gulf laboratories co. wll gulf geotechnical · pdf filelusail stormwater pumping station sw1...
TRANSCRIPT
GULF LABORATORIES CO. WLL
GULF GEOTECHNICAL SERVICES & MATERIAL TESTING LLC
Prequalification
Gulf Laboratories Co. W.L.L Gulf Geotechnical Services & Material Testing LLC
P.O. Box 4024, Doha, Qatar P.O. Box 515, PC 132 Al Khoudh, Sultanate of Oman
Tel : +974 4607034 / 4607036 Tel : +968 24542255 / 24542552
Fax : +974 4607628 Fax : +968 24545441
e-mail : [email protected] e-mail : [email protected]
Website : www.gulflaboratories.com
Prequalification Document
Contents
Page No.
COMPANY DETAILS ........................................................................................................1
ORGANIZATION STRUCTURE ........................................................................................2
EQUIPMENT AND RESOURCES .....................................................................................3
SERVICES ........................................................................................................................5
APPENDICES
APPENDIX A CERTIFICATATIONS & ACCREDITATIONS
APPENDIX B ORGANIZATION CHART
APPENDIX C COMPLETED PROJECTS
APPENDIX D FIELD & LABORATORY TESTING
Prequalification
1
Company Details
QATAR
Name of Company : Gulf Laboratories Co. W.L.L
Head Office Address : P.O. Box 4024, Doha, Qatar
Commercial Reg. # : 14419
Nature of Business : Geotechnical Investigations and Materials Testing
Established : Mid-1970’s
Owners : Mannai Corporation – Doha
Employees : 170
Office Location : Salwa Industrial Area.
Junction of Street # 2 and Al Kassarat Street
MMAA Approval Certificate Nos.
Geotechnical / Soil Investigation : No. SI012
Material Testing Laboratory : No. 061
SULTANATE OF OMAN
Name of Company : Gulf Geotechnical Services & Material Testing LLC
Head Office Address : PO Box 515, PC 132 Al Khoudh, Sultanate of Oman
Commercial Reg. # : 1041094
Nature of Business : Geotechnical Investigations and Materials Testing
Established : 2008
Owners : Mannai Corporation & Gulf Laboratories Co. WLL
Employees : 28 (by end of 2010)
Gulf Laboratories are certified to ISO 9001:2008 and OHSAS18001:2007 and are an ISO17025:2005 accredited laboratory.
Prequalification
2
Organization Structure
General Manager : Andrew Slate, BSc, CGeol, EurGeol
Deputy General Manager : Dr. Richard Ellis, PhD
Drilling & Geotechn. Manager : K.P.Abdul Majeed, BSc, MSc
Geotechnical Operations Manager (Oman) : Wael Mohd Saleh, BSc, MSc
Laboratory Operations Manager : Thomas Varghese, BSc
Senior Geotechnical Staff : M.N. Sananth, BSc, MSc
Chief Chemist : K.M. Arunan, BSc, MSc, FRSC
Senior Geologists : Abdul Rahman, BSc, MSc
Durga Bashyal, BSc, MSc
Bal Dhoj Karki, BSc, MSc
Geologists / Engineers : Sujin Jayadevan, BSc, MSc
Abdul Jawad, BSc,
Vineeth Nair, BSc
Subhesh Thottiyil, BSc
Gulzar Ansari, BSc
Chemists : 4 nos.
Laboratory Staff : 72 nos.
QA/QC Engineers : Francis Mercado, Allan Nabong
Drilling Supervisor : K. Kunamani, Orlando Boledo
Drilling Engineer : Subrajith Nayak
Drillers & Drilling Assistants : 42 nos.
Other Support Staff : 32 nos.
Prequalification
3
Equipment and Resources
Drilling Rigs – 6 no. Dual Purpose Truck Mounted
Hands England HE-35, Hands England HE-36
Boyles BBS 25, Dando Geotech
2 no. Pilcon Traveller T30 Rigs
Drilling Rigs – 11 no. Dual Purpose Crawler Mounted
2 no. Beretta T44 Rigs, 9 Hanjin P4000SD Rigs
Drilling Rigs – Cable Percussion
Pilcon Wayfarer Light Cable Percussion Rig
Specialized Rig
Pagani 200T Cone Penetration Rig with Piezocone
Marine Equipment
Jack-up Drilling Barge “Nautilus” (12m x 6m)
Ancillary Equipment
Air Compressors – 250 to 750cfm, Water Bowsers and Water Tanker
Pressuremeter test equipment, Drilling parameter measurement systems
Prequalification
4
Laboratory Facilities
Soil and aggregate testing laboratory
Asphalt testing laboratory
Cement testing laboratory
Chemical laboratory
Environmental testing laboratory (ICP and GCMS)
Microbiological and drinking water testing laboratory
On-site Materials Testing Laboratories
Geotechnical testing laboratory Triaxial, oedometer, shear-box test equipment
Geophysical Equipment
Soil Resistivity Testing Equipment
Thermal Resistivity Testing Equipment
Ground Penetrating Radar with DGPS
Pile Integrity Testing Equipment
Hydrological Resources
Submersible Pumps, V-Notch Weir Tanks, Pressure Transducer and Dataloggers
Prequalification
5
Services
GROUND INVESTIGATION
Onshore Soil Investigations, Nearshore Soil Investigations
Contaminated Land and Environmental Investigations
Exploratory Borehole Drilling and Sampling
Trial Pitting
In-Situ Testing
Static Cone Penetration and Piezocone Testing
Probehole Surveys
Geophysical Investigations
Soil Resistivity Testing
WATER RESOURCES AND WATER MANAGEMENT
Water Well Drilling
Soakaway Borehole Drilling
Well Casing Installation
Pumping Tests and Permeability Testing
Earthing and Cathodic Protection Boreholes
LABORATORY / MATERIALS TESTING
Soil and rock mechanics laboratory testing
Water & Wastewater testing
Concrete testing
Aggregate testing
Asphalt testing
Chemical testing
Environmental testing
GEOLOGICAL INVESTIGATIONS / MINERAL RESOURCES
Geological mapping
Walk-over surveys
Exploratory core drilling
GROUND ENGINEERING AND GROUND IMPROVEMENT
Pressure grouting
Gravity filling of cavities and voids
Anchor drilling
Micropiling
OTHER SERVICES
Pile Integrity Testing
Underground Service Detection
Ground Penetrating Radar
Electromagnetic Surveys
Electrical Resistivity Survey
Prequalification Document
APPENDIX A
CERTIFICATIONS &
ACCREDITATIONS
Prequalification 2010
Prequalification 2010
ISO 9001:2008 CERTIFICATE
(Please press CTRL and click on hyperlink to access)
ISO/IEC 17025:2005 CERTIFICATE
(Please press CTRL and click on hyperlink to access)
Prequalification 2010
APPENDIX B
ORGANIZATION CHART
Organization Profile
Prequalification 2010
Andrew Slate
General Manager
Thomas Varghese
Laboratory Operations
Manager
Chemist
Chemical Lab
Assistants
Lab Technicians
Asst. Lab
Technicians
Chemical &
Environmental Lab.
