greenville technical college - cufacilities.sites.clemson.edu · lau laundry lav lavatory lf linear...

12
2 1 Temp.Unit Temp.Unit ABB ROOM NAME 2201 SUBSYSTEM TYPICAL DIMENSION INDICATOR DETAIL/PLAN KEY SECTION KEYS DIRECTION OF SECTION ELEVATION KEY REVISION INDICATION REVISION NUMBER AREA REVISED DOOR NUMBER GLASS TYPE DRAWING TITLE DRAWING NAME DRAWING SCALE ENLARGED DETAIL INDICATOR DIRECTION OF SECTION TERMINATION OF SECTION DRAWING LOCATION ON SHEET GRID DETAIL LOCATION ON SHEET GRID SHEET IDENTIFIER FOR LOCATION OF DETAIL BUILDING SECTION LOCATION ON SHEET GRID SHEET IDENTIFIER FOR LOCATION OF SECTION WALL SECTION LOCATION ON SHEET GRID SHEET IDENTIFIER FOR LOCATION OF SECTION DETAIL LOCATION ON SHEET GRID SHEET IDENTIFIER FOR LOCATION OF DETAIL COLUMN GRID REFERENCE TERMINATION OF SECTION DRAWING NAME DRAWING SCALE DRAWING LOCATION ON SHEET GRID SHEET NUMBER WHERE DETAIL IS REFERENCED SHEET NUMBER WHERE DETAIL IS DRAWN A A1 PLAN 1/8" = 1'-0" NTS A1 PLAN A101 A1 1 201A CENTERLINE 9 1/2" FLOOR ELEVATION ROOM NAME & NUMBER AA12 0' - 9 1/2" ELEVATION LOCATION ON SHEET GRID SHEET IDENTIFIER FOR LOCATION OF ELEVATION DIRECTION OF ELEVATION A-201 A1 1i A1 A-101 SIM A1 A-101 SIM PHASE 1A PHASE 1B PHASE 2A NOT IN SCOPE PHASE 1B EXISTING ELECTRICAL PHASE 2B PHASE 3 PHASE 2A (CURRENT PHASE) CHECKED BY: DRAWN BY: DATE: PROJECT: REVISIONS: MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS 1 A 2 3 4 5 6 B C D E COPYRIGHT 2013 ALL RIGHTS RESERVED PRINTED OR ELECTRONIC DRAWINGS AND DOCUMENTATION MAY NOT BE REPRODUCED IN ANY FORM WITHOUT WRITTEN PERMISSION FROM LS3P ASSOCIATES LTD. TEL. 864.235.0405 FAX 864.233.4027 GREENVILLE, SOUTH CAROLINA 29601 110 WEST NORTH STREET SUITE 300 STATE PROJECT NO: H59 - 6083 - JM 575 MILLENNIUM BOULEVARD GREENVILLE, SC 29607 5/1/2017 5:24:49 PM C:\Users\elizabethcorr\Documents\Arch_GTC CMI_2015_elizabethcorr.rvt 3202-137050 24 APRIL 2017 EC CB JR CU LAB INFORMATION SHEET CG-001 ENT ERPRISE CAMPUS DEVELOPMENT CLEMSON LAB UPFIT - PHASE 1A GREENVILLE TECHNICAL COLLEGE DRAWING INDEX SHEET GENERAL ARCHITECTURAL ENGINEERING VICINITY MAP AREA MAP GRAPHIC SYMBOL LEGEND Greenville Technical College Enterprise Campus Development - Clemson University Lab Upfit 575 MILLENNIUM BLVD GREENVILLE, SC 29607 STATE PROJECT NUMBER: H59-6083-JM LS3P ASSOCIATES LTD. 110 West North Street, Suite 300 Greenville, SC 20601 tel: 864.235.0405 fax: 864.233.4027 RMF ENGINEERING 194 Seven Farms Drive, Suite G Charleston, SC 29492 tel: 843.971.9639 fax: 843.971.9641 STOR STORAGE SUSP SUSPENDED SYS SYSTEM T TREAD TEL TELEPHONE TEMP TEMPORARY TFF TOP OF FINISH FLOOR THK THICKNESS THRU THROUGH TO TOP OF TOB TOP OF BEAM TOC TOP OF CONCRETE, CURB TOF TOP OF FOOTING TOJ TOP OF JOIST TOM TOP OF MASONRY TOP TOP OF PARAPET TOS TOP OF SLAB TOW TOP OF WALL TRTD