gridpp: executive summary tony doyle. tony doyle - university of glasgow oversight committee 11...

27
GridPP: Executive Summary Tony Doyle

Upload: richard-barnett

Post on 28-Mar-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

GridPP: Executive Summary

Tony Doyle

Page 2: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

Exec2 SummaryGrid Status:

Geographical View: GridMapHigh-level View: ProjectMap

Topical View: CASTORPerformance Monitoring

Disaster PlanningTransition Point

The Icemen Cometh

Outline

Page 3: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

• 2007 is the third full year for the Production Grid• More than 10,000 kSI2k and 1 Petabyte of disk storage• The UK is the largest CPU provider on the EGEE Grid• Total CPU used of 25 GSI2k-hours in the last year to Sept.• The GridPP2 project has met 86% of its targets with 93% of

the metrics within specification (up to 07Q2)• The GridPP2 project has been extended by 7 months to April

2008– The LCG (full) Grid Service is underway– The aim is to continue to improve reliability and performance

• The GridPP3 proposal has been approved for 3 years through to March 2011 [total cost of £29.5m]– The aim is to provide a performant service to the experiments

• We anticipate a challenging period especially for the support of experiment applications running on the Grid

Exec2 Summary

Page 4: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

•To create a UK Particle Physics Grid and the computing technologies required for the Large Hadron Collider (LHC) at CERN

•To place the UK in a leadership position in the international development of an EU Grid infrastructure

Context

Page 5: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

• View can be geographical, high-level or topical

VO Viewscross-location

Top-level View

GeographicalViews

Federation,Partner,Site, etc.

Next level of GridMaps

Large-scale Federated Grid

Services Infrastructure

Global GridMap

Application Domain GridMap

Local GridMap Local GridMap Local GridMap

Alert Corrective action effect

Views of the Grid

Page 6: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

1. Geographical Status

http://gridmap.cern.ch/gm/

“A Leadership Position”

Page 7: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

Resource Status

The latest availability figures are (approx. in case of Tier-1):

Tier-1 Tier-2 TotalCPU [kSI2k] 1500 8588 10,088Disk [TB] 750 743 1,493Tape [TB] >800 >800•GridPP2 capacity targets met•Combined effort from all Institutions

Page 8: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

Aim: by 2008 (full year’s data taking)

- CPU ~100MSI2k (100,000 CPUs)

- Storage ~80PB - Involving >100 institutes

worldwide

- Build on complex middleware being developed in advanced Grid technology projects, both in Europe (Glite) and in the USA (VDT)

1. Prototype went live in September 2003 in 12 countries

2. Extensively tested by the LHC experiments in September 2004

3. February 2006 25,547 CPUs, 4398 TB storage

Status in Oct 2007: 245 sites, 40,518

CPUs, 24,135 TB storage

Grid Status

Page 9: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

Resource Accounting

100,000 3GHz CPUs

CPU resources at ~required levels

(just in time delivery)

time

LHC start-upCPU

Grid-accessible disk accounting being improved

Grid Operations Centre

Page 10: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

2. High-Level Status

0 .1 0 .2 0 .3 0 .4 0 .5 0 .6 0 .7 0 .8 0 .9 0 .1 0 0 .1 1 0 .1 2 0 .1 3 0 .1 4 0 .1 5 0 .1 6 0 .1 7 0 .1 0 0 0 .1 0 1 0 .1 0 2 0 .1 0 3 0 .1 0 4 0 .1 0 5 0 .1 0 6 0 .1 0 7 0 .1 0 8 0 .1 0 9 0 .1 1 0 0 .1 1 1 0 .1 1 2 0 .1 1 3 0 .1 1 4 0 .1 1 5 0 .1 1 6

0 .1 8 0 .1 9 0 .2 0 0 .2 1 0 .2 2 0 .2 3 0 .2 4 0 .2 5 0 .2 6 0 .2 7 0 .2 8 0 .2 9 0 .3 0 0 .3 1 0 .3 2 0 .3 3 0 .3 4 0 .1 1 7 0 .1 1 8 0 .1 1 9 0 .1 2 0 0 .1 2 1 0 .1 2 2 0 .1 2 3 0 .1 2 4 0 .1 2 5 0 .1 2 6 0 .1 2 7 0 .1 2 8 0 .1 2 9 0 .1 3 0 0 .1 3 1 0 .1 3 2 0 .1 3 3

