D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 1 -
GUJARAT WATER SUPPLY AND SEWERAGE BOARD
“JALBHAVAN”, SECTOR“JALBHAVAN”, SECTOR“JALBHAVAN”, SECTOR“JALBHAVAN”, SECTOR----10101010----A, GANDHINAGARA, GANDHINAGARA, GANDHINAGARA, GANDHINAGAR
(A Government of Gujarat Undertaking)
CONSTRUCTION SUPERVISION CONSULTANTACY (CSC)
YEAR – 2010-11
INSTRUCTION TO BIDDER AND CONDITIONS
SECTION-I
Gujarat Water Supply and Sewerage Board,
Jalseva Bhavan, Sector- 10/a,
Gandhinagar - 382010
Bid Documents for
Construction, Supervision, consultancy
Services for various Water Supply Project
Rate for Construction Supervision Consultancy works.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 2 -
SAVE WATER, WATER WILL SAVE YOU
GUJARAT WATER SUPPLY & SEWERAGE BOARD
"Jalseva Bhavan", Sector-10-A, Gandhinagar
TENDER NOTICE FOR RATE CONTRACT No. GWSSB/Material Cell/ Civil/Tender Notice/2010-11/
GWSSB Gandhinagar invites Online Tenders for fixing rate contract for Construction
Supervision Consultancy (CSC) for various water supply projects / office Building/ new
projects material inspection from any Indian Construction Supervision Consultancy (CSC)
firms.
HIGHT LIGHTS
Eligibility : Indian Construction Supervision Consultancy
(CSC) firms.
Tender Fees : Rs.2.500.00
EMD : Rs. 50,000/-
Downloading of Documents : Up to Date 08-09-2010 up to 18:00 Hrs.
Pre-bid Conference : On Date 21-08-2010 at 12:00 Hrs
Online Submission of Tech & Price Bid :
Up to Date 08-09-2010 up to 18:00 Hrs.
Submission of EMD, Tender Fee and Other Documents :
On Dt. 09-09-2010 to Dt.15-09-2010 during Office Hours at Jal Sewa Bhavan, Sector 10 A, Gandhinagar by RPAD / Speed Post only.
Online Opening of Bid : Technical Bid
Price - Bid
Date :09-09-2010 at 12:00 Hrs. After Technical Bid Evaluation, it will be informed later on
Further Details of this Tender are as Under : 1. Particular : Supervision, Inspection of works & materials related to water
supply Projects / Office Building / New Projects in Gujarat state.
2. Downloading of Tender document:
2.1 Bid Documents will be available on web site up to Dt. shown above.
2.2 Bidders wishes to participate in this tender will have to register on web site
http://www.nprocure.com
3. Digital Certificate:
3.1 Bidders wishes to participate in this on line tender will have to procure valid digital
certificate as per Information Technology Act – 2000
3.2 Bidders can procure this certificate from any of the Government Approved Certifying
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 3 -
Agency i.e.
1. Tata Consultancy Services
2. Safe Script OR
May contact M/s (n) Code solution for assistance at following address:
M/s (n) Code Solutions.
A Division of Gujarat Narmada Valley Fertilizers Comapny Ltd.
301, GNFC Infotower, Bodak Dev, Ahmedabad-300 054
Phone: 079-26857316, 26857317/18, Fax: +91-79-26857321
Email: [email protected] or http://www.nprocure.com
3.3 Bidders who already have a valid Digital Certificate need not procure a new Digital
Certificate.
4. Pre–Bid Conference:
4.1 Pre-bid conference for this tender shall be conducted on Dt. shown above at Gujarat
Water Supply & Sewerage Board, Head Office, Sector-10-A, Opp. Air Force
Station, Gandhinagar
4.2 The Bidders shall obtain the clarifications to the queries raised in form of Minutes of
Meeting which will be uploaded by GWSSB on the web site. These Minutes shall be a
part of Tender Document.
5. Online Submission of Tech-Bid & Price bid:
5.1 Bidders can prepare and edit their offers number of times before final submission. Once
finally submitted bidder cannot edit their offers submitted in any case. No written or
online request in this regards shall be granted.
5.2 Tenderer shall submit their offer i.e. Technical bid as well as price Bid in Electronic
format on above mentioned web site Dt. shown above after Digitally signing the same.
5.3 Offers submitted without digitally signed will not be accepted.
5.4 Offers in physical form will not be accepted in any case.
6. Submission of tender Fees, Bid Security and other Documents:
6.1 Demand Draft for Tender fee & DD/FDR/BG for EMD shall be submitted in electronic
format only through online (by scanning) while uploading the bid. This submission shall
mean that E.M.D. & tender fee are received for purpose of opening the bid. Accordingly
offer of those shall be opened whose E.M.D. & tender fee is received electronically.
However for the purpose of realization of DD/FDR/BG bidder shall send the DD/FDR/BG
in original through RPAD/Speed Post so as to reach to concerned office as mentioned in
the tender documents within 7 days from the last date of uploading. For not submitting
DD/FDR/BG in original bidder shall be banned to participate in any tender of the board
for period of 3 years as a penaltive action.
Any document in supporting of tender bid shall be submitted in electronic format only
through online (by scanning etc) & hard copy will not be accepted separately"
Tender fee and EMD in form of Demand Draft shall be paid in favour of "Member
Secretary" GWSSB payable at Gandhinagar issued by any of following banks.
1. All Nationalized bank
2. Private banks (i) IDBI Bank (ii) Axis Bank
(iii) HDFC Bank (Iv) ICICI Bank.
(A) Tender fee : Rs 2,500/(Rupees two thousand five hundred only
(B) EMD : Rs 50,000/(Rupees fifty thousand only) 6.2 Bidder has to submit the documents as said in 6.1 above and no other condition in any
form shall be considered at all, at the time of evaluation of the tender i.e. The bidder
shall have to submit unconditional offer without differing from any of the tender
condition.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 4 -
7. Opening of Tender:
7.1 Opening of Bid documents will be held on Dt. & time shown above in the office of
Chief/Executive Engineer, Material Cell (Civil) GWSSB, Gandhinagar.
7.2 Intending bidders or their representative who wish to remain present at GWSSB,
premises at the time of tender opining can do so.
7.3 The Offline technical evaluation of the tenders received on or before last date of
submission would be done and results will be displayed on website.
7.4 After Successful completion of Technical Evaluation, price bid of only those bidders
would be opened online who are found to be substantially responsive.
8 . Contacting Officer:
8.1 Further Details/Clarifications if any required will be available from Chief/Executive
Engineer, Material Cell (Civil) GWSSB, Gandhinagar. Ph. – 079-23251087/23251092
Mobile No. CE- 9978406504, EE - 9978406544
8.2 In case bidder needs any clarification/assistance or if training required for participating
in online tender, they can contact the following office.
M/s (n) Code Solutions.
A Division of Gujarat Narmada Valley Fertilizers Company Ltd.
301, GNFC Infotower, Bodak Dev, Ahmedabad-300 054 Phone: 079-26857316,
26857317/18,
Fax: +91-79-26857321
Email: [email protected] or www.nprocurement.com
9 GENERAL INSTRUCTIONS:
9.1 The fees for online tender document will not be refunded under any circumstances.
9.2 EMD in the form specified in tender document only shall be accepted.
9.3 Tenders without Tender fees, Earnest Money Deposit (EMD) and which do not fulfill all or
any of the condition or submitted incomplete in any respect will be rejected.
9.4 Conditional tender shall not be accepted.
9.5 The tender notice shall form a part of tender document.
9.6 The tenderers are advised to read carefully the “Instruction for Tenderer” and "Eligibility
Criteria” contained in the tender documents.
9.7 The internet site address for E -Tender is http://www.nprocurement.com Tender
Documents are also available on GWSSB website www.gwssb.org
9.8 Free training camp will be organized every Saturday between 4.00 to 5.00 P.M. at M/s
nProcurement Technologies Pvt. Ltd., 301, GNFC Infotower, Bodak Dev,
Ahmedabad-300 054. Bidders are requested to take benefit of the same.
The GWSSB reserves the rights to reject any or
all tenders without assigning any reason there of.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 5 -
Tenderer should read general terms and conditions of tender, Technical Specification and
following instructions thoroughly and carefully before submitting the online bid.
1. Rates shall be quoted as per Clause No. 2 of General Terms and Conditions.
2. Only Indian firms are eligible to compete in this bid.
3. The tenders shall be rejected out right if ;
i) If tenderer has quoted rates with any additional conditional and counter
conditions.
ii) In case of any deviation in the specification terms and conditions of the
tender.
iii) if the "Technical Bid" is decided as non responsive the "price Bid" shall not
be opened.
iv) Offer submitted in physical form only.
