h. pero, e uropean commission
DESCRIPTION
European policy developments and challenges in the field of Research Infrastructures. H. PERO, E uropean Commission. RIs are at the core of an efficient EU Research & Innovation strategy. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: H. PERO, E uropean Commission](https://reader035.vdocuments.site/reader035/viewer/2022081502/56816050550346895dcf7a4a/html5/thumbnails/1.jpg)
H. PERO, European Commission
European policy developments and challenges
in the field of Research Infrastructures
![Page 2: H. PERO, E uropean Commission](https://reader035.vdocuments.site/reader035/viewer/2022081502/56816050550346895dcf7a4a/html5/thumbnails/2.jpg)
![Page 3: H. PERO, E uropean Commission](https://reader035.vdocuments.site/reader035/viewer/2022081502/56816050550346895dcf7a4a/html5/thumbnails/3.jpg)
Designed and operated to attract and host the best researchers in the world (open access - size of research facilities is not the issue, excellence is !)
Help responding to Grand Challenges but need world-level quality in all aspects of their activities: scientific, educational, technical and managerial
Important role in the advancement of knowledge and technology, liberating creative potential of staff, users and providers, thus being crucial socio-economic drivers
RIs are at the core of an efficient
EU Research & Innovation strategy
![Page 4: H. PERO, E uropean Commission](https://reader035.vdocuments.site/reader035/viewer/2022081502/56816050550346895dcf7a4a/html5/thumbnails/4.jpg)
Research Infrastructures are facilities where basic research as well as applied
research are interacting to generate innovations for our daily life
![Page 5: H. PERO, E uropean Commission](https://reader035.vdocuments.site/reader035/viewer/2022081502/56816050550346895dcf7a4a/html5/thumbnails/5.jpg)
ESFRI projectsCurrent Preparatory Phases
![Page 6: H. PERO, E uropean Commission](https://reader035.vdocuments.site/reader035/viewer/2022081502/56816050550346895dcf7a4a/html5/thumbnails/6.jpg)
Although the ESFRI projects are very visible,the “integrating activities” are the most important EC
actions
278
209
29
147
25
352
202
20130
53
45
0
100
200
300
400
500
600
700
IntegratingActivities
ICT basede-Infrastructures
Design Studies Construction -Preparatory Phase
Construction -Implementation
Policydevelopment
M€
Remaining Budget (Calls 5 to 11) ~ 802 M€
Budget used (Calls 1 to 4) ~ 687 M€
New RIs370 M€( 25% )
Existing RIs1041 M€(70 %)
![Page 7: H. PERO, E uropean Commission](https://reader035.vdocuments.site/reader035/viewer/2022081502/56816050550346895dcf7a4a/html5/thumbnails/7.jpg)
Number of RIs has more than doubled
in FP7 versus FP6
0
20
40
60
80
100
120
140
160
180
200
FP2(1987-91)
FP3(1990-94)
FP4(1994-98)
FP5(1998-2002)
FP6(2002-06)
FP7(2007-13)
6300
248
557
6000
users / year
Number of RIs
![Page 8: H. PERO, E uropean Commission](https://reader035.vdocuments.site/reader035/viewer/2022081502/56816050550346895dcf7a4a/html5/thumbnails/8.jpg)
Distribution of projects per scientific domain and activity
(since 2007: 137 projects, average funding 8 M€)
0
5
10
15
20
25
30
35
40
45
50
e-infrastructures Physics andAstronomy
Life Sciences Environmentand EarthSciences
Social sciencesand Humanities
Engineeringand Energy
Mathematicsand Computer
Sciences
others
Num
ber o
f pro
ject
s
Policy development (23)
Design Studies (14)
Construction - Preparatory Phase (34)
ICT based e-infrastructures (28)
Integrating Activities (38)
![Page 9: H. PERO, E uropean Commission](https://reader035.vdocuments.site/reader035/viewer/2022081502/56816050550346895dcf7a4a/html5/thumbnails/9.jpg)
Next FP7 actions
WP 2011 To be launched in July 2010 (closing end 2010) ERANETs continued a specific support measure
to prepare an FP8 dedicated action for instrumentation
WP 2012 To be prepared by March 2011 Input welcome from experts, YOU…
International Cooperation?
![Page 10: H. PERO, E uropean Commission](https://reader035.vdocuments.site/reader035/viewer/2022081502/56816050550346895dcf7a4a/html5/thumbnails/10.jpg)
1 October - Rome
European Strategy Forum on Research Infrastructures ESFRI
• Importance of excellent research services (harmonized evaluation criteria needed) and of service-oriented e-infrastructures
• EU RI policy based on a partnership approach
between regional, national, EU, global levels(need for roadmaps)
• Importance of human resources for the setting-up and operation of attractive and sustainable RIs
• Involving technology suppliers from an early stage.
The future…More than 500 people
discussing during two days
![Page 11: H. PERO, E uropean Commission](https://reader035.vdocuments.site/reader035/viewer/2022081502/56816050550346895dcf7a4a/html5/thumbnails/11.jpg)
• For Europe, a fully integrated, consistent, efficient eco-system of Research Infrastructures, serving researchers and society in all S&T fields
• At global level, co-operation to tackle global Challenges, based on / feeding excellent research facilities and widely used & efficient e-infrastructures (need for increased inter-agencies cooperation)
• Research Infrastructures should act as knowledge industry for the knowledge society: a major cultural change for scientific institutions and agencies
A joint vision should
be agreed...
![Page 12: H. PERO, E uropean Commission](https://reader035.vdocuments.site/reader035/viewer/2022081502/56816050550346895dcf7a4a/html5/thumbnails/12.jpg)
We need addressing the key factors
affecting the vision and the capacity to change
• Capacity (or not) to work together / pool resources (thus coordination of national strategies)to face more complex problems / costly solutions
• Capacity (or not) to develop a favorable / catalytic environment for EU & Int’l research & innovation
• Capacity (or not) to strengthen relations with education, the people, and with industry
• Capacity (or not) to face research internationalization
Four EC communications
to come within the next
18 months
![Page 13: H. PERO, E uropean Commission](https://reader035.vdocuments.site/reader035/viewer/2022081502/56816050550346895dcf7a4a/html5/thumbnails/13.jpg)
• Global issues• To be targeted through international
cooperation (Carnegie meeting in Nov 2010?)• GSF-OECD specific action• Energy RI conference (29-30 Nov 2010,
Brussels)• Bilateral actions?
• Workshop on 1 Oct. 2010, in Roma • More US participation in the EC calls• AAAs specific workshops in 2011,• Exchange of experts, etc.
Looking for developing more international cooperation
![Page 14: H. PERO, E uropean Commission](https://reader035.vdocuments.site/reader035/viewer/2022081502/56816050550346895dcf7a4a/html5/thumbnails/14.jpg)
Facing Challenges... A formula:
U x V x C x F > R
Understanding, Vision, Capacity to Change, Feasibility,
facing the Resistance to change
Role of this W
S