APPENDIX C GRIHA Check List

Upload: others

Post on 28-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

APPENDIX C GRIHA Check List

Page 2: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the
Page 3: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

Criterion AppraisalMaximumPoints

Points beingattempted *

Remarks ‐RCC Remarks ‐KNC

Criterion 1 Site SelectionThe site plan must be in conformity with the development plan/masterplan/UDPFI guidelines (mandatory). This should comply with the provisions ofeco‐sensitive zone regulations, coastal zone regulations, heritage areas(identified in the master plan or issued separately as specific guidelines), waterbody zones (in such zones, no construction is permitted in the water‐spreadand buffer belt of 30 meter minimum around the FTL), various hazard pronearea regulations, and others if the site falls under any such area (mandatorywith no point allocation).

0 clients scope clients scope

The site should be located within ½ km radius of an existing bus stop,commuter rail, light rail or metro station and/or the proposed site must be aBrownfield site (to rehabilitate damaged sites where development is hinderedby environmental contamination, thereby reducing pressure on undevelopedland)

1 0 clients scope clients scope

1 0

Criterion 2 Preserve and protect landscape during construction/compensatorydepository forestation.Applicability Check 1There are existing several mature trees on site that can be preserved

yes

Construction has been planned in a way that excavation/basement work, up toplinth level is not coinciding with rainy season and the site disruption isrestricted to pre‐designated areas

1

generalcontractors scopein‐ applicable inconstructionstage

generalcontractors scopein‐ applicable inconstructionstage

*Points will be evaluated by GRIHA consultant appointed by IITH

GRIHA self‐evaluation toolNote: Applicability checks have been provided for various criterions in the table, to check for conditions on site which may make those criterion non‐applicable. If in the Applicability checks, the conditions specified are false for the given project, kindly input 'no' in place of the default 'yes'.

Page 4: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

Proper staging, spill prevention plan , sedimentation and erosion controlsystems in place.

1

generalcontractors scopein‐ applicable inconstructionstage

generalcontractors scopein‐ applicable inconstructionstage

Trees are preserved and protected properlyNote: Applicable if answer is yes in Applicability Check 1 above

1

Compensatory forestation is applied on siteNote: Applicable if answer is yes in Applicability Check 1 above

1masterplannersscope

masterplannersscope

4Criterion 3 Soil conservation (post construction)

Applicability Check 2Top soil quality meets the quality standard of top preservation criteria as percriteria 3

yes

Top soil is fertile and properly laid for vegetative growthNote: Applicable if answer is yes in Applicability Check 2 above

1

generalcontractors scopein‐ applicable inconstructionstage

generalcontractors scopein‐ applicable inconstructionstage

Measures taken for proper stabilization so soilNote: Applicable if answer is yes in Applicability Check 2 above

1

generalcontractors scopein‐ applicable inconstructionstage

generalcontractors scopein‐ applicable inconstructionstage

2

Page 5: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

Criterion 4 Design to include existing site features 

Building and site planning to minimize the disruption of natural ecosystemsand to maximize benefits from prevailing micro‐climate

4

can attempt forthese points asthe micro climateis not disterbed

can attempt forthese points asthe micro climateis not disterbed

4Criterion 5 Reduce hard paving on site

Net Paved area on site under parking, roads etc. to exceed 25% of the site area(minus the building footprint) or the net imperviousness factor of the siteshould not exceed the net imperviousness factors prescribed in the NBC 2005,whichever is more stringent.

1 achieved achieved

Total surface parking not to exceed as permitted by the local building by‐laws 0

More than 50% of the total paved area to havepervious paving oropen grid pavements orgrass pavers orshading through the use of vegetated pergolas orcovered with coating of SRI>0.5ORMore than 50% of the total paved area to have a combination of the above.

1more than 50%pervious coverplanned

more than 50%pervious coverplanned

2Criterion 6 Enhance outdoor lighting system efficiency

Luminous efficacy of 100% of lamps used in outdoor lighting to meet thecorresponding lamp luminous efficacy as mentioned in Table 6.1, as per GRIHA

1planned as perGRIHA guideline

planned as perGRIHA guideline

Automatic controls to be installed for 100% of outdoor lights 01

Page 6: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

Criterion 7 Plan utilities efficiently and optimize on‐site circulation efficiency

Various transportation and service corridors shall be minimized andconsolidated and the pedestrian walkways to be shaded.

1 single building single buildng

Aggregate utility corridors shall be used 1

Utility corridors shall be consolidated along the previously disturbed areas oralong new roads in order to minimize unnecessary cutting and trenching andensure easy maintenance

1masterplannersscope

masterplannersscope

3

Criterion 8 Provide minimum level of sanitation/safety facilities for constructionworkers

Ensure compliance with the NBC (2005) safety norms for providing thenecessary safety equipment and measures for construction workers

1

generalcontractors scopein‐ applicable inconstructionstage

generalcontractors scopein‐ applicable inconstructionstage

Provisions for drinking water, healthy and clean living conditions andsanitation facilities shall be provided  for the workers

1

generalcontractors scopein‐ applicable inconstructionstage

generalcontractors scopein‐ applicable inconstructionstage

2Criterion 9 Reduce air pollution during construction

Necessary measures to be taken on site to reduce air pollution for exampleproviding site barricading to a height of 3 m on the site perimeter, carry outwheel washing of vehicles entering/exiting the site, sprinkle water on roadswith loose dust etc.

2

generalcontractors scopein‐ applicable inconstructionstage

generalcontractors scopein‐ applicable inconstructionstage

2

Page 7: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

Criterion 10 Reduce landscape water demand

If landscape water demand is reduced by up to 30% 1landscapedesigners scope

landscapedesigners scope

If landscape water demand is reduced by up to 40% 2landscapedesigners scope

landscapedesigners scope

If landscape water demand is reduced by up to 50% 3landscapedesigners scope

landscapedesigners scope

3landscapedesigners scope

landscapedesigners scope

Criterion 11 Reduce building water use

Non Applicability condition: All faucets, which are installed in spaces withwater head heights less than 15 feet (4.6 m), in a gravity fed systems, can beexempt for calculations in Criterion 11.

If building water demand is reduced by up to 25% 1

attempted for25% reduction.Domestic &flushing duelplumbing sys forwater supply.Low flow fixtures,Low flow fixturesused

attempted for25% reduction.Domestic &flushing duelplumbing sys forwater supply.Low flow fixtures,Low flow fixturesused

If building water demand is reduced by up to 50% 1 not achieved not achieved2

Page 8: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

Criterion 12 Efficient water use during construction

Efforts to be taken to reduce the use of potable water during construction forexample use waste jute bags to cover columns and beams during curing, addadmixtures to concrete which cause a reduction in the water required forcuring etc.

1

generalcontractors scopein‐ applicable inconstructionstage

generalcontractors scopein‐ applicable inconstructionstage

1Criterion 13 Optimize building design to reduce conventional energy demand

The WWR and/or SSR shall be limited to the prescribed levels as per Table13.1(GRIHA Manual Introduction Volume‐I) and all fenestration shall meet eitherthe SHGC requirements of ECBC 2007OR shading requirements as suggested in13.1.4 OR 13.1.5, as per clause 13.2.3 to 13.2.5

2

refer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN13

refer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN14

Minimum 25% of the living area shall be daylighted and shall meet the level ofdaylight prescribed in NBC 2005 (reference Table 13.2 GRIHA ManualIntroduction Volume‐I)

2

 Majority ofspaces being labs, and can beexcluded, otherareas can fulfillthe criterion

 Majority ofspaces beingLibrary / bookschelves  , andcan be excluded,other areas canfulfill the criterion

If the total daylighted area>50% of the total living area and meets theprescribed level of daylight

1 Not achieved Not achieved

If the total daylighted area>75% of the total living area and meets theprescribed level of daylight

1

Over‐design of artificial lighting system shall be avoided and the lighting levelsin indoor spaces shall be maintained as recommended in NBC 2005.

2designed as perNBC 2005

designed as perNBC 2006

8

Page 9: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

Criterion 14 Optimize energy performance of building within specified comfort limits

All mandatory compliance measures (for all applicable buildings) asrecommended in the Energy Conservation Building Code 2007 of BEE shall becomplied with.

6

The thermal comfort conditions and at least 10% reduction from thebenchmark EPI, specified in GRIHA, shall be met.

2

If the reduction in energy consumption is > 20% of the benchmarked figureand the thermal comfort criteria are fully met

2

If the reduction in energy consumption is > 30% of the benchmarked figureand the thermal comfort criteria are fully met

4

If the reduction in energy consumption is > 40% of the benchmarked figureand the thermal comfort criteria are fully met

6

If the reduction in energy consumption is > 50% of the benchmarked figureand the thermal comfort criteria are fully met

8

16

Criterion 15 Utilization of fly‐ash or equivalent industrial/agricultural waste asrecommended by BIS in building structures

Replace 15‐25 % of OPC by weight with fly‐ash or equivalentindustrial/agricultural waste as recommended by BIS in structural concrete

1 can be achieved can be achieved

Replace more than 25% of OPC by weight with fly‐ash or equivalentindustrial/agricultural waste as recommended by BIS in structural concrete

1 can be achieved can be achieved

100% of the building blocks shall have at least 40% fly ash or equivalentindustrial/agricultural waste as recommended by BIS (by volume)

2 can be achieved can be achieved

the HVAC(distribution side)system isdesigned as perECBC 2007 ,however thechilled watergeneration andequipments andefficiancy to becompared alongwith masterplanners for acumulative result.

the HVAC(distribution side)system isdesigned as perECBC 2007 ,however thechilled watergeneration andequipments andefficiancy to becompared alongwith masterplanners for acumulative result.

Page 10: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

Replace 15‐25 % of OPC by weight with fly‐ash or equivalentindustrial/agricultural waste as recommended by BIS in masonry and plastermortar

1

Replace more than 25% of OPC by weight with fly‐ash or equivalentindustrial/agricultural waste as recommended by BIS in masonry and plastermortar

1

64‐5 points couldbe attempted.

4‐5 points couldbe attempted.

Criterion 16Reduce embodied energy of construction is reduced by adopting materialefficient technologies and/or low‐energy materials

The embodied energy of the structural systems of the building shall be reducedby at least 2.5% for 100% of the structural system in the building.

