GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

CHAPTER 3- ENVIRONMENTAL COMPLIANCE STATUS

S.No. Environmental Clearance Conditions Environmental Compliance

1) “Consent for Establishment” shall be

obtained from Haryana State Pollution

Control Board under Air and Water Act

and a copy shall be submitted to the

SEIAA, Haryana before the start of any

construction work at site.

Consent to Establishments has

been obtained prior to

construction. A copy of same is

enclosed as Annexure-I

2) A first aid room as proposed in the

project report shall be provided both

during construction and operation

phase of the project.

First Aid Room is being Provided

at site for Laborers as well as at

Hutments outside the project

site. Please refer Chapter 2B for

Photographs.

3) Adequate drinking water and sanitary

facilities should be provided for

construction workers at the site.

Provision should be made for mobile

toilets. Open defecation by the labors is

strictly prohibited. The safe disposal of

waste water and solid wastes generated

during the construction phase should

be ensured.

Water as drinking for laborers is

being provided by private water

tankers. Waste water is being

disposed using soak pits. Steel

Scrap, Tin, Cement Bags are

being sold to local vendor.

4) All the top soil excavated during

construction activities should be stored

for use in horticulture/landscape

development within the project site.

All the topsoil excavated during

construction phase has been

stored at isolated place and

utilized in Backfilling.

5) The Project proponent shall ensure that

the building material required during

construction phase is properly stored

a) A temporary store room

has been constructed for

storing the construction

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

within the project area and disposal of

construction waste should not create

any adverse effect on the neighboring

communities and should be disposed of

after taking necessary precautions for

general safety and health aspects of

people, only in approved sites with the

approval of competent authority.

material.

b) Construction waste

includes empty cement

bags; broken bricks, etc.

are being segregated

properly by the labor on

site.

c) Construction waste are

being sold to local vendors

6) Construction spoils, including

bituminous material and other

hazardous materials, must not be

allowed to contaminate watercourses

and the dump sites for such material

must be secured so that they should

not leach into the ground water and any

hazardous waste generated during

construction phase, should be disposed

off as per applicable rules and norms

with necessary approval of the Haryana

State Pollution Control Board.

a) No bituminous material

has been generated from

construction projects.

Small amount of

hazardous waste is being

generated due to used Oil

for DG sets and which is

stored in drums in

earmarked locations.

b) It is being handled as per

The Manufacture, Storage

and Import of Hazardous

Chemical Rules, 1989 and

Material Safety Data Sheet.

7) The diesel generator sets to be used

during construction phase should be

low sulphur diesel type and should

conform to Environment (Protection)

Rules prescribed for air and noise

emission standards.

Agreed. DG sets are being

utilized in case of power failure.

Noise Abatement: DG sets are

enclosed with acoustic enclosure

type

Fuel: Low Sulphur diesel will be

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

used in DG sets.

8) The diesel required for operating DG

sets shall be stored in underground

tanks and if required, clearance from

Chief Controller of Explosives shall be

taken.

DG Sets are being used for

backup purpose

The diesel required for the DG

sets is being purchased on daily

basis. If Storage is required,

permission from Explosive

Department will be taken.

9) Ambient noise levels should conform to

residential standards both during day

and night. Incremental pollution loads

on the ambient air and noise quality

should be closely monitored during

construction phase. Adequate measures

should be taken to reduce ambient air

and noise level during construction

phase, so as to conform to the

stipulated standards.

a) Incremental pollution loads

on the ambient air and

noise quality are being

closely monitored and test

reports are within the

permissible limits.

b) Test Result is enclosed as

Annexure II.

10) Fly ash should be used as building

material in the construction as per the

provisions of Fly Ash Notification of

September, 1999 and amended as on

27th August, 2003.

The fly ash mix cement and fly

ash bricks will be used in the

project as per the provisions of

Fly Ash Notification of

September, 1999 and amended

as on 27th August, 2003.

11) Storm Water Control and its re-use as

per CGWB and BIS Standards for

various applications should be ensured.

Strom Water control and its re-

use as per CGWB and BIS

standards are ensured.

