gws-wg results, victoria interop, may 2006 slide 1 gws-wg results ivoa interop meeting, victoria bc,...

6
GWS-WG results, Victoria Interop, May 2006 Slide 1 GWS-WG results IVOA Interop meeting, Victoria BC, May 2006

Upload: grace-mcdaniel

Post on 27-Mar-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: GWS-WG results, Victoria Interop, May 2006 Slide 1 GWS-WG results IVOA Interop meeting, Victoria BC, May 2006

GWS-WG results, Victoria Interop, May 2006 Slide 1

GWS-WG results

IVOA Interop meeting,Victoria BC, May 2006

Page 2: GWS-WG results, Victoria Interop, May 2006 Slide 1 GWS-WG results IVOA Interop meeting, Victoria BC, May 2006

GWS-WG results, Victoria Interop, May 2006 Slide 2

SSO

SSO authentication mechanisms is WD 1.0

Resolved issues of detailNB: we now require proxy-certificate support in TLS

More details of community/UAS requirements emerged

Ray’s demo helped a lot

Registry metadata proposedBuilds on registry-DM workNot much reaction; no dissenters? 1.0 WD?

Page 3: GWS-WG results, Victoria Interop, May 2006 Slide 1 GWS-WG results IVOA Interop meeting, Victoria BC, May 2006

GWS-WG results, Victoria Interop, May 2006 Slide 3

UWS

New arrangement of spec. acceptedWill progress this to v1.0

Will work up “Parameterized Applications” contract based on UWS (UWS-PA)

standardized CEALeads to asynchronous ADQL-serviceBuild this standard in GWS-WG

Page 4: GWS-WG results, Victoria Interop, May 2006 Slide 1 GWS-WG results IVOA Interop meeting, Victoria BC, May 2006

GWS-WG results, Victoria Interop, May 2006 Slide 4

VOSI & IVOA-BP

Split:getAvailability, getRegistration remain part of basic profileLog harvesting is no longer part of basic profileLog stuff is too specialized to impose on every service

BP stuff can go to 1.0 WD very quickly now

Page 5: GWS-WG results, Victoria Interop, May 2006 Slide 1 GWS-WG results IVOA Interop meeting, Victoria BC, May 2006

GWS-WG results, Victoria Interop, May 2006 Slide 5

VOSpace

VOSpace-1 ideas ~acceptedDisquiet about vos:// URIs, fuzzy data-objects

OK to go ahead with VOSpace-1 quicklyAim to finish by Autumn interopPrototyping teams assigned

Want to develop VOSpace-2 in parallelStart this summerParticipation invited, esp. authors of client tools

Page 6: GWS-WG results, Victoria Interop, May 2006 Slide 1 GWS-WG results IVOA Interop meeting, Victoria BC, May 2006

GWS-WG results, Victoria Interop, May 2006 Slide 6

Road-map

See http://www.ivoa.net/twiki/bin/view/IVOA/IvoaGridAndWebServices#road-map