Signature of tenderer
Place:
Date:
Instruction for Tenderer
Chief Engineer,
Material Cell (Civil)
GWSSB, Gandhinagar
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 6 -
Questionnaire to be filed up by the
Tenderer
1. Name of the firm :
2. Address of the firm :
3. Telephone No. :
4. Fax No. :
E mail Address :
5. Authorizes Representative
Name :
Address :
Telephone No. :
Fax No.
Mobile No.
E mail Address
6. Acceptance of the terms and conditions of the tendrers :
Tick Initial
Accepted
Not accepted
It is certified that the above information is true to the best of my knowledge and
belief. If any information furnished above found incorrect or false in that case I (Bidder) shall
be liable for penal action decided by GWSSB.
Signature of tenderer Chief Engineer,
Material Cell (Civil)
GWSSB, Gandhinagar
Place:
Date:
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 7 -
Gujarat Water Supply and Sewerage Board,
Gandhinagar
GENERAL TERMS AND CONDITIONS FOR THE TENDER FOR
CONSTRUCTION SUPERVISION CONSULTANCY SERCIVES (CSC) FOR VARIOUS
WATER SUPPLY & DRAINGE PROJECS / OFFICE BUILDING/ NEW PROJECT/
MATERIAL INSPECTION, ETC.
1. Eligibility for Bidding:
Indian Construction Supervision Consultancy (CSC) firms are only eligible to
compete in their own names in this bid and accordingly rate contract agreement
shall be executed with agency. However agency may designate only one
representative on appropriate power of attorney acceptable to GWSSB who
may deal with GWSSB on his behalf. The specimen signature of authorized
signatory of the CSC firms shall be given in the tender so that during the
execution of contract the correspondence from the same authority shall be
entertained.
Joint venture is not allowed.
2. Quoting Rates:
The Rates shall be quoted on percentage basis only. The rates quoted shall be
inclusive of all taxes & duties but exclusive of service charge which shall be
paid extra as actual. income tax if any shall be born by CSC agency. the TDP
shall be deducted at source as per provision of IT rules.
3. Submission of tender:
Tenderer should submit their offer online and it shall be submitted before last
date and time.
4. The offer for tenderer rates shall be valid for a period not less than 180 days
from the date of opening of price bid of the tender. Any tender having validity
for lesser period shall be outright rejected.
5. Taxes: The rates shall be inclusive of all taxes & duties except service charge.
6. Unit of Rate: The tenderer shall quote the rate on
• % basis of Cost of material to be inspected in price schedule - I and
• % basis of value of Accepted tender for Turn -Key projects / Labour
work in price schedule - II.
7. Payment:
(a) The Payment shall be made through 'NEFT' (National Electronic Fund Transfer)
as per payment schedule.
(b) Paying Authority: Concern Chief Engineer or any officer authorized by
GWSSB.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 8 -
(c) Payment by Demand Draft.
On request of CSC agency, payment shall be made through Demand Draft. Bank
Commission charges for D.D. shall be borne by agency. Chief Engineer or
authorized officer shall request the concern Bank to issue DD. However GWSSB
shall not be liable for any loss of DD during transaction.
8. Tender Agreement:
After approval of GWSSB, approved or accepted tendering party shall be
required to enter in to an agreement for the execution of the contract. The
stamp duty on all documents to be executed in connection with this rate
contract to be entered into shall be born by agency.
The rate contract agreement shall have to be executed on a Non - Judicial
stamp paper of appropriate value as per value in force at that time.
9. Duration:
The rate contract shall be valid up to a period of 1 (one) year from the date of
approval of the Rate Contract unless it is further extended by mutual consent.
10. Responsibility of CSC:
CSC shall be responsible for quality of complete work of contract entrusted to
them for inspection observed at any time before or after completion of work.
GWSSB shall black list the agency and can take action for recovery of cost of
the poor work.
11. Termination of Contract:
Member Secretary, Gujarat W/s & Sewerage Board Gandhinagar OR any
office authorized by him shall discretionary power as per either of the
conditions as given below with a future action to terminate the contract.
If any agency fails to discharge its duties as CSC work within time limit
satisfactorily. It shall be debarred from participating in the tender of GWSSB
rate contract for the period of RC validity three years thereafter.
If any agency fails to carry out the CSC work satisfactorily as per tender
specification, GWSSB shall take necessary actions of termination including
black listing the agency for the period up to three years.
The decision of the Member Secretary GWSSB in this regard shall be final &
binding to the agency.
This will also include any breach of contract leading to the loss to the GWSSB,
which may occur on account of agency.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 9 -
12. Right to reject any OR all offers failing to comply the above requirements is
reserved by Gujarat Water Supply and Sewerage Board, Gandhinagar.
13. Force Majeure:
The CSC Agency shall not be responsible for any event beyond the control of
the agency and could not have been foreseen prevented OR avoided by a
prudent person provided a notice of the happening is given within 15 days
from the date of occurrence there of by agency.
These events include but are not restricted to acts of God, Acts of enemy, Acts
of Government, fire, floods, earthquake, cyclone, explosion, riot, strikes
lockout civil commotion, sabotage, terrorism, epidemics etc.
14. Jurisdiction:
In the event of any dispute on difference arising out of this tender / contract,
the jurisdiction of the court shall be Gandhinagar (Gujarat) only.
15 Indemnity:
The CSC agency shall at all time indemnify the Member Secretary. Gujarat
Water Supply and Sewerage Board, Gandhinagar against all claims which may
be made for infringement of any right protected by patent registration and
shall take all risk of accidents or damage which cause a failure of the supply
from whatever cause arising and entire responsibility for the sufficiency of the
means use by supplier for the fulfillment of the contract. Provided always that
in the event of any claims in respect of alleged breach of letter, Patent,
registered patent, registration design of trademark being made against the
GWSSB shall notify to the CSC agency shall be at the liberty at his own
expense to conduct negotiation for settlement of any litigation that may arise
there from.
16. Dispute:
In the event of any problem dispute of difference arising out of or under this
contract the decision of member Secretary, Gujarat Water Supply and
Sewerage Board, Gandhinagar shall be the final and binding to the parties to
this contract.
17. Mode of Payment:
Payment shall be made as per payment schedule.
18. Undertaking of the Construction Supervision Consultancy Agency (CSC):
General Standards of performance by the Construction Supervision
Consultancy Agency (CSC).
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 10 -
(a) The Construction Supervision Consultancy Agency (CSC) shall carry
out the services with the diligence and efficiency and shall exercise
such skill and care in the performance of the services as is consistent
with recognized professional standards.
(b) The CSC shall act at all times so as protect the interest of the GWSSB
and shall take all reasonable steps to keep all expenses to a minimum
consistent with sound (Engineering) practices.
19. Specifications and designs:
The CSC shall review and ensure that the specifications and designs and all
documentations relating to procurement of goods and services for the project
are prepared on an impartial basis so as to promote fairness and standard
engineering practices.
20. Records:
(a) The CSC shall keep accurate and systematic records in respect of the
services in such from and details as is customary in the profession.
These records shall be kept at project site office of the CSC and shall be
made available to the client as and when required or asked for.
(B) The CSC shall permit the duly authorized representative of the client
and from time to time to inspect its records and accounts relating to the
service and to make copies thereof and shall permit the client of any
person authorized by the client from time to time to audit records and
accounts during and after the service.
21. Information:
The CSC shall furnish the client any such information relating to the service
and the project as the client may require from time to time.
22. Assignments sub contracts:
(A) Except with the prior written approval of the client the consultant shall
not assign or transfer the contractor or any part there of nor engage any
independent CSC or sub contractor to perform any part of the service.
(B) The approval by the client to the assignment of any part of the contract
or to the engagement by the CSC of independent CSC or sub contractors
to perform any part of the service shall not relieve the CSC from any of
its obligations under the contract.
(c) In the event that any such independent consultant or sub contractor is
found by the client to be incompetent in discharging his assigned duties,
the client may request the CSC forth with either to provide as a
replacement a consultant or sub contractor with qualifications or
experience acceptable to the client or to resume the performance of the
service itself.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 11 -
23. Confidentiality:
Except with the prior written consent of the client the CSC shall not at any
time communicate to any person or entity any confidential information
disclosed to them for the purpose the service or discovered by them in the
course of the service nor shall the CSC make public any information known
to them in the course of as a result of the service.