1 0

TERI to calcuateas per afterscrutinizing theBOQ

TERI to calcuateas per afterscrutinizing theBOQ

The embodied energy of the structural systems of the building shall be reducedby at least 5% for 100% of the structural system in the building.

2

TERI to calcuateas per afterscrutinizing theBOQ

TERI to calcuateas per afterscrutinizing theBOQ

The embodied energy of the non‐structural systems of the building shall bereduced by at least 5% for 100% of the structural system in the building blockwork.

1

TERI to calcuateas per afterscrutinizing theBOQ

TERI to calcuateas per afterscrutinizing theBOQ

The embodied energy of the non‐structural systems of the building shall bereduced by at least 10% for 100% of the structural system in the building blockwork.

2

TERI to calcuateas per afterscrutinizing theBOQ

TERI to calcuateas per afterscrutinizing theBOQ

4

Page 11: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

Criterion 17 Use low‐energy materials in Interiors

Minimum 70% of the total quantity of materials used for sub‐assembly/internal partitions/paneling/false‐ceiling/in‐built furniture shall below‐energy materials

2TERI to calculateas paer BOQ

TERI to calculateas paer BOQ

Minimum 70% of the total quantity of materials used for flooring shall be low‐energy materials

1TERI to calculateas paer BOQ

TERI to calculateas paer BOQ

Minimum 70% of the total quantity of materials used for door, windows andframes shall be low‐energy materials

1TERI to calculateas paer BOQ

TERI to calculateas paer BOQ

4

refer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN17

refer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN18

Criterion 18 Renewable energy utilizationNon Madatory conditionIf more than 80% of total built‐up area (FSI and non‐FSI) falls underresidential use, then the Appraisal 18.3.1(first appraisal clause ‐ asmentioned below) is non‐mandatory.

The minimum size of the renewable energy system, installed on site, should beequal to 1% of the total connected load for artificial lighting (internal andexternal) and space conditioning loads

2

Solar farmsplanned byMasterplannersfor campus

Solar farmsplanned byMasterplannersfor campus

If the total energy generated by the renewable energy system is equivalent to5% or more of the total annual energy consumption for artificial lighting

1provision forsolar panels onthe roof

If the total energy generated by the renewable energy system is equivalent to10% or more of the total annual energy consumption for artificial lighting

2

Page 12: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

If the total energy generated by the renewable energy system is equivalent to20% or more of the total annual energy consumption for artificial lighting

3

If the total energy generated by the renewable energy system is equivalent to30% or more of the total annual energy consumption for artificial lighting

4

If the total energy generated by the On‐site or Off‐site, renewable energysystem is equivalent to 100% or more of the total annual energy consumptionfor artificial lighting

2

8

Criterion 19 Renewable energy based hot water system

Applicability Check 3The total hot water requirement is more than 500 liters per day NO

refer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN19

refer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN20

If the renewable hot water system saves 20‐50% of the annual energy requiredfor hot waterNote: Applicable if answer is yes in Applicability Check 3 above

0

If the renewable hot water system saves 50‐70% of the annual energy requiredfor hot waterNote: Applicable if answer is yes in Applicability Check 3 above

0

If the renewable hot water system saves more than 70% of the annual energyrequired for hot waterNote: Applicable if answer is yes in Applicability Check 3 above

0

0

Page 13: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

Criterion 20 Waste water treatmentApplicability Check 4The total waste water generation on site is more than 10kL per day. Yes

scope ofMasterplanner

scope ofMasterplanner

The treated waste water shall meet the BIS recommended disposal standards,as per table 20.3, GRIHANote: Applicable is answer is yes to Applicability Check 4 above

2

2Criterion 21 Water recycle and reuse (including rainwater)

Applicability Check 5Ground water table is low and ground water recharge is advisable as perCentral Ground Water Board norms.

yesscope ofMasterplanner

scope ofMasterplanner

If the project demonstrates 25% annual water reuseNote: Applicable is answer is yes to Applicability Check 4 above

1

If the project demonstrates 50% annual water reuseNote: Applicable is answer is yes to Applicability Check 4 above

2

If the project demonstrates 75% annual water reuseNote: Applicable is answer is yes to Applicability Check 4 above

3

The surplus rainwater is recharged in to the ground after necessary filtrationNote: Applicable if answer is yes to Applicability Check 5

2

5

Page 14: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

Criterion 22 Reduction in waste during construction

Hazardous and inert waste shall be segregated during construction

generalcontractors scopein‐ applicable inconstructionstage

generalcontractors scopein‐ applicable inconstructionstage

The segregated waste shall be recycled and/or safely disposed1

Criterion 23 Efficient Waste segregation

Multi‐coloured bins shall be provided to segregate waste at source 1 0clients/masterplanners  scope

clients/masterplanners  scope

1 0Criterion 24 Storage and disposal of wastes

Separate space shall be allocated for collection of waste before transfer forrecycling

1 0clients/masterplanners  scope

clients/masterplanners  scope

1 0Criterion 25 Resource recovery from waste

Applicability Check 6Organic solid waste generation on site is more than 100 kg/day yes

Appropriate measures to be taken for zero‐waste generation from siteNote: Applicable if answer is yes to Applicability Check 6

2 0could beachievable at CDstage

could beachievable at CDstage

2 0

1

Page 15: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

Criterion 26 Use of low‐VOC paints/adhesives/sealants

100% of all paints used in building interior shall be low/zero‐VOC, as per Table26.1, GRIHA Manual

1 0could beachievable at CDstage

could beachievable at CDstage

100% of all adhesives and sealants used shall be low/zero‐VOC, as per Table26.1, GRIHA

1 0

100% of all composite wood products shall not use urea‐formaldehyde 1 03 0

Criterion 27 Minimize ozone depleting substancesAll insulation to be used in the building shall be CFC and HCFC free 0 achieved achievedAll HVAC and refrigeration equipment shall be CFC freeThe fire‐suppression systems and fire extinguishers shall be halon free

1 0Criterion 28 Ensure water quality

Water used for various purposes like drinking, irrigation etc. shall conform tothe BIS standards (Table 28.3, GRIHA Manual)

2 0clients/masterplanners  scope

clients/masterplanners  scope

2 0Criterion 29 Acceptable outdoor and indoor noise levels

The measured outdoor noise levels on site conform to the standard set by theCPCB, Table 29.1, GRIHA

1 0

report can beprepared whenthe buildings areocupied

report can beprepared whenthe buildings areocupied

The measured indoor noise levels inside the building meet the noise levelsrecommended by NBC 2005 (Table 29.2, GRIHA Manual)

1 0 achieved achieved

2 0Criterion 30 Tobacco and smoke control

Smoking is prohibited on siteORNecessary provisions shall be provided in the mechanical ventilation system bythe HVAC consultant

1 0IITH is a no‐smoking campus

IITH is a no‐smoking campus

1 0

1

Page 16: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

Criterion 31 Provide at least the minimum level of accessibility for persons withdisabilities

Buildings shall be designed in compliance with the NBC code in order to bedisabled friendly

1 0

provisions maderefer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN31

provisions maderefer to drawingIITH_RCC?KNC_A1_GRIHA_criteriaN32

1 0Criterion 32 Energy audit and validation

A mandatory energy audit shall be conducted by a BEE certified energy auditor 0 0

report can beprepared whenthe buildings areocupied

report can beprepared whenthe buildings areocupied

Criterion 33 Operation and Maintenance

Metering and sub‐metering of energy as well as water will be carried out asper GRIHA clause

1 0

report can beprepared whenthe buildings areocupied

report can beprepared whenthe buildings areocupied

An O & M protocol to be specified for operation and maintenance of thevarious systems in the building. Additionally,

1 0

2 097 0

Criterion 34 Innovation Points None NonePoint for innovation 0Point for innovation 0Point for innovation 0Point for innovation 0

Total 0

ScorePercentile

0

Page 17: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

APPENDIX D

IMPOSED LOAD DIAGRAM

Page 18: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the
Page 19: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

F-1

APPENDIX D : Imposed Load Diagram

a) KNC

i. GROUND FLOOR LEVEL

Page 20: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

F-2

ii. 1ST FLOOR LEVEL

iii) 2nd FLOOR LEVEL

Page 21: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

F-3

iv) 3rd FLOOR LEVEL

v) ROOF LEVEL

Page 22: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

F-4

ii) RCC

i) GROUND FLOOR LEVEL

Page 23: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

F-5

ii) 1st FLOOR LEVEL

iii) 2nd FLOOR LEVEL

Page 24: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

F-6

iv) 3rd FLOOR LEVEL

v) 4th FLOOR LEVEL

Page 25: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

APPENDIX E KNC & RCC Drawings

Page 26: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the
Page 27: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

KNOWLEDGE CENTREAT INDIAN INSTITUTE OF TECHNOLOGY HYDERABAD

ISSUED FOR DESIGN DEVELOPMENT 100%OCTOBER 31ST, 2014ARCHITECTURE

Page 28: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

UP

SITE BOUNDARY

DRIVEWAY

BOHENTRANCE

LOADING

MAINENTRANCE

EASTENTRANCE

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

As indicated

A-051--NSI

SITE PLAN

DESIGN DEVELOPMENT

SITE PLAN1

Page 29: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

A

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

2 3 4 5 6 7 8 9 10 11 12 13

1

A-261

1

A-256

1

A-259

1

A-276

1

A-280

1

A-277

1

A-252

1

A-262

1

A-2531

A-263

1

A-286

1

A-279

FIN. FLOOREL.+528.10M

1

A-278

1

A-257

EPS

1

A-282

1

A-251

1

A-254

1

A-281

1

A-285

1

1

A-255

1

A-258

1

A-260

1

A-272

1

A-271

1

A-275

1

A-284

1

A-273

1

A-274

EV PIT 3

PUMPROOM

FIN. FLOOREL.+528.80M

FIN. FLOOREL.+528.80M

FIN. FLOOREL.+528.10M

FF WATERTANK 1(50cbm)

FF WATERTANK 2(50cbm)