12) Water demand during construction

should be reduced by use of pre-mixed

RMC is being used for preparing

Ready mix Concrete which uses

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

concrete, curing agents and other best

practices.

optimum water as required for

construction and water used for

curing used to re-circulate again

and again in order to reduce

water usage. Curing agents like

Aquamine 721, 427 will be used

for fast curing of concrete and to

reduce the water demand.

13) In view of the severe constrains in water

supply augmentation in the region and

sustainability of water resources, the

developer will submit the NOC from

CGWA specifying water extraction

quantities and assurance from HUDA/

utility provider indicating source of

water supply and quantity of water with

details of intended use of water- potable

and non- potable. Assurance is required

for both construction and operation

stages separately. It shall be submitted

to SEIAA and RO, MoEF, Chandigarh,

before the start of construction.

Assurance of water supply has

been submitted along with the

proposal. STP water from

Authority is being utilized in

construction activities.

Dual Plumbing lines will be used

in order to prevent the water loss

and to provide a solution for

reuse of water in flushing and

gardening.

14) Roof should meet prescriptive

requirement as per Energy Conservation

Building Code by using appropriate

thermal insulation material.

Agreed. While preparing the roof

of the building during

construction phase it will be kept

in mind that prescriptive

requirement as per Energy

Conservation Building Code will

be adopted and appropriate

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

thermal insulation materials will

be used.

15) Opaque wall should meet prescriptive

requirement as per Energy Conservation

Building Code which is proposed to be

mandatory for all air conditioned spaces

while it is desirable for non-air-

conditioned spaces by use of

appropriate thermal insulation material

to fulfil requirement.

Opaque wall will be made as

such to meet prescriptive

requirement of maximum U

Factor and minimum R factor for

maximum insulation.

16) The approval of the competent authority

shall be obtained for structural safety of

the building on account of earthquake,

adequacy of firefighting equipment, etc.

as per National Building Code including

protection measures from lightening etc.

If any forestland is involved in the

proposed site, clearance under Forest

Conservation Act shall be taken from

the competent Authority.

a) To deal with any fire

related accident,

firefighting facility of single

handed hydrant valve, long

hose reel, and portable fire

extinguisher will be

provided.

b) The project falls under

seismic active Zone IV

indicating high damage

risk zone. The buildings

will be designed as

earthquake resistant and

comply with the required

IS specifications.

Structural safety of the

building due to

earthquake, adequacy of

firefighting equipment, etc.

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

as per the National

Building Code 2005

including protection

measures from lightening

etc.

c) Certificate from Structural

engineer will be submitted

in next compliance report

17) Overexploited groundwater and

impending severe shortage of water

supply in the region requires the

developer to redraw the water and

energy conservation plan. Developer

shall reduce the overall footprint of the

proposed development. Project

proponent shall incorporate water

efficiency/ saving measures as well as

water reuse/ recycling within 3 months

and before start of construction to the

SEIAA, Haryana and RO, MoEF, GOI,

Chandigarh.

We have already been submitted

the water efficiency/saving

measure with water balance

diagram to SEIAA, Haryana.

18)

The project proponent as stated in the

proposal shall construct 21 nos. rain

water harvesting pits for recharging the

ground water within the project

premises. Rain water harvesting pits

shall be designed to make provisions for

silting chamber and removal of floating

matter before entering harvesting pit.

a) Total of 21 rain water

harvesting pits is

proposed. Construction of

RWH pit will be started

soon.

b) Silting chamber will be

constructed for removal of

floating matter before

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

Maintenance budget and persons

responsible for maintenance must be

provided. Care shall also be taken care

that contaminated water do not enter

any RWH pit.

entering harvesting pit.

c) Persons will be hired for

maintenance of rain water

harvesting pits.

d) Provision will be made for

contaminated water does

not enter any RWH pit.

19) The project proponent shall provide for

adequate Fire Safety measures and

equipments as required by Haryana

Service Act, 2009 and instruction

issued by the local

Authority/Directorate of fire from time

to time. Further the project proponent

shall take necessary permission

regarding fire safety scheme/NOC from

competent Authority as required.

This will be followed.