24. Prohibition on association:
The CSC agrees that during the project work of this contract the CSC limits
its role under the project for the provision of the services and otherwise
disqualifies itself if any other, contractor/consulting engineer of manufacturer
with which the CSC is found associated or affiliated for the provision of
goods or services in any capacity for this project including bidding for any
part of the project except as the client may otherwise agree.
25. Independent contractor:
Nothing contained herein shall be construed as establishing or creating
between the client and CSC the relationship of master and servant or
principal and agent. It be understood that the position of CSC and of any one
else performing the service is that of an independent contractor.
26. Proprietary right of the client equipment:
(a) Equipment supplied by the client during the project shall remain at all
times the property of the client and shall be returned by the CSC in
accordance with procedures to be determined by the client.
(b) Equipment purchased by the client or by the CSC agency for the client
for the purposes of the project shall be property of the client.
27. Proprietary Right of the client in report and records:
All reports and relevant data such as maps, diagrams, plans, statistics and
supporting records or materials complied or prepared in the course of the
service shall be confidential and shall be absolute property of the client. The
CSC agency agrees to deliver all these materials to the client upon
completion of this contract. The CSC agency may retain a copy of such data
but shall not use the same for purposes unrelated to this contract without
prior written approval of the client.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 12 -
28. Insurance:
(a) The CSC agency shall take out and maintain adequate professional
liability insurance as well as adequate insurance purchased by the CSC
agency for providing service to the client for performance of this
contract.
(b) The client undertake no responsibility in respect of any life, health,
accident, travel and other insurance which may be necessary or
desirable for the personal of or sub contractors and specialists associated
with the CSC agency for the purpose of the service nor for any members
of any family of any such persons.
29. Reports:
All reports and recommendations and general correspondence from the CSC
agency to the client and all tender documents prepared by the CSC under this
contract shall be in the English/Gujarati language as desired by client.
30. Warranty as to Eligibility:
The CSC agency should be of Indian company/firm/ association etc. and the
service shall be wholly and substantially supplied from the country except
provided therein.
31. Notice of delay:
In the event that CSC agency foresees any delay in obtaining the required
service or facilities for the discharge of the service, the CSC agency shall
promptly notify client of such delay and may request an appropriate
extension of time for completion of the service.
32. Contractual Ethics:
No fees, gratuities, rebates, gifts, commissions or other payments, other than
those shown in the proposal or the contract been given or received in
connection with the selection process or the contract execution.
33. Establishment:
CSC agency must established office at Ahmedabad/ Gandhinagar with
Computer/Fax/Telephone/Internet facilities after fixing Contract and should
give details to GWSSB.
34. Appointment of Technical Staff:
CSC agency shall appoint the technical/non-technical staff as per qualifying
criteria awarded for the work and multiple in Nos. if multiple contracts are
awarded for inspection and those staff must be for minimum two years with
CSC agency.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 13 -
35. Liquidated Damages:
If CSC does not carry out the inspection work in time as demanded by Engineer in
charge of GWSSB or delay or left out the site, GWSSB shall levy the liquidated
damages at the rate of 0.1 percent of tender cost for particular work per day limited to
10 percent of tender cost for the particular work and GWSSB shall take the action to
black list or withdrawal all the work to CSC agency.
36. Performance Security; (A) For Material Inspection:-
The successful bidder shall have to pay initial performance security deposit of
Rs. 500000/- (Rupees Five Lacs) in the form of DD/ FDR / an unequivocal bank
guarantee issued by Nationalized Bank/Private Bank (I) IDBI Bank (II) Axis Bank
(III) HDFC Bank (IV) ICICI Bank having a branch at Gandhinagar in favour of
member secretary GWSSB, Gandhinagar having validity for six months.
50% performance security shall be returned to the agency within 30 days from the
date of successful completion of the contract and remaining 50% will be returned
after 6 month from the date of successful completion of the contract after getting "No
Objection Certificate" from concerned Executive Engineer of the Project. Monitoring
for the same shall have to be done by concerned Superintending Engineer.
(B) For Construction Supervision Consultancy Projects:-
Amount put to Tender
(in lacs)
Performance
Security Amount
20 to 50 lacs Rs. 30,000/-
50 to 100 lacs Rs. 60,000/-
100 to 300 lacs Rs. 1,50,000/-
300 to 500 lacs Rs. 2,00,000/-
500 to 1000 lacs Rs. 2,50,000/-
More than 1000 lacs Rs. 5,00,000/-
The successful bidder shall enter in to agreement with Executive Engineer in charge
of project.
Performance Security deposit in form of DD/ FDR / an unequivocal Bank guarantee
issued by Nationalized Bank / Private Bank (I) IDBI Bank (II) Axis Bank (III) HDFC
Bank (IV) ICICI Bank having Branch in Gujarat State B.G. should be in favour of
concern Executive Engineer in charge of Project.
50% performance security shall be returned to the agency within 30 days from the
date of successful completion of the contract and remaining 50% will be returned
after 6 month from the date of successful completion of the contract after getting No
objection certificate from concerned Superintending Engineer of the Project.
Signature of tenderer Executive Engineer
Material Cell (civil)
GWSSB, Gandhinagar Place:
Date:
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 14 -
Gujarat Water Supply & Sewerage Board
CONSTRUCTION SUPERVISION CONSULTANTACY (CSC)
YEAR – 2010-11
LOCAL COMPETITIVE BIDDING
Milestone Dates
Tender processing fee & documents in hard copy .
Dt:- 09-09-2010 to Dt:-15-09-2010 during office hours at Jal sewa Bhavan. Sector 10/A Gandhinagar through RPAD / Speed Post during office hours only.
Pre- Bid Conference Dt:-21-08-2010 at. 12.00 hrs. tttt2007ppppppghj at 11:00 Hours.
Last date of on line submission of Price Bid
Dt:- 08-09-2010 up to 18.00 hrs.-hhh12007
up to 18:00 Hours. Opening of the Technical Bid Price Bid
Date :09-09-2010 at 12:00 Hrs. After Technical Bid Evaluation, it will be
informed later on hfhfh007 at 11:00 Hours.
Chief Engineer Gujarat Water Supply & Sewerage Board,
GANDHINAGAR
BID DOCUMENTS FOR
Providing construction supervision
consultancy for water supply Projects / Office
Building/ material inspection under GWSSB
INVITATION FOR BIDS,
INSTRUCTIONS TO BIDDERS & CONDITIONS OF CONTRACT
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 15 -
TERMS OF REFERENCE
1) Preamble:
The Construction Supervision Consultant shall provide consultancy services for
Supervision of construction and inspection of Materials for water supply, drainage
and other civil engineering projects under GWSSB. The works shall be undertaken
on behalf of the concern ULB by GWSSB and funds for the works shall be obtained
from the Government of Gujarat and/or from the Government of India.
The project as a whole is facilitated and monitored by GWSSB. The scope of
the construction supervision consultant shall be to help GWSSB in implementation,
supervision of construction & inspection of materials as a responsible partner of
GWSSB. The Construction supervision consultant appointed by the consultant shall
be responsible in day to day work and shall remain in close touch with GWSSB. The
funds shall be managed by the GWSSB representing the Government of Gujarat.
2) Construction Supervision Consultant’s Scope Of Work :
There are two basic agreements which govern the work of the Consultant:
i) The Construction agreement between the GWSSB and the Contractor.
ii) The Operation and Maintenance agreement between the GWSSB and the
contractor. (Where ever applicable)
The duties and responsibilities of the Construction supervision consultant flow from
the above two agreements between the parties, but the primary agreement
governing the Construction supervision consultant shall be the Construction
agreement. The role of Construction supervision consultant shall be in four phases:
• Inspection of Material
• Pre-construction activities
• Activities during construction
• Defects correction supervision
• Post-construction activities
The Construction agreement and the Operation & Maintenance Agreement set out in
various clauses, the role of the Construction supervision consultant. Implicit in this
contract is the fact that the client has certain rights and obligations vis-à-vis the
contractor, and certain rights and responsibilities vis-à-vis the Government of
Gujarat. The Construction supervision consultant shall be expected to fulfill such
obligations, which are directly set out in the construction contract, as well as assist
the client for exercising and fulfilling the clients’ rights and obligations. The
Construction supervision consultant shall act as an extended arm of the client in the
technical and contractual issues connected with the implementation of the project.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 16 -
The two agreements are deemed to be a part of this TOR, in so far as the duties and
obligations of the Construction supervision consultant are concerned, and the
Construction supervision consultant shall acquaint himself to the letter and spirit of
the agreements.