Soil & Aggregate Lab
Wael. M.Saleh
Geotechnical Operations
Manager (Oman)
Geologists
Moataz Elsayed
Group QHSE
Manager
Executive Committee
Mannai Corporation
GULF GEOTECHNICAL SERVICES &
MATERIAL TESTING LLC ORGANIZATION CHART
Orlando Boledo
Drilling Supervisor
Drilling Crews
Workshop facilities
Mannai Corporation
Accounts, Credit Management,
Legal Dept, Purchasing
Khamis Al Aufi
PRO
Field technicians
Prequalification 2010
Appendix - C1
APPENDIX C
COMPLETED PROJECTS
Prequalification 2010
Appendix - C3
Major Completed Projects
Geotechnical Investigations & Drilling Projects
2009
Location Client Project Value (US$)
Oman Zoom Steel Iron Ore Exploration project, Ibra 343,400
Oman Saraya Bandar Jissah Saraya Bandar Jissah Resort 287,000
Oman Five Oceans Sohar Special Economic Zone 23,120
Oman Al Rimal Mining Limestone Quarry, NW of Salalah 272,600
Qatar CDC-Takenaka JV NDIA - Passenger Rail System – Geotechnical investigation
works 1,019,393
Qatar STFA Marine Construction EPIC for Container Terminal Berth 7 at Mesaieed Port –
CPT soundings 240,959
Qatar Adil Jaidah & Associates B+G+2 Office Building at C-ring Road 5,145
Qatar Coastal Consulting Engineering Submarine Cable at Corniche, Doha 15,019
Qatar Hyatt Plaza Drilling Soakaway boreholes 5,616
Qatar GHD Global Doha Park Project - Soil Testing & Drilling Boreholes to
Groundwater level. 9,641
Qatar CDC-Takenaka JV NDIA – Geotechnical investigation works 12,042
Qatar JGC / KBR – Qatar Shell
Pearl GTL PROJECT PI-008 – Proposed Location of
Operational Waste Storage Cell – Geotechnical
Investigation – Trial Pits
22,873
Qatar CCIC& Teyseer JV Qatargas 3 & 4 Onshore projects – Drilling Boreholes for
vertical anodes 10,885
Qatar Pillar Microwave Transmission Site – Muaither – Earthing
Borehole 1,370
Qatar Dohaland Heart of Doha, Geotechnical Investigation Works 681,018
Qatar Rent-a-Port Lusail Development – Marine Geotechnical Investigation 66,608
Qatar CCIC& Teyseer JV NDIA, CP-27 Geotechnical Investigation for utility tunnel 20,548
Qatar KBAS Contracting Barwa Industrial Area & Development of Mohd. Bin Jassim
St. 7,808
Qatar Sinohydro Corporation Lusail Stormwater Pumping Station SW1 – geotechnical
investigation 47,102
Qatar Mannai Trading Co. Proposed Development at RLIC for MCL – Geotechnical
Investigation 19,963
Qatar Hyder Consulting Lusail Pumping Station – Geotechnical Investigation 9,197
Qatar Halcrow Yolles NDIA – Airport Operations FAacilities Package No. 2 –
geotechnical investigation 33,075
Qatar Qatar Kentz Pearl GTL, RLIC – Earthing borehole drilling 5,342
Qatar Consolidated Gulf Co. WLL Mesaieed Tank Farm Area – geotechnical investigation 6,997
Qatar Tracer Qatar Improvement to Roads and Cark park at HGH – Earthing
boreholes 23,518
Qatar Danway Qatar Drilling Earthing Boreholes in Dukhan 16,767
Qatar Gulf Contracting Co. WLL Earthing Boreholes 5,764
Qatar Danway Qatar Drilling Earthing Boreholes in Umm Bab 2,541
Qatar Atkins / Mumtalkat Plot ECQ-D-11 Energy City, Lusail 21,085
Qatar Arab Engineering Bureau Ras Al Nassa Development (Marine Works), Doha 53,301
Prequalification 2010
Appendix - C4
Qatar Zenon Trading & Contracting Co. Soakaway borehole drilling 6,329
Qatar KEO International NDIA – Subsurface Exploration and Geotechnical
Exploration 47,278
Qatar DOPET Design Inputs for Raft Foundation 1,233
Qatar Al Jaber Energy Services Common Sulphur Plant Qatargas II – Cathodic Protection
boreholes 10,247
Qatar Redco Construction Almana Construction of B+G+3 office Building at Al Wakrah 2,027
Qatar Qatar Primary Material Co Geotechnical Investigation 16,362
Qatar Hyder Consulting Qatar Foundation, Education City, Additional Geotechnical
Investigation – infiltration tests 14,438
Qatar Gulf Contracting CO. WLL DOHA WEST SEWAGE TREATMENT WORKS - DRILLING
EARTHING BOREHOLES 43,836
Qatar WSP Environmental Aerospace City, Al Khor- Geotechnical Investigation 162,995
Qatar GEMS New Doha Port project – Supplementary site investigation 2,169,160
Qatar Aswan Trading Drilling Water Wells in Al Khor Farm 24,616
Qatar CCIC& Teyseer JV Qatargas 3 & 4 Onshore projects – Drilling Boreholes for
vertical anodes 7,123
Qatar Middle East Engineering
&Corrosion Control WLL MEEC - QP Tank Farms 21,945
Qatar STFA Marine-Construction
Company Gabbro Berth - Piezcone testing 35,644
Qatar Qatar National Museum QNM - Additional SI - Pumping tests 53,682
Qatar Cedgec Central Control Room for QAPCO 8,811
Qatar Nasser- Al Hajiri Pearl GTL Project - Earthing boreholes 33,288
Qatar Mohamed Mohanna Ali Dosari Cleaning & Deepening Water Well At Al-Khuraib 1,370
Qatar Shannon Engineering HKT & MKT Office Building Najma 0
Qatar CCIC & Teyseer Contracting Borehole at RLIC 10,890
Qatar Al Jaber & Partners Education City - North Side Utility Tunnels 35,616
Qatar JGC KBR Pearl GTL Project off Plot Waste Cell 22,885
Qatar Dornier Consulting Drilling of Additional GW Monitoring Wells 100,000
Qatar Diplomatic Contracting Company New Industrial Area - Soakaways 4,049
Qatar KEO International NDIA -CP63 - Additional SI works 29,147
2008
Location Client Project Value (US$)
Qatar MR. ABDULLA ABDULARAHMAN
HYDER
APARTMENT (B+G+2) - GEOTECHNICAL INVESTIGATION
WORKS 1,507
Qatar QATAR DEVELOPMENT CO. KINDER GARTEN SCHOOLS AT ISHGAWA - GEOTECHNICAL
INVESTIGATION 4,205
Qatar SOGREAH PUMPING TEST & WATER ANALYSIS 66,740
Qatar FIVES SOLIOS QATALUM PROJECT - FUME TREATMENT PLANT - SOIL
INVESTIGATION 33,808
Qatar QATAR PRIMARY MATERIALS GEOLOGICAL PROSPECTING FOR SAND DEPOSITS - SITE
INVESTIGATION 21,034
Qatar GEMS NDPP PROJECT 401,562
Qatar CRC MARKIYAH MALL - DRILLING EARTHING BOREHOLE 8,440
Qatar CH2MHILL DRILLING & INSTALLATION GROUND WATER WELL AT 13,432
Prequalification 2010
Appendix - C5
MESAIEED
Qatar FLUOR GROUND WATER MONITORING WELL IN CONDENSATE 1
& 2 AREA 64,029
Qatar MINISTRY OF MUNICIAPL
AFFAIRS & AGRICULTURE DRILLING 3 NOS. WATER WELL AT SABKHAT DUKHAN 7,397
Qatar HYUNDAI ENG'G & CONST. CO.
LTD
RAS LAFFAN "C" IWPP PROJECT (RAPO) - THERMAL
RESISTIVITY TEST 2,534
Qatar CCIC& TEYSEER RASGAS ONSHORE/ONPLOT EXPANSION - DRILLING OF
GROUND WATER MONITORING WELLS 20,274
Qatar HYUNDAI ENGINEERING &
CONSTRUCTION CO. LTD
RAS LAFFAN "C" IWPP PROJECT- SOIL INVESTIGATION
WORKS 285,686
Qatar FOSTER WHEELER QATAR PETROCHEMICAL COMPLEX PROJECT -
ENVIRONMENTAL BASE LINE SURVEY 153,374
Qatar NIPPON KOEI QUOTATION FOR PROVISION AND TRANPORTATION OF
CORE BOXES 3,562
Qatar JGC-KBR / QATAR SHELL
PEARL GTL PORJECT - SHELL CONTRACT PI-012 TPME,
PROJECT NO. 9216T - GEOTECHNICAL INVESTIGATION
WORKS
45,400
Qatar FLUOR MIDEAST LTD WEST SIDE FLUOR CAMP - DRILLING OF GROUND WATER
MONITORING WELLS 26,837
Qatar QATAR DEVELOPMENT CO. RIVERA GARDENS - DUHAIL - GEOTECHNICAL
INVESTIGATION WORKS 4,205
Qatar MAFCO B+G+10 BUILDINGS AT FAREEQUE ABDUL AZEEZ -
GEOTECHNICAL INVESTIGATION 20,466
Qatar RAKO CONTRACTING GEOTECHNICAL INVESTIGATION AT WAKRA 4,103
