Petroleum Development Oman L.L.C.
Document: Contract HSE Management:
Document ID GU-140 (Preparation for Contract C9)
Document Type Guidance
Security Un-Restricted
Di i li M t S f t & E i t
-
7/30/2019 GU-140 (C9)
2/19
Di i li M t S f t & E i t
Contract Holders: Do NOTInclude this page in the Contract
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
DOCUMENT Authorisation
-
7/30/2019 GU-140 (C9)
3/19
Contract Holders: Do NOTInclude this page in the Contract
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
The following is a brief summary of the four most recent revisions to this document. The
Document Custodian holds details of all revisions prior to these on file.
Revision No. Date Author Scope / Remarks
Rev 3.9 01/03/2012 CORPORATEHSE12
Revision to reflect the changes in the PR1171 Part 1 and
Part II. The revision includes, Letter of Assurance, Life
Saving Rules and a section 11 where the Contract Holder
may detail specific requirements.
2002 IssueRev 2.0
09/Oct/02 CSM/1 Revision to ensure consistency with SP1171 Part I and ParII. Chapters renumbered in logic sequence.
2002 Issue
Rev 1.0
July 02 CSM/1 New format. Minor editorial changes. Document now in
line with changes made to SP 1171 Part II. Advisory
comments added for Contract Holders. New sections
added on Commencement Certificate (formerly HSE
Certificate) and STOP programme. Paragraph added on
obligations of contractors under the General
Conditions. Consequence column deleted from Hazard
Table in Section 2. Reference documents changed in line
with new HSE-MS documents.
Note that this revision was NOT formally issued as a
completed document. It was however included on the
HSE-MS CD-ROM (Sept/2002).
User Notes:
-
7/30/2019 GU-140 (C9)
4/19
Contract Holders: Do NOTInclude this page in the Contract
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
Related Business Processes & CMF Documents
Related Business Processes
Code Business Process (EPBM 4.0)
Parent Document(s)
Doc. No. Document Title
CP 122 HSE Management System Manual
Other Related CMF Document(s)
Doc. No. Document Title
PR 1171 Pt
I & II
Contract HSE Management
-
7/30/2019 GU-140 (C9)
5/19
Contract Holders: Do NOTInclude this page in the Contract
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
Contents
Related Business Processes & CMF Documents1. Introduction
1.1 PURPOSE1.2 SCOPE1.3 RESPONSIBILITY1.4 REVIEW AND IMPROVEMENT
Appendix I: DOCUMENT C-09 HSE REQUIREMENTS1. Contractors HSE Management System & Contract HSE Management Plan2. Hazard Identification and Management Process (HEMP)3. HSE Training4. Commencement Certificate5. Performance Monitoring and Reporting6. HSE Incidents7. Site Restoration8. HSE Non-Compliance Penalties9. Behaviour and Assurance10 Applicable Doc ments
-
7/30/2019 GU-140 (C9)
6/19
Contract Holders: Do NOTInclude this page in the Contract
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
1. Introduction
1.1 Purpose
This document provides guidance for PDO Contract Holders (and other contract
personnel) in the preparation and use of the C-09 HSE Requirements section of
PDOs standard contract documentation i.e. HSE minimum requirements.
Appendix 1 provides the pro-forma of Section C-09 which shall be made
Contract Specific by the Contract Holder and/or Contract Engineer.
The purpose of Section C-09 of PDOs standard contract documentation is to:
Act as the enforceable contractual link to PDOs applicable HSE ManagementSystem documentation.
Determine and highlight the hazards related to the execution of the Work andServices under the Contract. Define how those hazards will be managed so
that risk is eliminated or minimized to ALARP (As Low As ReasonablyPractical).
Detail the requirements for Contractors to examine the proposed Scope ofWorks (Section C-4).
1.2 Scope
All Work or Services under Contract to PDO shall conform to the Document C-
09 HSE Requirements as detailed in Appendix 1 this document.
-
7/30/2019 GU-140 (C9)
7/19
Contract Holders: Do NOTInclude this page in the Contract
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
Appendix I: DOCUMENT C-09 HSE REQUIREMENTS
-
7/30/2019 GU-140 (C9)
8/19
Contract Holders: Do NOTInclude this page in the Contract
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
This page is left blank intentionally and shall not be included in the Contract Document.
-
7/30/2019 GU-140 (C9)
9/19
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
Petroleum Development Oman L.L.C.
