GUIDE TO: SUCCESSFUL PLAN REVIEW

Upload: robert-hesselgrave

Post on 02-Apr-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

GUIDE TO:

SUCCESSFUL PLAN REVIEW

Page 2: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

WE ARE HERE TO HELP YOU• The goal of this presentation is to help our

customers achieve first time success in plan review. Today we will be focused primarily on residential submittals.

Page 3: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

REMEMBER THESE THREE THINGS:

1. Each application needs to have ONE PERSON WHO IS RESPONSIBLE for compiling a complete and accurate submittal package.

2. The plans are required to demonstrate Code compliance and be clear enough that a qualified 3rd party is able to understand the proposed project without any prior knowledge.

Page 4: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

3. We are a valuable source of information for you. Our staff is always available to

answer questions an we encourage pre-submittal meetings.

Page 5: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

LET’S GET STARTED PUTTING THE PUZZLE TOGETHER!

Page 6: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

STEP ONE…• Each applicant begins by presenting a site

plan and all other documents to one of the Planners at the front counter…

Page 7: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

PLANNING, ZONING, & STORMWATER ISSUES

For the purposes of this presentation let’s assume there aren’t any, however…………………

Page 8: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

PLANNING AND ZONING• Please remember

to Always consult with one of our staff Planners for other potential requirements.

Page 9: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

COMMON MISTAKES MADE WHEN PREPARING A SITE PLAN

1. Only a portion of the parcel is shown on the site plan; the entire parcel boundary must be delineated.

2. Distance from the proposed structure to the property lines, and to other existing structures are not labeled.

3. Site plan is not on an 8.5x11 sheet of paper.

4. Site plan is not drawn to scale.

Page 10: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

COMMON MISTAKES MADE WHEN PREPARING A SITE PLAN

5. Streams, drainage ways, and other land features are not delineated.

6. Current easements are not shown on the site plan.

7. Existing roads, driveways, parking areas, decks and other impervious areas are not shown or labeled on the site plan.

8. Directional arrows are not labeled.

Page 11: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

STEP TWO…………After review and approval by the front counter Planner for land use requirements, the applicant will proceed to one of the Permit Techs.

Page 12: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

STEP TWO…

• This is the point where your submittal is actually entered into “TRAKiT”, our project tracking software system.

• At the time your Building Permit Application is accepted and entered into our tracking system, the Plan Review Fee is due and will be collected by the Permit Tech; so please remember the checkbook.

Page 13: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

INITIAL REVIEW FOR COMPLETENESS & COMMON ERRORS

• The Permit Tech will do a preliminary review of the plans and other submittal documents; truss sheets, HVAC design, engineering, etc. to verify if the submittal is complete.

• Please remember that the Permit Techs do not perform a complete review for Code compliance, but they do look for common inadequacies and may ask for additional information or corrections. The final Code review will be performed by one of the Plans Examiners after the submittal is accepted.

Page 14: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

IS THE SUBMITTAL COMPLETE?• Incomplete submittal packages to “Get in

line” will usually not be accepted.

• This practice is unfair to those who have done their due diligence to compile a complete package.

Page 15: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

RESIDENTIAL BUILDING PERMIT

SUBMITTAL REQUIREMENTS AND CHECKLIST

• This “Submittal Checklist”, which will be covered in detail later, is required to be included in the Building Permit submittal package and must be completed and signed.

This list will be covered in detail later

Page 16: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

TECHNICAL QUESTIONS MAY BE ASKED…

• The person who brings in the submittal package should have adequate knowledge of the project.

“He told me to just drop it off?!”

Page 17: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

STRUCTURE AREA The SQUARE FOOTAGES of all living

spaces, garages, decks, and covered porches are required to be clearly noted on the plans.

The areas are necessary to calculate fees and is required information for the Fire Districts.

AREASBasement 1000 sq ft

First floor 1000 sq ftBonus Room 500 sq ft

Decks 750 sq ft

Garage 750 sq ft

Total 4000 sq ft

Page 18: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

OUTSIDE AGENCY APPROVAL

• By Ordinance, relevant outside agency approval must be provided to us before a Building Permit can be issued.

• At the time of submittal, as a courtesy, the Permit Tech will send notification by e-mail to the relevant outside agencies, such as Panhandle Health District, the Fire District, etc. that there is a proposed project in their jurisdiction.

Page 19: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

PLEASE FOLLOW-UP

• It is important to remember that it is the responsibility of the APPLICANT to follow up with any additional requirements an outside agency may have.

