Haivan Pass Tunnel Construction Project. TUNNEL CONSTRUCTION. Table of Contents. Concept of Tunneling with New Austrian Tunneling Method (NATM) Typical X-section Drawings Tunnel Construction at Haivan Pass Tunnel Construction Project. Concept of Tunneling with NATM. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/1.jpg)
Haivan Pass Tunnel Construction ProjectHaivan Pass Tunnel Construction Project
TUNNEL CONSTRUCTION
![Page 2: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/2.jpg)
Table of ContentsTable of Contents
Concept of Tunneling with New Austrian Tunneling Method (NATM)
Typical X-section Drawings Tunnel Construction at Haivan Pass Tunnel
Construction Project
![Page 3: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/3.jpg)
Concept of Tunneling with NATMConcept of Tunneling with NATM
The NATM was developed by Austrian engineers from 1957 – 1965
The principles of the method:
– The support is adequately stabilizing the surrounding ground, so that the rate of convergence towards the tunnel is perceived to be approaching an asymptotic value
– Where, after initial support, further support may be applied incrementally
– The essence of design of a system of incremental support is to understand the stress-strain properties of the ground and of the tunnel support
– Since controlled strain of the ground has to occur in order to develop a changed stress field in the ground aroun dthe tunnel compatible with the degree of support
![Page 4: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/4.jpg)
Concept of Tunneling with NATMConcept of Tunneling with NATM
Difference of stress distribution around Tunnel
![Page 5: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/5.jpg)
Concept of Tunneling with NATMConcept of Tunneling with NATM
Conventional tunneling method - Example of steel rib and lagging
![Page 6: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/6.jpg)
Concept of Tunneling with NATMConcept of Tunneling with NATM
Image of ground arch effect of the NATM support
![Page 7: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/7.jpg)
Concept of Tunneling with NATMConcept of Tunneling with NATM
Image of ground arch effect of the NATM support
![Page 8: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/8.jpg)
Typical X-section DrawingsTypical X-section DrawingsHaivan Pass Tunnel ProjectHaivan Pass Tunnel Project
TUNNEL CONNECTION – SUPPORT SYSTEMMain Tunnel with Lay by and Pedestrian Cross Passage
MAIN TUNNEL
EVA. TUNNEL
Forepoling
Shotcrete
Rockbolts
![Page 9: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/9.jpg)
MAIN TUNNEL– SUPPORT SYSTEM
Tunnel center
Road center
Typical X-section DrawingsTypical X-section DrawingsHaivan Pass Tunnel ProjectHaivan Pass Tunnel Project
Waterproof membrane
Concrete lining
Shotcrete
Theoretical rock line
Concrete curbing
Electrical cable duct
Filter cement
aggregateFoundation beam for
concrete liningTunnel main sub drainage
perforated
Tunnel side drain
![Page 10: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/10.jpg)
Tunnel Construction at Haivan Pass Tunnel Tunnel Construction at Haivan Pass Tunnel Construction ProjectConstruction Project
1. Drilling tunnel face
2. Charging explosive
3. Excavating and mucking after blasting
4. Shotcreting, if necessary
5. Survey of section (installing steel rib, if necessary)
6. Installing wiremesh, if necessary
7-1. Installing rockbolts
7-2. Cutting head of rockbolts
7-3. Covering head of rockbolts
8. Concreting foundation beam
9. Constructing drain pipe
10. Fixing geotextile
11. Installing waterproofing membrane
12. Lining concrete
![Page 11: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/11.jpg)
Technical Term of NATM in the ProjectTechnical Term of NATM in the Project
Rockbolt
Wiremesh + Shotcrete
Steel rib
Geotextile
Waterproofing membrane
Mole drain pipe
Lining concrete
Foundation beam
![Page 12: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/12.jpg)
Work Sequence of NATM (1/12)Work Sequence of NATM (1/12)
1. Drilling tunnel face
![Page 13: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/13.jpg)
Work Sequence of NATM (2/12)Work Sequence of NATM (2/12)
2. Charging explosive
![Page 14: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/14.jpg)
Work Sequence of NATM (3/12)Work Sequence of NATM (3/12)
3. Excavating and Mucking after blasting
![Page 15: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/15.jpg)
Work Sequence of NATM (4/12)Work Sequence of NATM (4/12)
4. Shotcreting
![Page 16: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/16.jpg)
Work Sequence of NATM (5/12)Work Sequence of NATM (5/12)
5. Survey of section
![Page 17: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/17.jpg)
Work Sequence of NATM (6/12)Work Sequence of NATM (6/12)
6. Installing wiremesh
![Page 18: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/18.jpg)
Work Sequence of NATM (7/12)Work Sequence of NATM (7/12)
7-1. Installing rockbolts
![Page 19: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/19.jpg)
Work Sequence of NATM (7/12)Work Sequence of NATM (7/12)
7-2. Cutting head of rockbolts
![Page 20: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/20.jpg)
Work Sequence of NATM (7/12)Work Sequence of NATM (7/12)
7-3. Covering head of rockbolts by geotextile
![Page 21: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/21.jpg)
Work Sequence of NATM (8/12)Work Sequence of NATM (8/12)
8. Concreting foundation beam
![Page 22: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/22.jpg)
Work Sequence of NATM (9/12)Work Sequence of NATM (9/12)
9. Constructing drain pipe
![Page 23: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/23.jpg)
Work Sequence of NATM (10/12)Work Sequence of NATM (10/12)
10. Fixing geotextile
![Page 24: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/24.jpg)
Work Sequence of NATM (11/12)Work Sequence of NATM (11/12)
11. Installing waterproofing membrane
![Page 25: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/25.jpg)
Work Sequence of NATM (12/12)Work Sequence of NATM (12/12)
12. Lining concrete
![Page 26: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/26.jpg)
ConclusionConclusion
Hoping that this Presentation will be of some help toward better
implementation of the Project
Project’s homepage: http://haivan.cup.com
For further information, contact Consultant Team at email:
![Page 27: Haivan Pass Tunnel Construction Project](https://reader035.vdocuments.site/reader035/viewer/2022062408/56814238550346895dae54cb/html5/thumbnails/27.jpg)
Thank you Thank you
and and
Have a good timeHave a good time