0 .3 5 0 .3 6 0 .3 7 0 .3 8 0 .3 9 0 .4 0 0 .4 1 0 .4 2 0 .4 3 0 .4 4 0 .4 5 0 .4 6 0 .4 7 0 .4 8 0 .4 9 0 .5 0 0 .5 1 0 .1 3 4 0 .1 3 5 0 .1 3 6 0 .1 3 7 0 .1 3 8 0 .1 3 9 0 .1 4 0 0 .1 4 1 0 .1 4 2 0 .1 4 3 0 .1 4 4 0 .1 4 5 0 .1 4 6 0 .1 4 70 .5 2 0 .5 3 0 .5 4 0 .5 5 0 .5 6 0 .5 7 0 .5 8 0 .5 9 0 .6 0 0 .6 1 0 .6 2 0 .6 3 0 .6 4 0 .6 5 0 .6 6 0 .6 7 0 .6 8

2 .1 3 .1 4 .1 5 .1 6 .1

1 .1 .1 1 .1 .2 1 .1 .3 1 .1 .4 2 .1 .1 2 .1 .2 2 .1 .3 2 .1 .4 2 .1 .5 3 .1 .1 3 .1 .2 3 .1 .3 3 .1 .4 3 .1 .5 4 .1 .1 4 .1 .2 4 .1 .3 4 .1 .4 4 .1 .5 5 .1 .1 5 .1 .2 5 .1 .3 5 .1 .4 5 .1 .5 6 .1 .1 6 .1 .2 6 .1 .3 6 .1 .4 6 .1 .5

1 .1 .5 2 .1 .6 2 .1 .7 2 .1 .8 2 .1 .9 2 .1 .1 0 3 .1 .6 3 .1 .7 3 .1 .8 3 .1 .9 3 .1 .1 0 4 .1 .6 4 .1 .7 4 .1 .8 4 .1 .9 4 .1 .1 0 5 .1 .6 5 .1 .7 5 .1 .8 5 .1 .9 5 .1 .1 0 6 .1 .6 6 .1 .7 6 .1 .8 6 .1 .9

2 .1 .1 1 2 .1 .1 2 3 .1 .1 1 3 .1 .1 2 3 .1 .1 3 4 .1 .1 1 4 .1 .1 2 5 .1 .1 1 5 .1 .1 2

2 .2 3 .2 4 .2 5 .2 6 .2

1 .2 .1 1 .2 .2 1 .2 .3 1 .2 .4 2 .2 .1 2 .2 .2 2 .2 .3 2 .2 .4 2 .2 .5 3 .2 .1 3 .2 .2 3 .2 .3 3 .2 .4 3 .2 .5 4 .2 .1 4 .2 .2 4 .2 .3 4 .2 .4 4 .2 .5 5 .2 .1 5 .2 .2 5 .2 .3 5 .2 .4 5 .2 .5 6 .2 .1 6 .2 .2 6 .2 .3 6 .2 .4 6 .2 .5

1 .2 .5 2 .2 .6 2 .2 .7 2 .2 .8 2 .2 .9 2 .2 .1 0 3 .2 .6 3 .2 .7 4 .2 .6 4 .2 .7 4 .2 .8 4 .2 .9 4 .2 .1 0 5 .2 .6 5 .2 .7 5 .2 .8 5 .2 .9 5 .2 .1 0 6 .2 .6 6 .2 .7 6 .2 .8 6 .2 .9 6 .2 .1 0

2 .2 .1 1 2 .2 .1 2 2 .2 .1 3 2 .2 .1 4 2 .2 .1 5 4 .2 .1 1 4 .2 .1 2 4 .2 .1 3 4 .2 .1 4 4 .2 .1 5 5 .2 .1 1 5 .2 .1 2 5 .2 .1 3 5 .2 .1 4 5 .2 .1 5 6 .2 .1 1 6 .2 .1 2 6 .2 .1 3 6 .2 .1 4