20) The project proponent shall submit

assurance from DHBVN for supply of

6414 KW of power supply before the

start of construction. In no case project

will be operational solely on generators

without any power supply from any

external power utility.

Temporary Power requirement is

being provided by DHBVN.

Assurance from DHBVN

regarding assurance of power

supply during Operation phase

will be sent with forthcoming

compliance report.

21) Detail calculation of power load and

ultimate power load of the project shall

be submitted to DHBVN under

intimation to SEIAA, Haryana before the

start of construction. Provisions shall be

This will be followed. The

Ultimate Power load will be

known after development/

construction of colony/ building

as per the approved building

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

made for electrical infrastructure in the

project area.

plans by the Director General,

Town and Country Planning,

Chandigarh, Haryana.

22) The Project Proponent shall not raise

any construction in the natural land

depression/ Nallah/ water course and

shall ensure that the natural flow from

the Nallah/ Water course is not

obstructed.

There is no natural land

depression/ Nallah/ water

course in the project site. Natural

flow during rainy season will not

be obstructed as weep holes will

be provided to avoid any such

obstruction.

23) The project proponent shall keep the

plinth level of the building blocks

sufficiently above the level of the

approach road to the project as per

prescribed by-laws. Levels of the other

areas in the projects shall also be kept

suitably so as to avoid flooding.

Plinth level of the building blocks

will be made sufficiently above

the level of the approach road.

Level of the other areas will be

kept suitably above the approach

road level.

24) Construction shall be carried out so

that density of population doesn’t

exceed norms approved by Director

General Town and Country Planning

Department, Haryana.

It will be followed.

25) The Project Proponent shall submit an

affidavit with the declaration that

ground water will not be used for

construction and only treated water

should be used for construction.

No ground water is being utilized

in construction phase. Affidavit

regarding this will be submitted

with forthcoming compliance

report.

26) The Project Proponent shall not cut any

existing tree and project landscaping

No any tree was existing in

project site.

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

plan should be modified to include

those trees in green area.

27) The Project Proponent shall provide 3

meter high barricade around the project

area, dust screen for every floor above

the ground, proper sprinkling and

covering of stored material to restrict

dust and air pollution during

construction.

At present, the site is enclosed by

3 m fencing.

Sprinkling of water is being done

to suppress the fugitive dust

28) The project proponent shall construct a

sedimentation basin in the lower level of

the project site to trap pollutant and

other wastes during rains.

It will be followed and rain water

harvesting will be done through

these.

29) The project proponent shall provide

mobile sulabh toilets instead of soak pit

during construction phase for disposal

of sullage.

Mobile toilets at the site is being

provide at the site while in

hutment Soak Pit type of toilet is

being provided.

30) The project proponent shall ensure that

the U- value of the glass is less than

3.177 and maximum solar heat gain co-

efficient is 0.25 for vertical fenestration.

This will be followed at the time

of glass work of the towers.

31) The project proponent shall adequately

control construction dusts like silica

dust, non-silica dust, wood dust. Such

dust shall not spread outside project

premises. Project proponent shall

provide respiratory protective

equipment to all construction workers.

STP water is being used to

suppress the dust from site. No

wood work will be carried out at

the site. At project site proper

respiratory protective equipment

will be provided to all

construction workers

32) The project proponent shall ensure The plinth level of Building

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

plinth level of the building block is 1.5

meter above 100 years flood level of the

said Najafgarh Jheel.

Blocks is above to flood level of

the said Najafgarh Jheel

33) The project proponent shall obtain NOC

from HUDA as well as Irrigation

Department before the start of

construction, regarding possible adverse

effect of the project proposal on the said

Najafgarh Jheel.

The NOC from HUDA and

Irrigation department will be

submitted with forthcoming

compliance report.

34) The project proponent shall develop

complete civic infrastructure of the

Group Housing Colony including

internal roads, green belt development,

sewerage line, Rain Water recharge

arrangements, Storm Water drainage

system, Solid Waste Management Site

and provision for treatment of bio-

degradable waste, STP, water supply

line, dual plumbing line, electric supply

lines etc. And shall offer possession of

the units/ flats thereafter.

