grop · 2011-11-19 · grop d180l roadway roadway block walls o/all plant 1-7-09 1450 3000 600 600...

2
GROUP FLOW DATUM RL:10000 TOC RL:7700 . CV6 FINE PRODUCT STACK OUT CONVEYOR CV7 COARSE PRODUCT CONVEYOR VEYOR CV5 FINE PRODUCT CONVEYOR DREDGE FEED PIP . THE WRITTEN APPROVAL OF REPRODUCED OR AWING AND AS SUCH REVISED MANUALLY THEREON ARE COPYRIGHT 7 8 Telephone +61 (02) 4654 9442 9 Fax +61 (02) 4654 9425 SADA SERVICES PTY LIMITED P.O. BOX 52 NARELLAN N.S.W. 2567 IDENTIFICATION CV3 COAR DREDGE RETURN WATER PIPE Design, Installation and Contract Operation of Coal Processing Plants

Upload: others

Post on 19-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GROP · 2011-11-19 · grop d180l roadway roadway block walls o/all plant 1-7-09 1450 3000 600 600 19200 flow cv1-t1 cv1-t2 cv1-t3 datum rl:10000 toc. rl:8059 toc. rl:8071 toc. rl:8137

GROUP

D180L

ROADWAY

ROADWAY

BLOCK WALLS

O/ALL PLANT 1-7-09

1450

3000

600

600

19200

FLO

W

CV1-T3CV1-T2CV1-T1

DATUMRL:10000

TOC. RL:8137TOC. RL:8071TOC. RL:8059

RL:8059

RL:8000

STOCK PILE1200t

1200t

TOCRL:7700

.

.

250

250600

1750

1750

--

ITEM QTY DESCRIPTION

SADA SERVICES PTY LIMITEDMANUFACTURED WITHOUT THE WRITTEN APPROVAL OF

AND MUST NOT BE COPIED, REPRODUCED OR

THIS IS A CAD DRAWING AND AS SUCHSHOULD NOT BE REVISED MANUALLY

THIS DRAWING AND DESIGN THEREON ARE COPYRIGHT

K

J

No.

1REVISION

2

H

G

F

E

D

C

B

A

1 2

REFERENCE DRAWINGSDWG No.

BY DATE3 4 5

CAD FILE NAME:

CUSTOMER REFERENCE:

6

3 4 5 6

SIZE

DRAWING TITLE

CLIENT

7 8SCALE:

APPROVAL:

CHECKED:

DRAWN BY:Telephone +61 (02) 4654 9442

9 10

THIRD ANGLE

7 8 9 10

DWG No.

11 12

K

J

H

G

F

E

D

C

B

A

11 12

Fax +61 (02) 4654 9425

SADA SERVICES PTY LIMITEDP.O. BOX 52

NARELLAN N.S.W. 2567

0 ISSUED FOR CONSTRUCTION SAS 13/07/09

12 BLOCKS

EXISTING GROUND LINE

EXISTING WASHERY FLOOR

BALLAST FOR DRAINAGE

SAND & CEMENT BASE

BACKFILL WITH ASH12 BLOCKS

FULL BLOCK TURN90 DEGREES

73 FULL BLOCKS REQUIRED

3 HALF BLOCKS REQUIRED

2675

13 BLOCKS

13 BLOCKS

17 BLOCKS6 BLOCKSTOTAL

WP3

WP3

FEED

FRO

M D

RED

GE

FEED

FRO

M D

RED

GE

SADA SERVICES PTY LIMITED

WOLLONDILLY COAL REWASH PLANTS O A PCONVEYORSCONVEYOR IDENTIFICATION PLAN

WRP-S-0??? 0

SAS 13/11/08

1:100WRP-S-0??

--

A1REV.

SITE PLAN - CONVEYOR IDENTIFICATION

PLANT NORTH

CV6 FINE PRODUCT STACK OUT CONVEYOR

CV7 COARSE PRODUCT CONVEYOR

CV4 SAND CONVEYOR

CV2 REJECT CONVEYOR

CV1 PLANT FEED CONVEYOR

CV5 FINE PRODUCT CONVEYOR

CV3 COARSE REJECT CONVEYOR

DREDGE FEED PIPE

DREDGE RETURN WATER PIPE

D180L

ROADWAY

ROADWAY

BLOCK WALLS

O/ALL PLANT 1-7-09

1450

3000

600

600

19200

FLO

W

CV1-T3CV1-T2CV1-T1

DATUMRL:10000

TOC. RL:8137TOC. RL:8071TOC. RL:8059

RL:8059

RL:8000

STOCK PILE1200t

1200t

TOCRL:7700

.

.

250

250600

1750

1750

--

ITEM QTY DESCRIPTION

SADA SERVICES PTY LIMITEDMANUFACTURED WITHOUT THE WRITTEN APPROVAL OF

AND MUST NOT BE COPIED, REPRODUCED OR

THIS IS A CAD DRAWING AND AS SUCHSHOULD NOT BE REVISED MANUALLY

THIS DRAWING AND DESIGN THEREON ARE COPYRIGHT

K

J

No.

1REVISION

2

H

G

F

E

D

C

B

A

1 2

REFERENCE DRAWINGSDWG No.

BY DATE3 4 5

CAD FILE NAME:

CUSTOMER REFERENCE:

6

3 4 5 6

SIZE

DRAWING TITLE

CLIENT

7 8SCALE:

APPROVAL:

CHECKED:

DRAWN BY:Telephone +61 (02) 4654 9442

9 10

THIRD ANGLE

7 8 9 10

DWG No.