Qatar FERNAS CONSTRUCTION CO. EPIC FOR FUEL GAS SUPPLY TO QNCC - IV AND GCC -I
PLANTS AT UMM -BAB AREA 3,699
Qatar BEHZAD TRANSPORT DRILLING EARTHING BOREHOLES AT ADARMA 1,575
Qatar DOPET DOHA PETROLEUM CONSTRUCTION CO. (DOPET) - QP SITE 15,870
Qatar AL HUDA ENGINEERING WORKS EARTHING BOREHOLES FOR PLAZA II & III 1,912
Qatar KEPPLER SEGHERS DOHA NORTH SEWERAGE TREATMENT PALNT SITE 1 & 2 27,005
Qatar SALAM PETROLEUM SERVICES GEOTECHNICAL INVESTIGATION KHATIYAH MAIN IN
DUKHAN FIELDS 7,047
Qatar MADAR BUILDING MATERIAL GEOTECHINCAL INVESITGATION WORKS 7,064
Qatar AL WAZEERI TRADING
TRANSPORT & CONTG AL WAZEERI TRADING TRANSPORT 2,071
Qatar MAFCO CONTRACTING G + 3 BUILDING AT AL SAAD AREA - GEO TECHNICAL
INVESTIGATION WORKS 15,110
Qatar FERNAS CONSTRUCTION CO. PLANTS AT UMMBAB AREA - GEOTECHNICAL
INVESTIGATION WORKS 21,381
Qatar BEZHAD TRANSPRT DRILLING ONE BORE HOLE 1,575
Qatar AL SRAIYA STRABAG NEW IZGHAWA LINK ROAD - GEOTECHNICAL
INVESTIGATION WORKS 13,329
Qatar AMMICO CONTRACTING CO. WLL DRILLING & INSTALLATION OF GROUNDWATER
OBSERVATION WELL 4,384
Qatar KEO INTERNATIONAL GEOTECHNICAL INVESTIGATION 133,479
Qatar DAEWOO ENGINEERING CONSTRUCTION CO. RAS LAFFAN YARD RLIC -
GEOTECHNICAL INVESTICATION 171,486
Qatar STFA MARINE CONSTRUCTION GABRO BERTH EXPANSION AT MESAIEED 94,863
Qatar QATAR KENTZ DRILLING EARTHING BOREHOLES 4,110
Qatar MEDCO QATAR BAHRIAN CAUSEWAY - SOIL INVESTIGATION 121,014
Qatar MSK CONTRACTING GEOTECHNICAL 5,479
Qatar MSK CONTRACTING DRIILING GROUND WATER WELL 3,562
Prequalification 2010
Appendix - C6
Qatar DOPET DRILLING EARTHING BOREHOLES 9,189
Qatar ABYAAR REAL ESTATE
DEVELOPMENT GEOTECHNICAL INVESTIGATION WORKS 84,614
Qatar AL JABER & PARTNERS DRILLING EARTHING BOREHOLES 43,315
Qatar ENERGY TECHNICAL SERVICES GEOTECHNICAL INVESTIGATION WORKS 8,000
Qatar QATAR PRIMARY MATERIALS SITE IVESTIGATION 63,233
Qatar REDCO GROUP PRECAST CONCRETE FACTORY - GEOTECHNICAL
INVESTIGATION 5,425
Qatar QATAR KENTZ PEARL GTL SITE - RLIC - DRILLING EARTHING BORE HOLE 18,493
Qatar CCIC& TEYSEER PACKAGE CP 27 - NDIA - GEOTECHNICAL INVESTIGATION 25,478
Qatar HYDER CONSULTING ME THE SPORTS CITY PROJECTS - BOREHOLE DRILLING,
PUMPING TEST 76,660
Qatar QATAR PRIMARY MATERIALS CEMENT SILOS, GABBRO BERTH, MESAIEED -
GEOTECHNICAL INVESTIGATION 40,849
Qatar HILL INTERNATIONAL GRAND HYATT RESORT PORJECT - PHASE II -
GEOTECHNICAL INVESTIGATION 43,281
Qatar AL JABER GROUP ABUDHABI TOWER - GROUND INVESTIGATION 695,348
Qatar BEITY PROPOSED G + 8 BUILDING AT OLD GHANEM - SITE
INVESTIGATION WORKS 5,452
Qatar COWI A/S BARWA AL KHOR DEVELOPMENT - GEOTECHNICAL
INVESTIGATIONS 194,926
Qatar CONSTRUCTION ENTERPRISES
COMPANY
CONSTRUCTION OF AL KHOR PORT CHANNEL -
GEOTECHNICAL INVESTIGATION 5,660
Qatar EL SEIF ENGINEERING CONTG DRILLING BOREHOLE 3,642
Qatar AL RIYADH TRADING & CONT. CO. EARTHING BOREHOLES AT AL WAAB 1,904
Qatar QATAR KENTZ SOIL RESISTIVITY TEST 1,301
Qatar STS LUSAILPROJECT 43,712
Qatar DORNIER CONSULTING DRILLING INSTALLATION OF GROUNDWATER MONITOR
WELLS AT DUKHAN 107,945
Qatar TADMUR CONTRACTING &
TRADING EST
GEOTECHNICAL INVESTIGATION WORKS - FAHAHIL
STRIPPING PLANT IN DUKHAN 7,136
Qatar QDVC WEST BAY PARK SITE - SOIL INVESTIGATION 149,588
Qatar HYDER CONSULTING ME PACKAGE 1 - WAKRAH MAIN ROAD - GEOTECHNICAL
INVESTIGATION 101,582
Qatar HYDER CONSULTING ME PACKAGE 2 - MAJOR ROADS IN AL KHOR & AL HUWAILAH -
GEOTECHNICAL INVESTIGATION 113,318
Qatar HYDER CONSULTING ME PACKAGE 3 : ROADS & INFRASTRUCTURE - AIN KHALID 120,273
Qatar HYDER CONSULTING ME PACKAGE 4 - ROADS & INFRASTRUCTURE IN AL KHEESA
NORTH - GEOTECHNICAL INVESTIGATION 176,021
Qatar HYDER CONSULTING ME PACKAGE 5 : ROADS & INFRASTRUCTURE IN AL KHOR
INDUSTRIAL AREA 96,189
Qatar HYDER CONSULTING ME PACKAGE 6 : MKEINES UMMBAB LINK ROAD 155,687
Qatar AL FOWRIYA TRADING &
CONTRACTING G+1 SAFARI HYPER MARKET AT AIN KHALID DOHA 3,433
Qatar PUNJ LLOYD LTD SOIL RESISTIVITY SURVEY - WORK ORDER 1,370
Qatar CHIYODA CORPORATION BARZAN ONSHORE PLANNING PROJECT- GEOTECHNICAL
INVESTIGATION 120,890
Prequalification 2010
Appendix - C7
Qatar AL UMMA TRADING &
CONTRACTING
DRILLING GROUNDWATER WELLS AT BIN MAHMOUD
AREA 4,110
Qatar SINOHYDRO CORPORATION CP1
PROJECT
LUSAIL DEVELOPMENT PRELIMINARY INFRASTRUCTURE
WORKS P GEOTECHNICAL INVESTIGATION 67,605
Qatar INTERNATIONAL CONTRACTING
& TRADING CO. QATAR FOUNDATION - DRILLING WATER WELL 4,438
Qatar HYDER CONSULTING ME PACKAGE 4 A - ROADS & INFRASTRUCTURE IN UMM
QARN - GEOTECHNICAL INVESTIGATION 36,177
Qatar ARUP EDUCATION CITY 0
Qatar ARUP IQ TOWER - THE CRYSTAL - GEOTECHNICAL
INVESTIGATION 512,378
Qatar FERNAS CONSTRUCTION CO. DRILLING EARTHING BOREHOLES 24,690
Qatar SLAG AGGREGATE PRODUCER QUARRY FEASIBILITY STUDY 12,096
Qatar MEDCO QATAR BAHRIAN CAUSEWAY - SOIL INVESTIGATION 100,226
Qatar ATLAS INTERNATIONAL QSTRG STAGE -3 - DRILLING EARTHING BOREHOLE 24,164
Qatar EL SEIF ENGINEERING CONTG P94-NDIA, DRILLING BOREHOLES FOR EARTHING 102,753
Qatar DOPHA PETROLEUM CONT CO
LTD GRC 05/115 DRILLING EARTHING BOREHOLES 9,189
Qatar HYDER CONSULTING ME LUSAIL PUMPING STATION , GEOTECHNICAL
INVESTIGATION WORKS 43,984
Qatar ATELIERS JEAN NOUVEL NEW QATAR NATIONAL MUSEUM GEOTECHNICAL
INVESTIGATION 275,970
Qatar NEW VISION DRILLING EARTHING BOREHOLES AT SALWA ROADQ 1,644
2007
Location Client Project Value (US$)
Qatar CDE IRELAND LTD GEOTECHNICAL INVESTIGATION FOR SAND WASHING
PLANT AT AL KARANA 22,563
Qatar HYDRO ALUMINIUM AS QATALUM PROJECT – GEOTECHNICAL INVESTIGATION
FOR BRIDGES ACROSS COOLING WATER CHANNEL 10,931
Qatar JGC - KBR C/O QATAR SHELL GEOTECHNICAL WORKS FOR THE FIREWATER TANK /
WEST LAYDOWN AREA LOT W7A 9,445
Qatar JGC KBR - QATAR SHELL POTABLE WATER & FIRE WATER SYSTEM, CAMP AREA,
RASLAFFAN - GEOTECHNICAL INVESTIGATION 14,400
Qatar NIPPON KOEI CO. LTD / ASCO
CONSULTING ENGINEER
ABU HAMOUR SOUTHERN OUT FALL - GEOTECHNICAL
AND GEOPHYSICAL INVESTIGATION 224,459
Qatar STRABAG QATAR WLL PLANT OFFICE AREA BUILDINGS - GEOTECHNICAL
INVESTIGATION
14,015
Qatar PRIVATE ENGINEERING OFFICE /
GHD
PRIVATE BEACH VILLA AL THAKHIRA - GEO TECHNICAL
INVESTIGATION 11,740
Qatar CONSOLIDATED CONTRACTORS
INT'L CO. (CCIC)
QATARGAS II LNG FACILITIES PROJECT, RASLAFFAN -
DRILLING EARTHING BORE HOLE (CONTRACT GTC-QG-
11-ONS-15)
149,658
Qatar GEA BARWA BUSINESS CENTER - GEOTECHNICAL &
HYDROLOGICAL INVESTIGATION 305,462
Qatar AL JABER ENERGY SERVICES COMMON SULPHUR PLANT, QATAR GAS II - RLIC,
GEOTECHNICAL INVESTIGATION 22,551
Prequalification 2010
Appendix - C8
Qatar ENCANA INTERNATIONAL
(QATAR) LIMITED DRILLING WATER WELL & PUMPING TEST 61,200
Qatar RAS LAFFAN OLFINS COMPANY
LTD (RLOC)
ETHYLENE PIPELINE - MESAIEED TOPOGRAPHICAL
SURVEY 30,155
Qatar GEA GERMAN ENGINEERS AND
ARCHITECTS
BARWA BUSINESS CENTER - GEOTECHNICAL &
HYDROLOGICAL INVESTIGATION - 2ND PHASE 386,473
Qatar ATKINS QATAR FOUNDATION EDUCATION CITY - ADDITIONAL
GEOTECHNICAL INVESTIGATION 65,642
Qatar CBI SHELL PEARL GTL TANKAGE- CBI CONTRACT NO.
