guaranteed energy optimization - adensa · lighting, hvac, refrigeration, air compressors, etc. 1...
TRANSCRIPT
![Page 1: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/1.jpg)
Energy Integrated SolutionsGuaranteed Energy Optimization
Energy efficiency solutions for industrial and commercial customers for over 30 years
![Page 2: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/2.jpg)
2
EIS Procedure OverviewEnergy conservation and power improvement for equipment,
lighting, HVAC, refrigeration, air compressors, etc.
1 Purpose of New Procedures
2 New Process Description
3 New Pre-Assessment Questionnaire
4 Savings Estimate for Conditional Agreement
5
Electric Motor Loads
6
Motor Controls
7
Survey Software
8
Facility Information
9
10
HVAC & Refrigeration Systems
Group Discussion
![Page 3: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/3.jpg)
3
The Why is Important
As technology has advanced within various industrial
and commercial facilities, modifications to our process
must be improved.
▪ Insure proper sizing of available treatments
▪ Identify potential issues prior to design and
project implementation
▪ Properly identify all available and applicable
ECM opportunities to maximize savings
potential
▪ Provide additional operational improvements
that could assist in advancing the project
▪ Ensure proper information is obtained for
baseline analysis and M&V purposes
![Page 4: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/4.jpg)
4
EIS Optimization Process
Straight forward path to a customized solution
![Page 5: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/5.jpg)
5
EIS Optimization ProcessStraight forward path to a customized solution
1I n i t ia l
Assessment
2 3 4Measurement
& VerificationIns ta l la t ionEngineering
& Design Study
![Page 6: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/6.jpg)
6
Customer
Authorization
▪ 12 months electrical bills
▪ Walk through of facility
▪ Installation of meters
1.1 Facility Review
▪ Savings an payback ranges
estimated
▪ Cost for Facility Energy and Electrical
Reliability Assessment provided
2.1 Justification Summary
▪ Initial presentation of
Measurement and Verification
methodology presented
▪ Initial estimate of appropriate
technologies discussed
2.2 Presentation
of expected results
▪ Very extensive site survey of all electrical
equipment & systems
▪ Evaluation of existing equipment & systems
▪ Timing to complete project
▪ Finalized project cost, guaranteed
payback period, and other key data
2.3 Facility Energy &
Electrical Reliability
Assessment
▪ Done to appropriate national, local,
& corporate specific facility codes
▪ On site project manager
▪ Minimize impact on facility
operations
3. Technology Installation
▪ Determine appropriate
▪ methodology and variables
4.1 Measurement
NTP
▪ Customized verification per IPMVP
standard schedules B and C✓ Schedule B would include long-term
metering✓ Take into account operational
variables such as production, climate conditions, down time, occupancy,
etc.
4.2 Verification Project performance
guaranteed underwritten by
![Page 7: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/7.jpg)
7
The New Process Overview
▪ Internal client qualification and discussion prior to initial meeting or
discussion with operations or management personnel
▪ Pre-Assessment Questionnaire
✓ Customization of data acquired based on general knowledge of
client’s operation type
✓ Potential opportunity for data analysis of existing systems
✓ Additional data requirements identified
✓ Potential for Webinar with Affiliate, EIS, and operations personnel
▪ Post facility walk-through meeting and review of best steps for
advancing each customized assessment proposal
![Page 8: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/8.jpg)
8
The New Process OverviewContinued…
▪ Design of customized assessment and procedures
▪ Metering and specific systems analysis
▪ Electrical reliability assessments
▪ Compressed Air Surveys
▪ Steam Trap Surveys
▪ Retro-commissioning analysis
▪ Etc.
▪ Generation and Presentation of Facility Energy Assessment Report
and ECM Project Proposal
![Page 9: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/9.jpg)
9
Customer oriented Benefits and Solutions
Significantly Increased Savings and Operational
Improvements can be properly identified!
▪ Improved system functionality
▪ Improved production rates customer satisfaction
▪ Stability and reliability of various systems and
equipment improved
▪ Measurement and Verification process improved
▪ Allows for ongoing services to provide and
advance each client relationship
▪ Can significantly increase overall operational
savings
Savings Estimates for Conditional Agreement
![Page 10: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/10.jpg)
10
Survey Tool Development
A comprehensive survey system is being
developed and continuously improved
upon to provide the best tools at your
disposal for each client opportunity
![Page 11: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/11.jpg)
11
Additional Survey Data Requirements
![Page 12: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/12.jpg)
12
Customer oriented Benefits and Solutions
Some of the additional data requirements
include:
▪ Utility & water cost and consumption information
▪ Transformer Information
▪ MCC Panel Identification
▪ Electrical One-line Diagrams
▪ Equipment Asset list (if available)
▪ Previous system studies (if applicable)
▪ Electrical Main & Subpanel metering data
Facility and Electrical System Data
![Page 13: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/13.jpg)
13
Customer oriented Benefits and Solutions
Some of the additional data requirements could include the following:
▪ System name plate data
▪ Subpanel Identification
▪ Closed loop/ Open loop identification
▪ System capacity
▪ GPM
▪ Delta T
▪ Temperature set points
▪ BMS data if logged and available
▪ Cooling tower Information
▪ Etc.
HVAC & Refrigeration Systems
![Page 14: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/14.jpg)
14
Customer oriented Benefits and Solutions
Some of the additional data requirements include:
▪ Subpanel Identification
▪ Load type
▪ Motor Type
▪ Motor Make and Model
▪ Rated HP
▪ RPM
▪ FLA
▪ PF
▪ Eff
▪ Measured power quality readings
▪ Etc.
Electrical Motor Loads
![Page 15: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/15.jpg)
15
Customer oriented Benefits and Solutions
In addition to the electric motor information, the additional data requirements could include the following:
▪ Location of Motor Controls relative to motor
▪ Motor controls use for application
▪ Power Quality Measurement Readings
▪ Soft Start or VFD Make & Model
▪ Pictures of motor controls
▪ Load Utilization Information
▪ TOR or Auxiliary bypass present
▪ Relay voltage rating
▪ Ever run backwards or Overclocked
▪ Etc.
Electric Motor Controls
![Page 16: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/16.jpg)
16
Key PointsConclusions
1. We are an engineering company ▪ We use data to show opportunities for reduction▪ We use data to develop designs
▪ We use data to provide savings
2. We utilize proven technology▪ Our solutions are specific to our clients’ entire
electrical systems
▪ Our solutions are based on basic, electrical
principles
3. The EIS guarantee. You get what we told you!▪ Project performance insured through Lloyds of
London
▪ We under-promise and over-deliver
![Page 17: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/17.jpg)
17
Your Input is Valuable to Advancing our
Mutual Business Opportunities!
Questions and answers
![Page 18: Guaranteed Energy Optimization - Adensa · lighting, HVAC, refrigeration, air compressors, etc. 1 Purpose of New Procedures 2 New Process Description 3 New Pre-Assessment Questionnaire](https://reader034.vdocuments.site/reader034/viewer/2022051922/60102e9ebfe7b032d9672c26/html5/thumbnails/18.jpg)
Energy Integrated Solutions650 Hamilton Ave, Suite J
Atlanta, GA 30312
404-937-6547 (office)
www.energyintegratedsolutions.com
Energy efficiency solutions for industrial and commercial customers for over 30 years