11 12

K

J

H

G

F

E

D

C

B

A

11 12

Fax +61 (02) 4654 9425

SADA SERVICES PTY LIMITEDP.O. BOX 52

NARELLAN N.S.W. 2567

0 ISSUED FOR CONSTRUCTION SAS 13/07/09

12 BLOCKS

EXISTING GROUND LINE

EXISTING WASHERY FLOOR

BALLAST FOR DRAINAGE

SAND & CEMENT BASE

BACKFILL WITH ASH12 BLOCKS

FULL BLOCK TURN90 DEGREES

73 FULL BLOCKS REQUIRED

3 HALF BLOCKS REQUIRED

2675

13 BLOCKS

13 BLOCKS

17 BLOCKS6 BLOCKSTOTAL

WP3

WP3

FEED

FRO

M D

RED

GE

FEED

FRO

M D

RED

GE

SADA SERVICES PTY LIMITED

WOLLONDILLY COAL REWASH PLANTS O A PCONVEYORSCONVEYOR IDENTIFICATION PLAN

WRP-S-0??? 0

SAS 13/11/08

1:100WRP-S-0??

--

A1REV.

SITE PLAN - CONVEYOR IDENTIFICATION

PLANT NORTH

CV6 FINE PRODUCT STACK OUT CONVEYOR

CV7 COARSE PRODUCT CONVEYOR

CV4 SAND CONVEYOR

CV2 REJECT CONVEYOR

CV1 PLANT FEED CONVEYOR

CV5 FINE PRODUCT CONVEYOR

CV3 COARSE REJECT CONVEYOR

DREDGE FEED PIPE

DREDGE RETURN WATER PIPE

Design, Installation and Contract Operation of Coal Processing Plants

Page 2: GROP · 2011-11-19 · grop d180l roadway roadway block walls o/all plant 1-7-09 1450 3000 600 600 19200 flow cv1-t1 cv1-t2 cv1-t3 datum rl:10000 toc. rl:8059 toc. rl:8071 toc. rl:8137

•Fullin-houseCADanddraftingfacilities

•Equipmentprocurement,costingandsupplierassessment

•Projectmanagementfromconceptiontooperation

•Detailedcommissioningandperformancemonitoring

•Prepplanttechnicalaudits,includingthereviewofexistingoperationalplantsthathaveexperiencedchangestocharacteristics

•Upgradesandcircuitdesignincorporatingthereview,designandimplementationofupgradestoexistingplants

•Preventativemaintenance

•Environmentalauditsandremediationplanning

Modular Coal Preparation PlantsDedicatedaswearetosuperiorservice,innovationandexcellence,SADAGrouphasdevelopedhighlyefficientmodularcoalpreparationplantsthatcanbeadaptedtosuitanyspecificoperation.

Thebenefitsofourmodularcoalpreparationplantsare:

• Theyprovideacosteffectivealternative,withfasteronsiteconstructiontime

•Areexpandableandallowtheeasyadditionoffurthermodules

• Thehighlymobileportablemodulescanbereadilyrelocatedtonewareasasrequired

•Compactdesign

•Aminimalfootprintisrequiredforoperation

SADA Group Contract Operation SADA’sexperienceandexpertiseasalong-termcontractwasheryoperatorhasledtooursuccessfullydesigningand/orcontractoperatingseveralcoalpreparationplantsformajorAustraliancoalcompanies.

Offeringawealthofexperiencebothinmineoperationandinservicingthemanyneedsofminingcompanies,SADApridesitselfonbeingproactiveinresponsetoclientrequirements,withaquickdecisionmakingprocessbornfromyearsinthebusiness.

Weunderstandprojectsfromourclients’perspectiveanddrawonourownknowledgeandexperiencetothinkbeyondtheimmediatetodelivertrouble-free,seamless,integratedsolutionsoneveryprojectweundertake.

Design, Installation and Contract Operation of Coal Processing PlantsSADAGrouphasaprovenhistoryofbringingoutstandingtechnicalexpertisetobearindesigning,installingandcontractoperatingcoalprocessingplantsforourmanyclients.

EnlistingSADAonyourprojectsisguaranteedtoresultinefficientandcost-effectivesolutions,deliveredwithoutstandingdedicationtocustomerservice.

Design and Installation of Coal Preparation PlantsSADAGroup’sdesignandinstallationcapabilitiesencompassthefullspectrumofcoalpreparationservices,offeringanexceptional`one-stop’solutionforourclients.

Theservicesofferedbyourhighlyskilledteaminclude:

•Conceptplanningandfeasibilitystudies,includingassessmentofin-seamcoalqualitycharacteristics

•Engineeringanddesignwhichcantailortheprocessanddesigntosuitspecificprojects

• In-housedesignandprocessengineering

ASADA-drivencontractoperationoffersmanybenefitstoourclients.

SADA’sextensivecoalpreparationcapabilitiescoverallaspectsofcoalprocessingincludingscreening,crushing,dryandwetprocessing,densemediaprocessinganddewatering.

Weprovidealowercostpertonnealternativewhichimprovesyieldandlowersoperatingcosts,withourexperiencedmanagementteamdeliveringacontractoperationwhichfocusesonmaximisingrecoverableyieldandTPHthroughputwithminimaldowntime.

ASADAcontractoperationalsoensuresadherencetothehighestsafetystandards.BecausetheoperationandmanagementofasafeworkplaceisparamounttoSADAGroup,weimplementacarefullytailoredsafetymanagementsystemtosuiteachindividualoperation.

Tailings ReprocessingSADAGrouphasvastexperienceinthereprocessingoftailingsdamstoachievebothastrongeconomicreturnoninvestmentandanenvironmentaloutcomefordisusedtailingsdamsandchitter/rejectemplacement.

Postal PO Box 52, Narellan NSW 2567Phone 02 4654 9400Fax 02 4654 9425Email [email protected] www.sadacoal.com

GROUP