153130 - GEOTECHNICAL SITE INVESTIGATION 803,320
Qatar STFA MARINE CONSTRUCTION CONSTRUCTION OF NEW TEMPORARY BERTH NO. 7 AT
MESAIEED - STAND PIPE INSTALLATION & ASS. WORKS 61,136
Qatar JGC MIDDLE EAST FZE GROUND WATER MONITORING WELLS
CONSTRUCTION AT DOLPHIN PROJECT 54,301
Qatar RAFAEL VINOLY ARCHITECTS ARAB MUSEUM OF MODERN ART - GEOTECHNICAL
INVETIGATION 117,722
Qatar JGC KBR - QATAR SHELL STORAGE OF CORE BOXES 23,836
Qatar FCB QNC-3 ANCHORS IN ROCK UMMBAB - DRILLING
BOREHOLES FOR ANCHORS 62,740
Qatar QATAR PRIMARY MATERIALS GEOLOGICAL PROSPECTING FOR SAND DEPOSITS,
SOUTH QATAR. SITE INVESTIGATION 79,301
Qatar QATAR PRIMARY MATERIALS QPMC SAND WASHING PLANT-SOUTH OF AL-KARANA,
GROUND INVESTIGATION 19,759
2007
Location Client Project Value (US$)
Qatar HALCROW DEVELOPMENT OF RUWAIS PORT PHASE 2, DRILLING
EARTHING BOREHOLES 89,067
Qatar HALCROW NEW DOHA INT’L AIRPORT, AIRLINE OPERATIONS
FACILITIES GEOTECHNICAL INVESTIGATION 112,182
Qatar GULF EINGINEERING MULTI PURPOSE ADMIN. COMPLEX – RASLAFFAN,
GEOTECHNICAL INVS. 68,000
Qatar PUNJ LLOYD NDIA FUEL SYSTEM-GEOTECHNICAL & GEOPHYSICAL
SIOL INVESTIGATION 153,829
Qatar CTJV AL KHALEEJ PROJECT PHASE 2, GEOTECHNICAL &
TOPOGRAPHICAL SURVEY 52,249
Qatar IMCO DRILLING EARTHING BOREHOLES & INSTALLATION OF
EARTH RODS 40,287
Qatar CHIYODA TECHNIP AL KHALEEJ GAS PROJECT 28,125
Qatar QATAR SHELL GTL PEARL GTL PROJECT PI-017, HARBOUR TANK FARM
INTERIM SITE INESTIGATION 90,297
Qatar HALCROW OLD DOHA PORT REDEVELOPMENT GEOTECHNICAL
INVESTIGATION 28,127
Qatar HYDER CONSULTING LUSAIL DEVELOPMENT GROUND WATER
INVESTIGATION 377,632
Prequalification 2010
Appendix - C9
Qatar STS CONSULTANTS QATAR CONVENTION CENTER & TOWER
GEOTECHNICAL SITE INVESTIGATION 255,556
Qatar ELLERBE BECKET SPECIALITY TEACHING HOSPITAL IN EDUCATION CITY,
GEOTECHNICAL INVS. 48,564
Qatar CHIYODA TECHNIP QATAR LIQUIFIED GAS CO PMP/AGX PROJECT
GEOTECHNICAL & TOPOGRAPHICAL SURVEY 96,497
Qatar FCB CEMENT THIRD EXTENSION OF UMMBAB CEMENT PLANT-
GEOTECHNICAL INVESTIGATION 52,844
Qatar CHIYODA TECHNIP QATAR GAS 3 & 4 ONSHORE PROJECT TRAINS 6 & 7
SUB CONTRACTORS CAMP 31,280
Qatar HYDRO ALUMINIUM AS QATALUM PROJECT-GEOTECHNICAL INVESTIGATION
12,986
Qatar BAUER INTERNATIONAL OLD GHANIM SITE DRILLING GROUND WATER
MONITORING WELL 22,131
Qatar QATAR KENTZ RL3 COMMON OFFLOT PROJECT-RASLAFFAN 37,835
Qatar QATAR KENTZ PEARL GTL PLANT TANK AREA BOREHOLE WORK 75,973
Qatar QATAR SHELL PEARL GTL PROJECT CONSTRUCTION CAMP TRIAL PIT
WORK 30,462
Qatar QAPCO SIOL & WATER CONTAMINATION SURVEY IN AREA A &
B OF QATOFIN PROJECT 85,622
Qatar CBI CBI CONTRACT # 146682, RASLAFFAN GEOTECHNICAL
INVESTIGATION 88,638
Qatar GALFAR ALMISNAD EPIC UMMBAB TO SALWA ROAD DUAL CARRIAGE,
EARTHING BOREHOLES 112,534
Qatar LINDE AG AIR SEPERATION UNITS, RASLAFFAN –
PEARL QATAR, GEOTECHNICAL INVS. 109,671
Qatar JGC-KBR C/O QATAR SHELL PEARL GTL PROJECT ADDITIONAL CAMP SOIL
INVESTIGATION WORK 95,463
Qatar AL-JABER & PARTNERS PEARL PROJECT-EFFLUENT TREATMENT PLANT,
GEOTECHNICAL INVESTIGATION 432,359
Qatar GALFAR ALMISNAD
CONSTRUCTION OF ROADS, UTILITY CROSSINGS &
STREET LIGHTING IN INDUSTRIAL AREA, MESAIEED
GROUND WW
25,077
Qatar HYDRO ALUMINIUM AS QATALUM PROJECT – ADDITIONAL TOPOGRAPHICAL,
BATHYMETRICAL & GEOTECHNICAL INVESTIGATION 107,103
2006
Location Client Project Value (US$)
Qatar HALCROW DEVELOPMENT OF RUWAIS PORT PHASE 2, DRILLING
EARTHING BOREHOLES 89,067
Prequalification 2010
Appendix - C10
Qatar HALCROW NEW DOHA INT’L AIRPORT, AIRLINE OPERATIONS
FACILITIES GEOTECHNICAL INVESTIGATION 112,182
Qatar GULF ENGINEERING MULTI PURPOSE ADMIN. COMPLEX – RASLAFFAN,
GEOTECHNICAL INVS. 68,000
Qatar PUNJ LLOYD NDIA FUEL SYSTEM-GEOTECHNICAL & GEOPHYSICAL
SIOL INVESTIGATION 153,829
Qatar CTJV AL KHALEEJ PROJECT PHASE 2, GEOTECHNICAL &
TOPOGRAPHICAL SURVEY 52,250
Qatar IMCO DRILLING EARTHING BOREHOLES & INSTALLATION OF
EARTH RODS 40,288
Qatar CHIYODA TECHNIP AL KHALEEJ GAS PROJECT 28,125
Qatar QATAR SHELL GTL PEARL GTL PROJECT PI-017, HARBOUR TANK FARM
INTERIM SITE INESTIGATION 90,297
Qatar HALCROW OLD DOHA PORT REDEVELOPMENT GEOTECHNICAL
INVESTIGATION 28,127
Qatar HYDER CONSULTING LUSAIL DEVELOPMENT GROUND WATER
INVESTIGATION 377,632
Qatar STS CONSULTANTS QATAR CONVENTION CENTER & TOWER
GEOTECHNICAL SITE INVESTIGATION 255,556
Qatar ELLERBE BECKET SPECIALITY TEACHING HOSPITAL IN EDUCATION CITY,
GEOTECHNICAL INVS. 48,564
Qatar CHIYODA TECHNIP QATAR LIQUIFIED GAS CO PMP/AGX PROJECT
GEOTECHNICAL & TOPOGRAPHICAL SURVEY 96,497
Qatar FCB CEMENT THIRD EXTENSION OF UMMBAB CEMENT PLANT-
GEOTECHNICAL INVESTIGATION 52,844
Qatar CHIYODA TECHNIP QATAR GAS 3 & 4 ONSHORE PROJECT TRAINS 6 & 7
SUB CONTRACTORS CAMP 31,280
Qatar HYDRO ALUMINIUM AS QATALUM PROJECT-GEOTECHNICAL INVESTIGATION 12,986
Qatar BAUER INTERNATIONAL OLD GHANIM SITE DRILLING GROUND WATER
MONITORING WELL 22,132
Qatar QATAR KENTZ RL3 COMMON OFFLOT PROJECT-RASLAFFAN 37,836
Qatar QATAR KENTZ PEARL GTL PLANT TANK AREA BOREHOLE WORK 75,973
Qatar QATAR SHELL PEARL GTL PROJECT CONSTRUCTION CAMP TRIAL PIT
WORK 30,462
Qatar QAPCO SIOL & WATER CONTAMINATION SURVEY IN AREA A &
B OF QATOFIN PROJECT 85,622
Qatar CBI CBI CONTRACT # 146682, RASLAFFAN GEOTECHNICAL
INVESTIGATION 88,638
Qatar GALFAR ALMISNAD EPIC UMMBAB TO SALWA ROAD DUAL CARRIAGE,
EARTHING BOREHOLES 112,534
Qatar LINDE AG AIR SEPERATION UNITS, RASLAFFAN –
PEARL QATAR, GEOTECHNICAL INVS. 109,671
Qatar JGC-KBR C/O QATAR SHELL PEARL GTL PROJECT ADDITIONAL CAMP SOIL
INVESTIGATION WORK 95,463
Qatar AL-JABER & PARTNERS PEARL PROJECT-EFFLUENT TREATMENT PLANT,
GEOTECHNICAL INVESTIGATION 432,359
Qatar GALFAR ALMISNAD CONSTRUCTION OF ROADS, UTILITY CROSSINGS &
STREET LIGHTING IN INDUSTRIAL AREA, MESAIEED 25,077
Qatar HYDRO ALUMINIUM AS QATALUM PROJECT – ADDITIONAL TOPOGRAPHICAL,
BATHYMETRICAL & GEOTECHNICAL INVESTIGATION 107,103
2005
Prequalification 2010
Appendix - C11
Location Client Project Value (US$)
Qatar MANNAI CORPORATION WAREHOUSE AT STREET 23/24 SALWA INDUSTRIAL
AREA 3,658
Qatar QATAR DREDGING CO. PEARL OF THE GULF PROJECT – DOHA 47,136
Qatar HYDRO ALUMINIUM AS QATAR ALUMINIUM PROJECT 266,858
Qatar J & P QATAR W.L.L ERC 0492/C1 AL GHARRAFFA INTERCHANGE 2,411
Qatar KBAS CONTRACTIN & TRADING QUARRY FEASIBILITY AT KARAMA 17,205
Qatar INDUSTRIAL SERVICE GROUP OFFICE BLDG (2B +G + 9) AT NEW NEW KHOLAIFAT 6,027
Qatar CHIYODA CORPORATION RASGAS NEW CAMP AREA FOR TRAIN 6 & FEED
PROJECT 78,840
Qatar KBAS CONTG & TRADING KHALIFA STADIUM 1,842
Qatar MANNAI CORPORATION WARE HOUSE AT ST 23/24 SALWA INDUSTRIAL AREA –
ENVIRONMENTA SAMPLING & TESTING 3,658
Qatar C C C RAS LAFFAN EXPANSION PROJECT GROUND WATR
MONITORING WELLS 7,397
Qatar KBAS CONTRACTING SALAM STREET / DRILLING OF SOAKWAY BOREHOLES 5,589