STAIR 2 A-3021

FIN. FLOOR

EL.+528.90M

FIN. FLOOR

EL.+527.55M

FIN. FLOOR

+527.75M

FIN. FLOOR

EL.+529.20M

1

A-283

FIN. FLOOR

EL.+528.90M

FIN. FLOOR

EL.+528.90M

FIN. FLOOR

EL.+527.25M

SUMP PIT600X600X450

SUMP PIT600X600X450

SUMP PIT600X600X450

SUMP PIT600X600X450

SUMP PIT600X600X450

SUMP PIT600X600X450

MH

MH

MH

MH

MH900X450

MH900X450

MH900X450

MH900X450

600 dia

600 dia

600 dia

600 dia

2.2

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 150

A-100--NSI

PIT LEVEL PLAN

DESIGN DEVELOPMENT

PIT LEVEL PLAN1

Page 30: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

UP

UP

UPUP

UP

A-201

A

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

2 3 4 5 6 7 8 9 10 11 12 13

1

A-261

1

A-2031

A-202

A-204 1

1

ELV/TELECOMRM

COUNSELLINGROOM 2

STORAGE 5

MINIKITCHEN

MEN'S WC(STAFF) ELECTRICAL

ROOM

STAIR 2

MECH RM 3

STAIR 4VESTIBULE MECH RM 4

STAIR 3VESTIBULE

1

A-2561

A-259

1

A-276

1

A-280

1

A-277

1

A-252

1

A-262

1

A-2531

A-263

1

A-286

1

A-279

A-3011

A-3022

A-3041

A-3031

A-3051

A-204 2

A-202

2

A-2032

A-3111

A-603

1

EASTENTRANCE

ENTRANCEHALL

CAFETERIA

KITCHEN

MEETINGROOM 1

MEETINGROOM 2

ADMINISTRATIONOFFICE

MECH RM 1

WOMEN'SWC (STAFF)

PS 1

WOMEN`SWC

PUBLICATIONSUPPORT

ROOM

ARCHIVERM

MECH RM 2

CORRIDOREAST

AUDIOVISUALROOM 2

AUDIOVISUALROOM 1

STORAGE 6

JANITOR'SROOM/FIRECONTROL

DIRECTOR'SROOM

SE 1

EPS 1

DS

STAIR 1VESTIBULEFHC 1

BOHCORRIDOR

1

STAIR 3

PE1 PE2STAIR 4

FHC 4

EV HALL EPS 2

STORAGE 2

COUNSELLINGROOM 1

JC 1

MEN'S WCJC 31

A-278

1

A-257

STORAGE 3

PS 2

JC 2

JC 4

WAITINGAREA

MICROREADING

ROOM

CORRIDORWEST

LOCKER RM

1

A-282

1

A-251

NORTHENTRANCE

HALL

FHC 3

STORAGE 1

STORAGE 4

1

A-254

1

A-281

1

A-285

1

A-2551

A-258

1

A-260

1

A-272

1

A-271

1

A-275

1

A-284

1

A-273

FIN. FLOOREL.+530.90M

FIN. FLOOREL.+530.90M

FIN. FLOOREL.+530.40M

FIN. FLOOREL.+530.90M

FIN. FLOOREL.+529.90M

FIN. FLOOREL.+529.90M

FIN. FLOOREL.+529.70M

FIN. FLOOREL.+530.90M

FIN. FLOOREL.+529.20M

FIN. FLOOREL.+530.40M

FIN. FLOOREL.+530.90M

FIN. FLOOREL.+530.40M

DRAINPIPE

FIN. FLOOREL.+530.40M

FIN. FLOOREL.+530.40M

FIN. FLOOR

+529.20M

FIN. FLOOR

+529.20M

FIN. FLOOR

+530.40M

FIN. FLOOR

+530.40MFIN. FLOOR

+529.20M

FIN. FLOOR

+529.20M

FIN. FLOOR

+529.50MFIN. FLOOR

+529.50M

FIN. FLOOR

+529.50M

FIN. FLOOR

+529.50M

FIN. FLOOR

+529.50M

FIN. FLOOR

+529.60MFIN. FLOOR

+529.60M

FIN. FLOOR

+529.60M

FIN. FLOOR

+529.60M

FIN. FLOOR

+529.90MFIN. FLOOR

+529.90M

FIN. FLOOR

+529.90M

FIN. FLOOR

+529.90MFIN. FLOOR

+529.90M

FIN. FLOOR

+529.90M

FIN. FLOOR

+530.40M

FIN. FLOOR

+528.95M

BOH PARKING

A-205

2

A-2053

FHC 2unassigned

FIN. FLOOREL.+531.05M

HVAC SPACE

A-205 1

1

A-274

A-205

4

A-205

5

A-205 6

A-205

7

A-614

3

1

24

A-614

7

5

68

A-603

4

A-603 2

A-6042

A-604

3

A-604 1

A-609

3

A-615

1

3

READINGSPACE

STAIR 1

A-6033

MH

MH

MH

1

A-283

A-203

3

A-2023

SLOPE 1=40

FIN. FLOOR

+530.74 FIN. FLOOR

+530.90

FIN. FLOOR

+530.40

SLOPE 1=12

SLOPE 1=12

SLOPE 1=18SLOPE 1=18

SLOPE 1=18

FIN. FLOOR

+529.60

SLOPE 1=24

SLOPE 1=14

SLOPE 1=28

WATERMIST MECH

ROOM

BOHCORRIDOR

2

STAIR 5

FIN. FLOOR

+530.90FIN. FLOOR

+530.76

SLOPE 1= 15

SLOPE 1= 18

MH

MH900X450

MH900X450

MH900X450

MH900X450

600 dia

600 dia

600 dia

600 dia

2.2

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 150

A-101CheckerNSI

GROUND FLOOR PLAN

DESIGN DEVELOPMENT

GROUND FLOOR PLAN1

Page 31: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

UP

UP

UP

UP

UP

UP

UP

A-201

A

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

2 3 4 5 6 7 8 9 10 11 12 13

1

A-261

1

A-2031

A-202

A-204 1

1

STAIR 4VESTIBULE

GROUPSTUDY

ROOM 102

WOMEN`SWC

STAIR 2

A-3013

A-3023

A-30403

A-3033

A-3063

A-3053

MANIFOLDERROOM

PRINTINGROOM

READINGRM 101

CORRIDORNORTH

1

A-2561

A-259

1

A-276

1

A-280

STAIR 5

1

A-277

1

A-2521

A-262

1

A-2531

A-263

1

A-286

1

A-279

STAIR 6

DUCTSPACE1

EPS 1

FHC 2

unassigned

MEN`S WC

STAIR 4

FHC 3

PE2PE1

EPS 3DS 3

STAIR 1VESTIBULEDS 1

FHC 1

GROUPSTUDY

ROOM 101

DS 5

FHC 4

STAIR 3

MEDIALITERACYROOM 1

EPS 2

JC 1

JC 2

MECHROOM 3

FIN. FLOOREL.+535.90M

FIN. FLOOR

EL.+535.90M

FIN. FLOOR

EL.+535.90M

PS

1

A-278

1

A-257

1

A-282

1

A-251

FIN. FLOOREL.+535.90M

FIN. FLOOREL.+537.10M

STORAGE 2

MEDIALITERACYROOM 2

STORAGE 1

1

A-254

CORRIDORWEST

NORTHHALL

1

A-281

1

A-285

SE 1

1

A-2551

A-258

1

A-260

1

A-272

1

A-271

1

A-275

1

A-284

1

A-273

HALL

FIN. FLOOREL.+536.05M

FIN. FLOOREL.+536.50M

CORRIDOREAST

1

A-274

STAIR 1

EV HALL

SOUTHHALL

SEE A-103FOR THISAREA

1

A-283

DS 4

DS 6

DS 2

SLOPE 1=15

SLOPE 1=14

2.2

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 150

A-102--NSI

FIRST FLOOR PLAN

DESIGN DEVELOPMENT

FIRST FLOOR PLAN1

Page 32: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UPUP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UPUP