TREATED TV TELEVISION TYP TYPICAL UL UNDERWRITERS LABORATORIES UNO UNLESS NOTED OTHERWISE VERT VERTICAL VEST VESTIBULE VIF VERIFY IN FIELD W WEST, WIDE W/ WITH W/O WITHOUT W/W WALL TO WALL WC WATER CLOSET WD WOOD WP WORKING POINT, WATERPROOFING WR WATER REPELLENT WT WEIGHT WWF WELDED WIRE FABRIC YD YARD OD OUTSIDE DIAMETER OH OPPOSITE HAND OPP OPPOSITE OPT OPTION(AL) PCF POUNDS PER CUBIC FEET PLAM PLASTIC LAMINATE PLF POUNDS PER LINEAR FEET PLYWD PLYWOOD PNL PANEL PR PAIR PREFAB PREFABRICATED PREFIN PREFINISH PRKG PARKING PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PT PAINT, POST-TENSIONED, PRE-TREATED PVC POLYVINYL CHLORIDE (PLASTIC) QTR QUARTER QTY QUANTITY R RADIUS, RISER RCP REFLECTED CEILING PLAN RD ROOF DRAIN REF REFRIGERATOR, REFERENCE REQD REQUIRED RL ROOF LEADER RM ROOM RO ROUGH OPENING ROW RIGHT OF WAY S SOUTH SC SOLID CORE SD STORM DRAIN SECT SECTION SF SQUARE FEET SIM SIMILAR SPEC SPECIFICATION SPKR SPEAKER SQ SQUARE SS STAINLESS STEEL STD STANDARD HDWR HARDWARE HM HOLLOW METAL HORIZ HORIZONTAL HT HEIGHT HVAC HEATING, VENTILATION & AIR CONDITIONING ID INSIDE DIAMETER INCL INCLUDE(D), (ING) INFO INFORMATION INSUL INSULATION INT INTERIOR JAN CLO JANITOR CLOSET KIT KITCHEN KO KNOCKOUT LAB LABORATORY LAM LAMINATE LAU LAUNDRY LAV LAVATORY LF LINEAR FEET LVR LOUVER MAINT MAINTENANCE MATL MATERIAL MAX MAXIMUM MECH MECHANICAL MEZZ MEZZANINE MFG MANUFACTURING MFR MANUFACTURER MIN MINIMUM MISC MISCELLANEOUS MO MASONRY OPENING MR MOISTURE RESISTANT MTD MOUNTED MTG MOUNTING MTL METAL N NORTH NIC NOT IN CONTRACT NOM NOMINAL NON COMB NON-COMBUSTIBLE NTS NOT TO SCALE OC ON CENTER E EAST EA EACH EIFS EXTERIOR INSULATION & FINISH SYSTEM EJ EXPANSION JOINT EL ELEVATION ELEC ELECTRIC(AL) ELEV ELEVATOR ENCL ENCLOSE(D) EOS EDGE OF SLAB EQ EQUAL EQUIP EQUIPMENT EWC ELECTRIC WATER COOLER EXIST EXISTING EXP JT EXPANSION JOINT EXT EXTERIOR F/F FACE TO FACE FD FLOOR DRAIN FE FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FF EL FINISH FLOOR ELEVATION FHC FIRE HOSE CABINET FIN FLR FINISHED FLOOR FLR FLOOR, FILLER FOC FACE OF CURB FOF FACE OF FINISH FOM FACE OF MASONRY FOS FACE OF SLAB FOW FACE OF WALL FT FOOT, FEET FTG FOOTING FURN FURNISH, FURNITURE GA GAGE GALV GALVANIZED GC GENERAL CONTRACTOR GYP BD GYPSUM BOARD GYP PLAS GYPSUM PLASTER HC HANDICAP HD HEAVY DUTY HDWD HARDWOOD A/C AIR CONDITION(ING) ADMIN ADMINISTRATION AFF ABOVE FINISHED FLOOR ALT ALTERNATE ALUM ALUMINUM APPROX APPROXIMATE(LY) ARCH ARCHITECT(URAL) AUTO AUTOMATIC AUX AUXILIARY AV AUDIOVISUAL BITUM BITUMINOUS BL BUILDING LINE BLDG BUILDING BOS BOTTOM OF STEEL BOT BOTTOM CAB CABINET CJ CONTROL JOINT CL CENTER LINE CLG CEILING CLG HT CEILING HEIGHT CLO CLOSET CLR CLEAR(ANCE) CMU CONCRETE MASONRY UNIT COL COLUMN CONC CONCRETE CONF CONFERENCE CONT CONTINUE. CONTINUOUS CORR CORRIDOR CU