2 .3 3 .3 4 .3 6 .3

1 .3 .1 1 .3 .2 1 .3 .3 2 .3 .1 2 .3 .2 2 .3 .3 2 .3 .4 2 .3 .5 3 .3 .1 3 .3 .2 3 .3 .3 3 .3 .4 3 .3 .5 4 .3 .1 4 .3 .2 4 .3 .3 4 .3 .4 4 .3 .5 6 .3 .1 6 .3 .2 6 .3 .3 6 .3 .4 6 .3 .5

2 .3 .6 2 .3 .7 2 .3 .8 2 .3 .9 2 .3 .1 0 3 .3 .6 3 .3 .7 3 .3 .8 3 .3 .9 3 .3 .1 0 4 .3 .6 4 .3 .7 4 .3 .8 4 .3 .9 4 .3 .1 0

2 .3 .1 1 3 .3 .1 1 3 .3 .1 2 3 .3 .1 3 4 .3 .1 1 4 .3 .1 2 4 .3 .1 3

2 .4 3 .4 4 .4 6 .4

2 .4 .1 2 .4 .2 2 .4 .3 2 .4 .4 2 .4 .5 3 .4 .1 3 .4 .2 3 .4 .3 3 .4 .4 3 .4 .5 4 .4 .1 4 .4 .2 4 .4 .3 4 .4 .4 4 .4 .5 6 .4 .1 6 .4 .2 6 .4 .3 6 .4 .4

2 .4 .6 2 .4 .7 2 .4 .8 2 .4 .9 2 .4 .1 0 3 .4 .6 3 .4 .7 3 .4 .8 3 .4 .9 3 .4 .1 0 4 .4 .6 4 .4 .7 4 .4 .8 4 .4 .9 4 .4 .1 0

2 .4 .1 1 2 .4 .1 2 2 .4 .1 3 2 .4 .1 4 2 .4 .1 5 3 .4 .1 1 3 .4 .1 2 3 .4 .1 3 3 .4 .1 4 3 .4 .1 5

2 .5 3 .5 9 0 D a y s2 .5 .1 2 .5 .2 2 .5 .3 2 .5 .4 2 .5 .5 3 .5 .1 3 .5 .2 3 .5 .3 3 .5 .4 3 .5 .5

2 .5 .6 2 .5 .7 2 .5 .8 2 .5 .9 2 .5 .1 0 3 .5 .6 3 .5 .7 3 .5 .8 3 .5 .9 M o n i to r O K 1 .1 .1 2 .5 .1 1 2 .5 .1 2 2 .5 .1 3 2 .5 .1 4 M o n i to r n o t O K 1 .1 .1 M ile s to n e c o m p le te 1 .1 .1

2 .6 3 .6 M ile s to n e o v e rd u e 1 .1 .1

2 .6 .1 2 .6 .2 2 .6 .3 2 .6 .4 2 .6 .5 3 .6 .1 3 .6 .2 3 .6 .3 3 .6 .4 3 .6 .5 M i le s to n e d u e s o o n 1 .1 .1

2 .6 .6 2 .6 .7 2 .6 .8 2 .6 .9 2 .6 .1 0 3 .6 .6 3 .6 .7 3 .6 .8 3 .6 .9 3 .6 .1 0 M i le s to n e n o t d u e s o o n 1 .1 .1

2 .6 .1 1 2 .6 .1 2 2 .6 .1 3 I t e m no t A c tiv e 1 .1 .1

O t he r L in k N e tw o r k L H C D e p lo ym e n t

P r o j e c t P la n n in g

C M S

P o r t a l

S t a t u s D a te - 3 0 / J u n /0 7 + n e x t

U K Q C D

N a v ig a te d o w nE x t e rn a l l in k

P h e n o G r id

L H C A p p s

1 .1

1 .3

S e c u r ity

In fo M o n

D e s ig n

S e r v ic e C h a l le n g e s

P r o d u c t io n G r i d M i l e s to n e s P r o d u c t io n G r i d M e t r ic s