Qatar JGC MIDDLE EAST FZE DOLPHIN – UPSTREAM AND COMPRESSION FACILITIES 18,315
Qatar MTC SURVEY QAFAC II & GEOTECHNICAL SURVEY 39,082
Qatar MTC SURVEY
NEW BRITISH EMBASSY OFFICES RESIDENCE &
AMENITIES TOPOGRAPHICAL & GEO TECHNICAL
SURVEY
12,671
Qatar CHIYODA CORP
SOIL INVESTIGATION & TOPOGRAPHICAL SURVEY –
QATAR GAS III – PROJECT QATAR GAS 3 FEED PROJECT
RASLAFFAN
304,372
Qatar J & P DRILLING BORE HOLES OUR QUOTE ER/6553 4,171
Qatar QATAR KENTZ WLL
QATARGAS II DEVELOPMENT PROJECT RLIC CAMP
AREA, RASLAFFAN, (7-BOREHOLES, SOIL & ROCK
SAMPLING LAB TEST)
9,849
Qatar FBJ ENTERPRISES VILLA COMPLEX LUQTA – GEOTECHNICAL
INVESTIGATION 5,971
Qatar GULF ENGINEERING &
INDUSTRIAL CONSULTANCY
BMC 2004023 CONSULTANCY QTY SURVEY FOR
AQUATIC & FISHERIES REASEARCH CENTRE AT
WAKRAH
33,879
Qatar SMEC INTERNATIONAL HALUL ISLAND REMEDIATION 103,667
Qatar COWI A/S NORTH BEACH DEVELOPMENT ADDITIONAL
BOREWELL 3,397
Qatar QATAR KENTZ 524-QG-II LABOUR CAMP FACILITIES PHASE II –
RASLAFFAN 6,685
Qatar DODSAL PTE LTD DOLPHIN UPSTREAM & COMPRESSION FACILITIES
PROJECT RLIC – DRILLING EARHING BOREHOLES 3,767
Qatar PENINSULAR PETROTECH ENG. HALUL TANK CP SYSTEM, DRILLING BOREHOLES FOR
CATHODIC PROTECTION 61,349
Qatar ARAB CONSULTING ENGINEERS 15 NEW SCHOOLS AROUND DOHA AND VILLAGES 50,137
Qatar CPC/LATTANZI DOHA AIRPORT – GEOTECHNICAL INVESTIGATION 5,765
Qatar QATAR PETROLEUM GEOTECHNICAL INV. FOR GABBRO PROJECT 346,927
Qatar DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 5,308
Qatar KELLOG BROWN ROOT FEED FOR RATIONALIZATION OF CONTROL SYSTEM AT
KHATIYAH AND FAHAHIL DEGASSING STATION 15,795
Qatar TRAGS AL KHOR CLUB CONVERSION – EARTHING BOREHOLES 5,088
Qatar C.D.C BARJEEL RESIDENTIAL TOWERS AT WEST BAY – PILING
AND EXCAVATION WORKS 123,844
Prequalification 2010
Appendix - C12
Qatar J & P DRILLIJNG BORE HOLE FOR STREET LIGHTING 1,956
Qatar ALHUDA ENG WORKS DEVELOPMENT OF KHALIFA TENNIS & SQUASH 4,877
Qatar Q-CON EPIC OF 11KV DUKHAN TOWNSHIP NETWORK
UPGRADE 18,808
Qatar ATKINS PRIMARY INFRASTRUCTURE DESIGN SERVICES FOR
EDUCATION CITY 110,818
Qatar QATAR PETROCHEMICAL HIGH COD TANK IN ETHYLENE PLANT GEOTECHNICAL
INVESTIGATION 7,767
Qatar ATKINS FEED FOR LPG PIPELINE FROM QP REFINARY TO NEW
LPG BOTTLING PLANT 42,941
Qatar PRIVATE ENGINEERING OFFICE VILLA AT AL THAKIRA – GEOTECHNICAL
INVESTIGATION 5,589
Qatar GULF DESIGN PROPOSED BUILDING AT A-RING ROAD FOR AHMED
DARWISH 5,247
Qatar ATKINS QATAR PRIMARY ROUTES DHUKAN HIGHWAY 74,014
Qatar CHIYODA TECHNIP JOINT
VENTURE
ADDITIONAL TOPOGRAPHICAL SURVEY OF
DESALINATED WATER PIPES ROUTE AND
GEOTECHNICAL INVESTIGATION AT LEAN LNG TANK
AREA
28,962
Qatar SLAG AGGREGATE PRODUCER QUARRY FEASIBILITY STUDY AT KARAMA 7,808
Qatar AL-SAAD CONSULTING ENG 2B+G+M+14+SERVICE FLOOR FOR DR. SUMAIKH AT
OLD SALATA 9,781
Qatar CTJV RASGAS ONSHORE/ONPLOT EXPANSION PROJECT –
GEOTECH INVESTIGATION 78,840
Qatar SILVER ARACH PROPOSED G+5 BUILDING AT UMM GHUWALINA 4,384
Qatar CCC/TEYSEER JV QATAR GAS II DEVELOPMENT PROJECT RASLAFFAN –
DRILLING GROUND WATER 18,630
Qatar QATAR PETROLEUM GEOTECHNICAL INVESTIGATION FOR THE GABBRO
SUPPORT SERVICES 346,927
Qatar CDC BARJEEL RESIDENTIAL TOWER AT WEST BAY – PILING
AND EXCAVATION WORKS 123,844
Qatar TEFFEN EPIC OF RASLAFFAN, MESAIEED ETHANE
TRANSMISSION PIPELINE PROJECT 37,151
Qatar WS ATKINS NEW DOHA INTERNATIONAL AIRPORT –
INFRASTRUCTURE ROAD PRELIMINARY DESIGN 106,135
Qatar HALCROW LTD MUSEUM OF ISLAMIC ARTS – GEOTECHNICAL
INVESTIGATION 27,555
2004
Location Client Project Value (US$)
Qatar CHIYODA CORPORATION QATARGAS II LNG PLANT FEED PROJECT – RAS LAFFAN
161,995
Qatar KETTANESH CONSTRUCTION RAS LAFFAN LNG TANK-5 40,860
Qatar AL HUDA ENGINEERING WORKS KHALIFA SPORTS HALL – DOHA 12,329
Qatar DOHA PETROLEUM CONST. CO. HELIUM RECOVERY UNIT – RAS LAFFAN 18,767
Qatar AMERICAN INT’L.
CONTRACTORS INC. (AICI)
MILLENNIUM VILLAGE FACILITIES – AL UDEID AIRBASE 11,849
Qatar CHIYODA CORPORATION AL KHALEEJ GAS PROJECT – LPG TANKS – RAS LAFFAN 50,431
Qatar QATAR PETROLEUM GEOTECHNICAL INVESTIGATION FOR PHOTOGRAPHY
MUSEUM 41,856
Qatar ENELPOWER RAS LAFFAN POWER & DESALINATION STATION 14,932
Prequalification 2010
Appendix - C13
Qatar LG ENGG. & CONST. CORP. –
KOREA
QP LAB PROJECT – MESAIEED 20,966
Qatar OVERSEAS BECHTEL,
INCORPORATED – UK
NEW DOHA INTERNATIONAL AIRPORT PROJECT 1,730,653
Qatar CHIYODA CORPORATION QATARGAS II LNG PLANT FEED PROJECT – RAS LAFFAN
(ON-PLOT) 121,185
Qatar W.S ATKINS & PARTNERS DUKHAN ROAD – DETAILED DESIGN 40,592
Qatar AL ATTIYAH CONTG. & TRADG.
CO.
ERC 0588 C1 RIW IN NORTH OF DUHAIL – STAGE 2 16,767
Qatar CHIYODA CORPORATION RLIC – CAMP AREA 106,443
Qatar DORNIER CONSULTING GROUNDWATER ASSESSMENT PROJECT –
MONITORING WELLS IN DUKHAN 45,842
Qatar MECON QAPCO EXPANSION PROJECT – MESAIEED 26,458
Qatar DORNIER CONSULTING GROUNDWATER ASSESSMENT – HALUL ISLAND 24,932
Qatar JAMES CUBITT & PARTNERS
ENGINEERING CONSULTANCY
LAFFAN TOWER (3 B+G+M+32+2 P+15)
ADMINISTRATIVE TOWER AT WEST BAY 11,767
Qatar JOANNOU & PARASKEVAIDES
QATAR W.L.L.
ERC 0492/C1 – AL GHARRAFFA INTERCHANGE 34,603
Qatar
QATAR PETROLEUM LTC 172/03 – BASELINE SURVEY AND MONITORING OF
THE GROUNDWATER MONITORING WELLS IN
MESAIEED INDUSTRIAL CITY
281,418
Qatar FCB CEMENT QATAR CEMENT PLANT UMM BAB 27,123
Qatar CHIYODA CORPORATION QATARGAS II LNG PLANT PROJECT – SULPHUR
HANDLING AREA & PIPELINE ROUTE 61,014
Qatar BUZWAIR E&C. ERC 0390 C5 – DESIGN & CONST. OF ACCESS ROADS
TO MOTORCYCLE RACETRACK 15,452
Qatar
MARUBENI GTC 1/2002 – POWER SUPPLY TO QATAR
FOUNDATION AND 132kV OHL REPLACEMENT BY
CABLE IN GHARRAFA – DOHA
52,041
Qatar COWI – QATAR NORTH BEACH DEVELOPMENT – DOHA 727,617
Qatar QATAR PETROLEUM SO # 30443 – FIREWALL TANK AT FAHAHIL STRIPPING
PLANT 6,493
Qatar MMAA – DRAINAGE DEPT. 7A+7B+7E – ABU HAMOUR SOUTHERN OUTFALL 20,990
Qatar ATKINS NEW QASCO DIRECT REDUCTION IRON FACILITY 7,397
Qatar INDUSTRIAL SERVICES GROUP TOWER BUILDING AT WEST BAY 7,808
Qatar NASSER S. AL HAJRI CO. LTD. DOLPHIN ONSHORE FACILITIES PROJECT – RAS LAFFAN 136,986
Qatar QATAR DREDGING CO. NDIA – CORE DRILLING IN ROCK OUTCROP 11,616
Qatar QATAR LIQUEFIED GAS CO. AMINE REGENERATION UNIT AREA 7,808
Qatar MEDGULF CONST. CO. GTC 04/175/ED – EPIC OF NEW PRODUCTION &
INJECTION WELLS AT ARAB D PLANT IN DUKHAN 25,327
Qatar ATKINS DUKHAN HIGHWAY – ADDITIONAL BOREHOLES 16,896
Qatar RMJM – DUBAI DUBAI TOWER – DOHA 583,578
Qatar CHIYODA CORPORATION QATARGAS II LNG PLANT FEED PROJECT – RAS LAFFAN 8,135
Qatar MOHAMED BIN MUBARAK
SALEH AL KULAIFI
DEVELOPMENT AT WEST BAY LAGOON – DOHA 6,671
Qatar TRADING & AGENCY SERVICES DUKHAN FITNESS CENTRE, DUKHAN TOWNSHIP 11,027
*Pre-2004 project references are available on request.