All the amenities and facilities

will be provided as mentioned in

proposal and commitment made

during presentation before

SEIAA, Haryana.

35) The project proponent shall provide one

refuse area till 24 meter, one till 39

meter and one after every 15 meter as

per National Building Code.

Not Required as each flats have

own balcony.

36) The project proponent shall provide fire

control room and fire officer for building

above 30 meter as per National Building

Code.

It will be followed. Provision for

separate fire control room will be

insured.

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

37) The project proponent shall obtain

permission of Mines and Geology

Department for excavation of Soil before

the start of construction.

All the excavated soil has been

stored in the campus only.

38) The project proponent shall seek

specific prior approval from concerned

local Authority/ HUDA regarding

provision of Storm Drainage and

sewerage system including their

integration with external services of

HUDA/ Local Authorities beside other

required services before taking up any

construction activity.

All the necessary approval from

concerned local Authority/

HUDA regarding provision of

Storm Drainage and sewerage

system including their

integration with external services

of HUDA/ Local Authorities will

be taken.

39) The site for solid waste management

plant be earmarked on the layout plan

and the detailed project for setting up

the solid waste management plant shall

be submitted to the authority within

one month.

Solid waste will be collected by

using door to door network.

Collection will be done in the

campus and will be sent to the

municipal solid waste

management site. Biodegradable

waste produced at site will be

given to authorized recycler for

vermicomposting.

40) The project proponent ensures that no

construction activity is undertaken

either on surface or below or above

surface of revenue rasta passing

through the project area.

It is ensured that no

construction activity will be

undertaken either on or below or

above revenue rasta passing

through the project area.

41) The project proponent shall indicate the

width and length of revenue rasta

This will be followed.

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

stretch, for awareness of public, Sign

boards shall also display the message

that this is public rasta/road and any

citizen can use it. There shall not be

any gate with or without guards on

revenue rasta.

42) The project proponent shall submit the

copy of fire safety plan duly approved by

Fire Department before the start of

construction.

Copy of fire safety plan has

already been submitted to SEIIA,

Haryana.

43) The project proponent shall provide

helipad facility as required under NBC

Norms and shall seek permission of

helipad from AAI accordingly

This will be followed as the

maximum height of building will

be 95.50 meters.

44) The project proponent shall not raise

any construction activity in the ROW

reserved/ acquired for High Tension

Wire Passing through the project area

and shall maintain horizontal and

vertical ROW as required under Indian

Electricity Rules, 1956/DHBVN latest

instruction.

This is being followed.

45) The project proponent shall provide rain

water pumping system in the project

area to avoid water logging in the

project area.

However water logging at the site

is rare but at some moment

water may be logged mostly

during rainy season. At this

moment water logging will be

prevented by using water

pumping system.

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

OPERATION PHASE

a) “Consent to Operate” shall be

obtained from Haryana State

Pollution Control Board under Air

and Water Act and a copy shall be

submitted to SEIAA, Haryana.

This will be followed after

completion of construction phase

and prior to Operation Phase of

the project.

b) The Sewage Treatment Plant (STP)

shall be installed for the treatment

of the sewage to the prescribed

standards including odor and

treated effluent shall be recycled.

The installation of the STP should

be certified by an independent

expert and a report in this regard

shall be submitted to the SEIAA,

Haryana before the project is

commissioned for operation.

Tertiary treatment of waste water is

mandatory. Tertiary treatment of

waste water is mandatory. The

project proponent shall remove not

only ortho phosphorus but total

phosphorus to the extent of less

than 2 mg/liter. Similarly total

Nitrogen level shall conform to the

norms and standards of

CPCB/HSPCB, whichever is

environmentally better, Project

Proponent shall implement such

a) STP of capacity 790 KLD

(450 KLD of STP in Phase-i

while 340 KLD of STP in

Phase-II) will be installed

at the site. Civil work of

phase-I STP is being done.

b) Persons will be deputed for

handling and managing of

STP.

c) Treated effluent will be

reused in flushing,

horticulture and

recreational activities like

sprinkling on road etc.,

dual plumbing plan will be

adopted for the same.

d) All the parameters are

measure by HSPCB and

are under prescribed limit

of CPCB

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

STP technology which does not

require filter backwash.

c) Separation of the grey and black

water should be done by the use of

dual plumbing line. Treatment of

100% grey water by decentralized

treatment should be done ensuring

that the re-circulated water should

have BOD less than 10 mg/ltr and

the recycled water will be used for

flushing, gardening and DG set

cooling etc. achieve zero exit

discharge.

