn '), c 5 gg = 5- o 8 v, v,o 2 ag," structure, odor, moisture, optional descriptions, geologic interpretation) s s s s = 2 S $
C ~ I - L L W
- 0 --300 000 0.0 - 0.3 SM NOTE: 8 in. concrete above start of boring at 0 ft. 60 40
NOTE: Borehole filled with bentonite chips upon completion.
0 Open End Rod
T Thin Wall Tube Rock Cored (lin. ft.)
![Page 17: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/17.jpg)
Boring No. DP00081
File No.: 32486 - Sheet No.: 1 of 1 Start: August 31, 2005 Finish: August 31, 2005 Driller:
rn& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Casing
TY Pe
Inside Diameter (in.)
Hammer Weight (Ib.:
Hammer Fall (in.)
Drilling Equipment and Procedures Sampler Barrel
G
1 314
Push - -
Rig Make & Model: GeoProbe
Bit Type: Cutting Head Drill Mud:
Casing: Macrocore HoisUHammer: Hydraulic
NOTE: Borehole filled with bentonite chips upon completion.
H&A Rep.: C. Canfield - Elevation Datum Location N - E -
E g g g a , .- =
- - S k s giQ
Gravel
a,
8
Field Test '0
$ o 3 = =I 2 o z h z
NOTE: 8 in. concrete above start of boring at 0 ft.
", E, 0 z
g , 6 s
b: 5 s
Visual-Manual Identification and Description
2 q 5
- O J
- ss Q=
Sand
(Densitylwnsistency, wlor, GROUP NAME, max particle size**. structure, odor, moisture, optional descriptions. geologic interpretation)
6 s
I
)00.01 SM 0.0 - 0.3
a , E $ I $
s
a,
if s
![Page 18: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/18.jpg)
HALEY& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
NOTE: Borehole filled with bentonite chips upon completion.
0 Open End Rod
T Thin Wall Tube
U Undisturbed Sample
TY pe
Inside Diameter (in.)
Hammer Weight (lb.;~
Hammer Fall (in.)
Boring No. DP00082
File No.: 32486 - Sheet No.: 1 of 1 Start: August 31, 2005 Finish: August 31, 2005 Driller: H&A Rep.: C. Canfield
Elevation Datum Location N - E -
Casing
Gravel
6 s
Sampler -
G
1 314
Push
s
Sand
r . 2 ;i:
40
g q 5 -
CI)
=
- - 2 z 4 6
s
Barrel
-
Drilling Equipment and Procedures
Rig Make & Model: GeoProbe
Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoisffHammer: Hydraulic
- 0
Q
5 a
E
2
Field Test - 1 Visual-Manual Identification and Description -
gs QJ=
g a s
60
- 5 a SM ND
(Densitylconsistency. color, GROUP NAME, max. partide size*., structure. odor, moisture, optional descriptions, geologic interpretation) -
NOTE: 8 in. concrete above start of boring at 0 ft.
5 o
Xf3.01
5 L? n + a w
0.0 - 0.3
![Page 19: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/19.jpg)
![Page 20: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/20.jpg)
TEST BORING REPORT Boring No. DP86 I
![Page 21: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/21.jpg)
Boring No. DP00088
File No.: 32486 - Sheet No.: 1 of 1 Start: August 31, 2005 Finish: Aug~~t31 ,2005 Driller:
HALEY& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Casing Barrel
TY pe
Inside Diameter (in.)
Hammer Weight (Ib.;
Hammer Fall (in.)
Sampler
Gravel Sand Field Test Visual-Manual Identification and Description
6
- 0 I I
000 0.0 - 0.3 SM Dark brown, silty fine SAND, moist, no odor, no stain. 60 40
T Thin Wall Tube
U Undisturbed Sample
Drilling Equipment and Procedures
G
1 314
Push - -
Rig Make & Model: GeoProbe
Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoistIHammer: Hydraulic
H&A Rep.: C. Canfield
Elevation Datum Location N - E -
![Page 22: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/22.jpg)
TEST BORING REPORT Boring No. DP00089 I
![Page 23: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/23.jpg)
TEST BORING REPORT 1 Boring No. DP00090 I
![Page 24: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/24.jpg)
TEST BORING REPORT Boring No. DP00091
![Page 25: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/25.jpg)
TEST BORING REPORT Boring No. DP00093
![Page 26: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/26.jpg)
TEST BORING REPORT Boring No. DP00094
![Page 27: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/27.jpg)
TEST BORING REPORT 1 Boring No. DPOOOBS I
- --
Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
- .