3) CONSTRUCTION SUPERVISION CONSULTANT'S GENERAL DUTIES :
The broad role of the Construction supervision consultant shall be to act as the
Client's representative for:
1. Material inspection @ Manufacturer factory & at site of work;
2. Overall Design review;
3. Check of survey and setting out;
4. Construction supervision, Quality Assurance and Progress Monitoring;
5. Measurements, scheduling and certification;
6. Reporting;
7. Other activities related to the technical and contractual aspects of the
construction of the Project.
The Construction supervision consultant shall, during the pre construction period,
inspect the project site at intervals in order to determine the progress of mobilization.
The Construction supervision consultant shall monitor the progress of surveys and
setting out, review the construction drawing submitted by the contractor and shall
review the contractor’s proposal in broad terms of Technical Requirements and the
Performance Standards stipulated for the works in the tender.
The representative of Construction supervision consultant shall, during the
construction period, be available on regular basis at the project site in order to
supervise, inspect, monitor and certify the works, and shall see that the Technical
Requirements and the Performance Standards stipulated for the works are fully
taken care of as per tender requirement. The Construction supervision consultant
shall also monitor the progress of setting out, and review the construction drawings
and as-built-drawings submitted by the contractor. The Construction supervision
consultant shall also perform test checking of measurements, certification of
payments, adherence to project programmes, and reporting. The Construction
Supervision Consultant shall also be liable for "100% Scrutiny" of measurement for
certification of Auditor/ Charter Accountant & shall give their comments for payments,
adherence to project programmes and reporting.
For the period during the defect liability, the construction supervision consultant shall
inspect the project site at interval of one month in order to monitor technical
performance during defect liability period of the project. The payment for every
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 17 -
month visit during defect liability period includes in quoted price. No extra payment
shall be made for the same. But he shall also be available "on call" at reimbursable
basis, for which CSC shall be paid at Rs.5000/- plus service tax per day for defect
correction period, which shall be born by the concern contractor of the work.
The Construction supervision consultant shall report to the Client at very frequent
intervals, on a daily, weekly, and monthly basis, such details as are mutually agreed
between the Client and Construction supervision consultant. Apart from period
reports, the Construction supervision consultant shall intimate the Client in writing of
any deviations from the Technical Requirements and Performance Standards.
It is reiterated that the contract is for an important public Facility; the Client binds the
contractor on performance. It shall be the responsibility of CSC to see that the over
all performance of the project is as per design and tender requirements. Construction
supervision consultant shall ensure that a complete internal record of the work is
available. The Construction supervision consultant shall ensure that his inspections
do not impede the design, construction and operation and maintenance of the
Facility.
4) Roles & responsibilities of CSC agency:
1. CSC is required to support overall “contract management” of the component in
implementing the rural water supply and urban water supply and drainage projects of
Gujarat.
2. CSC should study contract documents for all procurements and construction activity
in civil, mechanical and electrical works including EPC (engineering procurement and
Construction) turnkey contracts. Based on such study, CSC should define all
parameters relating to quality assurance, testing and certification.
3. CSC should check all the surveys and settings previously done by GWSSB /
Consultants and should finalise the survey documents which needs implementation.
4. CSC should review, finalize & recommend approval of “Quality Assurance” plan
prepared and provided by the manufacture as well as construction contractors based
on contract specifications and formulate and put in place quality assurance and
material inspection procedures in accordance to the relevant codes (BIS, AWWA etc)
and standard engineering design and implementation standards. It shall be the
responsibility of CSC to review, finalize and recommend approval of “Inspection Test
Plans” (ITP) prepared by the vendors and the contractors.
5. CSC should review Engineering Designs (Civil, Structural, Mechanical, Electrical and
Instrumentation control) and drawings formulated by the EPC / turnkey contractors
as per the specifications contained in contracts in accordance with the prescribed
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 18 -
codes / standards like BIS, AWWA, API, ISO etc. as may be applicable from the
point of view of implementation at site and recommend its approval.
6. CSC agency should ensure and certify quality of the materials and equipments and
issue “Inspection Reports” and “Quality Certificates”. for the items that are expected
to be covered under this scope. This is not an exclusive list as all items of materials
and equipments specified in the designs, drawings and contracts shall be covered
under the scope.
7. CSC agency should ensure that the manufacturer / supplier gets the raw materials
and the finished goods tested in approved laboratories in their presence as per the
requirement prescribed in the applicable quality standard specifications and work
specifications contained in the contract. Strict implementation of the “Quality
Assurance Plan” and “Material Testing Procedures” are the core duties of the CSC
agencies.
8. The CSC agency shall give a clearance certificate for acceptance of the materials
and equipments inspected and accepted for supply to GWSSB. The payment shall
be released as per contract only after such certification is made available by the CSC
agency on the record.
9. The inspection agency (CSC) will check and certify lines and levels of reference, as
per the approved drawings and designs and contractor’s setting out of works so as to
ensure accuracy in work locations and levels of all structures, pipelines, machineries
prime movers, equipments and facilities.
10. The inspection agency will check and certify all equipments and construction
materials brought on site by the contractor / supplier with reference to the materials
and work specifications prescribed in the contracts and their conformity with the
approved designs and drawings.
11. CSC agency will check and monitor contractor’s site management systems and
methods for permanent and temporary works as per the work specifications,
approach and methodology including centering & scaffoldings, equipment installation
and workmanship in compliance to the applicable standards, manufacture’s
recommendations, safety codes local regulations and bye-laws and also from the
point of view of avoidance of public nuisance.
12. CSC should ensure strict adherence to approved drawings, specification and
conditions of contract and inform GWSB, if there are any unacceptable deviations.
CSC agency should also suggest remedies to correct such deviations.
13. Inspection agency should witness from time to time such tests to ensure the quality
of construction materials and equipment and workmanship as required under the
construction contract. In case of any unacceptable deviation, they should give
directions to the contractor to take necessary corrective action.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 19 -
14. CSC agency will supervise the testing of works, materials and facilities so as to
ensure its conformity with the plan of action and work specifications. After analyzing
the test results, decide whether the said facilities are sufficiently sound to be
incorporated in the permanent works, without adversely effecting functional and
operational efficiency.
15. CSC agency will provide guidance and assistance to the contractor and the GWSSB
site staff to resolve technical problems cropping up in site and work management.
16. CSC agency should also monitor all the safety precautions at site of work and guide
the contractor accordingly.
17. CSC agency will certify quality of works, physical progress, and bill of quantities,
interim and final payments as per the terms and conditions of construction contract.
They are supposed to review the milestones for payments before advising the
payments.
18. It will be the duty of CSC agency to see that the materials are periodically tested as
per IS specifications. For RCC work and especially for water retaining structures the
field testing of concrete cubes is necessary and it shall be the duty of CSC agency to
take the field tests of the cubes. In case it does not materialize due to any reason,
CSC agency should inform the Client for his intervention.
19. CSC should issue the field inspection reports on the same day to (i) GWSSB
Engineer in charge and (ii) Representative of contractor, under intimation to
Executive Engineer. GWSSB should act effectively and immediately no sooner the
CSC inspection reports are received. CSC should also issue fortnightly inspection
report to (i) Chief Engineer, (ii) Superintending Engineer and (iii) Executive Engineer
with summary of progress achieved in the period of report and total achievement.
The monthly progress report should be submitted in prescribed format to all
concerned.
20. It shall be the responsibility of CSC to check Manpower & Machinery of the
contractor and see that it is as per the requirement of the tender specifications.
21. If contractor sub lets the work, CSC agency should see that the main contractor has
got the written permission of the Engineer in charge for sub letting the work. Further
sub letting of the part of the work is not allowed.
22. CSC agency will prepare and present progress reports and project completion report
as per the actual work done and should assist GWSSB in finalizing the accounts as
per tender conditions.
23. CSC agency should assist GWSSB in clearing the ROU matters / claims and in
getting the approval from authorities for various activities.
24. CSC should also review the stages of work such as construction phase, testing
phase, commissioning phase and handing over phase.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 20 -
25. CSC agency will scrutinize and check all quantity and price variations under and
construction contract and claims lodged by the contractor with reference to the
conditions of contract and its reasonability with necessary justifications for clearance
and payment.
26. CSC agency will examine the cases of “Time Limit Extension” as requested by the
contractor and make appropriate recommendations to GWSSB.
27. CSC agency will ensure that the equipments and structures planned and provided
are adequately designed, constructed and installed so as to resist multi-hazard risks
including seismic forces, cyclones, floods etc as per the prescribed engineering
standards.