• Please remember: You can track Permit approval progress on our website at “PERMIT SEARCH”: http://permits.kcgov.us/index.asp

• If an outside agency is not responding, please contact THAT AGENCY to follow up.

Page 20: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

AFTER ALL REVIEWS AND APPROVALS ARE

COMPLETE….. • The applicant will be notified to come in to our

office for the Permit to be issued.

• Remaining fees will be collected at that time. Again, please don’t forget the checkbook.

Page 21: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

PERMIT TRACKING

• Again; the public can search the status of all Building Permits on the Kootenai County website! Please visit: http://permits.kcgov.us/index.asp

Page 22: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

TRY ELECTRONIC SUBMITTAL!

• Kootenai County Building and Planning Department now accepts and encourages electronic plans for review.

• Both Building and Site Disturbance Permits.

• Upload to Net Account, or

• On CD.

Page 23: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

A LITTLE BIT OF PAPER IS STILL REQUIRED……

• At this time permit applications are required to be submitted in person.

• The 8 ½ x 11 site plan must also be submitted in person to check for land use issues.

• If the structure is residential over 3,600 square feet (or commercial) one paper set is required by the Fire Districts to be submitted to us and receive our stamps for the applicant to take to them for review.

Page 24: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

IT’S A MUCH EASIER AND MORE EFFICIENT METHOD

• MUCH LESS PAPER

• Corrections can be e-mailed or downloaded between the Plans Examiner and the Designer.

• Plan review is faster.

• Easier to store plans.

• It’s GREEN!

Page 25: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

INCLUDE ALL CONSTRUCTION DOCUMENTS

• Construction drawings• Engineering

calculations• Truss data sheets• RESCHECK• HVAC design• ETC.• Everything is required

to be in PDF format

Page 26: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

ELECTRONIC SUBMITTAL

• Contact the Building Division to set up a Web Submittal Account.

• It is necessary to provide an e-mail address and choose a password.

• We’ll teach you how to download and retrieve documents.

• You will be notified automatically by e-mail when any document is downloaded to your account.

Page 27: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

UPON APPROVAL

• After all documents are approved, we will e-mail or download the approved set to you for printing.

• The applicant is required to get one approved set printed which will then be kept on the jobsite as the approved plans required for inspections.

• The approved and printed jobsite set is required to be brought in by the applicant for signing at the time the permit is issued.

Page 28: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

New customer computer!

• Please check out the NEW customer self-help computer in our office.

• There are links to many helpful sites and tools, and we’ll keep adding to the list.

Page 29: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

GREAT SOURCES OF INFORMATION………

• Kootenai County Building and Planning:• http://www.kcgov.us/departments/bandp/

or call 208-446-1040• International Code Council:

www.iccsafe.org• Idaho Association of Building Officials:

www.idabo.org• Air Conditioning Contractors of America: http://www.acca.org/• Stairway Manufacturers Association:

www.stairways.org

Page 30: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

GREAT SOURCES OF INFORMATION ………

• Idaho Division of Building Safety: www.dbs.idaho.gov

• APA-The Engineered Wood Association: www.apawood.org

• American Wood Council: www.awc.org• Simpson Strong Tie: www.strongtie.com• Wood Truss Council of America:

www.woodtruss.com• N.I.C.E. has donated the most relevant Codes

and Commentaries to five area libraries: www.nice.idabo.org/index.htm

Page 31: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

RESIDENTIAL REQUIREMENTS AND CHECKLIST

Page 32: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

WHY ALL OF THE PLAN REQUIREMENTS?

• Not all requirements can be assumed on the plan, but most are.

• In the IRC alone, there are approximately 30,000 requirements.

Page 33: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

• Besides the basics, many of the plan review requirements are based on issues commonly encountered by the field inspectors.

Page 34: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

Most would agree that It’s MUCH easier to make a correction on paper than by demolition.

Page 35: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

WHO’S THE TEAM LEADER? AGAIN………….PLEASE REMEMBER: It can’t be stressed enough that for

successful plan review, each permit application must have ONE PERSON WHO IS RESPONSIBLE for compiling a complete and accurate submittal package.

Page 36: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

WHO IS ON THE TEAM?

• YES - A design TEAM creates the construction documents.

• Architect?...................................YES

• Designer?...................................YES

• Engineer?...................................YES

• General Contractor?...................YES

• Home owner?.............................YES

• Sub Contractors?.......................YES

• Building and Planning Staff?......YES

Page 37: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

WITHOUT TEAMWORK, well……

?