Prequalification 2010
Appendix - C14
Major Completed Projects
Laboratory
Client Project Details Period
MIDMAC NDIA CP14 – AIRSIDE & LANDSIDE
ROADWAYS
ON-SITE MATERIALS TESTING
LABORATORY Ongoing
CCIC TEYSEER JV NDIA AIR TRAFFIC CONTROL & SUPPORT
FACILITIES CP-27
ON-SITE MATERIALS TESTING
LABORATORY Ongoing
BILFINGER BERGER BARWA CITY – PHASE 1 ON-SITE MATERIALS TESTING
LABORATORY Ongoing
DESCON PEARL GTL PROJECT – CIVIL WORKS ON-SITE MATERIALS TESTING
LABORATORY Ongoing
GALFAR AL MISNAD CULTURAL VILLAGE ON-SITE MATERIALS TESTING
LABORATORY Ongoing
HYUNDAI ENGG QAFCO 5 ON-SITE MATERIALS TESTING
LABORATORY Ongoing
SINOHYDRO CORP LUSAIL CP-1 ON-SITE MATERIALS TESTING
LABORATORY Ongoing
REDCO INT’L LUSAIL PRECAST PLANT ON-SITE MATERIALS TESTING
LABORATORY Ongoing
REDCO INT’L ST.12, INDUSTRIAL AREA ON-SITE MATERIALS TESTING
LABORATORY Ongoing
CCIC TEYSEER JV NDIA – CP-17 OIL & CONCRETE TESTING Ongoing
QATAR PETROLEUM
CALL OFF SERVICES FOR COLLECTION
AND ANALYSIS OF LIQUID AND SOIL
SAMPLES AT MIC
ENVIRONMENTAL SAMPLING
AND LABORATORY ANALYSIS Ongoing
QCON QAFCO 5 – MELAMINE & UREA-1
REVAMP PROJECT
3RD
PARTY MATERIAL TESTING
SERVICES Ongoing
QATAR SHELL PEARL GTL PROJECT – INDEPENDENT
MATERIAL TESTING LABORATORY
3RD
PARTY MATERIAL TESTING
SERVICES Ongoing
MEDGULF CONSTRUCTION EPIC FOR MEW MAINTENANCE
WORKSHOP - RASGAS
3RD
PARTY MATERIAL TESTING
SERVICES Ongoing
MIDMAC TARMAC JV DOHA INTERNATIONAL AIRPORT –
ASPHALT WORKS
3RD
PARTY MATERIAL TESTING
SERVICES Ongoing
STRABAG PEARL GTL 3
RD PARTY MATERIAL TESTING
SERVICES Ongoing
QCON DOLPHIN PROJECT 3
RD PARTY MATERIAL TESTING
SERVICES Ongoing
MEDGULF RASGAS RL-3 3
RD PARTY MATERIAL TESTING
SERVICES Ongoing
VIOLLIA QATAR DOHA SOUTH AND INDUSTRIAL AREA
SEWAGE TREATMENT PLANT
EFFLUENT AND INFLUENT
TESTING Ongoing
GULF CEMENT CO NEW CEMENT FACTORY, UMMBAB-
FEASIBLITY STUDY.
CHEMICAL ANALYSIS ON
LIMESTONE
Oct – Dec
2006
CCIC RLX, RAS LAFFAN GROUND WATER MONITORING April 2006 -
Ongoing
JGC MIDDLE EAST DOLPHIN, RAS LAFFAN GROUND WATER MONITORING Oct 2005 -
Ongoing
SYNOHYDRO GAMUDA NEW DOHA INT’NATIONAL AIRPORT ENVIRONMENTAL TESTING &
POTABLE WATER ANALYSIS
April 2006 -
2009
METITO PROJECT; C705 ENVIRONMENTAL TESTING Dec 2006 –
Ongoing
URS CORPORATION ORYX GTL, RAS LAFFAN ENVIRONMENTAL TESTING Mar-06
Prequalification 2010
Appendix - C15
A.A. ENGINEERING INDUSTRIAL AREA STW SEWAGE WATER TESTING Mar 2006 –
Ongoing
RUMAILLAH SERVICES PUMPING STATIONS-DOHA SEWAGE WATER TESTING Sep 2005 –
Sep 2006
QATAR DREDGING CO NEW DOHA INTERNATIONAL AIRPORT ENVIRONMENTAL TESTING Jan 2005 -
2007
SATCO International RAS LAFFAN ENVIRONMENTAL TESTING ON
SOIL & WATER
Aug 06 -
Ongoing
BOSKALIS WESTMINSTER RAS LAFFAN ENVIRONMENTAL TESTING ON
SOIL & WATER
Feb 2006
Ongoing
MUSHRIF CONT.CO DOHA WEST STW MATERIALS AND IN-SITU
TESTING
Sep 2006-
Ongoing
DESCON ENG.CO OLEFIN PROJECT, RAS LAFFAN MATERIALS AND IN-SITU
TESTING
Jul 2006-
Ongoing
ALJABER ENERGY COMMON SULPHUR, QATARGAS II, RAS
LAFFAN
MATERIALS AND IN-SITU
TESTING
Jun 2006-
Ongoing
FLUOR MIDDLE EAST RAS GAS, RAS LAFFAN MATERIALS AND IN-SITU
TESTING
Sep2006-
Ongoing
NASSER AL HAJRI RAS GAS, RAS LAFFAN MATERIALS AND IN-SITU
TESTING
Sep 2006-
Ongoing
NASSER AL HAJRI QATARGAS SRU, RAS LAFFAN MATERIALS AND IN-SITU
TESTING
Sep 2006-
Ongoing
CDC/TAKENAKA NEW INTERNATIONAL AIRPORT SOIL, & CONCRETE TESTING Sep 2006-
Ongoing
MIDMAC NEW INTERNATIONAL AIRPORT SOIL, ASPHALT, CONCRETE
AGGREGATE TESTING
Sep 2005 -
Ongoing
SIX CONSTRUCTION CO. NEW INTERNATIONAL AIR PORT CONCRETE TESTING Aug 2005 -
Nov 2006
ITT INDUSTRIES DOHA SOUTH SEWAGE WATER
ANANLYSIS SEWAGE WATER TESTING Jun - Jul 2005
ASHGHAL AL DHAKIRA SEWAGE TREATMENT
WORK SEWAGE WATER TESTING
May - Jun
2005
NASSER AL HAJRI DOLPHIN PROJECT, RAS LAFFAN MATERIALS AND IN-SITU
TESTING
Oct 2004 –
Ongoing
QATAR PETROLEUM BASE LINE SURVEY OF GROUND WATER
MONITORING WELLS AT MIC
GROUNDWATER SAMPLING
AND LABORATORY TESTING.
Jul 2004 –
Apr 2008
SIX CONSTRUCT MUSEUM OF ISLAMIC ARTS MATERIALS AND IN-SITU
TESTING
Jan 2004 -
Feb 2005
SIX CONSTRUCT / MIDMAC KHALIFA STADIUM REDEVELOPMENT –
PACKAGE 3 – WEST STAND
MATERIALS AND IN-SITU
TESTING
Oct 2003 to
Mar 2005
OVERSEAS BECHTEL INC. NEW DOHA INTERNATIONAL AIRPORT
PROJECT
SOIL AND WATER SAMPLING
AND TESTING FOR VARIOUS
CONTAMINANT SPECIES
Feb - Aug
2004
HYDER CONSULTING
DOHA WEST SEWAGE TREATMENT
WORKS - FLOW SAMPLING AND
LABORATORY TESTING
SEWAGE SAMPLING AND
LABORATORY TESTING
Sep - Oct
2003
QAPCO QATOFIN PROJECT, MESAIEED
SOIL AND WATER SAMPLING
AND TESTING FOR VARIOUS
CONTAMINANT SPECIES
Nov-03
AL BAIDA TECHNICAL
SERVICES
DEEP WELL DRILLING PROJECTS, SW
QATAR
HEAVY METAL ANALYSIS OF
GROUND WATER SAMPLES Jul-03
QP / MIC NODCO REFINERY AREA, MESAIEED ENVIRONMENTAL ANALYSIS –
HEAVY METALS AND TPH Apr-03
MMAA – DRAINAGE
DEPARTMENT
GROUND WATER SAMPLING AND
ANALYTICAL LABORATORY TESTING –
PUMP STATIONS ENVIRONMENTAL
IMPACT STUDY
GROUND WATER SAMPLING
AND LABORATORY TESTING FOR
VARIOUS CONTAMINANT
SPECIES
May-03
Prequalification 2010
Appendix - C16
MMAA – DRAINAGE
DEPARTMENT CP-505 INDUSTRIAL AREA SEWERAGE
LABORATORY ANALYSIS OF
SEWAGE SAMPLES Feb-03
QATAR PETROLEUM WOQOD BITUMEN STORAGE AND
LOADING FACILITIES – MESAIEED
SOIL AND WATER SAMPLING
AND TESTING FOR VARIOUS
CONTAMINANT SPECIES
Jan-03
NITCO AL KHOR SEWAGE TREATMENT WORKS LABORATORY ANALYSIS OF
SEWAGE SAMPLES
May - Sep
2002
MMAA – DRAINAGE
DEPARTMENT ABU HAMOUR SOUTHERN OUT FALL.