Bit Type: Cutting Head Drill Mud:
Hammer Weight (Ib. Casing: Macrocore
Casing
Hammer Fall (in.) I 1 I - 1 ~oisu~arnmer: Hydraulic
File No.: 32486 - Sheet No.: 1 of 1 Start: September 2,2005 Finish: September 2, 2005 Driller: HBA Rep.: C. Canfield
Elevation Datum Location N - E -
G Rig Make & Model: GeoProbe
Sampler Barrel Drilling Equipment and Procedures
![Page 28: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/28.jpg)
Boring No. DP00096
File No.: 32486 - Sheet No.: 1 of 3 Start: September 1, 2005 Finish: September 1, 2005 Driller: %A Rep.: C. Canfield
HALEX& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
TY Pe
Inside Diameter (in.)
Hammer Weight (Ib.;
Hammer Fall (in.)
Casing
1 314
Push
Sampler
G
- -
Barrel
- 6
- 9
-10 - I
0 Open End Rod Overburden (tin. ft.) T Thin Wall Tube
U Undisturbed Sample
S Split Spoon
Drilling Equipment and Procedures ---
Rig Make & Model: GeoProbe
Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoistIHammer: Hydraulic
E g F g
g .s' 0 = $
- Gravel
6 s
10
Elevation Datum Location N - E -
e s
20
20
2 5 V,
0 J
- 1
- 2
- 3
- 4
- 5 -
- 6
- 7
- g e 6
s
30
20
b s
5
Visual-Manual Identification and Description
5 - 2
(Densityhnsistency. color, GROUP NAME, max. pa.cIe size*., structure, odor, moisture, optional descriptions, geologic interpretation)
Medium dense, light brown to tan, poorly graded fine to coarse SAND with some gravel, moist, no odor, no stain.
Sam wi th lo percent pebbles.
000
m5
0 z & g * s s
L1
5 U)
Sand
a 5 2 (:
25
15
0.0 - 0.3
5,0 - 5.3
q
C L C
5 5 $ . $ 6 . $ $ %
if s
20
10
=
SP
SP
I
n Y a 5 B el
$ Z
Field In
P
"
Test
8 o r 2 5
* f 2 9
![Page 29: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/29.jpg)
![Page 30: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/30.jpg)
![Page 31: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/31.jpg)
![Page 32: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/32.jpg)
![Page 33: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/33.jpg)
![Page 34: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/34.jpg)
![Page 35: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/35.jpg)
![Page 36: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/36.jpg)
![Page 37: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/37.jpg)
![Page 38: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/38.jpg)
![Page 39: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/39.jpg)
![Page 40: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/40.jpg)
![Page 41: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/41.jpg)
TEST BORING REPORT Boring No. DP00103
![Page 42: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/42.jpg)
![Page 43: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/43.jpg)
Boring No. DP00104
File No.: 32486 - Sheet No.: 1 of 2 Start: September 1, 2005 Finish: September 1, 2005 Driller:
rn& TEST BORING REPORT ALDRCH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Casing
Type
Inside Diameter (in.)
Hammer Weight (lb.;~
Hammer Fall (in.)
Sampler
Gravel Sand 0
Field Test h 6 z - 4= Visual-Manual Identification and Description "- g a 2- - g s Q QC 0
g p E E P - (Density/consistency. color. GROUP NAME, ma*. p a l d e size'..
, , , g 2 a - 0 ,
XX).OI 0.0 - 0.3 SM Medium dense, dark brown, silty fine SAND, moist, no odor, no 60 40 stain.
0 Open End Rod
T Thin Wall Tube
U Undisturbed Sample
G
1 314
Push
Barrel Drilling Equipment and Procedures
- -
Rig Make & Model: GeoProbe
Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoistIHarnmer: Hydraulic
H&A Rep.: C. Canfield Elevation Datum Location N - E -
![Page 44: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/44.jpg)
![Page 45: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/45.jpg)
![Page 46: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/46.jpg)
![Page 47: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/47.jpg)
HiUJiX& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
NOTE: Borehole filled with bentonite chips upon completion.