Page 38: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

HERE’S WHAT THE BUILDING CODE REQUIRES OF THE PLANS:

Braced wall lines shall be identified on the construction documents, including, but not limited to, bracing methods, location and length of braced wall panels, attachment of the braced wall panels at the top and anchorage of the braced wall panel at the bottom.

Page 39: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

WHAT DOES THAT MEAN?•The days of plans on a napkin are behind us now!

Page 40: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

ACCURACY IS A MUST

• The scope of work and Code compliance is required to be clearly and accurately indicated in the plans.

Page 41: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

PUT THE PIECES TOGETHER

• Please put the pieces of the puzzle together before you come in to submit for an application.

Page 42: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

PUT THE PIECES TOGETHER

Most delays in the permit process are a result of incomplete, inaccurate, conflicting or unclear documents.

Page 43: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

• Is there too much information in the General Notes?

• Are the plans to scale?• Are the notes, details, truss data sheets, RESCHECK, engineering,

etc. consistent with each other?

Page 44: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

CLEAR AND ACCURATE?

• Have canned plans been modified to reflect what will actually be in the scope of the proposed work?

• Flipped or mirrored plans will not be accepted.

• Old “whiteout” plans that havebeen used before will not be likely be accepted.

Page 45: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

DETAILS• If generic file details are used on the plan,

include ONLY those which specifically apply to your project.

• Two story section for a one story house, etc.

• Cross reference all details to

the location they will be used

such as:3

A 1.1

Page 46: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

OLD HANDOUT DETAILS

• All old details we have provided in the past are obsolete; PLEASE put them in the recycle bin.

Page 47: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

DON’T LEAVE IT TO OTHERS

• We can’t accept notes on the plan such as these:– “By Others” (Who is Mr. Others?)– “By Vendor”– “Preliminary”– “See Engineering” (if there isn’t any)

Page 48: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

BUILDING ORDINANCE 450

• The Building Ordinance contains all of the Code adoptions and amendments. It is a companion to the various Codes.

• The Building Ordinance also lists the relevant design criteria.

• The Building Ordinance details code violation and appeal requirements

Page 49: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

IS A PERMIT REQUIRED?

•There are few things that don’t require a building permit.

•IRC Section R105.2 lists exempt work.

•It is always best to contact us and ask.

Page 50: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

USE THE CORRECT CODES(And note them on the plan)

• 2009 International Residential Code

• 2009International Building Code

• 2009 International Energy Conservation Code

• Plumbing and electrical under jurisdiction of the State of Idaho

Page 51: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

PLEASE DON’T USE OLD CODES

• Remove notes such as 1997 UBC, NW Energy Code, etc.

• Here’s a classic: “All work shall comply with the requirements of the 1988 Uniform Building Code and all applicable regulations of Bonner County”

Page 52: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

LIST (And Use) THE CORRECT DESIGN CRITERIA

• WIND:

• 90mph 3 second gust (76 mph sustained)

• Exposure?– B,C, or even D

Page 53: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

SEISMIC ZONE C

• R301.2.2: Exception: Detached one- and two-family dwellings• located in Seismic Design Category C are exempt from• the seismic requirements of this code.

Page 54: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

SOIL• Assumed soil bearing pressure is 1,500 psf

-If an engineered design is for more than 2,000 psf, a geotechnical report is required.

-Minimum frost burial depth is 24”

Page 55: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

Zone A: Minimum 40 psf Roof Snow Load or Engineered Design

Zone B: Minimum 50 psf Roof Snow Load or Engineered Design

Zone C: Engineered Design based upon the snow

load findings of the engineer. (Exceeds the limits of the IRC)

Page 56: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

WHY ENGINEERING FOR ZONE C ?

• R301.2.3 Snow loads. Wood framed construction, cold formed steel framed construction and masonry and concrete construction in regions with ground snow loads 70 pounds per square foot (3.35 kPa) or less, shall be in accordance with Chapters 5, 6 and 8. Buildings in regions with ground snow loads greater than 70 pounds per square foot (3.35 kPa) shall be designed in accordance with accepted engineering practice.

Page 57: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

HOW MANY PSF IS IT?

Page 58: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

ZONE C ?

• The engineer determines the ground snow load and from that, determines the roof snow load and construction requirements for the entire building.

• It may be a full design from the roof to the ground.

• It may be determined that standard light frame construction is adequate.

• The engineer decides to what extent the building needs to be designed.

Page 59: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

THE IRC IS PRESCRIPTIVE

• This is a limited “cookie cutter” code.• Buildings or portions of buildings that are not

conventional, light frame platform and balloon frame construction require an engineered design.