DOCUMENT C-09HSE REQUIREMENTS
(Revision 3.9)
-
7/30/2019 GU-140 (C9)
10/19
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
1. Introduction1.1 PURPOSE1.2
SCOPE
1.3 RESPONSIBILITY1.4 REVIEW AND IMPROVEMENT
Appendix I: DOCUMENT C-09 HSE REQUIREMENTS1. Contractors HSE Management System & Contract HSE Management Plan2. Hazard Identification and Management Process (HEMP)3. HSE Training4. Commencement Certificate5. Performance Monitoring and Reporting6. HSE Incidents7. Site Restoration8. HSE Non-Compliance Penalties9. Behaviour and Assurance10.Applicable Documents11. PDO HSE Specific Details
Attachment 1 - Applicable DocumentsAtt h t 2 HSE T i i R i t
-
7/30/2019 GU-140 (C9)
11/19
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
All Work and Services executed as part of this Contract shall conform to the HSERequirements as detailed in this section C9 of the Contract.
1. Contractors HSE Management System &Contract HSE Management Plan
1.1.The Contractor shall have a developed HSE Management System that iscompatible with Companys HSE Management System as described in CP-122
HSE Management System Manual Rev. 5.
1.2.The Contractor shall submit a Contract HSE Management Plan (HSE plan)describing the specific actions, programs and procedures that will be
implemented by the Contractor to manage hazards associated with the
execution of the Work and Services under the Contract.1.3.The HSE Management Plan will include a completed HEMP review
incorporating all activities in the scope of the contract (see 2 below).
1.4.The HSE Management Plan shall be developed in accordance with the ContractHSE Management Procedure PR-1171, Part II section 2.6.
1.5.The Contract HSE Management Plan shall cover all Contract Phases frommobilisation through execution, demobilisation and site restoration.
1.6.The requirements specified in this section C-09 apply regardless of the status ofan activity (e.g. standing by or demobilised).
1.7.Contractor shall ensure that any person, admitted to site by the Contractor orSub Contractor shall comply with the relevant HSE specification herein.
2. Hazard Identification and Management Process (HEMP)
2.1.The Company has reviewed the content of the Work/Services to be providedunder the Contract and has identified activities/tasks and hazards that, as a
i i h ld b id d b th C t t h d l i th t t
-
7/30/2019 GU-140 (C9)
12/19
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
Use of electrical
Hand Tools
Electrical power Electrocution tools without correct
plugs, damaged
insulation
Construction WasteCollection
Nails sharp andheavy objects
Worker impactswith nail and
receives puncture
wound
Denailing ofmaterials not
managed,
Pressure testing Air or liquid
under pressure
Catastrophic release
of contents
No test pack checks
before activity,
Gas Welding Flammable gas
under pressure
Leak of gas and
ignition
No gas flash back
arrester, gas leaks,
unsecured cylinders,welding or cutting
near flammable
fluids, fumes, open
flame, arcing, UV
light, heat stress,
Painting Toxic fumes Build up of toxic
vapours in enclosedarea
None or little
ventilation,inappropriate
respiratory
protection, worker
not aware of the risks
Chemical Cleaning Toxic/Flammabl
e/Harmful/corro
sive material
Crude oil & diesel,
paints & coatings,
oils & greases,
l t id d
-
7/30/2019 GU-140 (C9)
13/19
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
2.2The Contractor shall prepare and implement comprehensive HEMP as part of theHSE Management Plan prior to Commencement of the Work or Services as per PR1171 Part II Appendix 6.
3. HSE Training3.1.The Contractor shall provide, as a minimum, HSE training for Contractor
Personnel in accordance with the minimum HSE training requirements as listed
in Attachment 2 of this C9 document.
3.2.Training MatrixContractor shall at all times maintain an up to date list of allpersonnel employed under the contract, and details of the training courses they
have attended, including the attendance date. Appendix PR1171 Part II?
The Contract Holder shall insertinto this C-09 (as Attachment II) the standard
minimum HSE training requirements. The list shall be made specific for this
contract by deleting courses that are not applicable.
Refer to SP 1157 HSE Training Specification for further information regarding
HSE training requirements.
3.3.The Contractor shall bear all costs of meeting the HSE training requirements ofthe contract.
4. Commencement Certificate
The Contract Holder shall sign the commencement certificate (reference
PR1171 Part II Appendix 1) when the Contractor has confirmed that they are in
f di h k d d h ifi h
-
7/30/2019 GU-140 (C9)
14/19
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
5. Performance Monitoring and Reporting
The Contract Holder shall ensure that there is an agreed Company, HSEmonitoring plan, in line with the requirements of PR1171 Part I Appendix 2.
This should reflect the annual, monthly, weekly etc targets that have been agreedwith the contract team.
5.1.The Contractor shall regularly monitor HSE performance as per the agreedContract HSE Management Plan and shall complete and submit the Health and
Safety Statistics - Monthly Return (Appendix 4 of PR 1171 Contract HSE
Management Part II) to the Contract Holder. This should be submitted not later
than 1600 hrs on the last day of the calendar month.
6. HSE Incidents
The Contract holder needs to ensure that the Contractor is aware of the
recording and reporting of incidents including Near Miss reporting. The hard
copy versions for reporting refer to PR1171 Part II Appendix 4.