UP

A-201

A

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

2 3 4 5 6 7 8 9 10 11 12 13

1

A-261

1

A-2031

A-202

A-204 1

1

EPS 1

DS 3

WOMEN`SWC

STAIR 2

STEPPEDOPENSHELF

STAIR 3VESTIBULE

FHC 1

STAIR 3DS 7

1

A-256

1

A-259

1

A-276

1

A-280

1

A-277

1

A-252

1

A-262

1

A-253

1

A-263

1

A-286

1

A-279

A-3014

A-3024

A-3043

A-3034

A-3064

STAIR 1 MEN`S WC

DS 4

PS 2

OPENSHELF

GROUPSTUDY

ROOM 201

GROUPSTUDY

ROOM 202

GROUPSTUDY

ROOM 203

GROUPSTUDY

ROOM 204

GROUPSTUDY

ROOM 205

GROUPSTUDY

ROOM 207

GROUPSTUDY

ROOM 208

GROUPSTUDY

ROOM 209

STAIR 2VESTIBULE FHC 4

EPS 2

FHC 2DS 2

DS 8PE1 PE2STAIR 4VESTIBULE

FHC 3

STAIR 4

FIN. FLOOR

EL.+536.50MFIN. FLOOREL.+535.90M

FIN. FLOOR

EL.+537.10M

FIN. FLOOREL.+537.70M

FIN. FLOOREL.+537.70M

FIN. FLOOREL.+538.90M

FIN. FLOOREL.+540.10M

FIN. FLOOR

EL.+538.30M

FIN. FLOOR

EL.+539.50M

FIN. FLOOR

EL.+540.70M

FIN. FLOOR

EL.+541.30M

1

A-278

1

A-257

JC 2

1

A-282

1

A-251

EPS 3

1

A-254

FIN. FLOOR

EL.+541.30M

1

A-281

1

A-285

SE 1

1

A-255

1

A-258

1

A-260

1

A-272

1

A-271

1

A-275

1

A-284

1

A-273

FIN. FLOOREL.+538.90M

FIN. FLOOREL.+540.10M

FIN. FLOOREL.+541.30M

FIN. FLOOREL.+541.30M

FIN. FLOOREL.+538.90M

FIN. FLOOREL.+540.10M

FIN. FLOOREL.+541.30M

FIN. FLOOREL.+541.30M

FIN. FLOOREL.+541.30M

FIN. FLOOREL.+541.30M

FIN. FLOOREL.+541.30M

1

A-274

STAIR 1VESTIBULE

BOOKCORRIDOR

NORTH

OPEN TOBELOW

STAIR 5

JC 1

GROUPSTUDY

ROOM 210

OPEN TOBELOW

WESTTERRACE

FIN. FLOOR

+541.10M

FIN. FLOOR

+541.10M

FIN. FLOOR+541.10M

DS 5

DS 6

DS 1

1

A-283

PS 1

SLOPE 1=20

SLOPE 1=20

SLOPE 1=20

SLOPE 1=20

SLOPE 1=20

SLOPE 1=20

SLOPE 1=20

FIN. FLOOR

+536.50

FIN. FLOOR

+536.05

SLOPE 1=15

SLOPE 1=14

SLOPE 1=16

EV HALL

2.2

NORTH TERRACE

NORTH EASTTERRACE

EAST TERRACE

SOUTH TERRACE

FIN. FLOOREL.+541.30M

A-50110

A-501.23

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 150

A-103CheckerNSI

SECOND FLOOR PLAN

DESIGN DEVELOPMENT

SECOND FLOOR PLAN1

Page 33: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

A-201

A

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

2 3 4 5 6 7 8 9 10 11 12 13

1

A-261

1

A-2031

A-202

A-204 1

1

1

A-256

1

A-259

1

A-276

1

A-280

1

A-277

1

A-252

1

A-262

1

A-253

1

A-263

1

A-286

1

A-279

A-3015

A-3025

A-3044

A-3035

A-3065

STAIR 4 STAIR 3STORAGE 3

STAIR 2

STAIR 6

GROUPSTUDY

ROOM 301

GROUPSTUDY

ROOM 302

GROUPSTUDY

ROOM 304

GROUPSTUDY

ROOM 305

GROUPSTUDY

ROOM 306

GROUPSTUDY

ROOM 307

GROUPSTUDY

ROOM 308

GROUPSTUDY

ROOM 309

READINGROOM 301

STAIR 2VESTIBULE

WOMEN`SWC

STAIR 3VESTIBULE

FHC 2

EPS 1STORAGE 4

STAIR 4VESTIBULE

FHC 4

GROUPSTUDY

ROOM 303

MEN`S WC

EPS 3

PS 1

PE2PE1 READINGROOM 302

DS 1

EPS 2

STAIR 1STAIR 1

VESTIBULESTORAGE 1FHC 1

STORAGE 5

STORAGE 2

JC 1

JC 2

1

A-278

1

A-257

1

A-282

1

A-251

FHC 3

1

A-254

1

A-281

1

A-285

PS 3

PS 2

SE 1

1

A-255

1

A-258

1

A-260

1

A-272

1

A-271

1

A-275

1

A-284

1

A-273

FIN. FLOOREL.+545.00M

FIN. FLOOREL.+545.00M

FIN. FLOOREL.+545.00M

FIN. FLOOREL.+545.00M

1

A-274

READINGLOUNGESOUTH

BRIDGE

READINGLOUNGENORTH

OPEN TO BELOWOPEN TO BELOW

CORRIDORNORTH

1

A-283

EV HALL

2.2

NORTH TERRACE

NORTH EASTTERRACE

EAST TERRACE

SOUTH TERRACE

DN

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 150

A-104CheckerNSI

THIRD FLOOR PLAN

DESIGN DEVELOPMENT

THIRD FLOOR PLAN1

Page 34: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

UP

A-201

A

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

2 3 4 5 6 7 8 9 10 11 12 13

1

A-261

1

A-202

A-204 1

1

1

A-256

1

A-259

1

A-276

1

A-280

1

A-277

1

A-252

1

A-262

1

A-253

1

A-263

1

A-286

1

A-279

1

A-278

1

A-257

1

A-282

1

A-251

1

A-254

1

A-281

1

A-285

EPS

STAIR 2

MECHPENTHOUSE

FIN. FLOOREL.+549.50M

FIN. FLOOREL.+549.50M

1

1

A-255

1

A-258

1

A-260

1

A-272

1

A-271

1

A-275

1

A-284

1

A-273

1

A-274

SOLAR PANEL

A-3026

1

A-283

DR04 DR04

DR03

DR34

DR

25

DR25DR25

DR

25

DR

25

2.2

A

B

C

D

E

F

G

H

11 12 13

1

A-261

1

A-280

1

A-262

1

A-263

1

A-286

1

A-279

1

A-282

1

A-281

1

A-285

15 CBM

7.5 CBM

1

A-284

FLUSHINGWATER 1

FLUSHINGWATER 2

CITYWATER 2

FF WATER 4

15 CBM

7 CBM

CITYWATER 1

7 CBM

FF WATER 1

FF WATER 2

FF WATER 3

7.5 CBM

7.5 CBM

7.5 CBM

1

A-283

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 150

A-105CheckerNSI

MAINTENANCE ROOF LEVEL PLAN

DESIGN DEVELOPMENT

ROOF LEVEL PLAN - ACCESSIBLE AREA1 WATER TANK2

Page 35: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

UP

A-201

A

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

2 3 4 5 6 7 8 9 10 11 12 13

1

A-261

1

A-2031

A-202

A-204 1

1

1

A-256

1

A-259

1

A-276

1

A-280

1

A-277

1

A-252

1

A-262

1

A-253

1

A-263

1

A-286

1

A-279

1

A-278

1

A-257

1

A-282

1

A-251

1

A-254

1

A-281

1

A-285

1

1

A-255

1

A-258

1

A-260

1

A-272

1

A-271

1

A-275

1

A-284

1

A-273

1

A-274

SKY LIGHT

SKY LIGHT

SKY LIGHT

SKY LIGHT

600

600

FIN. FLOOR

+550.00M

FIN. FLOOR

+550.00M

FIN. FLOOR

+549.50M

FIN. FLOOR

+549.50M

FIN. FLOOR

+549.50M

MECHANICALPENTHOUSEFOR FHCMECHANICAL

PENTHOUSEFOR PRESSURISED FAN

MECHANICALPENTHOUSEFOR FHC

MECHANICALPENTHOUSEFOR FHC

MECHANICALPENTHOUSEFOR FHC

MECHANICALPENTHOUSE

1

A-283

H.P

L.P.

2.2

F

G

H

J

K

6 7 8

1

A-256

1

A-280

1

A-277

1

A-279

1

A-278

1

A-257

1

A-254

1

A-281

1

A-255

1

A-258

E

F

G

H

J

K

6 7 8 9

1

A-256

1

A-280

1

A-277

1

A-279

1

A-278

1

A-257

1

A-254

1

A-281

1

A-255

1

A-258

A-5214

ABOVE SOFFIT

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 150

A-106CheckerNSI

ROOF PLAN

DESIGN DEVELOPMENT

ROOF PLAN - OVERALL1 MAINTENANCE CATWALK2

ABOVE SOFFIT3

Page 36: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

FIRST FLOOR LEVEL+535.90 m

GROUND FLOOR LEVEL+530.90 m

SECOND FLOOR LEVEL+541.30 m

THIRD FLOOR LEVEL+545.00 m

2 3 4 5 6 7 8 9 10 11 12 13

1

A-261

GROUND LEVEL+530.40 m

1

A-256

1

A-259

1

A-252

1

A-262

1

A-253

1

A-263

1

A-257

1

A-251

1

A-254

T.O ROOF+549.40 m

1

1

A-255

1

A-258

1

A-260

PEAK+558.80 m

ST 01ST 01ST 01 ST 01 ST 01ST 01

RAIN WATERDRAIN PIPE

RAIN WATERDRAIN PIPE

RAIN WATERDRAIN PIPE

RAIN WATERDRAIN PIPE RAIN WATER

DRAIN PIPE

CONC 01

? ??

MTL 01

MTL 01MTL 01

MTL 01MTL 01

A-5033

A-5011

A-5021

GL 01GL 02

GL 03GL 05

GL 06

GL 12

SL 01

MTL 01

?

?

?

?

LVR01

GRL 03

----

GL 04

A-5027

?

A-5231

GRL12

GRL11

GRL13 GRL13 GRL13

SMOKEEXHAUST FAN

OPENING FORMAINTENANCE DECK

CONC 01

CONC 01

CONC 01

CONC 01

CONC 01 CONC 01

CONC 01 CONC 01 CONC 01

CONC 01

2.2

A-501.22

A-5213

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 100

A-201--NSI

BUILDING ELEVATION SOUTH

DESIGN DEVELOPMENT

ELEVATION SOUTH1

Page 37: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

FIRST FLOOR LEVEL+535.90 m

GROUND FLOOR LEVEL+530.90 m

SECOND FLOOR LEVEL+541.30 m

THIRD FLOOR LEVEL+545.00 m

2345678910111213

1

A-261

GROUND LEVEL+530.40 m

1

A-256

1

A-259

1

A-252

1

A-262

1

A-253

1

A-263

1

A-257

1

A-2511

A-254

T.O ROOF+549.40 m

1

1

A-255

1

A-258

1

A-260

PEAK+558.80 m

ST 01 ST 01 ST 01 ST 01 ST 01 ST 01

?

AAC 01

AAC 01

RAIN WATERDRAIN PIPE

RAIN WATERDRAIN PIPE

RAIN WATERDRAIN PIPE

RAIN WATERDRAIN PIPERAIN WATER

DRAIN PIPE

AAC 01

AAC 01

MTL 01 MTL 01 MTL 01 MTL 01 MTL 01MTL 01

A-5026

A-50107

GL 08

GL 11

GL 01

GL 09

GL 10

SL 02

?

RAIN WATERDRAIN PIPE

SMOKEEXHAUST FAN

OPENING FORMAINTENANCE DECK

2.2

A-501.21

FIRST FLOOR LEVEL+535.90 m

GROUND FLOOR LEVEL+530.90 m

SECOND FLOOR LEVEL+541.30 m

678910111213

1

A-261

GROUND LEVEL+530.40 m

1

A-256

1

A-259

1

A-262

1

A-2631

A-257

1

A-2581

A-260

CONC 01

CONC 01

AAC 01

AAC 01

MTL 01

AAC 01AAC 01

CONC 01CONC 01CONC 01CONC 01 CONC 01

GL 31

A-5048

A-5046

GL 26

GL 25

GRL20GRL05 GRL06GRL20GRL20GRL20

GRL04

FIRST FLOOR LEVEL+535.90 m

GROUND FLOOR LEVEL+530.90 m

R

1

A-271

AAC 01

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 100

A-202--NSI

BUILDING ELEVATION NORTH

DESIGN DEVELOPMENT

ELEVATION NORTH 11

ELEVATION NORTH 22 ELEVATION WEST 2 - BOH ENTRANCE3

Page 38: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

FIRST FLOOR LEVEL+535.90 m

GROUND FLOOR LEVEL+530.90 m

SECOND FLOOR LEVEL+541.30 m

THIRD FLOOR LEVEL+545.00 m

A B C D E F G H J K L M N P Q R

GROUND LEVEL+530.40 m

1

A-276

1

A-2801

A-277

1

A-286

1

A-2791

A-2781

A-282

1

A-281

1

A-285

T.O ROOF+549.40 m

1

A-272

1

A-271

1

A-275

1

A-284

1

A-273

PEAK+558.80 m

1

A-274

ST 01

AAC 01

?