MARINE WATER, LAKE SURFACE
WATER & SEDIMENT AND
DISCHARGE WATER SAMPLING
AND ANALYSIS FOR
CONTAMINATION STUDY.
OFFSHORE CURRENT AND TIDAL
MONITORING.
Jun 2002 -
Apr 2003
GULF HOUSING & CONST. QATARGAS – DEBOTTLENECKING
PROJECT, RAS LAFFAN
MATERIALS AND IN-SITU
TESTING
Jul 2002 – Jul
2005
GRANDI LAVORI FINCOSIT LAND RECLAMATION IN LPG STORAGE
AREA AT RAS LAFFAN
MATERIALS AND IN-SITU
TESTING
Mar 2002 –
May 2003
GRANDI LAVORI FINCOSIT MULTI-PRODUCTS BERTH, MESAIEED MATERIALS AND IN-SITU
TESTING
Oct 2001 –
Sep 2004
GRANDI LAVORI FINCOSIT CRUSHED STONE FACILITY AT MESAIEED MATERIALS AND IN-SITU
TESTING
Oct 2001 -
Aug 2004
GRANDI LAVORI FINCOSIT RAS LAFFAN COMMON COOLING WATER
PROJECT
MATERIALS AND IN-SITU
TESTING
Jun 2002 -
Nov 2003
CCIC RAS LAFFAN COMMON COOLING WATER
PROJECT
MATERIALS AND IN-SITU
TESTING
Jun 2002 -
Sep 2004
CCIC RAS LAFFAN EXPANSION PROJECT MATERIALS AND IN-SITU
TESTING
Oct 2001 -
2004
J&P IMMIGRATION & SALWA INTERCHANGES MATERIALS AND IN-SITU
TESTING
Apr 2003 –
Sep 2004
CCIC KHALIFA SPORTS HALL MATERIALS AND IN-SITU
TESTING
Sep 2003 –
Aug 2005.
READINESS MANAGEMENT U.S. AIRBASE, AL UDEID ASPHALT AND CONCRETE
TESTING WORKS
Apr - Jun
2002
INTERBETON QAFCO – IV EXPANSION, MESAIEED ALL TESTING WORKS INCLUDING
ONSITE LABORATORY
May 2002 –
May 2003
CCIC QAFCO – IV EXPANSION, MESAIEED ALL TESTING WORKS INCLUDING
ONSITE LABORATORY 2002 - 2004
WSP INTERNATIONAL RAS ABU ABOUD - EIA
SAMPLING AND ANALYSIS OF
SOIL AND WATER FOR
CONTAMINATION STUDY
Dec-02
QAPCO GROUND WATER MONITORING WELLS
SAMPLING AND ANALYSIS OF
SOIL AND WATER FOR
CONTAMINATION STUDY
Feb-02
MECON / KHARAFI SULPHUR RECOVERY EXPANSION LAB AND FIELD TESTING OF
SOIL, CONCRETE & AGGREGATE 2001 - 2002
ERM / LAHMYER RAS ABU FONTAS, SAILIYAH, WAJBAH
AND DOHA SOUTH – EIA
SAMPLING AND ANALYSIS OF
SOIL AND WATER FOR
CONTAMINATION STUDY
Sep-01
HYDER CONSULTING
DOHA SOUTH SEWAGE TREATMENT
WORKS – FLOW SAMPLING &
LABORATORY TESTING
SEWAGE SAMPLING &
LABORATORY TESTING Jul-01
TECHNIP ALBA, BAHRAIN ALL TESTING WORKS INCLUDING
ONSITE LABORATORY 1999 - 2001
LG ENGINEERING NODCO REFINERY EXPANSION,
MESAIEED
ALL TESTING WORKS INCLUDING
ONSITE LABORATORY 1999 - 2001
QAFCO QAFCO – IV CONTAMINATED LAND
INVESTIGATION
SAMPLING AND ANALYSIS OF
SOIL AND GROUNDWATER May-00
Prequalification 2010
Appendix - C17
DAMES & MOORE
NGL-4 BASE CASE, NGL-3 AND NGL TANK
FARM – ENVIRONMENTAL IMPACT
ASSESSMENT
SAMPLING AND ANALYSIS OF
SOIL AND WATER FOR
CONTAMINATION STUDY
Aug-99
MIDMAC CONTRACTING CO QAFCO – III EXPANSION, MESAIEED LAB AND FIELD TESTING OF
SOIL, CONCRETE & AGGREGATE 1996 - 1998
TOYO ENGINEERING QATAR GAS UPSTREAM PROJECT, RAS
LAFFAN
ALL TESTING WORKS INCLUDING
ONSITE LABORATORY 1995 - 1998
TAYLOR WOODROW QATAR FLOUR MILL, DOHA LAB AND FIELD TESTING OF
SOIL, CONCRETE & AGGREGATE 1995 - 1997
CHIYODA CORPORATION QATAR GAS LNG PROJECT, RAS LAS
LAFFAN CONCRETE TESTING 1994 - 1996
Prequalification 2010
APPENDIX F
FIELD AND LABORATORY TESTING
Organization Profile
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
1. CONCRETE
1.1 Compressive strength of cubes including weight, nominal dimensions and approximate density of specimen
BS : 1881 : Part : 116 As per project specification
As per project specification 1 Day
1.2 Compressive strength of concrete cylinders ASTM C 39 As per project specification
As per project specification 1 Day
1.3 Flexural strength of concrete beams ASTM C 78 As per project specification
As per project specification 1 Day
1.4 Indirect Tensile Strength of concrete cylinders ASTM C 496 As per project specification
As per project specification 1 Day
1.5 Compressive strength, density and visual examination and preparation, of drilled concrete cores
BS 1881 : Part : 120 Min. 2 days Length / diameter ratio is between 1 and 1.2
4 Days
1.6 Compressive strength of concrete blocks including weight and nominal dimensions of specimens
BS : 2028, Appendix F Not applicable 12 samples from each lot 2 Days
1.7 Water absorption of concrete specimen including preparation
BS 1881 : Part : 122 Age of sample shall be within 28 - 32 days
3 samples from each set 5 Days
1.8 Water absorption and volume of permeable voids including sample preparation
ASTM C 642 Not applicable 1 sample from each set 7 Days
1.9 Initial surface absorption test (ISAT) BS 1881 : Part : 208 As per project specification
As per project specification 2 Days
1.10
Concrete mix design and laboratory trial mixes
BS 1881 : Part : 125 Not applicable As per mix design
5 Days and compression test results on 7
th and
28th day
1.11 Water permeability test DIN 1048 As per project specification
3 cubes per mix 4 Days
1.12 Chloride Permeability test ASTM C 1202 As per project specification
As per project specification 3 Days
Prequalification 2010
F-2
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
2. FRESH CONCRETE
2.1 Slump test and temperature BS 1881: Part: 102 Max. 2 hrs. After mixing Each truck Immediate
2.2 Air content BS 1881:Part: 106 Max. 2 hrs. After mixing As per project specification Immediate
2.3 Sampling and manufacture of concrete cubes 150mm size
BS 1881 Part: 108 Max. 2 hrs. after mixing As per project specification 1 Day
3. TILES / MARBLES
3.1 Water absorption ASTM C 97 Not applicable As per project specification 3 Days
3.2 Density ASTM C 97 Not applicable As per project specification 3 Days
3.3 Modulus rupture ASTM C 99 Not applicable As per project specification 2 Days
3.4 Compressive strength ASTM C 170 Not applicable As per project specification 2 Days
3.5 Transverse strength BS 4131 Not applicable As per project specification 2 Days
4. CEMENT
4.1 Initial and final setting times BS : 4550 A.S.A.P 1 Kg 2 Days
4.2 Soundness of cement BS : 4550 A.S.A.P 1 Kg 3 Days
4.3 Fineness of cement (specific surface) BS : 4550 A.S.A.P 1 Kg 2 Days
4.4 Compressive strength of mortar cubes using standard sand (set of 6 cubes)
BS : 4550 A.S.A.P 2 Kg 28 Days
Prequalification 2010
F-3
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
5. BITUMINOUS MIXTURES
5.1 Density of drilled bitmac core BS 598 As per project specification
As per project specification 2 Days
5.2 Determination of bitumen content and aggregate grading of bituminous mixtures
BS 598 A.S.A.P 20 Kgs 2 Days
6. AGGREGATES
6.1 Moisture content BS : 812 A.S.A.P 5 Kgs 1 Day
6.2 Sieve analysis BS : 812 Not specified 10 Kgs 1 Day
6.3 Clay, silt and dust content in fine or coarse aggregates
BS : 812 / ASTM C 117 Not specified 10 Kgs 2 Days
6.4 Flakiness index BS : 812 Not specified 10 Kgs 1 Day
6.5 Elongation index BS : 812 Not specified 10 Kgs 1 Day
6.6 Bulk density (compacted and uncompacted) BS : 812 Not specified 20 Kgs 1 Day
6.7 Specific gravity and water absorption BS : 812 Not specified 10 Kgs 2 Days
6.8 Shell content (visual description) BS : 812 Not specified 10 Kgs 1 Day
6.9 Aggregate impact value BS : 812 Not specified 10 Kgs 2 Days
6.10 Aggregate crushing value BS : 812 Not specified 10 Kgs 2 Days
6.11 Ten percent fines value BS : 812 Not specified 10 Kgs 3 Days
6.12 Los Angeles abrasion value ASTM C 131 Not specified 10 Kgs 3 Days
6.13 Soundness of aggregate (Sodium or Magnesium sulphate)
ASTM C 88 Not specified 10 Kgs 7 Days
Prequalification 2010
F-4
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
6.14 Immersed rotational test CML Test Method 1.97 Not specified 100 Kgs 3 Days
6.15 Clay lumps and friable particles content ASTM C 14271 Not specified 10 Kgs 3 Days
6.16 Scratch hardness ASTM C 851-76 Not specified 10 Kgs 2 Days
6.17 Drying shrinkage of aggregate BS : 812 Not specified 10 Kgs 15 Days