FT CUBIC FOOT CU YD CUBIC YARD DEMO DEMOLISH DEPT DEPARTMENT DET DETAIL DF DRINKING FOUNTAIN DIA DIAMETER DIAG DIAGONAL DIM DIMENSION DIV DIVISION DN DOWN DS DOWNSPOUT ABBREVIATIONS SCOPE OF WORK CONSTRUCTION DOCUMENTS INCLUDE PHASE 1 A FOR CLEMSON UNIVERSITY'S ROBOTICS LAB. PHASE 1B AND PHASE 2 (A&B) OF THE LAB UPFIT ARE SHOWN FOR REFERENCE ONLY FOR DESIGN OF THE ASSEMBLY LAB, EMBEDDED SYSTEMS LAB, TRANSFER OF THE EXTRUSION MACHINE FROM THE CAMPBELL CENTER TO GTC'S CENTER FOR MANUFACTURING INNOVATION, PULTRUSION LINE, FUME HOOD LAB & COMPOSITES LAB. SEE PHASING PLAN. THE FOLLOWING TO BE ITEMIZED IN PRICING: 1. UNIT PRICE PER ADDITIONAL FLOOR DRAIN 2. UNIT PRICE PER ELEC/ DATA BACK BOX ROUGH IN 3. UNIT PRICE PER ELEC/ DATA DROP - SINGLE PHASE 120-V - TRIPLE PHASE 480-V 4. FURNITURE: LAB HEIGHT TABLES & WORKSTATIONS TO BE TENANT PROCURED. GC TO COORDINATE FURNITURE & ELECTRICAL REQUIREMENTS. 5. ALL ITEMS IN FUME HOOD LAB TO BE SCOPE OF GC (PHASE 2A). NOTE: (REFERENCE ONLY) GENERAL: SIGNAGE 1. CODE RELATED SIGNAGE ONLY 2. ALL OTHER SIGNAGE BY TENANT PHASE 1B: ASSEMBLY 1. RAISED WORKING PLATFORM TO BE BUILT BY TENANT. 2. TAKT SUPERMARKET TO BE TENANT FURNISHED 3. (6) WORKSTATIONS W (1) CHAIR (2) 120-V DUPLEX EACH (FURNITURE BY TENANT) PHASE 1B: EMBEDDED SYSTEMS LAB 1. LAB TABLES PROVIDED BY TENANT 2. EQUIPMENT FURNISHED BY TENANT PHASE 2A & B: COMPOSITES 1. MOLDING MACHINE TO BE ASSEMBLED INSIDE OF THE LAB 2. EXTRUSION MACHINE'S FILTER MACHINE TO BE OWNER PROVIDED 3. VERIFY MOLD STORAGE 4. (6) WORKSTATIONS W (1) CHAIR (2) 120-V DUPLEX EACH (FURNITURE BY TENANT) 5. EQUIPMENT FURNISHED BY OWNER PHASE 2A: FUME HOOD LAB 1. PHASE 2A INCLUDES INFILLING RATED DOOR & FRAME @ EXISTING FUME HOOD LAB OPENING. 2. ENCLOSING EXISTING ELECTRICAL PANELS: INCLUDES (2) DOORS & FRAMES, SEE SCHEDULE. 3. LAB CASEWORK (BY GC) BOD = VWR STANDARD STEEL LAB CASEWORK. 4. LAB FURNITURE & BLAST RESISTANT REFRIGERATOR (BY GC) FUTURE: AV/IT 1. CLEMSON NETWORK CONNECTION TO THE CAMPBELL CENTER, PHASE 3. CG-001 CU LAB INFORMATION SHEET CG-002 CU LAB CODE REVIEW & LIFE SAFETY PLAN CA-100 CLEMSON LAB FLOOR PLAN & WALL TYPES CA-121 CLEMSON LAB REFLECTED CEILING PLAN CA-160 CLEMSON LAB OVERALL EQUIPMENT PLAN CA-161 ENLARGED ROBOTICS LAB PLAN - PHASE 1A CA-301 CLEMSON LAB SECTIONS 3/32" = 1'-0" A4 CLEMSON LAB UPFIT - PHASING PLAN PROJECT PHASING PLAN No. Description Date 7 AV REVISION 10/28/2015 15 CU UPFIT PHASE 1A 12/16/2016 16 CU UPFIT PHASE 1B 02/15/2017 CE-001 CLEMSON LAB LEGEND CE-002 OVERALL POWER PLAN CE-101 CLEMSON LAB POWER CE-102 ROBOTICS POWER PLAN PHASE 1 CE-501 EXISTING ELECTRICAL ONE-LINE DIAGRAM CE-601 ELECTRICAL SCHEDULES CM-001 MECHANICAL LEGENDS, NOTES AND ABBREVIATIONS CM-101 MECHANICAL NEW CONSTRUCTION PLAN PHASE 1A CMD-101 ROBOTICS MECHANICAL DEMOLITION PLAN PHASE 1A