CONC 01

CONC 01

CONC 01

AAC 01CONC 01

CONC 01

AAC 01

AAC 01

CONC 01

RAIN WATERDRAIN PIPE

RAIN WATERDRAIN PIPE

RAIN WATERDRAIN PIPE

RAIN WATERDRAIN PIPE

ST 01ST 01ST 01ST 01

ST 01

ST 01 ST 01

MTL 01MTL 01

MTL 01MTL 01 MTL 01

MTL 01MTL 01

GL 31

GL 31

GL 06

GL 07

GL 08

GL 09

SL 03

GL 24

GRL15

GRL16 GRL16

? GRL17

A-50106

A-50103A-502

8

?

?

A-5044

GRL18

GRL19 GRL19

1

A-283

SMOKEEXHAUST FAN

OPENING FORMAINTENANCE DECK

FIRST FLOOR LEVEL+535.90 m

GROUND FLOOR LEVEL+530.90 m

SECOND FLOOR LEVEL+541.30 m

A B C D E F G

1

A-280

1

A-286

1

A-282

1

A-281

1

A-285

1

A-284

CONC 01

ST 01

ABOVE SOFFIT ABOVE SOFFIT ABOVE SOFFIT

AAC 01

ST 01

GL 15

GL 16 GL 17

A-5038

1

A-283

FIRST FLOOR LEVEL+535.90 m

GROUND FLOOR LEVEL+530.90 m

12

1

A-261

1

A-262

1

A-263

GL 27

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 100

A-203--NSI

BUILDING ELEVATION EAST

DESIGN DEVELOPMENT

ELEVATION EAST 1 - BACK ENTRANCE1

ELEVATION EAST 2 - EAST ENTRANCE2 ELEVATION NORTH - EAST ENTRANCE3

Page 39: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

FIRST FLOOR LEVEL+535.90 m

GROUND FLOOR LEVEL+530.90 m

SECOND FLOOR LEVEL+541.30 m

THIRD FLOOR LEVEL+545.00 m

ABCDEFGHJKLMNPQR

GROUND LEVEL+530.40 m

1

A-276

1

A-280

1

A-277

1

A-286

1

A-279

1

A-278

1

A-282

1

A-281

1

A-285

T.O ROOF+549.40 m

1

A-272

1

A-2711

A-275

1

A-284

1

A-273

PEAK+558.80 m

1

A-274

ST 01 ST 01 ST 01 ST 01 ST 01

MTL 01MTL 01 MTL 01

MTL 01

MTL 01

SL 04

GL 01

A-501.24A-501

11

1

A-283SMOKEEXHAUST FAN

OPENING FORMAINTENANCE DECK

FIRST FLOOR LEVEL+535.90 m

GROUND FLOOR LEVEL+530.90 m

SECOND FLOOR LEVEL+541.30 m

ABCDEFGHJKLMNPQR

GROUND LEVEL+530.40 m

1

A-276

1

A-280

1

A-277

1

A-286

1

A-279

1

A-278

1

A-282

1

A-281

1

A-285

1

A-272

1

A-271

1

A-275

1

A-284

1

A-273

1

A-274

CONC 01

CONC 01MTL 01

CONC 01GL 18

GL 19GL 20 GL 21 GL 13

GL 14

GL 23

GL 22

GRL02

GRL20

A-5035

A-50414

A-50411

GRL20 GRL20

GRL07 GRL08

1

A-283

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 100

A-204--NSI

BUILDING ELEVATION WEST

DESIGN DEVELOPMENT

ELEVATION WEST 11

ELEVATION WEST 22

Page 40: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

FIRST FLOOR LEVEL+535.90 m

GROUND FLOOR LEVEL+530.90 m

SECOND FLOOR LEVEL+541.30 m

THIRD FLOOR LEVEL+545.00 m

ABCDEFGHJKLMNPQR

GROUND LEVEL+530.40 m

FOOTING (TBD)+526.40 m

1

A-276

1

A-280

1

A-277

1

A-286

1

A-279

1

A-278

1

A-282

1

A-281

1

A-285

T.O ROOF+549.40 m

1

A-272

1

A-271

1

A-275

1

A-284

1

A-273

WESTENTRANCE

PEAK+558.80 m

1

A-274

MECH PIT LEVEL+527.55 m

CONC 01

AAC 01

MTL 01

RAIN WATERDRAIN PIPE RAIN WATER

DRAIN PIPE

READINGZONE

READINGZONE

GRL20

GRL02

WESTTERRACE

1

A-283

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 100

A-251CheckerNSI

BUILDING SECTION - NORTH ANDSOUTH 01

DESIGN DEVELOPMENT

SECTION NORTH AND SOUTH 011

Page 41: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

FIRST FLOOR LEVEL+535.90 m

GROUND FLOOR LEVEL+530.90 m

SECOND FLOOR LEVEL+541.30 m

THIRD FLOOR LEVEL+545.00 m

ABCDEFGHJKLMNPQR

GROUND LEVEL+530.40 m

FOOTING (TBD)+526.40 m

1

A-276

1

A-280

1

A-277

1

A-286

1

A-279

CAFETERIA

MECH RM 4

READINGROOM 302GROUP

STUDYROOM 301

GROUPSTUDY

ROOM 201

CORRIDORNORTH

DUCTSPACE1

ARCHIVERM

1

A-278

1

A-282

1

A-281

1

A-285

T.O ROOF+549.40 m

1

A-272

1

A-271

1

A-275

1

A-284

1

A-273

READINGSPACE

CORRIDORNORTH

GROUPSTUDY

ROOM 101

STORAGE 2NORTH

ENTRANCEHALL STORAGE 3

BOHCORRIDOR

1 MEN'S WCWOMEN`S

WC

STEPPEDOPENSHELF

PEAK+558.80 m

1

A-274

BOOKCORRIDOR

NORTH

MECHANICALPIT

MECH PIT LEVEL+527.55 m

CONC 01

CONC 01CONC 01

ABOVE SOFFIT

CONC 01

CORRIDORSOUTH

BOOKCORRIDOR

SOUTH

READINGSPACE

MECHANICALPIT

A-5022

1

A-283

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 100

A-256CheckerNSI

BUILDING SECTION - NORTH ANDSOUTH 06

DESIGN DEVELOPMENT

SECTION NORTH AND SOUTH 061

Page 42: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

FIRST FLOOR LEVEL+535.90 m

GROUND FLOOR LEVEL+530.90 m

SECOND FLOOR LEVEL+541.30 m

THIRD FLOOR LEVEL+545.00 m

A B C D E F G H J K L M N P Q R

GROUND LEVEL+530.40 m

FOOTING (TBD)+526.40 m

1

A-2761

A-280

1

A-277

1

A-286

WOMEN`SWC MEN`S WC

MEN`S WCWOMEN`SWC

STAIR 2

GROUPSTUDY

ROOM 206

GROUPSTUDY

ROOM 306

ELECTRICALROOM

EASTENTRANCE

READINGROOM 301

GROUPSTUDY

ROOM 309

GROUPSTUDY

ROOM 308

GROUPSTUDY

ROOM 307

GROUPSTUDY

ROOM 207

GROUPSTUDY

ROOM 208

GROUPSTUDY

ROOM 209

MECH RM 2

1

A-278

1

A-282

1

A-281

1

A-285

T.O ROOF+549.40 m

1

A-272

1

A-2711

A-275

1

A-284

1

A-273

DS 4

STORAGE 2 PS 2

FHC 3

FHC 4

FHC 2

STAIR 2EPS

EPS 3

EPS 2

EPS 1MEDIALITERACYROOM 2

MECHANICALPITEPS

PEAK+558.80 m

FHC 2

STAIR 2

STAIR 2

STAIR 2

MECHPENTHOUSE

1

A-274

WOMEN`SWC

PS

PS 2

MECH PIT LEVEL+527.55 m

ABOVE SOFFIT

PUMPROOM

PS 1

ABOVE SOFFIT

1

A-283

DS 6 DS 5

DS 6 DS 5

NORTHENTRANCE

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 100

A-263CheckerNSI

BUILDING SECTION - NORTH ANDSOUTH 13

DESIGN DEVELOPMENT

SECTION NORTH AND SOUTH 131

Page 43: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

FIRST FLOOR LEVEL+535.90 m

GROUND FLOOR LEVEL+530.90 m

SECOND FLOOR LEVEL+541.30 m

THIRD FLOOR LEVEL+545.00 m

2345678910111213

1

A-261

GROUND LEVEL+530.40 m

FOOTING (TBD)+526.40 m

1

A-256

1

A-259

1

A-252

1

A-262

1

A-253

1

A-263

1

A-257

1

A-251

1

A-254

T.O ROOF+549.40 m

1

1

A-255

1

A-258

1

A-260

MEN`S WC

MEN`S WC

STORAGE 1STAIR 1FHC 1STAIR 1

VESTIBULESE 1DS 1

DS 3 SE 1STAIR 1

VESTIBULE FHC 2 DS 2

FHC 1STAIR 1VESTIBULEDS 3 SE 1

DS SE 1STAIR 1

VESTIBULE FHC 1MECH RM 1

WESTENTRANCE

PEAK+558.80 m

EV PIT 3

MECH PIT LEVEL+527.55 m

CONC 01 CONC 01 CONC 01 CONC 01 CONC 01 CONC 01

AAC 01

AAC 01

AAC 01

AAC 01AAC 01

ST 01

MECHANICALPIT

A-50108

DS 2 DS 1

DS 1 WESTTERRACE

STAIR 1

STAIR 1

STAIR 1

EV PIT 3

2.2

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 100

A-271CheckerNSI

BUILDING SECTION - EAST ANDWEST 01

DESIGN DEVELOPMENT

SECTION EAST AND WEST 011

Page 44: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

FIRST FLOOR LEVEL+535.90 m

GROUND FLOOR LEVEL+530.90 m

SECOND FLOOR LEVEL+541.30 m

THIRD FLOOR LEVEL+545.00 m

2345678910111213

1

A-261

GROUND LEVEL+530.40 m

FOOTING (TBD)+526.40 m

1

A-256

1

A-259

1

A-252

1

A-262

1

A-253

1

A-263

1

A-257

1

A-251

1

A-254

T.O ROOF+549.40 m

1

1

A-255

1

A-258

1

A-260

STEPPEDOPENSHELF

GROUPSTUDY

ROOM 306

GROUPSTUDY

ROOM 206

MEDIALITERACYROOM 2

ELECTRICALROOM

CORRIDOREAST

AUDIOVISUALROOM 2

WOMEN'SWC (STAFF)