28. During inspection of materials, the samples are to be collected as prescribed under
IS/Contract specifications. In case of pipes, it should be seen that at least one
sample is inspected from one lot of pipes irrespective of the percentage.
29. CSC shall guide GWSSB officials regarding the handling of materials, storage
guidelines and other such factors which if ignored can affect the quality of materials,
especially in case of PVC / HDPE pipes.
30. CSC agency shall report directly to GWSSB and should avoid direct control over
contractor as far as possible. GWSSB shall be the sole point for instructions to
contractors.
31. CSC shall monitor Work programme, identify slacks and slippage, and suggest
remedial measures and shall monitor adequacy of manpower, machinery and other
resources to meet the target.
32. They should also Co-ordinate the review meetings, and review and certify milestone
payments.
33. CSC shall review and verify variations and advice in value engineering and advice on
time extensions.
34. CSC shall monitor implementation of quality assurance procedures.
35. CSC is supposed to review and certify stages of work such as Taking Over,
Construction Completion, and Maintenance certificate.
36. CSC shall have to scrutinize the all designs submitted by Agency.
37. Any defect identified by CSC shall be rectified through concern Agency under
Supervision of CSC. The intimation for the same shall be passed to client.
38. CSC shall be Liable to carry out the execution according to all guidelines of PWD
manual.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 21 -
5) REPORTING AND CO-ORDINATION :
The Construction supervision consultant (and his staff) shall report only to the
Client's representative. The Construction supervision consultant shall not exercise
any direct control over the contractor, but shall report to the Client's representative
who shall be the sole point of contact with the Contractor. The Client shall also have
senior and supervisory staff as required at site. The contracts also provide for
Construction supervision consultant to supervise the contract agreement. Similarly
the Lenders may appoint a Lender's engineer. The Construction supervision
consultant shall co-ordinate with all such persons for the fulfillment of obligations, but
shall report solely to the Client's representative.
6) PROJECT TEAM :
The Consultant would be required to form a multi disciplinary Project Team for this
assignment, from the areas given below:
(a) Water Supply Engineering
(b) Hydraulics with Surge Analysis & Control
(c) Project Management
(d) Structural Engineering
(e) Mechanical, Electrical, Instrumentation
(f) Quality Assurance and Quality Control
(g) Contract expert
(h) Environment Engineer
The Consultant Team should also have multi-disciplinary skills with various
experiences in monitoring of the Environmental Management Plan.
7) Roles & responsibilities of GWSSB:
1. It is generally seen that the drawings and specifications do not tally. In case of
ambiguity, decision from GWSSB shall be very quick as it affects the progress of the
work. The role of CSC under such circumstances shall be of catalyst in resolving the
dispute / ambiguity of the tender documents.
2. Periodical meetings shall be held by the Chief Engineer between GWSSB
implementing officers, contractors and CSC agency. The proceedings of the meeting
should be furnished to all concerned including to CSC agency for follow up actions.
The next review meeting should start with the review of the follow up actions taken
reports of the previous meetings.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 22 -
3. All the relevant drawings and detailed drawings designs, calculations for the
components like Pumping Machinery, WTP, ESR, Sump etc should be provided to
CSC agency. CSC is supposed to go through the details and should comment and
issue their findings and suggestions to GWSSB for improving the overall efficiency of
the project. GWSSB should consider the suggestions and take necessary actions
where ever necessary.
4. CSC should be provided with all the necessary documents like estimates, tender
papers, designs, and drawings for their use in hard copy as well as in soft copy. CSC
agency should thoroughly go through these documents and offer their suggestions, if
necessary.
5. The actions for approving the Designs, QAP, and Changes etc. shall immediately be
taken by the competent authority and CSC should provide their helping hand in
finalizing the approval where ever required.
6. When the designs are approved on Weight basis and on mixed design basis for
important concrete structures, the copy of the same should be given to CSC agency.
It shall be the duty of CSC agency to see that the concreting at work site is done
strictly under the conditions which are assumed in design. No variations should be
allowed. If CSC notices the variation, he is authorized to stop the work and inform
GWSSB. The decision of Chief Engineer in that case shall be final and binding to
contractor.
7. After the materials are received at site or store, GWSSB officials will check the
materials at site from physical parameters like dimensions, thickness, and density
point of view and will compare the results with the report of inspection at Factory. If
some deviations in standard specifications are observed then these deviations shall
be properly justified by CSC agency.
8. GWSSB shall exchange data and information pertaining to project with CSC agency
and should have day to day interaction and monitoring of activities to enable active
project management.
9. GWSSB should issue the letter of authority to CSC agency where ever required to
facilitate the assignment and other related activities required to be done by CSC
agency.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 23 -
8) Compulsory requirement for CSC Team:
(I) Requirement of Staff:
Time requirements in Project Phases (months)
Sr.
No.
Title
Experience Pre-construction
Phase
Construction
Phase
O&M
(24 months)
1. Team Leader
/ Project
Management
Specialist.
Graduate in civil engineering
with over 5 years experience in
monitoring of water supply
drainage, any other civil
component projects, preferably
having design/office experience
and having handled at least two
projects of similar nature as per
PWD manual. Work experience
in EPC Projects shall carry
additional marks.
1 No
2. Civil
Engineer
Graduate engineer with over 5
years experience in design and
construction of Metallic/
Nonmetallic pipe line water
supply projects including
hydraulic designs/structural
design.
1 No
1 No
_
3. Site Engineer Graduate / Diploma engineer
with 2 / 5 years experience in
field work
5 Nos
5 Nos.
1 No
(As & when
required)
4. Mechanical
Engineer
Graduate engineer with over 5
years experience in design of
pumping machineries, surge
analysis, welding technology
etc.
_
1 No
(As & when
required)
_
5. Electrical
Engineer.
Graduate engineer with over 5
years experience in
electrification of pumping
machinery in HT/ LT allied
work.
_
1 No
(As & when
required)
_
6. Contract
Expert
Graduate engineer with over 5
years experience in handling
works contracts, Quality
survey, arbitration and legal
aspects of construction
contracts as per PWD manual.
1 No
7. Financial
Expert
Registered C.A. firm/ Auditor 1 No
(II) The bidder should have executed at least 5 projects, amounting not less than Rs.1 Crores, as
TPI / CSC / PMC agency in last 3 years in any civil engineering projects, of which 2 projects
must be in water supply / drainage sector. Details shall be given in following table, along
with certificate of concern department.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 24 -
Turn key Tender Labour work only Project cost (Approved
Tender Cost) in Lacs No. of Projects Amount of Projects No. of Projects Amount of Projects
20 to 50
50 to 100
100 to 300
300 to 500
500 to 1000
> 1000
(III) The bidder should have average financial turnover for last three years of at least Rs.1 Crores.
Financial evaluation shall be carried out according to balance sheet submitted by Bidders.
9) PHASING OF AND LOCATION FOR CONSULTANCY SERVICES:
The Consultancy services are to be rendered in following four phases together with
the locations:
a) Pre-Contract work : Office / site, as appropriate
b) Contract Monitoring, Construction Supervision : Site / at venders premises
Material inspection any where in India
c) Defects Correction Supervision : Site
d) Post-Contract work : Office / site as appropriate
Specific details of the services to be rendered are defined by phase in Terms of
Reference.
10) PROCEDURES AND AUTHORITY LEVEL:
The Consultant shall carry out the Services as defined in Terms of Reference or as
otherwise required for efficient works' execution, while acting in the capacity of the
"Representative of the Client" according to the intentions of the "Conditions of
Contract", which form part of the tender/contract documents for works execution and
are available for review at the GWSSB. The "Conditions of Contract" clarifies in
detail, the duties and authorities of the Construction supervision consultant and of his
representative, to whom the Construction supervision consultant may delegate duties
and authorities as required.
Principally, the Construction supervision consultant has to carry out the periodical
qualitative and supervision of works execution and construction contract
administration on behalf of the Client following the laid down procedures.
The powers vested in the Construction supervision consultant there to under the
terms and conditions of this Contract are subject to limitations as stipulated in the
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 25 -
above said "Conditions of Contract" in respect of taking major steps in construction
contract administration notably referring to:
− approving assignment and sub-contracting
− issuing a notice to commence
− certifying additional costs and payments
− determining extensions of time
− issuing a certificate of substantial completion
− issuing a defects correction certificate for which the specific approval of the Client in
writing will be needed in advance.