Dual Plumbing line will be

provided for the separation of the

grey and black water generated

from site. Dual Plumbing Plan

Already has been submitted to

SEIAA, Haryana. Treated water

from In-house STP will be

recirculated through dual

plumbing system to achieve zero

exit discharge.

d) For disinfection of the treated

wastewater ultra-violet radiation of

ozonization process should be used.

This will be followed during

installation of STP at site.

e) Diesel power generating sets

proposed as source of back-up

power for lifts, common area

illumination and for domestic use

should be enclosed type and

conform to rules made under the

Environmental (Protection) Act,

1986. The location of the DG sets

shall be in the basement as

promised by the project proponent

with appropriate stack height above

the highest roof level of the project

as per the CPCB norms. The diesel

Proposed Diesel Generator will be

used only in case of normal

power Failure.

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

used for DG sets shall be ultra-low

Sulphur diesel ( 0.05 % sulphur),

instead of low Sulphur diesel.

g) The project proponent as stated in

the proposal should maintain at

least 32.86% green cover area for

tree plantation especially all around

the periphery of the project and on

the road sides preferably with local

species which can provide

protection against noise and

suspended particulate matter. The

open spaces inside the plot should

be preferably landscaped and

covered with vegetation/grass,

herbs and shrubs. Only locally

available plant species shall be

used.

This will be followed. Greenbelt

will be developed as per plan

submitted to SEIAA and will be

32.86 % of the total Plot Area.

h) The project proponent shall strive to

minimize water in irrigation of

landscape by minimizing grass

area, using native variety,

xeriscaping and mulching utilizing

efficient irrigation system,

scheduling irrigation only after

checking evapo- transpiration data.

Agreed. Irrigation of landscape by

minimizing grass area, using

native variety, xeriscaping and

mulching utilizing efficient

irrigation system will be used to

minimize the water demand.

Irrigation will be scheduled only

after checking evapo-

transpiration data.

i) Rainwater harvesting for roof run-

off and surface run-off, as per plan

a) Total 21 RWH pits will be

constructed as per the plan

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

submitted should be implemented.

Before recharging the surface run-

off, pre-treatment through

sedimentation tanks must be done

to remove suspended matter, oil

and grease. The bore well for

rainwater recharging shall be kept

at least 5 mts. above the highest

ground water table. Care should be

taken that the contaminated water

does not enter any RWH pit. The

project proponent shall avoid

Rainwater Harvesting of first 10

minutes of rainfall. Roof top of the

building shall be without any toxic

material or paint which can

contaminate rain water. Wire mess

and filters should be used wherever

required.

submitted to SEIAA,

Haryana.

b) Rainwater harvesting as

per plan for roof run-off

and surface run-off will be

implemented

c) Suspended matter, oil and

grease will be removed by

treatment before

recharging with surface

run-off.

d) The bore well for recharge

will be kept at least 5 mts.

above the highest ground

water table.

j) The ground water level and its

quality should be monitored

regularly in the consultation with

Central Ground Water Authority.

This will be followed.

k) There should be no traffic

congestion near the entry and exit

points from the roads adjoining the

proposed project site. Parking

should be fully internalized and no

public should be utilized.

Parking will be fully internalized.

Entry and exit point will be bell

shaped to minimize the traffic

congestion at the entry and exit

gate.

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

l) A report on the energy conservation

measures conforming to energy

conservation norms finalize by

Bureau of Energy Efficiency should

be prepared incorporating details

about building materials &

technology; R & U factors etc. and

submit to the SEIAA in three

month’s time.