MEN'S WC(STAFF) MEN'S WC JC 3

CORRIDORWEST

ADMINISTRATIONOFFICE

MECHANICALPIT

NORTHHALL READING

RM 101DUCT

SPACE1

WESTENTRANCE

PEAK+558.80 m

MECH PIT LEVEL+527.55 m

MTL 01

MECHANICALPIT

JC 2

BRIDGE

READINGZONE

CORRIDOREAST

BOOKCORRIDOR

EAST

STAIR 5HALL

2.2

2.2

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 100

A-278CheckerNSI

BUILDING SECTION - EAST ANDWEST 08

DESIGN DEVELOPMENT

SECTION EAST AND WEST 081

Page 45: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

FIRST FLOOR LEVEL+535.90 m

GROUND FLOOR LEVEL+530.90 m

SECOND FLOOR LEVEL+541.30 m

THIRD FLOOR LEVEL+545.00 m

2 3 4 5 6 7 8 9 10 11 12 13

1

A-261

GROUND LEVEL+530.40 m

FOOTING (TBD)+526.40 m

1

A-256

1

A-259

1

A-262

1

A-253

1

A-263

1

A-257

1

A-2511

A-254

T.O ROOF+549.40 m

1

1

A-255

1

A-258

1

A-260

STEPPEDOPENSHELF

GROUPSTUDY

ROOM 309

GROUPSTUDY

ROOM 209

ENTRANCEHALL

STAIR 5

HALL

EASTENTRANCEWEST

ENTRANCE

PEAK+558.80 m

MECH PIT LEVEL+527.55 m

CONC 01

CONC 01 CONC 01 CONC 01 CONC 01

ABOVE SOFFIT

MTL 01

MTL 01

MECHANICALPIT

FF WATER 3

BRIDGE

BOOKCORRIDOR

EAST

CORRIDOREAST

READINGSPACE

ENTRANCEHALL

READINGZONE

ABOVE SOFFIT ABOVE SOFFIT

UPTURN BEAM

2.2

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECFICIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWING AND REPORT ANY DISCREPRANCY FOR CLARIFICATIONBEFOR PROCEEDING WITH WORKS.6.CONTRCTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRCTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCESNEEDED FOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGSTHOES THAT ARE WITHIN THE SCOPE OF THE WORK OF THECONTRACT AS WELL AS THOSE TO BE SUPPLIED BY OTHERES.THEREFORE ALL DIMENSIONS SHOWN ON DRAWINGS RELEVANT TOTHESE INSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFEOM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS ANS SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

KNOWLEDGE CENTERAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

KNOWLEDGE CENTER

01 31 MAR 2014 ISSUED FOR SD

KNC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

2014/10/31

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 04 JUL 2014 ISSUED FOR DD 50%

05 03 AUG 2014 ISSUED FOR DD 70%

06 08 SEP 2014 ISSUED FOR DD 90%

07 31 OCT 2014 ISSUED FOR DD 100%

1 : 100

A-282CheckerNSI

BUILDING SECTION - EAST ANDWEST 12

DESIGN DEVELOPMENT

SECTION EAST AND WEST 121

Page 46: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

RESEARCH CENTRE COMPLEXAT INDIAN INSTITUTE OF TECHNOLOGY HYDERABAD

ARCHITECTURE

Page 47: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

A

B

C

D

E

F

H

J

K

L

M

N

P

1 2 3 4 5 6 7 8 9

G

10

MAIN ENTRANCE

BOH ENTRANCE

North

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 As indicated

A-052Checker--

SITE PLAN

DESIGN DEVELOPMENTDRAWING

SITE PLAN1

Page 48: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

1

A-252

1

A-256

A

B

C

D

E

F

H

J

K

L

M

N

P

1 2 3 4 5 6 7 8 9

G

1

A-258

1

A-251

1

A-253

1

A-254

1

A-259

1

A-255

STAIR6

10

FIN. FLOOR

+524.80

FIN. FLOOR

+525.80

FIN. FLOOR

+525.80 FIN. FLOOR

+526.10

FIN. FLOOR

+526.10

FIN. FLOOR

+526.10FIN. FLOOR

+526.10

FIN. FLOOR

+526.10

A-3061

SUMP PIT

SUMP PIT600x600x450H

SUMP PIT600x600x450H

A-3031

1

A-260

SUMP PIT1200x1200xH1500

SUMP PIT1200x1200xH1500

SPOUT OPENINGSPOUT OPENING

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 150

A-100----

PIT PLAN

DESIGN DEVELOPMENTDRAWING

PIT LEVEL PLAN1

Page 49: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

A-202

A-201 1

1

A-252

1

A-256

1

A

B

C

D

E

F

H

J

K

L

M

N

P

1 2 3 4 5 6 7 8 9

G

1

A-257

1

A-258

1

A-251

1

A-253

1

A-254

1

A-259

1

A-255

A-3011

FIN. FLOOREL.+528.70M

A-3021

A-3032

A-3041

A-3051

A-305.23

FIN. FLOOR

+528.40

FIN. FLOOR

+527.50

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+529.00FIN. FLOOR

+528.40

FIN. FLOOR

+529.00FIN. FLOOR

+528.70FIN. FLOOR

+528.70

10

FIN. FLOOR

+528.70

FIN. FLOOR

+528.70

FIN. FLOOR

+528.70

FIN. FLOOR

+528.40

FIN. FLOOR

+528.70

FIN. FLOOR

+528.70

OPENTO

BELOW

FIN. FLOOR

+529.00

A-613

A-75726

A-3063

MAIN ENTRANCE

BOH ENTRANCE

T.O.SLAB

+527.70T.O.SLAB

+527.70

T.O.SLAB

+527.70

T.O.SLAB

+527.70

FIN. FLOOR

+528.40

T.O.SLAB

+527.70

T.O.SLAB

+527.70

T.O.SLAB

+527.70

T.O.SLAB

+527.70

T.O.SLAB

+527.70

T.O.SLAB

+527.70

T.O.SLAB

+527.70

T.O.SLAB

+527.70

T.O.SLAB

+527.70

FIN. FLOOR

+528.70

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

FIN. FLOOR

+528.40

1

A-260

FENCE H=1100

MH MH

MH

MH

1

3

4

FIN. FLOOR

+528.15

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 150

A-101----

GROUND FLOOR PLAN

DESIGN DEVELOPMENTDRAWING

GROUND FLOOR PLAN1

Page 50: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

A-202

A-202

A-201 1

1

A-252

1

A-256

1

2

A

B

C

D

E

F

H

J

K

L

M

N

P

1 2 3 4 5 6 7 8 9

G

1

A-257

1

A-258

1

A-251

1

A-253

1

A-254

1

A-259

1

A-255

A-3012

FIN. FLOOR

+532.40

FIN. FLOOR

+532.40

FIN. FLOOR

+532.40

A-3022

A-3033

A-3042

A-3052

OPENTO

BELOWFIN. FLOOR+532.35

FIN. FLOOR

+532.40

FIN. FLOOR

+532.40

OPENTO

BELOW

OPENTO

BELOWOPEN

TOBELOW

OPENTO

BELOW

FIN. FLOOR

+532.40FIN. FLOOR

+532.40

FIN. FLOOR

+532.40

FIN. FLOOR+532.40

FIN. FLOOR

+532.40

FIN. FLOOR

+532.40

OPENTO

BELOW

OPENTO

BELOW

OPENTO

BELOW

OPENTO

BELOW

OPENTO

BELOW

OPENTO

BELOW

OPENTO

BELOW

OPENTO

BELOW

GASSTORAGE

A-61111

OPENTO

BELOW

OPENTO

BELOW

OPENTO

BELOW

FIN. FLOOR

+532.40

FIN. FLOOR

+532.40

FIN. FLOOR

+532.40

FIN. FLOOR

+532.40

1

A-260

ROOF

HANDRAIL

A

5 6 7

A-75826

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 150

A-102----

FIRST FLOOR PLAN

DESIGN DEVELOPMENTDRAWING

FRIST FLOOR PLAN1 ENTRANCE CANOPY2

Page 51: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

A-202

A-201 1

1

A-252

1

A-256

1

A

B

C

D

E

F

H

J

K

L

M

N

P

1 2 3 4 5 6 7 8 9

G

1

A-257

1

A-258

1

A-251

1

A-253

1

A-254

1

A-259

1

A-255

A-3013

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

A-3023

A-3034

A-3043

A-3053

FIN. FLOOR

+536.05

FIN. FLOOR

+536.05

FIN. FLOOR

+536.40

FIN. FLOOR

+536.05

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

OPEN TOBELOW

MAINTENANCEDECK FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

INTERIOR FINISHESWILL BE INSTALLED

INITIALLY

INTERIOR FINISHESWILL BE INSTALLED

INITIALLY

OPEN TOBELOW

FIN. FLOOR

+536.40

A-614

9

RAINWATER DOWNPIPE

RAINWATER DOWNPIPE

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPTSPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT SPT