Whilst, therefore, being fully accountable to the client in ensuring that the
works are executed within the tender total or such other sum as may become
payable to the contractor under the provisions of this contract and within the
scheduled time for completion, the Construction supervision consultant also has
duties towards the contractor in administrating and interpreting the contract properly
and fairly to maintain the work schedule and to avoid disputes. Thereto the
Construction supervision consultant shall ensure that the Client's and the
contractors’ rights under the construction contract are upheld by ensuring good
verbal and written communication between himself, the Client and his
representatives and the contractor and his representatives. The Construction
supervision consultant shall follow the contractor's progress carefully and forecast
well ahead the needs for critical actions to be taken. He shall ensure that items with
a lead time or otherwise not readily available e.g. pipes, pumps and electrical
installation items are ordered well in time by the contractor. He should help
contractor in preparing the Procurement Schedule of important materials and shall
also ensure that excessive quantities of materials are not ordered where the delivery
of such quantities could cause difficulties on site or the materials could deteriorate.
The Construction supervision consultant, during the contract, shall provide the Client
with monthly reports indicating physical progress compared to the work schedule and
cost aspects including amounts certified so far and during that month and any
financial implication in the reports, the Construction supervision consultant shall also
include observations and comments on testing results and quality of workmanship.
11) SCOPE OF WORK:
In the capacity of Construction supervision consultant, the Consultant shall carry out
duties and authorities which include, without being limited to them, the following
functions and tasks by phase of work.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 26 -
11.1 Pre-Contract work:
i) read and understand the concept of the details of the works and of the Services from
the various documents prepared by or on behalf of the Client.
ii) inspect all existing surveys, mapping and other site data to determine and identify
additional work as required to provide the contractor with sufficient information to
execute the works with no claims or time extension.
iii) Jointly with the Client, develop formats for reporting and recording.
iv) mobilize all staff and other requirements well in time to carry out the services.
11.2 Contract, Construction supervision and inspection of materials / machineries &
equipments
Contract Monitoring
i) With in the powers granted to the Construction supervision consultant, administer the
construction contract on behalf of the client.
ii) Work closely with the client, to assist him to carry out his obligations under the
construction contract in order that the contractor is not hampered in any way in
carrying out his duties.
iii) ensure that the contractor carries out the works in accordance with the construction
contract and assist the contractor therewith, all to enable the contractor to fully carry
out his obligations within the tender total or such other sum as may become payable
to him under the provisions of his contract and within the scheduled time for
completion.
iv) Liaise between the Client and the contractor to ensure good communication between
all parties such that disputes do not arise and that any such disputes are settled
reasonably and amicably and assist in any adjudication.
v) Keep accurate records of all site activities and operations and those required
elsewhere for efficient works execution from the contractor and others under the
construction contract, including but not restricted to
− Correspondence between client, Consultant and contractor as well as between them
and third parties.
− Minutes of scheduled meetings
− daily, weekly and monthly report from the Engineer's representative and the site
inspectors
− Instructions, variation orders, approval forms, etc.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 27 -
− Level and survey books, including checks on setting out and completed work.
− Work records, such as measurement, level, dimension, as built drawings and
material delivery notes.
− progress Reports based on Prima Vera or M.S. Project software
− charts and drawings
− test data and laboratory reports
− plant and labour returns
− day work records
− financial records, including interim statements plus supporting particulars and
certificates
− Administrative records of concerning leave, sickness, accidents, etc
where applicable as submitted and as corrected, if necessary.
Work's programming:
i) Agree with the Client on the overall construction program.
ii) Agree with the contractor at the start of the works on his detailed work program.
iii) Monitor progress of the works and ensure that the contractor, as and when required,
produces revised programs.
iv) Ensure that the contractor allows for sufficient lead time for the provision of all
materials, plant, equipment and labour to avoid hold ups or bottlenecks.
v) Timely devise, jointly with the contractor, a plan of action for detailed investigations
and testing of existing facilities, if any to be incorporated in the permanent works.
vi) Prevent any hold ups due to factors beyond the control of the contractor, including
such factors in the hands of the client like granting of access to all parts of the site,
provision of certain facilities and storage areas, obtaining of rights of way and way
leaves and any such other items which are the duty of or where assistance is to be
given by the Client
vii) Assist the contractor in case, notwithstanding the above time problems not caused
by himself occur in making up for any lost time or in negotiating interim extension of
time.
Inspection of Materials, Machineries and Equipments :
Inspection of Materials Machineries and equipments AT THE PLACE OF
MANUFACTURER WITHIN Gujarat and outside Gujarat in the country.
The inspection shall consist of preparation of methodology sequences and system
report inclusive its commissioning for each category works ensuring quality
assurance and control so as to achieve the desired objective and sustainability of the
system for the anticipated serve life to each category.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 28 -
Any effective modification found necessary during their inspection process for
achieving the designated aim shall be brought to the notice of the Client and
obligatory on the agency.
Typical inspection checklists shall be prepared for each category of works on each
operation and activities with reference to documents and standards. The acceptance
/ rejection report through the concerted inspection engineer ensuring al the points
shall be mandatory.
The inspection system and procedure shall be prepared and maintained on day-to-
day basis. The inspection crews shall have guidelines, test plans, scope of
inspection, procedures, checklists and various formats to carry out inspection in a
systematic method.
The inspection reports shall have to be prepared on computer using M.S. word2000.
The inspecting authority shall have to establish office at Ahmedabad / Gandhinagar
with infrastructure facilities including computer hardware and software facilities on
site, testing instruments at his cost and responsibility. The office shall be headed by
a senior technocrats with project related background and experience not less than 15
years, who shall be the team leader.
The inspection report on based on factory and / or on site inspection shall be
submitted to the engineer-in-charge of the project, periodically as per requirement.
All stationary, drawing stationary, design facilities, reprographic facilities etc. shall be
provided by the inspecting authority at his own cost.
The inspecting authority shall issue necessary certification on progressive
completion of each category of work after ensuring quality control and assurance so
as to achieve the designed objectives of the particulars works. The certification shall
be based on satisfactory adherence of the system and procedures of the inspection.
Supervision of construction:
i) Supervise the mobilization of the contractor, his staff, plant, equipment etc. and his
provisions for storage and other operating areas, paying particular attention to land
made available for the construction of the works, including rights-of-way and way
leaves.
ii) Provide the contractor with points, lines and levels of reference, as made available
by the Client or otherwise established, and check the contractor’s setting out his shall
include the accurate locations and levels of all structures, the lines and levels of
pipelines and the locations of accesses, storage areas, working areas, way leaves
etc.
iii) Check all construction materials and equipment arriving on site to ensure that they
are in compliance with the lists of supplies submitted by the contractor and meet the
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 29 -
requirements of the specification and the applicable standards’ ensure that all
materials handing and storage is in accordance with the manufacturers’
recommendations. Advise to the EPC contractor for safety measures & epidemics.
iv) Monitor and inspect the contractor’s methods of construction for permanent and
temporary works, including false work, checking of centering & scaffolding,
reinforcement and supervision of concrete & other civil work, as well as materials
and equipment installation, workmanship and other site operations in regard of
compliance with the requirements of the specification, the applicable standards and
the manufacturer’s recommendations, with all due attention being given to
adherence to safety codes, labour laws, either laws, bye-laws and regulations and
avoidance of public nuisance.
v) Prepared and Issue to the contractor from time to time, as and when necessary,
such further drawings, specification and instructions as required under the
construction contract to enable the contractor to complete his obligations under his
contract in a timely manner.
vi) Direct and witness from time to time such tests regarding construction materials and
equipment and workmanship as required under the construction contract to be
executed by the contractor or elsewhere and instruct the contractor to undertake
corrective action in case of non-compliance with the specification or the applicable
standards.
vii) Supervise the contractor’s detailed investigations and testing of existing facilities, if
any, in regard of compliance with the plan of action and decide on the basis of the
results of the testing on whether the said facilities are sufficiently sound to be
incorporated in the permanent works Winton adversely effecting later operation and
functioning.
viii) In the event of technical problems arising on site, assist the contractor in overcoming
them in the interest of the Client. Within the tender total or such other sum as may
become payable to the contractor under the provisions of his contract and within the
scheduled time for completion.
ix) Issue instructions to carry out work on a day-work basis as and when necessary.
x) Upon having obtained approval of the client, issue variation orders or order extension
of time as required under the construction contract.
Supervision of construction including commissioning and testing of entire system.
Review / Approval of the documents:
− Study of contract documents for Civil / Mechanical and Electrical work.
− Inspection test plan prepared by the contractor for Civil, Mechanical and Electrical
works.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 30 -
− Material test certificates for cement, reinforcement and major bulk materials.
− Al check test reports laboratory as well as internal for the materials convert, mortar
etc.