Report on Energy conservation

measures and details about

building materials & technology;

R & U factors etc. have been

submitted with proposal.

m Energy conservation measures like

installation of LED for lighting the

areas outside the building should

be integral part of the project design

and should be in place before

project commissioning. Use of solar

panels must be adapted to the

maximum extent possible for energy

conservation.

a) LEDs will be used wherever

possible as a measure of

energy conservation.

b) Use of T-5 and solar lighting

in open spaces, common

area, and landscape area for

lighting outside the building

will be the integral part of the

project design.

c) Used CFLs and TFLs will be

properly collected and

disposed of properly and will

be sent to authorized dealers

and recyclers so as to avoid

mercury contamination.

n) The project proponent shall use

zero ozone depleting potential

material in insulation, refrigeration,

air conditioning and adhesive.

Project proponent shall also provide

Agreed. We will encourage and

aware resident to use zero ozone

depleting potential material in

insulation, refrigeration, air

conditioning and adhesive.

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

Halcon free fire suspension system.

0) The solid waste generated should be

properly collected and segregated as

per the requirement of the MSW

Rules, 2000 and as amended from

time to time. The bio-degradable

waste should be treated by

appropriate technology at the site

earmarked within the project area

and dry/inert solid waste should be

disposed off to the approved sites

for land filling after recovering

recyclable material.

This will be followed during

operation phase as:

a) The solid waste will be

collected and segregated as

per the requirement of the

MSW Rules, 2000.

b) The bio-degradable waste

will be composted by using

organic waste converter at

the site earmarked within

the project area, and this

will be implemented in the

near future.

c) Dry/inert solid waste will

be disposed off to the

approved sites for land

filling after recovering

recyclable material.

p) The provision of solar water heating

system shall be as per norms

specified by HAREDA and shall be

made operational in each building

block.

Each tower will be equipped with

solar water heating system as per

HAREDA norms.

q) The traffic plan and the parking

plan proposed by the project

proponent should be adhered to

meticulously with further scope of

additional parking for future

Traffic plan and Parking will be

developed as per plan submitted

to SEIAA, Haryana.

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

requirement. There should be no

traffic congestion near the entry

and exit points from the road

adjoining the proposed project site.

Parking should be fully internalized

and no public space should be

used.

r) The project shall be operationalized

only when HUDA/ public authority

will provide domestic water supply

system in the area.

This will be followed.

s) Operation and maintenance of STP,

solid waste management and

Electrical Infrastructure, pollution

control measures shall be ensured

even after the completion of the

Project.

Agreed. Operation and

maintenance of STP, solid waste

management and Electrical

Infrastructure will be ensured for

lifetime as contract will be done

by various agencies and all these

conditions will be mentioned in

the MOU signed with RWA at the

time of handing over the project

t) Different types of Wastes should be

disposed off as per the provisions of

Municipal Solid Waste, biomedical

waste, Hazardous waste, e- waste,

batteries and plastic rules made

under Environment Protection Act,

1986. Particularly e-waste and

battery waste shall be disposed of

as per existing E-waste

a) Different type of solid

waste will be generated

and collected in colored

bins (green, blue and dark

grey) separate for bio-

degradable and non-

biodegradable are proposed

to be provided at the

strategic locations within

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

Management Rules 2011 and

Batteries Management Rules 2001.

The project proponent should

maintain a collection center for E-

waste and it should be disposed of

to only registered and authorized

dismantler/ recycler.

the site and will be done

according to solid waste

management plan

mentioned in Report.

b) Biodegradable waste will

be subjected to

composting. The inert solid

waste will be transported

to a local Solid Waste

dumping site.

c) E-waste will be collected by

the authorized recycler and

MoU for the same will be

done and submitted to the

office.

u) Standards for discharge of

Environmental pollutants as

enshrined in various schedules of

rule 3 of Environment Protection

Rule 1986 shall be strictly complied

with.

Air Pollution: Only source of Air

Pollution will be DG Set, stack

height will be maintained 6m

above the highest roof level for

better dispersion of Pollutant

generated from DG sets.

Noise Pollution: Only source of

Noise Pollution will be DG Set,

Enclosure and silencers will be

provided on the DG Set to reduce

the noise to impact the

surroundings.