1L C G E x te r n a l

4M / S /N

5N o n -L H C A p p s M a n a g e m e n t

2 3

K n o w le d g e T r a n s fe r

L H C b

G A N G A

A T L A S

In te r o p e r a b il it yS a m G r id

E n g a g e m e n tW o r k lo a d

6

1 .2

D e v e lo p m e n t

D is s e m in a t io n

P r o j e c t E x e c u t io n

B a B a rM e ta d a t a

S t o r a g e

U p d a te

C le a r

Production Grid project nearing successful completion…

Page 11: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

Tape oriented Disk orientedRequest oriented

Castor

3. Topical Status

Page 12: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

Castor

Experiments• migration to Castor is an

important milestone• weekly technical

meetings set up• deployment of separate

instances of Castor 2.1.3 for ATLAS, CMS and LHCb

• The current progress, next steps and concerns of the experiments in this area are provided in the User Board report.

Tier-1• http://www.gridpp.ac.uk/wiki/

RAL_Tier1_CASTOR_Experiments_Technical_Issues

• CASTOR 2.1.3 has recently proven to be robust under test loads and early service challenge trials

• CASTOR 2.1.4 ready for deployment (“disk1” storage classes)

• Tier-1 review planned for November

Page 13: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

• Bridging the Experiment-Grid Gap..

Availability Status

htt

p:/

/hepw

ww

.ph.q

mul.ac.

uk/~

lloyd/g

ridpp/u

kgri

d.h

tml

90% max80% typical

c.f.95% T2 target

98% T1 target

80% max70% typical

c.f.~95% target

Page 14: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

htt

p:/

/ww

w3

.egee.c

esg

a.e

s/gri

dsi

te/a

ccounti

ng/C

ESG

A/t

ree_e

gee.p

hp

ResourcesAccumulated EGEE CPU Usage 102,191,758

kSI2k-hoursor >100 GSI2k-hours (!)

Via APEL accounting

UKI: 24,788,212 kSI2k-hours

Page 15: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

Past year’s CPU Usage

by experiment

UK Resources

Page 16: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

Past year’s CPU Usage

by Region

UK Resources

Page 17: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

06/2

0/04

07/1

9/04

08/1

7/04

09/1

5/04

10/1

4/04

11/1

2/200

4

12/1

1/200

4

01/0

9/200

5

02/0

7/200

5

03/0

8/200

5

04/0

6/200

5

05/0

5/200

5

06/0

3/200

5

07/0

2/200

5

07/3

1/05

08/2

9/05

09/2

7/05

10/2

6/05

11/2

4/05

23/1

2/200

5

21/0

1/200

6

19/0

2/200

6

20/0

3/200

6

18/0

4/200

6

18/0

5/200

6

16/0

6/200

6

15/0

7/200

6

13/0

8/200

6

11/0

9/200

6

12/1

0/200

6

11/1

1/200

6

10/1

2/200

6

08/0

1/200

6

08/0

2/200

6

09/0

3/200

6

Date

Pu

bli

shed

jo

b s

lots

UK total job slots

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

06/0

2/2

004

07/0

3/2

004

08/0

3/2

004

09/0

3/2

004

10/0

4/2

004

11/0

4/2

004

12/0

5/2

004

01/0

5/2

005

02/0

5/2

005

03/0

8/2

005

04/0

8/2

005

05/0

9/2

005

06/0

9/2

005

07/1

0/2

005

08/1

0/2

005

09/1

0/2

005

10/1

1/2

005

11/1

1/2

005

12/1

2/2

005

12/0

1/2

006

12/0

2/2

006

15/0

3/2

006

15/0

4/2

006

17/0

5/2

006

17/0

6/2

006

18/0

7/2

006

18/0

8/2

006

18/0

9/2

006

22/1

0/2

006

22/1

1/2

006

23/1

2/2

006

23/0

1/2

006

25/0

2/2

006

Date

% j

ob

slo

ts u

sed

% EGEE slots used % UK slots used

2004 2005 2006 2007

2004 2005 2006 2007

Job Slots and Use

Currently ~51% which falls short of the 70% target

Page 18: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

Tier-1

•CPU, disk and tape resources being built up according to plan•2008 procurement well underway