T Thin Wall Tube
U Undisturbed Sampl
Boring NO. DP00106
File No.: 32486 - Sheet No.: 1 of 1 Start: September 1, 2005 Finish: September 1 , 2005 Driller: H&A Rep.: C. Canfield Elevation Datum Location N - E -
Barrel
- -
Sampler
G
1 314
Push
TY pe
Inside Diameter (in.)
Hammer Weight (Ib.:
Hammer Fall (in.)
Drilling Equipment and Procedures --
Rig Make & Model: GeoProbe
Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoisffHammer: Hydraulic
Casing
ii
10
Gravel Sand
8 J:
20
a g m e g - is3
0) .-
2 E J:
10
Field Test -
- 0
$ . % e m s $ ! f J:
20
8 J:
20
a =
$ $
g SP
- ~ S Q
a
0 z
E n s
62
000
% g 2 J:
20
Visual-Manual Identification and Description
(Density1conYstency. caor, GROUP NAME, m a . partide sizett structure, odor, moisture, optional descriptions, geologic interpretation)
Gray to brown, poorly graded fine to coarse SAND with gravel, dry,
- PC
5 5 an
0.0 - 0.3
m
3 ak?L$65
r i s 9
![Page 48: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/48.jpg)
![Page 49: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/49.jpg)
![Page 50: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/50.jpg)
Boring No. DP00109
File No.: 32486 - Sheet No.: 1 of 2 start: September 1 , 2005 Finish: September 1, 2005 Driller:
HALEY& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Casing
Inside Diameter (in.)
Hammer Weight (Ib.:
Hammer Fall (in.)
Sampler
$ 5 2 Gravel Sand
0 Field Test " - z " &, % Visual-Manual Identification and Description
& % a , a , s E 2 9 Q QC z g UY
UY (Density/consistency. color, GROUP NAME, max. particle size", B p 0 v, g no gg ie2
= : - 0 structure, odor, moisture, optional descriptions, geologic interpretation)
- 0 -1 ND 000 0.0 - 0.3 SM Soft to medium stiff, dark brown, silty fine SAND, moist, no odor, 60 40
no stain.
**Redrilled 8-12 ft.
0 Open End Rod
T Thin Wall Tube
U Undisturbed Sample
G
1 314
Push
Barrel Drilling Equipment and Procedures
- -
Rig Make & Model: GeoProbe
Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoistlHamrner: Hydraulic
H&A Rep.: C. Canfield Elevation Datum Location N - E -
![Page 51: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/51.jpg)
![Page 52: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/52.jpg)
![Page 53: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/53.jpg)
![Page 54: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/54.jpg)
![Page 55: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/55.jpg)
TEST BORING REPORT Boring No. DP00112
![Page 56: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/56.jpg)
![Page 57: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/57.jpg)
TEST BORING REPORT Boring No. DP00113
![Page 58: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/58.jpg)
![Page 59: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/59.jpg)
![Page 60: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/60.jpg)
![Page 61: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/61.jpg)
![Page 62: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/62.jpg)
TEST BORING REPORT Boring No. DP00115
![Page 63: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/63.jpg)
![Page 64: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/64.jpg)
![Page 65: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/65.jpg)
![Page 66: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/66.jpg)
![Page 67: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/67.jpg)
![Page 68: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/68.jpg)
![Page 69: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/69.jpg)
![Page 70: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase](https://reader030.vdocuments.site/reader030/viewer/2022040211/5e6c7fe22346310d082b52a1/html5/thumbnails/70.jpg)
Boring No. DP00118
File No.: 32486 - Sheet No.: 1 of 2 Start: September 2, 2005 Finish: September 2, 2005 Driller:
HALEY& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
TY pe G Rig Make & Model: GeoProbe H&A Rep.: C. Canfield
Inside Diameter (in.) 1 314 Bit Type: Cutting Head Elevation Drill Mud: Datum
Hammer Weight (Ib.: Push - Casing: Macrocore Location
Hammer Fall (in.) N - - HoistIHammer: Hydraulic E -
Gravel Sand Field Test 0 Visual-Manual Identification and Description
- 0 000 0.0 - 0.5 SP Loose, black stained, poorly graded, fine to medium SAND, strong 40 50 10
hydrocarbon odor.
Color grading to dark brown.
Slight oil stain, hydrocarbon odor.
T Thin Wall Tube
U Undisturbed Sample
Drilling Equipment and Procedures Casing Sampler Barrel