SPT

SPT

SPT

SPT

SPT

FIN. FLOOR

+536.05

FIN. FLOOR

+536.05

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

FIN. FLOOR

+536.40

1

A-260

EMERGENCYSHOWER UNIT

EMERGENCYSHOWER UNIT

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 150

A-103----

SECOND FLOOR PLAN

DESIGN DEVELOPMENTDRAWING

SECOND FLOOR PLAN1

Page 52: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

A-202

A-201 1

1

A-252

1

A-256

1

A

B

C

D

E

F

H

J

K

L

M

N

P

1 2 3 4 5 6 7 8 9

G

1

A-257

1

A-258

1

A-251

1

A-253

1

A-254

1

A-259

1

A-255

FIN. FLOOR

+540.90

FIN. FLOOR

+540.90

FIN. FLOOR

+540.55

A-3024

A-303.23

A-3044

A-3054

FIN. FLOOR

+540.90

FIN. FLOOR

+540.90

FIN. FLOOR

+540.90FIN. FLOOR

+540.90

FIN. FLOOR

+540.55

FIN. FLOOR

+540.90

FIN. FLOOR

+540.90

FIN. FLOOR

+540.90

FIN. FLOOR

+540.90

FIN. FLOOR

+540.90

FIN. FLOOR

+540.55

FIN. FLOOR

+540.90

FIN. FLOOR

+540.55

A-6022

SPT

SPTSPT

SPT

SPT

SPT

SPT

SPT

SPT

SPTSPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

FIN. FLOOR

+540.55

FIN. FLOOR

+540.55FIN. FLOOR

+540.90

FIN. FLOOR

+540.90

FIN. FLOOR

+540.55 FIN. FLOOR

+540.90

FIN. FLOOR

+540.55

FIN. FLOOR

+540.90

FIN. FLOOR

+540.90

FIN. FLOOR

+540.90

FIN. FLOOR

+542.00

FIN. FLOOR

+542.00

FIN. FLOOR

+540.55FIN. FLOOR

+540.90

1

A-260

EMERGENCYSHOWER UNIT

EMERGENCYSHOWER UNIT

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 150

A-104----

THIRD FLOOR PLAN

DESIGN DEVELOPMENTDRAWING

THIRD FLOOR PLAN1

Page 53: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

A-202

A-201 1

1

A-252

1

A-256

1

A

B

C

D

E

F

H

J

K

L

M

N

P

1 2 3 4 5 6 7 8 9

G

1

A-257

1

A-258

1

A-251

1

A-253

1

A-254

1

A-259

1

A-255

FIN. FLOOR

+545.40

FIN. FLOOR

+545.40

FIN. FLOOR

+545.05

A-302.21

A-303.21

A-304.21

A-305.21

FIN. FLOOR

+545.40

FIN. FLOOR

+545.40

FIN. FLOOR

+545.40

FIN. FLOOR

+545.40

FIN. FLOOR

+545.40

FIN. FLOOR

+545.05

FIN. FLOOR

+545.05

FIN. FLOOR

+545.40FIN. FLOOR

+545.40

FIN. FLOOR

+545.40

FIN. FLOOR

+545.40

FIN. FLOOR

+545.40

OPENTO

BELOW

FIN. FLOOR

+545.40

A-6022

A-615

10

MAINTENANCE

BALCONY

SPT

SPTSPT

SPT

SPT

SPT

SPT

SPT

SPT

SPTSPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

MOVABLE PARTITION

FIN. FLOOR

+545.05

FIN. FLOOR

+545.40

FIN. FLOOR

+545.40

FIN. FLOOR

+545.40

FIN. FLOOR

+545.05

FIN. FLOOR

+545.05

FIN. FLOOR

+545.05

FIN. FLOOR

+545.05

1

A-260

EMERGENCYSHOWER UNIT

EMERGENCYSHOWER UNIT

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 150

A-105----

FOURTH FLOOR PLAN

DESIGN DEVELOPMENTDRAWING

FOURTH FLOOR PLAN1

Page 54: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

A-202

A-201 1

1

A-252

1

A-256

1

A

B

C

D

E

F

H

J

K

L

M

N

P

1 2 3 4 5 6 7 8 9

G

1

A-257

1

A-258

1

A-251

1

A-253

1

A-254

1

A-259

1

A-255

FIN. FLOOR

+549.90

FIN. FLOOR

+549.90

FIN. FLOOR

+549.90

FIN. FLOOR

+549.90

FIN. FLOOR

+547.65

MECHANICALPENTHOUSEFOR FHC

MECHANICALPENTHOUSEFOR FHC

MECHANICAL PENTHOUSE FOR FHC

MECHANICALPENTHOUSE

FOR PRESSURISEFAN

MECHANICAL PENTHOUSEFOR FHC

MECHANICALPENTHOUSE

FOR FHC

MECHANICALPENTHOUSE

1

A-260 GUTTER

GUTTER

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 150

A-106Checker--

ROOF PLAN

DESIGN DEVELOPMENTDRAWING

ROOF PLAN1

Page 55: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

A-201 1

1

A-252

1

A-256

A

B

C

D

E

F

H

J

K

L

M

N

P

1 2 3 4 5 6 7 8 9

G

1

A-257

1

A-258

1

A-251

1

A-253

1

A-254

1

A-259

1

A-255

A-3014

FIN. FLOOR

+549.90

FIN. FLOOR

+549.90

FIN. FLOOR

+549.90

FIN. FLOOR

+551.05

FIN. FLOOR

+551.05

FIN. FLOOR

+551.05

FIN. FLOOR

+550.50

FIN. FLOOR

+551.05

FIN. FLOOR

+551.90

FIN. FLOOR

+547.65

FIN. FLOOR

+551.05

FIN. FLOOR

+551.05

FIN. FLOOR

+551.05

FIN. FLOOR

+551.05FIN. FLOOR

+551.05

FIN. FLOOR

+551.80

FIN. FLOOR

+549.90

MECHANICALPENTHOUSE

FOR PRESSURISEFAN

MECHANICALPENTHOUSE

MECHANICALPENTHOUSE

MECHANICALPENTHOUSE

MECHANICALPENTHOUSE

MECHANICALPENTHOUSE

MECHANICALPENTHOUSE

MECHANICALPENTHOUSE

MECHANICALPENTHOUSE

MECHANICALPENTHOUSE

MECHANICALPENTHOUSE

1

A-260

SPT SPT

SPT SPT

A-1072

B

C

D

E

F

H

J

K

L

M

N

3 4 5 6 7 8

G

FIN. FLOOR

+553.95

FIN. FLOOR

+552.55

FIN. FLOOR

+554.95

FIN. FLOOR

+551.80

FIN. FLOOR

+551.05

FIN. FLOOR

+551.05

FIN. FLOOR

+550.11

A-7566

FIN. FLOOR

+551.05

FIN. FLOOR

+551.05

MECHANICALPENTHOUSEFOR PRESSURISE FAN

MECHANICALPENTHOUSE

MECHANICALPENTHOUSE

MECHANICALPENTHOUSE

MECHANICALPENTHOUSE

MECHANICALPENTHOUSE

SPT SPT

SPT SPT

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 150

A-107----

ROOF PLAN - RL+2500 & +4000

DESIGN DEVELOPMENTDRAWING

ROOF PLAN - RL+25001 ROOF PLAN - RL+ 40002

Page 56: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

GROUND FLOOR LEVEL+528.40 m

FIRST FLOOR LEVEL+532.40 m

GROUND LEVEL+528.00 m

SECOND FLOOR LEVEL+536.40 m

THIRD FLOOR LEVEL+540.90 m

FOURTH FLOOR LEVEL+545.40 m

ROOF LEVEL+549.90 m

ROOF LEVEL +2500+552.40 m

PIT LEVEL+526.10 m

1

A-252

1 2 3 4 5 6 7 8 9

1

A-251

1

A-253

1

A-254

10

AAC RAILING

RC RAILING

AAC RAILING

RC RAILING

AAC RAILING

RC RAILING

AAC RAILING

RC RAILING

AAC WALL

GRANITE STONE PANEL(300MM X 300 MM)

CONCRETE

CONCRETEBUILDING SINAGE

AAC WALL

AAC WALL

AAC WALL

AAC WALL

AAC WALL

CONCRETE

CONCRETE

GRANITE STONE PANEL(300MM X 300 MM)

GRANITESTONEPANEL(300MM X300 MM)

BLOCK SCREEN

BLOCK SCREEN

BLOCK SCREEN

GROUND FLOOR LEVEL+528.40 m

FIRST FLOOR LEVEL+532.40 m

GROUND LEVEL+528.00 m

SECOND FLOOR LEVEL+536.40 m

THIRD FLOOR LEVEL+540.90 m

FOURTH FLOOR LEVEL+545.40 m

ROOF LEVEL+549.90 m

ROOF LEVEL +2500+552.40 m

PIT LEVEL+526.10 m

1

A-256

ABCDEFHJKLMNP G

1

A-257

1

A-258

1

A-259

1

A-255

AAC RAILING

RC RAILING

AAC RAILING

RC RAILING

AAC RAILING

RC RAILING

AAC RAILING

RC RAILING

AAC WALL AAC WALL

CONCRETE

SIGNAGE

AAC WALL

AAC WALL

AAC WALL

AAC WALL

AAC WALL

AAC WALL

GRANITESTONEPANEL

GRANITE STONE PANEL(300MM X 300 MM)

GRANITE STONE PANEL(300MM X 300 MM)

GRANITE STONE PANEL(300MM X 300 MM)

1

A-260

BLOCKSCREEN

BLOCKSCREEN

BLOCKSCREEN

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 150

A-201----

ELEVATION

DESIGN DEVELOPMENTDRAWING

ELEVATION SOUTH2

ELEVATION WEST1

Page 57: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

GROUND FLOOR LEVEL+528.40 m

FIRST FLOOR LEVEL+532.40 m

GROUND LEVEL+528.00 m

SECOND FLOOR LEVEL+536.40 m

THIRD FLOOR LEVEL+540.90 m

FOURTH FLOOR LEVEL+545.40 m

ROOF LEVEL+549.90 m

ROOF LEVEL +2500+552.40 m

PIT LEVEL+526.10 m

1

A-252

12345678

1

A-251

1

A-253

1

A-254

10

CONCRETE

AAC RAILING

RC RAILING

AAC RAILING

RC RAILING

AAC RAILING

RC RAILING

AAC RAILING

RC RAILING

GATE TYPE 1

GATE TYPE 2

GATE TYPE 2

GATE TYPE 2

AAC WALL AAC WALL

AAC WALL

AAC WALL

AAC WALL

CONCRETE

CONCRETE

GRANITE STONE PANEL(300MM X 300MM)

RWP

RWP

GRANITE STONE PANEL(300MM X 300MM)