Soil Pollution: Landscaping will

be done properly with the start of

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

construction work to prevent soil

pollution.

Water Pollution: STP of capacity

550 KLD has been installed and

treated effluent is reused in

Horticulture and Flushing

through Dual Plumbing Lines.

v) Water Supply shall be metered to

different residential units and

different utilities.

Separate meter will be provided

to the STP for measuring and

calculation of water demand.

w) The project proponent shall ensure

that the stack height of DG Sets is

as per the CPCB guidelines and

also ensure that the emission

standards of noise and air are

within the CPCB prescribed limits.

Noise and Emission level of DG Sets

greater than 800 KVA shall be as

per CPCB latest standards for high

capacity DG Sets.

Stack Height of DG Sets will be

maintained 6m above the height

of the tallest building and as per

CPCB norms

x) All electric supply exceeding 100

amps, 3 phases shall maintain the

power factor between 0.98 lag to 1

at the time of connection.

It will be followed.

y) The project proponent shall not use

fresh water for HVAC and DG

cooling. Air based HVAC system

should be adopted and only treated

water shall be used by project

a) Treated water from STP

will be reused in DG Set

Cooling.

b) Coil type cooling DG Sets

shall be used for saving

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

proponent for cooling, if it is all

needed. . The project Proponent

shall also use evaporative cooling

technology and double stage cooling

system for HVAC in order to reduce

water consumption. Further,

temperature, relative humidity

during summer and winter seasons

should be kept in optimal level.

Variable speed drive, best co-

efficient of Performance, as well as

optimal integrated point load value

and minimum outside fresh air

supply may be restored for

conservation of power and water.

Coil type cooling DG Sets shall be

used for saving cooling water

consumption for water cooled DG

Sets.

cooling water consumption

for water cooled DG Sets

c) It will be followed

z. The project proponent shall ensure

that the transformer is constructed

with high quality grain oriented, low

loss silicon steel and virgin

electrolyte grade copper. The project

proponent shall obtain

manufacturer’s certificate also for

that.

This will be followed at the time

of transformer installation.

aa) The project Proponent shall that

exit velocity from the stack should

We ensure the better quality of

drinking/domestic water to

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

be sufficiently high. Stack shall be

designed in such a way that there is

no stack down-water under any

meteorological condition.

resident as per prescribed

standard.

ab) The project proponent shall provide

water sprinkling system in the

project area to suppress the dust in

addition to the already suggested

mitigation measures in the Air

Environment Chapter of EMP.

Water Sprinkling System will be

provided in lawn area and open

area for the suppression of dust.

PART-B. GENERAL CONDITIONS

i) The project Proponent shall ensure

the commitments made in Form -1,

Form- 1A, EIA/ EMP and other

documents submitted to SEIAA for

the protection of environment and

proposed environmental safeguards

are complied with in letter and

spirit. In case of contradiction

between two or more documents on

any point, the most environmentally

friendly commitment on the point

shall be taken by the project

proponent.

Commitments made in Form-1,

Form- 1A, EIA/ EMP and other

documents submitted to SEIAA

will be complied with.

ii) Six monthly compliance reports

should be submitted to the HSPCB

and Regional Office MoEF, GoI,

Northern Region, Chandigarh and a

copy to SEIAA Haryana.

Agreed.

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

iii) STP Outlet after stabilization and

stack emission shall be monitored

monthly. Other environmental

parameters and green belt shall be

monitored on quarterly basis. After

every 3(three) month, the project

proponent shall conduct

environmental audit and shall take

corrective measures, if required,

without delay.

a) This monitoring schedule

will be implemented in

EMP and all the audit

findings will be

incorporated without delay.

b) The same will be added in

MOU signed with RWA.

iv) The SEIAA, Haryana reserves the

right to add additional safeguard

measure subsequently, if found

necessary. Environmental

Clearance granted will be revoked if

it is found that false information

has been given for getting approval

of this project. SEIAA reserves the

right to revoke the clearance if

conditions stipulated are not

implemented to the satisfaction of

SEIAA/ MoEF.

Agreed.

v) The project Proponent shall not

violate any judicial orders/

pronouncements issued by any

court/ tribunal.