Page 60: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

ENGINEERING REQUIREMENTS• If engineering is submitted, supporting

calculations must be included with the submittal.

• The engineer’s requirements are required to be transferred onto the plan and be consistent with the remainder of the plan.

• Any engineered design in the plans is required to be stamped.

• An engineer’s letter endorsing another’s work will not be accepted unless that work was supervised by the engineer.

Page 61: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

NON-PRESCRIPTIVE METHODS

• Any type of construction or structural component which is not contained prescriptively in the International Residential Code requires an engineered design.

Page 62: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

ALTERATION TO AN ENGINEERED DESIGN

• Any alteration which is attached to or otherwise affects an engineered design requires stamped engineering.

Page 63: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

MANUFACTURED HOMES

• Any alteration or addition to a mobile or manufactured home requires an engineered design.

Page 64: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

BEARING WALL STUD LENGTH

• Laterally unsupported (perpendicularly) stud length is limited to 10’. – May be increased to 12’ if the required length

of bracing in Table R602.10.1 is multiplied by 1.20.

• Greater un-restrained bearing stud lengths require a stamped engineered design.

Page 65: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

BEAMS• Calculations are required for any beam

exceeding 6’ in length.• Stamped engineering with calculations is

required for beams exceeding 25’ in length, not uniformly loaded, or with a point load.– Cross reference all calcs to the plan: B1, B2, etc.

Page 66: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

Design of a beam could easily include the design of other components; hangers, columns, footings, etc. to complete the load path.

BEAM ENGINEERING

Page 67: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

COMPLETE LOAD PATH

• The IRC states that design and construction must provide a complete load path that meets all of the requirements for the transfer of all loads from their point of origin through the load resisting elements to the foundation. Gravity, uplift, and lateral forces should be considered.

Page 68: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

CANTILEVERED FLOOR• Floor cantilevers exceeding those allowed

by R502.3.3, Table R502.3.3(1), or Table R502.3.3(2) require an engineered design.

Page 69: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

RETAINING WALLS

• Any unrestrained retaining wall exceeding 4’ high measured from the bottom of the footing requires stamped engineering.

• Any restrained retaining wall, such as a basement, exceeding 9’ high and retaining more than 8’ of fill requires stamped engineering.

• Any retaining wall retaining additional surcharge requires stamped engineering.

Page 70: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

15% slope

• Any building site with a slope steeper than 15% requires a stamped engineered foundation plan.

Page 71: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

Cut / Fill• Cut or fill slopes steeper than 2 horizontal

units to 1 vertical unit require a stamped engineered design.

Page 72: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

2 / 1 Slope (50%)

1 unit 2 units

1 unit

Page 73: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

SETBACKS FROM SLOPES

Page 74: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

SETBACKS FROM SLOPES…

Page 75: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

5’ SETBACK FOR CUT OR FILL

• Kootenai County Site Disturbance Ordinance Section 7 A. (4)

• Except where roads or driveways cross property lines, the tops and toes of cut and fill slopes shall set back from property boundaries one half the height of the slope with a minimum of 5’ and a maximum of 20’, unless the design professional has demonstrated to the Administrator that smaller setbacks provide a sufficient measure of safety and stability for activities which may occur on adjacent property.

Page 76: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

PROPERTY LINE SETBACK FOR CUT

CUT LINE – 2:1 MAX OR PROVIDE ENGINEERING

PROPERTY LINE

½ THE HEIGHT OF THE SLOPE WITH A 5’

MINIMUM AND 20’ MAXIMUM OR PROVIDE

ENGINEERING

Page 77: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

PROPERTY LINE SETBACK FOR FILL

PROPERTY LINE

FILL

½ THE HEIGHT OF THE SLOPE WITH A 5’ MINIMUM AND 20’ MAXIMUM OR

PROVIDE ENGINEERING

Page 78: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

HVAC DESIGN

•Beginning January 1, 2010 all of the area jurisdictions began seeking compliance with the Code requirements for HVAC system design based on ACCA Manuals

J & D (S).

Page 79: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

NEW SYSTEMS ONLY

• This requirement only applies to new complete systems which are submitted for permitting after January 1, 2010.

• Simple appliance change-outs do not apply if the structure was submitted for permits before January 1, 2010.

Page 80: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

WHAT IS REQUIRED?

•ACCA Manuals J & D worksheets, either paper and pencil or spreadsheets:

http://www.acca.org.speedsheet/ or;

ACCA certified software reports such as Wrightsoft and Elite.