Upload: lytruc

Post on 17-Jul-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 21

    Temp.Unit

    Temp.Unit

    ABB

    ROOMNAME

    2201

    SUBSYSTEM

    TYPICAL DIMENSION INDICATOR

    DETAIL/PLAN KEY

    SECTION KEYS

    DIRECTION OF SECTION

    ELEVATION KEY

    REVISION INDICATION

    REVISION NUMBER

    AREA REVISED

    DOOR NUMBER

    GLASS TYPE

    DRAWING TITLE

    DRAWING NAME

    DRAWING SCALE

    ENLARGED DETAIL INDICATOR

    DIRECTION OF SECTION

    TERMINATION OF SECTION

    DRAWING LOCATION ON SHEET GRID

    DETAIL LOCATION ON SHEET GRID

    SHEET IDENTIFIER FORLOCATION OF DETAIL

    BUILDING SECTION LOCATIONON SHEET GRID

    SHEET IDENTIFIER FORLOCATION OF SECTION

    WALL SECTION LOCATION ON SHEET GRID

    SHEET IDENTIFIER FORLOCATION OF SECTION

    DETAIL LOCATION ON SHEET GRID

    SHEET IDENTIFIER FORLOCATION OF DETAIL

    COLUMN GRID REFERENCE

    TERMINATION OF SECTION

    DRAWING NAME

    DRAWING SCALE

    DRAWING LOCATION ON SHEET GRID

    SHEET NUMBER WHERE DETAIL IS REFERENCEDSHEET NUMBER WHERE DETAIL IS DRAWN

    A

    A1PLAN1/8" = 1'-0"

    NTSA1

    PLAN

    A101A1

    1

    201A

    CENTERLINE

    9 1/2"

    FLOOR ELEVATION

    ROOM NAME & NUMBER

    AA12

    0' - 9 1/2"

    ELEVATION LOCATION ON SHEET GRID

    SHEET IDENTIFIER FORLOCATION OF ELEVATION

    DIRECTION OF ELEVATION

    A-201

    A1

    1i

    A1

    A-101

    SIM

    A1

    A-101

    SIM

    PHASE 1A

    PHASE 1B

    PHASE 2ANOT IN SCOPE

    PHASE 1B

    EXISTINGELECTRICAL

    PHASE 2B

    PHASE 3

    PHASE 2A

    (CURRENTPHASE)

    CHECKED BY:

    DRAWN BY:

    DATE:

    PROJECT:

    REVISIONS:

    MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    COPYRIGHT 2013 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

    TEL. 864.235.0405 FAX 864.233.4027

    GREENVILLE, SOUTH CAROLINA 29601

    110 WEST NORTH STREET SUITE 300

    STATE PROJECT NO: H59 - 6083 - JM

    575 MILLENNIUM BOULEVARDGREENVILLE, SC 29607

    5/1

    /2017 5

    :24:4

    9 P

    M

    C:\

    Users

    \eliza

    beth

    co

    rr\D

    ocu

    men

    ts\A

    rch

    _G

    TC

    CM

    I_2015_elizab

    eth

    co

    rr.r

    vt

    3202-137050

    24 APRIL 2017

    EC

    CB JR

    CU LABINFORMATIONSHEET

    CG-001

    EN

    TE

    RP

    RIS

    E C

    AM

    PU

    S D

    EV

    EL

    OP

    ME

    NT

    CLEMSON LAB UPFIT - PHASE 1A

    GREENVILLE

    TECHNICAL

    COLLEGE

    DRAWING INDEX SHEET

    GENERAL

    ARCHITECTURAL

    ENGINEERING

    VICINITY MAP AREA MAP

    GRAPHIC SYMBOL LEGEND

    Greenville Technical CollegeEnterprise Campus Development - Clemson University Lab Upfit575 MILLENNIUM BLVDGREENVILLE, SC 29607