Page 19: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

(measured by UK Tier-1 and Tier-2 for all VOs)

~90% CPU efficiency due to i/o bottlenecksConcern that this is currently ~70% at the Tier-1

Efficiency

Each experiment needs to work to improve their

system/deployment practice anticipating e.g. hanging

gridftp connections during batch work

A big issue for the Tier-2s..A bigger issue for the Tier-1..

target

htt

p:/

/ww

w.g

ridpp.a

c.uk/

pm

b/d

ocs

/Gri

dPP-P

MB

-11

3-I

neffi

cient_

Jobs_

v1

.0.p

df

Page 20: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

Intervention PolicyAll UK sites are given flexibility to deal with

stalled jobs (in order that their CPUs are occupied more fully overall) according to the following stalled job definition:

Any job consuming <10 minutes CPU over a given 6 hour period (efficiency < 0.027) is considered stalled

There is a recognised intervention scheme for UK sites

Stalled Jobs

Page 21: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

SAM site testing

htt

p:/

/hepw

ww

.ph.q

mul.ac.

uk/~

lloyd/g

ridpp/s

am

.htm

l

• Performance over past 6 months to be used for Tier-2 hardware allocations..

The metric is to be based onSAM Test Efficiency x (CPU Delivered + Disk Available)

Page 22: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

SAM site testing

htt

p:/

/hepw

ww

.ph.q

mul.ac.

uk/~

lloyd/g

ridpp/s

am

.htm

l

30/05/07 27/08/07

Overall SAM Test Success Rate

0

20

40

60

80

100

120

30

/05

/20

07

06

/06

/20

07

13

/06

/20

07

20

/06

/20

07

27

/06

/20

07

04

/07

/20

07

11

/07

/20

07

18

/07

/20

07

25

/07

/20

07

01

/08

/20

07

08

/08

/20

07

15

/08

/20

07

22

/08

/20

07

29

/08

/20

07

05

/09

/20

07

12

/09

/20

07

19

/09

/20

07

26

/09

/20

07

%age success

Page 23: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

Experiments categorisation:• Non-scalability or general failure of the Grid data

transfer / placement system.• Non-scalability or general failure of the Grid workload

management system.• Non-scalability or general failure of the metadata /

bookkeeping system.• Medium-term loss of data storage resources.• Medium-term loss of CPU resources.• Long-term loss of data or data storage resources.• Long-term loss of CPU resources.• Medium- or long-term loss of wide area network.• Grid security incident.• Mis-estimation of resource requirements.

Disaster Planning

Page 24: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

Disaster Modes:

Importance ofCommunication:

Work in progress..

Disaster Planning

Page 25: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

Transition PointFrom UK Particle Physics perspective the Grid is the basis

for computing in the 21st Century:1. needed to utilise computing resources efficiently and securely2. uses gLite middleware (with evolving standards for interoperation)3. required significant investment from PPARC (STFC) – (£100m) over

10 yrs - including support from HEFCE/SFC4. required 3 years’ prototype testbed development [GridPP1]5. provides a working production system that has been running for three

years in build-up to LHC data-taking [GridPP2]6. enables seamless discovery of computing resources:

utilised to good effect across the UK – internationally significant7. not (yet) as efficient as end-user analysts require:

ongoing work to improve performance8. ready for LHC – just in time delivery9. future operations-led activity as part of LCG, working with

EGEE/EGI (EU) and NGS (UK) [GridPP3]10.future challenge is to exploit this infrastructure to

perform (previously impossible) physics analyses from the LHC (and ILC and Fact and..)

Page 26: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

Proposal Writing Proposal Defence

Proposal Approval

31st March 2006 – P

PARC Call 31 st October 2007? –

Grants implemented

Transition Point

• Planning..• Good things take time.. ~20 months

Implementation

Page 27: GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical

Oversight Committee11 October 2007 Tony Doyle - University of Glasgow

Security

Network Monitoring

Information Services

Grid Data Management

Storage Interfaces

Workload Management

Transition Point

GridPP would like to thank all the middleware developers who have

contributed to the establishment of the Production Grid