It will be followed.

vi) All other statutory clearances such

as the approvals for storage of

diesel from Chief Controller of

All the required and necessary

permission are under process

while some has obtained as

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

Explosives, Fire Department, Civil

Aviation Department, Forest

Conservation Act, 1980 and Wildlife

(Protection) Act, 1972, PLPA, 1900,

Forest Act, 1927 etc. shall be

obtained, as applicable by project

proponents from the respective

authorities prior to construction of

the project.

follows:

A) AAI NOC is enclosed as

Annexure-III.

B) Forest NOC is enclosed as

Annexure-IV.

C) Fire Scheme NOC is enclosed

as Annexure-V.

vii) The project Proponent should

inform the public that the project

has been accorded Environment

Clearance by the SEIAA and copies

of the clearance letter are available

with State Pollution Control Board

and SEIAA. This should be

advertised within 7 days from the

date of issue of the Environment

Clearance Letter at least in 2 local

newspapers that are widely

circulated in the region and the

copy of the same should be

forwarded to SEIAA Haryana. A

copy of Environment Clearance

conditions shall also be put on

project proponent’s website for

public awareness.

It will be followed and will be

submitted along with next

compliance report.

viii) Under the Provision of

Environmental (Protection) Act,

Agreed. Construction has been

started after obtaining

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

1986, legal action shall be initiated

against the project proponent if it

was found that the construction of

project has been started before the

obtaining prior environmental

clearance.

Environmental Clearance vide

letter no. SEIAA/HR/2013/1079

dated 23-10-2013 and consent

to establish vide letter no.-

HSPCB/Consent/2821214GUN

OCTE408046 dated

18/02/2014.

ix) Any appeal against this

Environment Clearance shall lie

with the National Green Tribunal, if

preferred, within a period of 30

days as prescribed under section 16

of the National Green Tribunal Act,

2010.

Agreed.

x) The project Proponent shall put in

place Corporate Environment Policy

as mentioned in MoEF, GoI OM No.

J-11013/41/2006-IA II (I) dated

26.4.2012 within 3 months period.

Latest Corporate Environment

Policy should be submitted to

SEIAA within 3 months of issue of

this letter.

Corporate Environment Policy

will be Submitted to SEIAA in

forthcoming compliance report.

xi) The fund ear-marked for

environmental protection measures

should be kept in separate account

and should not be diverted for other

purposes and year wise expenditure

shall be reported to the SEIAA/RO

It will be followed.

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

MoEF GoI under rules prescribed

for Environment Audit.

xi) The project proponent shall obtain

NOC under Aravali Notification from

CEC of Hon’ble Supreme Court

regarding coverage under Aravali

Notification before start of

construction.

Aravali NOC will be submitted

with next compliance report.

xii) The project Proponent shall ensure

the compliance of Forest

Department, Haryana Notification

No. S.O.121/PA2/1900/S.4/97

dated 28.11.1997.

project is Group Housing Project

only the Environmental Friendly

and Ornamental Plant will be

planted at site under Greenbelt

Development however point in

notification will be complied.

xiii) The project Proponent shall ensure

that no vehicle during

construction/operation phase enter

the project premises without valid

“Pollution Under Control”

It is ensured that only vehicle

with valid Pollution Under

Control certificate will be allowed

to the site.

xiv) The Project Proponent is

responsible for compliance of all

condition in Environment Clearance

letter and project Proponent cannot

absolve himself/herself of the

responsibility by shifting it to any

engaged by project proponent.

Agreed.

xv) The Project Proponent shall seek

fresh Environment Clearance if any

stage there is change in the

Agreed.

GROUP HOUSING PROJECT AT SECTOR - 109, VILLAGE – BABUPUR, GURGAON, HARYANA. Dec’14

M/s CHINTELS INDIA LTD.

planning of the proposed project.

xvi) Besides the developers/ Applicant,

the responsibility to ensure the

compliance of Environment

safeguard/condition imposed in the

Environmental Clearance letter

shall also lie on the license in

whose name/nemes the

License/CLU has been granted by

the Town & Country Planning

Department, Haryana.

Agreed.