The Contractor shall report to Company and shall investigate all work-related
HSE incidents, and comply with the requirements as outlined in the latest
version of Companys Incident Notification, Analysis, Reporting and Follow-up
Procedure (PR 1418).
7. Site Restoration
Upon Completion of the Work or Services, the Contractor shall satisfactorily
restore the Site, including any areas of the Company concession area and any
i th d b th C t t t f th W k S i
-
7/30/2019 GU-140 (C9)
15/19
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
8. HSE Non-Compliance Penalties
The Contractors obligation to consistently adhere to the Contracts HSErequirements is considered by PDO as being the direct responsibility of the
Contractors supervisor and management. The clauses below are standard
penalty clauses that are to be included. Adding incentive schemes (bonus) for
good HSE performance is good practice and should be considered but the
criteria for award MUST be robust. A sample Default form is available and can
be referenced in PR1171 Part 1 Appendix B.
8.1.Repeated failure by the Contractor to comply with contract HSE obligationsmay result in the removal from site of the relevant Contractors supervisory
and/or managerial personnel.
8.2.In the event that the Company considers that the Contractor has failed tocomply with the latest approved Contract HSE Management Plan, or other HSE
Requirements, then Company shall issue the Contractor with an HSE Default
Notice.
8.3.An HSE Default Notice is any written notification issued by the Companydetailing specific aspects of the Works or Services that do not comply with
either the latest approved Contract HSE Management Plan or other Contract
HSE Requirements.
8.4.For each HSE Default notification the following amounts will become due to
th C
-
7/30/2019 GU-140 (C9)
16/19
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
9. Behaviour and Assurance
9.1.STOPThe Contractor shall fully implement a Safety Training Observation
Programme, or Company approved equivalent, in accordance with the
Companys Specification SP 1259 STOP.
Contract Owner
The Contract Owner shall decide whether STOPTM or an equivalent programme
shall be implemented in a contract or not.
As a general guide, STOPTMor an equivalent programme, shall be implementedin all contracts except those that are of a non-operational nature (e.g.: an
insurance contract). Formal deviation not to implement STOP TM or an
equivalent programme shall be given by the Service Group Custodian for the
type of work covered in the contract.
9.2.Life Saving Rules
The LSRs are an important part of PDO business and it is imperative that the
Contractor is fully knowledgeable of the 12 rules including, how to communicate
and embed them into the activities of the contract. Ensure the Contractor knows
where to find the details and commitment forms as well as the discipline matrix
for rule breakers.
http://sww1.pdo.shell.om/dept/cd/csm/blocks/hsefunction/lifesavingrules.asp
-
7/30/2019 GU-140 (C9)
17/19
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
The Contractor Chief Executive Officer (CEO) shall submit an HSE Letter of
Assurance (LoA) every year before 1st March to Company. The LoA is a
confirmation from the CEO, with or without qualifications, that the current
implementation status and integrity of the Contractor HSE management systemmeets the Contract requirements. Only one LoA per Contractor is required
covering all contracts with Company that are operational on 1 January of that
year. Company will issue the format and submission details for the LoA annually.
10. Applicable Documents
10.1. The Contractor shall comply with, the requirements of CompanysHealth, Safety and Environment Management System Manual (CP 122) Rev.5
and other documentation as listed in the tables in Appendix 1 and any
documents referenced therein.
As a minimum the Contract Holder shall check the latest Version Date of the
documents. The document list can be accessed on the CORPORATE HSE web
site. The contract holder is to update and/or delete documents that are notrelevant to the contract. Copy and paste the latest and appropriate list of
documents from the WEB.
HSE Documents
10.2. The Contractor may download Companys HSE Management System and other
documents via the World Wide Web (WWW). The site can be accessed through thefollowing URL, username and password:
URL h // d /h f /
http://sww1.pdo.shell.om/dept/cd/csm/blocks/documentation/hsedocs.asphttp://sww1.pdo.shell.om/dept/cd/csm/blocks/documentation/hsedocs.asphttp://sww1.pdo.shell.om/dept/cd/csm/blocks/documentation/hsedocs.asp -
7/30/2019 GU-140 (C9)
18/19
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
Attachment 1 - Applicable Documents
-
7/30/2019 GU-140 (C9)
19/19
Petroleum Development Oman LLCRevision: 3.9
Effective: March 2012
Page 1 of 19 GU-140 (C-09) : HSE in Contracts HSE Minimum Requirements Printed 25/08/13
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Attachment 2: HSE Training Requirements
The Contract Holder shall copy andinsert
at this location the standard minimum HSE training requirements as listed in SP1157 availablein PDO HSE Web Page. The list shall be made specific forthiscontract by deleting non applicable courses.