Site Supervision of construction:
− Ensuring setting up of field laboratories
− Contractors internal test on materials, concrete, mortar etc.
− Pipe line trenching, bedding
− Lowering, laying and welding & jointing of Mild Steel pipe lines of various sizes.
− Installation of valves, specials fittings.
− Inside in-situ lining
− Pipeline hydro testing and pre commissioning test.
− Proper alignment of pipeline trenching.
− Nallah / River crossings – culverts bridges etc.
− Major / minor road crossings
− Railway crossings
− Orientation, location of structures depth of foundation etc. with respect to approved
drawings and approved test plan
− Dimensions, reinforcement, concreting in foundation for major civil works.
− Shuttering, plumb, dimensions, concreting etc. in sub structure including vertical wall,
ring beams, tie beams, columns, slab etc as per approved inspection test plan.
The items listed in scope of works are major items covered under the
construction contract.
The miscellaneous items and any other major items remained in the lists but
required for the successful implementation of the project shall also form the part of
scope of work under this consultancy.
Operation and Maintenance Manuals and Training of Operators
i) ensure that "as-built" drawings meeting professional standards are provided by the
contractor.
ii) prepare detailed project report "as-executed" and operation and maintenance
manuals for all components of the permanent works, as required.
iii) train scheme operators, selected by the Client or others, to give them the appropriate
skills for proper operation and maintenance of the works.
11.3 Defects Correction Supervision:
i) Make periodic site visits to ensure that any outstanding work agreed upon with the
contractor before the issue of the certificate of substantial completion is properly
carried out.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 31 -
ii) In the event of any defect and whenever required, visit the site, ensure that repairs
are properly carried out.
iii) On the occasion of site visits as above and / or request of the Client, supervise
performance of the operators and report to the Client in case of shortcomings,
including recommending on corrective actions.
iv) At the end of the defects correction period and when all outstanding work is
completed and all repairs are carried out satisfactorily, issue the defects corrections
certificate in accordance with the provisions of the construction contract.
11.4 Post Contract Work:
i) on removal of all material, plant, equipment and staff from the site by the contractor,
agree with the Client and the contractor on all monies owed to or by the contractor,
including the remaining retention money, and release all guarantees and securities in
accordance with the provisions of the construction contract.
i) after clearing and tidying up of the site by the contractor is complete, carry out all
work required to finalize the construction contract administratively.
12) Milestone for CONSTRUCTION SUPERVISION CONSULTANT for Water Supply
and Drainage Projects:
The following is a typical general guide line that gives an overall responsibility and
the duties of CSC for different types and kinds of works that are generally the part of
civil and mechanical activities of water supply and drainage projects. There may be
various other categories of works, but the general guide lines will remain more or
less same.
12.1 General
• CONSTRUCTION SUPERVISION CONSULTANT to study the tender document
thoroughly including specifications, drawings and bill of quantities and to offer
ambiguity if any
• CONSTRUCTION SUPERVISION CONSULTANT to visit the site, examine the
soil, analysis, report, survey data and opine regarding the location of the structures
and lay out prepared by the contractor – water table, flood level, etc
• The CONSTRUCTION SUPERVISION CONSULTANT to study the methodology
and work plan submitted by the contractor
• CONSTRUCTION SUPERVISION CONSULTANT to collect the samples of the
material, steel, and send the same for testing from the approved laboratory and
approve the material to be consumed in the work
• CONSTRUCTION SUPERVISION CONSULTANT to attend project review meeting
and submit the progress report to employer
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 32 -
• CONSTRUCTION SUPERVISION CONSULTANT to opine regarding excess, extra
items, time limit and other contractual matter
12.2.1.1 Inspection
CONSTRUCTION SUPERVISION CONSULTANT to visit the site at various
important and critical stages for each component of the project as under:
12.2.2 Pipeline Work
1. All the material i.e. pipes, valves, joints, etc. to be inspected and tested at
factory as per the relevant BIS and as per tender specifications
2. Regular supervision and checking of excavation of pipeline trenches,
bedding and laying, jointing of pipeline work
3. At the time of hydraulic testing and commissioning of the pipeline
12.2.1.2 Civil Work
It is essentially the responsibility of CSC to arrange for over all supervision
and inspection of works, however there should be some bare minimum visits
for regular supervision and checking of the works as shown against each item
of work.
12.2.2.1 Pump House
1. Approval of the foundation along with comparison with S.B.C. report and
water table, etc.
2. Visit at plinth level including foundation for pumping machinery, etc.
3. Visit at slab level including checking of reinforcement, centering and cube
testing, etc
4. Visit at final finishing including verification of excess extra items, time limits
and important contractual matter
12.2.1.3 GSR/Sump
1. Approval of the foundation along with comparison with S.B.C. report and
water table, etc.
2. Visit at the site of casting of base slab including reinforcement checking, etc.
3. Visit at 50% height of vertical walls and columns including reinforcement
checking, cube test, etc.
4. Visit at full height of vertical walls and columns including reinforcement
checking, cube test, etc.
5. Visit at the time of roof slab casting with checking of steel and centering
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 33 -
6. Visit during the plastering and other allied works including inlet, outlet, scour
arranged
7. Visit at the time of hydraulic testing and commissioning and certifying of test
results for cube test and reinforcement test, etc.
12.2.1.4 Elevated Service Reservoir
1. Foundation approval along with comparison with S.B.C. report and water
table, etc.
2. Visit at the time of casting the footing and vertical shaft wall or columns etc
with dimension check, verticality check and cube test, etc.
3. Visit at 30% staging height with dimension check, verticality check and cube
test, etc.
4. Visit at 60% staging height with dimension check, verticality check and cube
test, etc.
5. Visit at 100% staging height with ring beam, checking the centering,
reinforcement, centering, dimensions of container, verticality check including
cube test, and casting of base slab and slant wall
6. Visit at the time of vertical wall of container – reinforcement, centering and
dimensions of container and verticality check including cube test
7. Visit at the time of casting roof slab/dome – checking centering,
reinforcement, etc
8. Visit at the time of erection of vertical pipes – pipe checking and alignment
check
9. Visit during the plastering and other allied works
10. Visit at the time of testing and commissioning along with checking of excess,
extra items time limit and other contractual matter
12.2.1.5 Filtration Plant
Scrutinizing the hydraulic diagram along with approved design and the lay out
of all the units suggested by agency
Visit for checking the line out and foundation of clarifier, filter, chemical house
along with SBC report, water table and general appearance, etc
12.2.1.5.1.1 Clarifier
1. Visit at the time of base slab along with checking all required levels
2. Visit at the time of floculator walls along with checking at all required levels,
cube test and verticality test
3. Visit at the time of casting vertical wall up to 50% height along with checking
at all required levels, cube test and verticality test
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 34 -
4. Visit at the time of casting vertical wall at 100% height, casting launder and
platform along with checking at all required levels, cube test and verticality
test, v-notch fixing, etc.
5. Visit at the time of finishing and testing
6. Minimum 3 visit for erection of mechanical and electrical equipment and
testing of equipment at factory site and installation, testing and trial run at site
12.2.1.6 Filter House
1. Approval of the foundation along with checking S.B.C. report and water table,
etc.
2. Visit at the time of base slab concreting and column footing, reinforcement,
etc
3. Minimum 2 visit for concreting work for vertical wall of the filter bed and first
floor slab – verification with structural drawings, cube test, etc.
4. Visit at the time of casting roof slab – verification with structural drawings,
cube test, etc.
5. Visit at the time of casting all the chambers and channels and other allied
work
6. Minimum 3 visit for erection of mechanical and electrical equipment and
testing of equipment at factory site and installation, testing and trial run at site
7. 3 visits at the time of all the piping work and under drainage system, filling of
gravel and sand – filter media – back wash arrangement, wash out
arrangement as per drawings, etc
8. Visit at the time of commissioning, hydraulic testing, flow testing and quality
and quantity checks
12.2.1.7 Chemical House and Recycling Unit
1. Periodical 4 visits for both the work considering all of above technical points
including laboratory and office setting – alum and chlorine dosing –
equipment testing, installation and commissioning
12.2.2 Mechanical and Electrical
1. 100% inspection of material i.e. pump, motor, transformer, cables, panel,
valves, etc
2. Finalization of P. & I. diagram
3. Checking of lay out of foundation blocks
4. Erection of pumps and motor
5. Erection of electrical components
6. Trial run and testing of equipment
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 35 -
13) Payment terms to CSC agency: 1. CSC agency should be witness for each Test as per prescribed norms & standards in
the factory, when the call for Inspection is received from supplier / manufacturer /
Contractor of work. In case of false inspection call received i.e. material is not ready
for inspection at time of visit, CSC shall be eligible to elaborate actual expenditure
(minimum to Rs. 5000/-) plus 20% over head. This expenditure shall be born by
supplier / manufacturer/ Contractor. The client shall immediately issue warning
notice to concern contractor.