7. SOILS
7.1 Moisture content BS : 1377 A.S.A.P 5 Kgs 1 Day
7.2 Wet density undisturbed sample BS : 1377 A.S.A.P 2 Kgs 1 Day
7.3 Dry density undisturbed sample BS : 1377 A.S.A.P 2 Kgs 2 Days
7.4 Atterberg limits - Liquid and Plastic BS : 1377 Not specified 5 Kgs 2 Days
7.5 Specific gravity BS : 1377 Not specified 5 Kgs 2 Days
7.6 Sieve analysis BS : 1377 Part : 2, 9.2 Not specified 10 Kgs 3 Days
7.7 Sedimentation analysis BS : 1377 Part : 2 Test 9.5 Not specified 10 Kgs 3 Days
7.8 Dry density / Moisture content relationship
BS : 1377 and ASTM D 1557
Not specified 50 Kgs 2 Days
7.9 California bearing ratio (CBR) BS : 1377 Not specified 35 Kgs 6 Days
7.10 Linear shrinkage BS : 1377 Not specified 10 Kgs 3 Days
7.11 Sand Equivalent Value ASTM D 2419 Not specified 10 Kgs 2 Days
Prequalification 2010
F-5
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
8. ROCKS
8.1 Point load test - per specimen ASTM D 5731 A.S.A.P
Irregular specimen Min. size 50mm Core sample - length diameter ratio to be > 1
1 Day
8.2 Uniaxial compression test and modulus of deformation (including specimen preparation, moisture content and wet density determination)
ASTM 2938 / 3148 A.S.A.P Length diameter ratio to be > 1
2 Days
8.3 Splitting tensile strength ASTM D 3967 A.S.A.P Length diameter ratio to be > 1
2 Days
9. CHEMICAL TESTING
Aggregate / Rock
9.1 Water soluble sulphate content BS 812 : Part : 118 Not specified 5 Kgs 3 Days
9.2 Water soluble chloride content BS 812 : Part : 117 Not specified 5 Kgs 3 Days
9.3 Acid soluble sulphate content BS 812 : Part : 118 Not specified 5 Kgs 3 Days
9.4 Acid soluble chloride content BS 812 : Part : 117 Not specified 5 Kgs 3 Days
9.5 Organic matter ASTM C 40 Not specified 5 Kgs 3 Days
9.6 Potential alkali silica reactivity ASTM C 289 Not specified 5 Kgs 4 Days
9.7 Full chemical analysis ASTM C 471 Not specified 5 Kgs 4 Days
Soil (For Back fill)
9.8 pH value BS 1377 : Part : 3 Not specified 1 Kg 1 Day
9.9 Electrical conductivity BS 1377 : Part : 3 Not specified 1 Kg 1 Day
Prequalification 2010
F-6
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
9.10 Water soluble sulphate content BS 1377 : Part : 3 Not specified 2 Kgs 3 Days
9.11 Water soluble chloride content BS 1377 : Part : 3 Not specified 2 Kgs 3 Days
9.12 Acid soluble sulphate content BS 1377 : Part : 3 Not specified 2 Kgs 3 Days
9.13 Acid soluble chloride content BS 1377 : Part : 3 Not specified 2 Kgs 3 Days
9.14 Organic matter BS 1377 : Part : 3 Not specified 2 Kgs 3 Days
Soil (For Agricultural purposes)
9.15 Sodium Absorption Ratio (SAR) Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 4 days
9.16 Boron Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 3 days
9.17 Cat ion Exchange capacity Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 4 days
9.18 Exchangeable Sodium Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 3 days
9.19 Salinity Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 2 days
9.20 Chloride Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 2 days
9.21 Sulphate Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 3 days
Prequalification 2010
F-7
No. Test Standard Sample Holding Time
Required Volume Standard Turn Around Time
9.22 Phosphate Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 2 days
9.23 Total Kjeldahl Nitrogen (TKN) Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 3 days
9.24 Total Nitrogen Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 3 days
9.25 Carbonates Laboratory Manual for the Examination of Water, Waste Water and Soil
Not specified 2 kgs 2 days
Concrete
9.26 Sulphate content BS 1881 : Part : 124 Not specified 5 Kgs 3 Days
9.27 Chloride content BS 1881 : Part : 124 Not specified 5 Kgs 3 Days
9.28 Cement content BS 1881 : Part : 124 Not specified 5 Kgs 3 Days
9.29 Depth of carbonation BS 1881 : Part : 124 Not specified 5 Kgs 1 Day
9.30 Type of cement BS 1881 : Part : 124 Not specified 5 Kgs 3 Days
Cement /Lime/ Gypsum
9.31 Full chemical analysis BS 4550 / ASTM C 71/ ASTM C114
A.S.A.P 5 Kgs 4 Days
Water for Concrete
9.32 pH Using pH meter A.S.A.P 200 ml 1 Day
9.33 Sulphate content AWWA / APHA 28 Days 200 ml 3 Days
9.34 Chloride content AWWA / APHA 28 Days 200 ml 3 Days
Prequalification 2010
F-8
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
9.35 Total dissolved solids (TDS) AWWA / APHA 28 Days 200 ml 3 Days
9.36 Total suspended solids (TSS) AWWA / APHA 28 Days 200 ml 3 Days
9.37 Carbonate & Bi carbonate AWWA / APHA 28 Days 200 ml 3 Days
Water for Drinking
9.38 Cations and anions including pH, EC, TDS & TSS AWWA / APHA 7 Days 500 ml 2 Days
9.39 Bacteria – Total & Faecal Coliforms AWWA / APHA 6 Hours 500 ml 2 Days
9.40 Trace Metals USEPA 3005/6010B 6 months (acidified) 200 ml 3 Days
9.41 Tri halo methane USEPA5030/8015 2 days
Waste water
9.42 Biochemical Oxygen Demand (BOD) AWWA / APHA 24 Hours 500 ml 6 Days
9.43 Chemical Oxygen Demand (COD) AWWA / APHA
7 Days 500 ml 2 Days
9.44 Dissolved oxygen
AWWA / APHA A.S.A.P 500 ml 1 Day
9.45 Chlorine content AWWA / APHA A.S.A.P 500 ml 1 Day
9.46 Ammonia AWWA / APHA 7 Days 500 ml 2 Days
9.47 Sulphide AWWA / APHA 7 Days 500 ml 2 Days
9.48 Nitrate AWWA / APHA 28 Days 500 ml 1 Day
9.49 Nitrite
AWWA / APHA 2 Days 500 ml 1 Day
9.50 Total Kjeldahl Nitrogen (TKN) AWWA / APHA 7 Days 500 ml 3 Days
Prequalification 2010
F-9
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
9.51 Total Nitrogen AWWA / APHA 7 days 500 ml 2 Days
9.52 Total Suspended Solids AWWA / APHA 7 Days 200 ml 1 Day
9.53 Sludge Volume Index AWWA / APHA 6 Hours 1.5 L 1 Day
9.54 Turbidity AWWA / APHA 24 hours 200 ml 1 Day
9.55 Total Faecal Coliform AWWA / APHA 6 Hours 500 ml 2 Days
9.56 Phenols AWWA / APHA 28 Days 500 ml 2 Days
9.57 Cyanides AWWA / APHA 14 days 500 ml 3 Days
9.58 Fat, Oil & Grease AWWA / APHA 28 Days 1000 ml 3 Days
9.59 Total Organic Carbon (TOC) AWWA / APHA 28 Days 200 ml 3 Days
9.60 Phosphate AWWA / APHA 48 Hours 100 ml 2 Days
9.61 Heavy metals USEPA 3010/6010B 6 months 200 ml 2 Days
10. Environmental Analysis
10.1 Total petroleum hydrocarbons (TPH) USEPA 8015 / 5030 / 3540 3510 / 1664
14 Days 2000 ml / 2 kg 5 Days
10.2 Volatile organic compounds (VOC) USEPA 8260 14 Days 500ml / 1 kg 5 Days
10.3 Semi volatile organic compounds (SVOC) USEPA 8270 14 Days 1000ml / 1 kg 5 Days
10.4 Polyaromatic hydrocarbon (PAH) USEPA 8310 14 Days 1000ml / 1 kg 5 Days
10.5 PCBs USEPA 8082 / 3540 14 Days 1000ml / 1 kg 5 Days
10.6 Pesticides USEPA 8081 14 Days 1000ml / 1 kg 5 Days
Prequalification 2010
F-10
No. Test Standard Sample Holding Time Required Volume Standard Turn Around Time
10.7 Chlorinated Hydrocarbons USEPA 3510/8121 14 Days 100 ml/200gm 4 Days
10.8 BTEX USEPA 5030/8015 14 Days 100 ml/200gm 4 Days
10.9 TCLP USEPA 1311 14 Days 100 ml/200 gm 2 Days
10.10 Heavy metals USEPA 3005 / 3010/6010B 6 Months 500ml / 1 kg 5 Days
11. PULVERISED FUEL ASH (PFA)
11.1 Loss on ignition BS : 3892 Not specified 1 Kg 4 Days
11.2 Magnesia content BS : 3892 Not specified 1 Kg 4 Days
11.3 Sulphate content BS : 3892 Not specified 1 Kg 4 Days
11.4 Moisture content BS : 3892 Not specified 1 Kg 4 Days
11.5 Fineness BS : 3892 Not specified 1 Kg 4 Days
12. FIELD TESTING
12.1 Insitu Density Testing BS 1377 Part: 9 - - -
12.2 Concrete Core Drilling (Maximum 400mm depth)
BS 1881 Part: 120 - - -
12.3 California Bearing Ratio Tests, allows for reaction up to 20kN, client to provide reaction vehicle
BS 1377 Part: 9 - - -
12.4 Plate Bearing Tests 0.555m diameter plate loaded up to 900 KN/m
2.
BS 1377 Part: 9 - - -