•Other methods may become approved in the future.

Page 81: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

AND………………

•Completed Kootenai County HVAC Review Form.

•The Manufacturer’s data performance sheets for the appliances that will be used.

•A mechanical plan drawing which shows the location of the appliances, the locations, sizes, and fittings of the duct system.

Page 82: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

TUTORIALS @ ACCA.ORG

• There are several great training tools available free on the ACCA website:

http://www.acca.org/codes/brochures/

http://www.acca.org/speedsheet/

http://www.acca.org/codes/reviewform/index.php

• More future.training will be hosted by N.I.C.E.

Page 83: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

FLOOR PLAN• Intended use of each room.• All window and door sizes and method of

operation. Note all required EGRESS.• Indicate all required safety glazing.

Page 84: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

FLOOR PLAN

• Complete dimensions.

• Location of all required smoke detectors.

• Location and CFM of all required ventilation.

• Location and type of all heat sources.

• Location and type of all fuel appliances.

• Indicate all required fire separation.

• Indicate vehicle impact protection.

Page 85: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

ELEVATIONS

• Provide elevation views from all sides.

• Accurately demonstrate the adjacent grade at least 20 feet.

Page 86: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

FOUNDATION PLAN• Indicate the location of all footings, stem

walls, piers, and retaining walls with dimensions. (include all decks)

• Note the size and placement of all rebar.

• Note specific hardware and it’s location.

Page 87: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

FOUNDATION PLAN

• Indicate the depth of the footings.

• Indicate the method and amount of ventilation.

• Indicate the access opening and size.

Page 88: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

FLOOR FRAMING PLANS

• Indicate all joist sizes and spacing.

• If I-joists, indicate manufacturer and series.

• All beam sizes and locations.

• Include all decks.• Include all specific

connecting hardware.

Page 89: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

DECK FRAMING• Include joist size and spacing and all beams.• Include ledger and flashing details. See section

R502.2.2.1 of the Building Ordinance.• Include all connecting hardware.

Page 90: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

ROOF FRAMING PLAN• Indicate all rafter sizes and spacing.

• If I joists, indicate manufacturer and series.

• Indicate all beam locations and sizes.

• Include construction details for all over-framing or infill including support.

• Indicate all connecting hardware, including uplift restraint.

Page 91: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

TRUSSES

• The truss plan is required to match the construction plans.

• Include data sheets for each truss.• Check uplift and required bearing length.

Page 92: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

WALL BRACING

• Indicate the location and methods of required wall bracing.

• Provide ONLY details for braced wall panels specific to the job.

• Include required interior wall bracing.

• If hold down hardware is required, indicate the locations and specific hardware.

Page 93: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

CONTINUOUS SHEATHING

• If the continuous sheathing provisions of IRC R602.10.5 are used, all requirements must be met and demonstrated on the plan.

• Any wall bracing design method is required to apply to an entire braced wall line.

Page 94: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

CROSS SECTIONS

• Must be specific to the proposed project.

• Identify all construction materials.

• Note all insulation

• Provide stair, handrail, and guard details.

Page 95: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

STAIRS

Provide stair, handrail, and guard details.

Page 96: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

ENERGY CODE COMPLIANCE

• May be prescriptive.

• Otherwise provide RESCHECK

http://www.energycodes.gov/rescheck/

• Either method is required to be consistent with what is noted on the plan and in the HVAC Manual J load calculations.

Page 97: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

IF THERE IS A CORRECTION LETTER…

• Double check to make sure all of the items have been addressed before re-submitting.

• All required additional information is required to be be transferred onto the plans.

• It speeds up the re-review if changes are flagged on the plans.

• Return the original redlined documents.• Provide two new clean sets of plans.• If a second correction letter is issued, the application

may move to the end of the first time submittal line.

Page 98: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

WHO COMPLETES THE CHECKLIST?

• THE TEAM LEADER !

Page 99: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

REMEMBER THESE THREE THINGS:

1. Each application needs to have ONE PERSON WHO IS RESPONSIBLE for compiling a complete and accurate submittal package.

2. The plans are required to demonstrate Code compliance and be clear enough that a qualified 3rd party is able to understand the proposed project without any prior knowledge.

Page 100: GUIDE TO: SUCCESSFUL PLAN REVIEW. WE ARE HERE TO HELP YOU The goal of this presentation is to help our customers achieve first time success in plan review

3. We are a valuable source of information for you. Our staff is always available to

answer questions an we encourage pre-submittal meetings.