2. In case the work is not completed or seems to be delayed for a longer period for
want of sanction from competent authority or for any other reasons, the payment to
CSC shall be made on the basis of the cost of the actual work done and not on the
billed amount of the contractor.
3. In case of termination of contract also the CSC shall be paid on the basis of the
actual work done by the contractor and not in the billed amount of the contractor, as
generally interim payments to contractors are not being fully done.
4. In case the progress of the work is not satisfactory, which generally happens in the
fag end of the completion stage, minimum monthly remuneration will be paid to CSC
which shall be equal to the salary of the field staff plus 20% overheads. The field
staff will be decided in consultation with Client according to the quantum of works in
progress.
5. Materials tested at factory fail in site and if authentication of materials is proved that
these are tested by CSC, the responsibility of failure lie with CSC agency. GWSSB,
at his will, can take either of the actions like (i) termination of contract with CSC
agency, (ii) penalizing the CSC agency up to 10% cost payable to CSC agency, (iii)
black listing the CSC agency from the department for a period up to 5 years or by
other means as deemed fit to GWSSB.
6. If materials received at store or site of work are found to be of inferior quality or are
found doubtful then at the report of CSC, all the materials shall have to be replaced
by the manufacturer / supplier / contractor. CSC will be paid at actual expenses plus
20% overheads for the second inspection which shall be born by the manufacturer /
supplier / contractor.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 37 -
2.0 PREAMBLE TO PRICE SCHEDULES 1. The bid is lump sum bid for construction supervision consultancy services for
implementation of water supply, Drainage, other civil engineering project. 2. The bidder shall quote his firm and fixed lump sum price, on percentage
basis, for the entire work under this Contract, defined in more details in various sections of this bid document.
3. The rates and prices shall be submitted in the formats given in the enclosed
Price Schedules. Rates and prices received in any other formats will be rejected and the Bids will be disqualified.
4. It will be entirely at the discretion of the Employer to accept or reject the
consultant’s proposal, without giving any reasons whatsoever and the consultant shall not be permitted to withdraw his bid on this account.
5. Interim payment will be made as per break up given in the Price document. 6. Prices shall be written in ink and shall be entered in figures and in words.
Where there is a discrepancy between the unit rates and the amount entered, the latter shall govern.
7. The Price Schedules are to be read in conjunction with the Conditions of
Contract, the Specifications and other sections of these bid documents and these documents are to be taken as mutually explanatory of one another.
8. Prices quoted by the consultant shall be firm for the entire period of Contract
without any escalation. 9. GWSSB will distribute the work among more than one consultants as deemed
fit. 10. The interim payment will be made by GWSSB every month if possible as per
availability of fund.
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 39 -
PRICE SCHEDULE
For Material Inspection
Summary of costs (Lump - sum fix price, on percentage basis)
Percentage of Cost of
Material to be inspected
(Excluding all Taxes, Excise Duty & Freight)
Sr.
No.
Description of services
In figure In words
1 Providing Inspection of Material (Civil/
Mechanical/ Electrical) as per latest relevant
IS code & Specification including all taxes,
duties, local Charges etc complete.
A Pre delivery inspection at Manufacturer's
factory.
B Post delivery inspection at GWSSB store / site
of work.
Signature:
Authorized person of consultant
Client
PRICE SCHDULE - I
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 40 -
PRICE SCHDULE - II
For Turnkey Tender / Labour work Tender
Summary of costs (Lump - sum fix price, on percentage basis)
Percentage of Accepted Tender(*)
(*) in which Cost of Material to be inspected
(excluding all Taxes, Excise Duty & Freight) shall
be considered
Sr.
No.
Description of services
In figure In words
1 Providing construction Supervision
Consultancy services including verification of
surveys and drawings, as pre construction
activity, inspection of all type of materials and
supervision of works during construction
phase and periodical visits during M & R up
to defect liability period for water supply,
drainage, and other civil engineering projects
as per terms of reference including all the
taxes, duties, local charges etc. complete.
A Project cost up to Rs. 10 Crores
B Project cost above Ts. 10 Crores and up to Rs.
25 Crores
C Project cost above Rs. 25 Crores and up to Rs.
50 Crores
D Project cost above Rs. 50 Crores
Signature:
Authorized person of consultant
Client
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 41 -
Payment Schedule
The payment to the consultant will be made as under.
(A) For Material Inspection only (Schedule- I)
The Break up of payment to CSC shall be as under.
1. Inspection of material 90 % of quoted price shall be made with in
30 days from the date of inspection release
note.
Remaining 10% of quoted price shall be
made after six months from inspection
release note.
(B) For Turnkey Tender / Labour work Tender (Schedule - II)
Break up
The break up of Payment to CSC shall be as under:
Sr. No. Name of activity Percentage of L.S. quoted price in
summary cost Above 1 Crores cost
A Pre construction activity` 5 %
B Construction supervision & allied activity 80 %
C Post construction activity 15 %
Total 100 %
Schedule of payment
A. Pre construction Activity: 5 % of quoted price. Break up of Activity
Sr. No. Particulars Percentage to be released of total
amount
1 On submission of review report of contract 10 %
2 On submission of methodology & work
plan
10 %
3 On setting out project office with required
facility at site with deployment of staff.
20%
4 On review of work survey & setting out the
line out of work.
50 %
5 Any other matter require to perform 10 %
Total 100 %
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 42 -
B. Construction & Supervision of work: 80 % of quoted price proportionate to
percentage of cost of work carried out.
Further Break up of Activities
Sr.
No. Particulars Percentage
1. As per Bill amount of actual work
executed.
85 %
After one month from payment made
to contractor
15 %
Total 100 %
• The payment shall be based upon percentage of CSC contract with respect to
work contract for each activity and percentage of work carried out by work
contract, work inspected, inspection certificate released and bill of work
contract certification.
• The proposal of statutory permission e.g. Railway, Forest, Road crossing shall
be prepared by CSC. Necessary letters shall be issued by Executive Engineer in
charge.
C. Post Construction Activity: 15 % of Quoted price
Sr.
No. Particulars Percentage to be released
1 On release of performance guarantee
and other securities
95 %
Monthly prorata Basis during
Defect liability Period.
2 After clearing and tiding of sites by
the contractor to complete & carry out
all works required to finalize the
construction contract administratively.
5 %
Total 100 % of quoted price
D:\AC-bleaching- CSC Tenders 10-11\Final CSC - RC -10-11.doc - 43 -
Mode of Billing and Payment
Billing and payments in respect of the Services shall be made as follows:
1. As soon as practicable as and not later than fifteen (15 days) after the end of each
calendar month during the period of the Services, the Consultants shall submit to the
Client, in duplicate, the bill for the services rendered by him. In case of additional
payment under clause 7, the necessary documents in support of claim shall be
furnished. Each such separate monthly statement shall distinguish that portion of the
total eligible costs which pertains to remuneration from that portion which pertains to
reimbursable expenditure.
2. The Client shall cause the payment of the Consultants periodically as given above the
payment within thirty (30) days after the receipt by the Client of the bills supporting
documents. Only such portion of a monthly statement that is not satisfactorily
supported may be withheld from payment. Should any discrepancy be found to exist
between actual payments and costs authorized to be incurred by the consultants, the
client may add or subtract the difference from any subsequent payments.
3. The final payment under this Clause shall be made only after the final report and a
final statement, identified as such, shall have been submitted by the consultants and
approved as satisfactory by the Client. The services shall be deemed completed and
finally accepted by the Client and the final report and final statement shall be deemed
approved by the Client as satisfactory unless within ninety (90) days period client
gives written notice to the Consultants specifying in detail deficiencies in the
Services, in the final report or in final statement, the consultants shall there upon
promptly make any necessary corrections, and upon completion of such corrections,
the foregoing process shall be repeated. Any amount which the Client has paid or
caused to be paid in accordance with this Clause in excess of the amounts actually
payable in the accordance with the provisions of this Contract shall be reimbursed by
the Consultants to the Client within thirty (30) days after receipt by the Consultants of
notice thereof. Any such claim by the Client for reimbursement must be made within
(12) calendar months after receipt by the Client of a final report and a final statement
approved by the Client in accordance with the above.
Signature of Client Signature of Consultant