grupo gl construcciones y promociones sa de cv was founded over 13 years ago and is proud to be a...
TRANSCRIPT
Grupo GLGrupo GL
Grupo GL: INDUSTRIAL PARKS Grupo GL: INDUSTRIAL PARKS • Polígono Empresarial Santa Rosa:120,000 M2.• Polígono Empresarial La Griega: 100,000 M2.
Location MapLocation Map
National Cross National Cross RoadRoad
Nogales
FERROMEXKANSAS CITY SOUTHERN
OTHER FERROSUR
An Intermodal Complex System is being developed in Celaya City
Piedras Negras
Altamira
Nuevo Laredo
Ciudad Juarez
Tampico
Veracruz
Lázaro Cárdenas
Manzanillo
Mexicali
Monterrey
Guadalajara
Ciudad de México
Coatzacoalcos
Main PortsMain Ports
Containers Movement
Main AirportsMain Airports
MichoacánMichoacán
GuanajuatoGuanajuato
QuerétaroQuerétaro
San Luis PotosíSan Luis Potosí
JaliscoJalisco
Bajío 15km
Morelia 196km.
Querétaro 175km
Main Distances in the Main Distances in the GTO. Industrial CorridorGTO. Industrial Corridor
120 km
75 km
85 km
40 km
105 km
91 km
51 km
65 km
65 km
27 km
40 km
50 km
47 km
Localización centralLocalización central
Distance to Mexico City 248 KM
Distance to Querétaro 48 KM
Distance to San Luis Potosí 200 KM
Distance fto San Miguel de Allende 13 KM
Distance to Highway 57 21 KM
Distance to Bajío Airport 110 KM
Distance to Querétaro International Airport 65 KM
Location MapLocation MapBASE DE CLIENTES
50 Y 250 KMSBASE DE CLIENTES
50 Y 250 KMS
Population in 50 kmPopulation in 50 km
Purisima del Rincon
Valle de SantiagoPenjamo
Huanimaro
Abasolo
Romita
Cueramaro
Ciudad Manuel Doblado
Pueblo Nuevo
Irapuato
Salvatierra
Cortazar
Jaral del Progreso
Tarimoro
Jerecuaro
Apaseo el Alto
Celaya
Sta Cruz de Juventino Rosas
Villagran
Salamanca
Comonfort
Apaseo el Grande
Guanajuato
Leon
Silao
Ocampo
San Luis de la Paz
Dolores Hidalgo
Allende
San Diego de la Union
San Felipe
Atarjea
Santa Catarina
San Jose IturbideTierra Blanca
Doctor Mora
VictoriaXichu
ReferenciaNo.
ComunidadesPoblación
TotalPoblación. Masculina
Población Femenina
Población Economicamente
Activa
Población Economicamente Activa Masculina
Población Economicamente Activa Femenino
PI SAM 2,222 1,210,799 575,435 631,412 454,224 300,396 153,828
Master PlanMaster Plan
Infrastructure of theInfrastructure of theSan Miguel Piligono Empresarial Stage San Miguel Piligono Empresarial Stage
11 INTERNAL ROADS The internal roads have 21m width and was built with asphalt pavement 10cm thickness including a bicycle road each side of the street of 1.5m width December 2014 SIDE WALKS Both side of the street will have side walks built on 7cm concrete 1.5 width on main road and 1m width on secondary roads, all on both side of the street. ELECTRIC SUBSTATION Phase one an electric substation of 2T-3F-20 MVA 115/13.8 2/8 A 2.4 MVAR. February 2015Provitional 5mva’s power by november 2014. 250 kVA/ha
WATER TREATMENT PLANT (WTP) The WTP will be built according to NOM – 03 and will have a full capacity of 1.5 lt/sec. Will be built in 3 phases .05lt/sec each phase. 1st. Phase to be ready on December 2015 Price $5.38 Pesos VAT included.
WATER The park has 2 water wells with 448,560 cubic meters per year capacity.The park will build an elevated water tank 300 cubic meters capacity to distribute the water to each lot. December 20141 lt sq. meter/day, price $23.58 Pesos VAT included.
Infrastructure of theInfrastructure of theSan Miguel Piligono Empresarial Stage San Miguel Piligono Empresarial Stage
11 COMMUNICATIONS The park will have a Telmex substation. February 2015 ACCES ROADS Main access from “Carretera 111” that includes deceleration and acceleration lines according to SCT norms and regulations. February 2015 Expansion to 4 lines according to “Comision Estatal de Caminos” norms and regulations for the Corral de Piedras Road from Carretera 111 to the Park with a central ridge. December 2014
MANTENANCE
Price $0.40 Pesos per sq. meter total land
CONSTRUCTION
50% of the total land
Infrastructure and Services of theInfrastructure and Services of theSan Miguel Piligono EmpresarialSan Miguel Piligono Empresarial
•300 Acres/121 has.
•Available workforce in the surrounding Area
•Lots from 7600 m2
•Maion roads 21 mts wide
•Connections with the main highways within the country
•Water supply
•Electrical subestation
•Water treatment plant