    STATE PROJECT NUMBER:H59-6083-JM

    LS3P ASSOCIATES LTD.110 West North Street, Suite 300Greenville, SC 20601tel: 864.235.0405fax: 864.233.4027

    RMF ENGINEERING194 Seven Farms Drive, Suite GCharleston, SC 29492tel: 843.971.9639fax: 843.971.9641

    STOR STORAGE

    SUSP SUSPENDED

    SYS SYSTEM

    T TREAD

    TEL TELEPHONE

    TEMP TEMPORARY

    TFF TOP OF FINISH FLOOR

    THK THICKNESS

    THRU THROUGH

    TO TOP OF

    TOB TOP OF BEAM

    TOC TOP OF CONCRETE, CURB

    TOF TOP OF FOOTING

    TOJ TOP OF JOIST

    TOM TOP OF MASONRY

    TOP TOP OF PARAPET

    TOS TOP OF SLAB

    TOW TOP OF WALL

    TRTD TREATED

    TV TELEVISION

    TYP TYPICAL

    UL UNDERWRITERSLABORATORIES

    UNO UNLESS NOTED OTHERWISE

    VERT VERTICAL

    VEST VESTIBULE

    VIF VERIFY IN FIELD

    W WEST, WIDE

    W/ WITH

    W/O WITHOUT

    W/W WALL TO WALL

    WC WATER CLOSET

    WD WOOD

    WP WORKING POINT,WATERPROOFING

    WR WATER REPELLENT

    WT WEIGHT

    WWF WELDED WIRE FABRIC

    YD YARD

    OD OUTSIDE DIAMETER

    OH OPPOSITE HAND

    OPP OPPOSITE

    OPT OPTION(AL)

    PCF POUNDS PER CUBIC FEET

    PLAM PLASTIC LAMINATE

    PLF POUNDS PER LINEAR FEET

    PLYWD PLYWOOD

    PNL PANEL

    PR PAIR

    PREFAB PREFABRICATED

    PREFIN PREFINISH

    PRKG PARKING

    PSF POUNDS PER SQUARE FOOT

    PSI POUNDS PER SQUARE INCH

    PT PAINT, POST-TENSIONED,PRE-TREATED

    PVC POLYVINYL CHLORIDE (PLASTIC)

    QTR QUARTER

    QTY QUANTITY

    R RADIUS, RISER

    RCP REFLECTED CEILING PLAN

    RD ROOF DRAIN

    REF REFRIGERATOR, REFERENCE

    REQD REQUIRED

    RL ROOF LEADER

    RM ROOM

    RO ROUGH OPENING

    ROW RIGHT OF WAY

    S SOUTH

    SC SOLID CORE

    SD STORM DRAIN

    SECT SECTION

    SF SQUARE FEET

    SIM SIMILAR

    SPEC SPECIFICATION

    SPKR SPEAKER

    SQ SQUARE

    SS STAINLESS STEEL

    STD STANDARD

    HDWR HARDWARE

    HM HOLLOW METAL

    HORIZ HORIZONTAL

    HT HEIGHT

    HVAC HEATING, VENTILATION & AIRCONDITIONING

    ID INSIDE DIAMETER

    INCL INCLUDE(D), (ING)

    INFO INFORMATION

    INSUL INSULATION

    INT INTERIOR

    JAN CLO JANITOR CLOSET

    KIT KITCHEN

    KO KNOCKOUT

    LAB LABORATORY

    LAM LAMINATE

    LAU LAUNDRY

    LAV LAVATORY

    LF LINEAR FEET

    LVR LOUVER

    MAINT MAINTENANCE

    MATL MATERIAL

    MAX MAXIMUM

    MECH MECHANICAL

    MEZZ MEZZANINE

    MFG MANUFACTURING

    MFR MANUFACTURER

    MIN MINIMUM

    MISC MISCELLANEOUS

    MO MASONRY OPENING

    MR MOISTURE RESISTANT

    MTD MOUNTED

    MTG MOUNTING

    MTL METAL

    N NORTH

    NIC NOT IN CONTRACT

    NOM NOMINAL

    NON COMB NON-COMBUSTIBLE

    NTS NOT TO SCALE

    OC ON CENTER

    E EAST

    EA EACH

    EIFS EXTERIOR INSULATION & FINISHSYSTEM

    EJ EXPANSION JOINT

    EL ELEVATION

    ELEC ELECTRIC(AL)

