Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design June 5, 2013. Turning Research into Every Day Practice . For past two years, SHRP2 research has been wrapping up and implementation gearing up Products include: Guides Software tools - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design

Greta Smith, P.E.Associate Program Director, Project DeliveryAASHTO Subcommittee on Design

June 5, 2013

Page 2: Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design

Turning Research into Every Day Practice

• For past two years, SHRP2 research has been wrapping up and implementation gearing up

• Products include:– Guides– Software tools– New processes– Technologies and Tools– Testing procedures– Collaborative-decision making protocols– Driver behavior data

2

Page 3: Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design

Efforts are Collaborative

• Implementation is cooperative. It engages:– AASHTO – FHWA– SHRP2/TRB staff

• States are the customers of AASHTO implementation

• FHWA, TRB also serve locals, academia, MPOs

3

Page 4: Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design

Prioritizing States’ Needs

• AASHTO’s role is focused on identifying which products meet the states’ practical needs

• We are relying on members and committees to define how implementation can be successful

4

Page 5: Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design

What Can SHRP2 Solutions Do For You?• Use new assessment tools and

processes to understand – and respond to – risk.

• Better plan for and predict travel-times on busy roadways.

• Manage complex projects – of allsizes and complexity – with next generation strategies.

• Deliver a quality product using model performance specifications.

5

Page 6: Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design

FHWA Implementation Assistance Program Opportunities for implementation assistance• Proof of Concept Pilots• Lead Adopter Incentives• User Incentives Timeline• Application process through FHWA

– First round awards announced May 3, 2013– Tentative schedule for second round:

• Product announcements in June• Product webinars in July• Solicitation in early August, final applications due early

September; announcement October6

Page 7: Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design

Looking forward: Updated SHRP2 Implementation Funding

More funding will be available

Current funding available:• SAFETEA-LU $81 Million• FFY 2012 MAP-21 $11 Million• FY 2013-14 SP&R funding $58 Million• Additional FHWA funding $18 Million

Estimated total funding available: $168 Million

7

Page 8: Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design

Expanding the Program

• More money: Additional $87 million available to put toward implementation

• More products: 39 additional research projects are becoming available

• More experience: Engaging states to champion product implementation

8

Page 9: Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design

AASHTO Implementation Task Force • ITF Meeting, March 28-29

- 28 State DOTs met to review products for next round of implementation plan

• Survey of AASHTO Committees to gauge value of potential new products

• 11 meetings of Focus Area Teams• Engagement of FHWA

and TRB• ITF Recommendations

now being developed

9

Page 10: Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design

10

SCOD Survey Responses

Full survey available at http://SHRP2.transportation.org

R01A R02 R05 R06C R06D R06E R11 R21 C05 C08 L05 L07 L080.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

AASHTO SHRP2 Product Survey

Subcommittee on Design Weighted Average of Survey

Page 11: Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design

Next Steps for SHRP2

• SHRP2 Oversight Committee determines expanded program and next products (June 2013)

• Begin full-scale state implementation of first six products (Summer 2013+)

• Next round of Implementation Assistance(Late summer 2013)

• Begin planning implementation of 2014 products

11

Page 12: Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design

What’s Your Role? • Become a champion for the products that fit your program• Identify key technical stakeholders and advocates within

your states• Carry the message back to your colleagues and peers• Become a “lead state”• Provide panel members for Implementation

Planning Workshops• Participate in technical transfer

and implement products

12

Page 13: Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design

Questions?

13

Stay informed and stay tuned! Greta Smith, Associate Program Director, Project Delivery

Ph: 202-624-5815 Email: [email protected]

For more SHRP2 information: http://SHRP2.transportation.org

Contact Pam Hutton, AASHTO SHRP2 Implementation Manager, 303-263-1212 or [email protected]