GROUND FLOOR LEVEL+528.40 m

FIRST FLOOR LEVEL+532.40 m

GROUND LEVEL+528.00 m

SECOND FLOOR LEVEL+536.40 m

THIRD FLOOR LEVEL+540.90 m

FOURTH FLOOR LEVEL+545.40 m

ROOF LEVEL+549.90 m

ROOF LEVEL +2500+552.40 m

PIT LEVEL+526.10 m

1

A-256

A B C D E F H J K L M N PG

1

A-257

1

A-258

1

A-259

1

A-255

BUILDING SIGNAGE

AAC RAILING

RC RAILING

AAC RAILING

RC RAILING

AAC RAILING

RC RAILING

AAC RAILING

RC RAILING

AAC WALL

CONCRETE

GATE TYPE 2

GATE TYPE 2

GATE TYPE 2

GRANITE STONE PANEL(300MM X 300MM)

AAC WALL AAC WALL

GRANITE STONE PANEL(300MM X 300MM)

1

A-260

BLOCK SCREEN

BLOCK SCREEN

BLOCK SCREEN

RWPRWP

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 150

A-202----

ELEVATION

DESIGN DEVELOPMENTDRAWING

ELEVATION NORTH2

ELEVATION EAST1

Page 58: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

GROUND FLOOR LEVEL+528.40 m

FIRST FLOOR LEVEL+532.40 m

GROUND LEVEL+528.00 m

SECOND FLOOR LEVEL+536.40 m

THIRD FLOOR LEVEL+540.90 m

FOURTH FLOOR LEVEL+545.40 m

ROOF LEVEL+549.90 m

ROOF LEVEL +2500+552.40 m

PIT LEVEL+526.10 m

1

A-256

ABCDEFHJKLMNP G

1

A-257

1

A-258

1

A-259

1

A-255

FOOTING LEVEL+524.00 m

1

A-260

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 100

A-251----

BUILDING SECTION NORTH-SOUTH

DESIGN DEVELOPMENTDRAWING

BUILDING SECTION1

Page 59: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

GROUND FLOOR LEVEL+528.40 m

FIRST FLOOR LEVEL+532.40 m

GROUND LEVEL+528.00 m

SECOND FLOOR LEVEL+536.40 m

THIRD FLOOR LEVEL+540.90 m

FOURTH FLOOR LEVEL+545.40 m

ROOF LEVEL+549.90 m

ROOF LEVEL +2500+552.40 m

PIT LEVEL+526.10 m

1

A-256

ACDEFHJKLMNP G1

A-257

1

A-258

1

A-259

1

A-255

2

A-303.2

FOOTING LEVEL+524.00 m

1

A-260

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 100

A-252----

BUILDING SECTION NORTH-SOUTH

DESIGN DEVELOPMENTDRAWING

BUILDING SECTION1

Page 60: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

GROUND FLOOR LEVEL+528.40 m

FIRST FLOOR LEVEL+532.40 m

GROUND LEVEL+528.00 m

SECOND FLOOR LEVEL+536.40 m

THIRD FLOOR LEVEL+540.90 m

FOURTH FLOOR LEVEL+545.40 m

ROOF LEVEL+549.90 m

ROOF LEVEL +2500+552.40 m

PIT LEVEL+526.10 m

1

A-256

ABCDEFHJKLMNP G

1

A-257

1

A-258

1

A-259

1

A-255

2

A-305.2

FOOTING LEVEL+524.00 m

1

A-260

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 100

A-254----

BUILDING SECTION NORTH-SOUTH

DESIGN DEVELOPMENTDRAWING

BUILDING SECTION1

Page 61: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

GROUND FLOOR LEVEL+528.40 m

FIRST FLOOR LEVEL+532.40 m

GROUND LEVEL+528.00 m

SECOND FLOOR LEVEL+536.40 m

THIRD FLOOR LEVEL+540.90 m

FOURTH FLOOR LEVEL+545.40 m

ROOF LEVEL+549.90 m

ROOF LEVEL +2500+552.40 m

PIT LEVEL+526.10 m

1

A-252

1 2 3 4 5 6 7 8 9

1

A-251

1

A-253

1

A-254

FOOTING LEVEL+524.00 m

A-7541

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 100

A-255----

BUILDING SECTION EAST-WEST

DESIGN DEVELOPMENTDRAWING

BUILDING SECTION1

Page 62: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

GROUND FLOOR LEVEL+528.40 m

FIRST FLOOR LEVEL+532.40 m

GROUND LEVEL+528.00 m

SECOND FLOOR LEVEL+536.40 m

THIRD FLOOR LEVEL+540.90 m

FOURTH FLOOR LEVEL+545.40 m

ROOF LEVEL+549.90 m

ROOF LEVEL +2500+552.40 m

PIT LEVEL+526.10 m

1

A-252

1 2 3 4 5 6 7 8 9

1

A-251

1

A-253

1

A-254

FOOTING LEVEL+524.00 m

10

A-7531

A-7511

A-7521

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 100

A-256----

BUILDING SECTION EAST-WEST

DESIGN DEVELOPMENTDRAWING

BUILDING SECTION1

Page 63: GRIHA Check List · and to maximize benefits from prevailing micro‐climate 4 can attempt for these points as the micro climate is not disterbed can attempt for these points as the

GROUND FLOOR LEVEL+528.40 m

FIRST FLOOR LEVEL+532.40 m

GROUND LEVEL+528.00 m

SECOND FLOOR LEVEL+536.40 m

THIRD FLOOR LEVEL+540.90 m

FOURTH FLOOR LEVEL+545.40 m

ROOF LEVEL+549.90 m

ROOF LEVEL +2500+552.40 m

PIT LEVEL+526.10 m

1

A-252

1 2 3 4 5 6 7 8 9

1

A-251

1

A-253

1

A-254

FOOTING LEVEL+524.00 m

Date Scale Drawn Checked

Sheet Number

No. Date Issue

GENERAL NOTES

SIGN. SEAL.

1. ANY DRAWING TO BE REFERRED AS A PART OF THE SET ONLY ANDNOT IN ISOLATION.2.ALL DIMENSIONS ARE IN MM GROUND LEVEL IN METERS UNLESSMENTIONED OTHERWISE.3.DO NOT SCALE FROM THE DRAWING.4.ALL DIMENSIONS TO BE VERIFIED ON SITE.5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVENTARCHTECTURE, STRUCTURAL,M,E & P DRAWING ANDSPECIFICATIONS.CONTRACTOR SHALL CO-ORDINATE THESEDRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATIONBEFORE PROCEEDING WITH WORKS.6.CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVALWHEREVER ESSENTIAL.7.CONTRACTOR WILL BE RESPONSIBLE FOR THE CHECKING ANDVERIFICATION OF ALL DIMENSIONS, SIZES AND TOLERANCES NEEDEDFOR THE INSTALLATIONS OF ALL EQUIPMENT AND FITTINGS THOESTHAT ARE WITHIN THE SCOPE OF THE WORK OF THE CONTRACT ASWELL AS THOSE TO BE SUPPLIED BY OTHERES. THEREFORE ALLDIMENSIONS SHOWN ON DRAWINGS RELEVANT TO THESEINSTALLATION ARE FOR GUIDANCE ONLY.8.LEVELS MENTIONED FOR LINTELS AT DOOR AND OPENINGS AREFROM FINISHED FLOOR LEVEL.9.ANY DISCREPANCY IN THE DRAWINGS/DIMENSION/SPECIFICATIONSTO BE BROUGHT TO THE NOTICE OF CONSULTANT PRIOR TOSUBMISSION OF TENDER PRICE.ANY CLAIMS DUE TO SUCHDISCREPANCIES WILL NOT BE ACCEPTED/APPROVED LATER.10. ALL CUTOUTS AND SLEEVES OF M.E.P. SERVICES MUST BECLOSED AS PER METHOD SPECIFIED.11.ALL OPENINGS DIMESIONS SHOWN ARE STRUCTURAL OPENINGSUNLESS NOTED OTHERWISE.12ALL WET AREAS AND SHAFT FLOORING SHOULD HAVE WATERPROOFING LAYER AS PER SPECIFICATIONS.13.ALL STRUCTURE FRAME AND SUB STRUCTURE MATERIAL ANDFRAME TO BE DETERMINED BASED ON THE CONFIRMATION OFSTRUCTURAL ENGINEER.14.ALL STEEL EXPOSED OUTSIDE IS MADE OF GALVANIZED STEELWITH PAINTING.15. ALL ALUMINUM HAVE SECONDARY ELECTROLYTIC TREATMENT.

Sheet Title

Project Name

IITH CAMPUS DESIGN STUDIOFaculty of Engineering Building1,Rm #331

7-3-1 Hongo,Bunkyo-Ku,Tokyo 113-8656,JAPAN

NIHON SEKKEIINTERNATIONAL INC.

NIHON SEKKEI INC.6-5-1 Nishi-Shinjuku,Shinjuku

Tokyo 163-1329 JAPAN

APL DESIGN WORKSHIP INC.4-2-1 Yushima,Bunkyo-KuTokyo 113-0034 JAPAN

THIS DRAWING IS THE COPY RIGHT PROPERTY OF ASTUTEENGG. SERVICES PVT. LTD. ANY MISUSE,DUPLICATION,ALTERATION OD REUSE FOR ANOTHER PURPOSE IS STRICTLYPROHIBITED & SHALL BE DEALT LEGALLY

RESEARCH CENTER COMPLEXAT CAMPUS OFIIT HYDERABAD

Architect/Engineer

Architect Of Record

INDIAN INSTITUTE OF TECHNOLOGYHYDERABAD

RESEARCH CENTER COMPLEX

01 31 MAR 2014 ISSUED FOR SD

RCC-

NOT FOR CONSTRUCTION

9 & 10, Symphony C, Range Hills,Bhosale Nagar, Pune - 411 020, (India)

02 31 MAY 2014 ISSUED FOR DD 30%

03 17 JUN 2014 ISSUED FOR COST ESTIMATION

04 4 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 50%

05 28 JUL 2014 ISSUED FOR DESIGN DEVELOPMENT 70%

06 8 SEP 2014 ISSUED FOR DESIGN DEVELOPMENT 90%

07 31 OCT 2014 ISSUED FOR DESIGN DEVELOPMENT100%

2014/10/31 1 : 100

A-259----

BUILDING SECTION EAST-WEST

DESIGN DEVELOPMENTDRAWING

BUILDING SECTION1