    ELEV ELEVATOR

    ENCL ENCLOSE(D)

    EOS EDGE OF SLAB

    EQ EQUAL

    EQUIP EQUIPMENT

    EWC ELECTRIC WATER COOLER

    EXIST EXISTING

    EXP JT EXPANSION JOINT

    EXT EXTERIOR

    F/F FACE TO FACE

    FD FLOOR DRAIN

    FE FIRE EXTINGUISHER

    FEC FIRE EXTINGUISHER CABINET

    FF EL FINISH FLOOR ELEVATION

    FHC FIRE HOSE CABINET

    FIN FLR FINISHED FLOOR

    FLR FLOOR, FILLER

    FOC FACE OF CURB

    FOF FACE OF FINISH

    FOM FACE OF MASONRY

    FOS FACE OF SLAB

    FOW FACE OF WALL

    FT FOOT, FEET

    FTG FOOTING

    FURN FURNISH, FURNITURE

    GA GAGE

    GALV GALVANIZED

    GC GENERAL CONTRACTOR

    GYP BD GYPSUM BOARD

    GYP PLAS GYPSUM PLASTER

    HC HANDICAP

    HD HEAVY DUTY

    HDWD HARDWOOD

    A/C AIR CONDITION(ING)

    ADMIN ADMINISTRATION

    AFF ABOVE FINISHED FLOOR

    ALT ALTERNATE

    ALUM ALUMINUM

    APPROX APPROXIMATE(LY)

    ARCH ARCHITECT(URAL)

    AUTO AUTOMATIC

    AUX AUXILIARY

    AV AUDIOVISUAL

    BITUM BITUMINOUS

    BL BUILDING LINE

    BLDG BUILDING

    BOS BOTTOM OF STEEL

    BOT BOTTOM

    CAB CABINET

    CJ CONTROL JOINT

    CL CENTER LINE

    CLG CEILING

    CLG HT CEILING HEIGHT

    CLO CLOSET

    CLR CLEAR(ANCE)

    CMU CONCRETE MASONRY UNIT

    COL COLUMN

    CONC CONCRETE

    CONF CONFERENCE

    CONT CONTINUE. CONTINUOUS

    CORR CORRIDOR

    CU FT CUBIC FOOT

    CU YD CUBIC YARD

    DEMO DEMOLISH

    DEPT DEPARTMENT

    DET DETAIL

    DF DRINKING FOUNTAIN

    DIA DIAMETER

    DIAG DIAGONAL

    DIM DIMENSION

    DIV DIVISION

    DN DOWN

    DS DOWNSPOUT

    ABBREVIATIONS

    SCOPE OF WORK

    CONSTRUCTION DOCUMENTS INCLUDE PHASE 1 A FOR CLEMSON UNIVERSITY'S ROBOTICS LAB. PHASE 1B AND PHASE 2 (A&B) OF THE LAB UPFIT ARE SHOWN FOR REFERENCE ONLY FORDESIGN OF THE ASSEMBLY LAB, EMBEDDED SYSTEMS LAB, TRANSFER OF THE EXTRUSION MACHINE FROM THE CAMPBELL CENTER TO GTC'S CENTER FOR MANUFACTURING INNOVATION,PULTRUSION LINE, FUME HOOD LAB & COMPOSITES LAB. SEE PHASING PLAN.

    THE FOLLOWING TO BE ITEMIZED IN PRICING:

    1. UNIT PRICE PER ADDITIONAL FLOOR DRAIN2. UNIT PRICE PER ELEC/ DATA BACK BOX ROUGH IN3. UNIT PRICE PER ELEC/ DATA DROP

    - SINGLE PHASE 120-V- TRIPLE PHASE 480-V

    4. FURNITURE: LAB HEIGHT TABLES & WORKSTATIONS TO BE TENANT PROCURED. GC TO COORDINATE FURNITURE & ELECTRICAL REQUIREMENTS.5. ALL ITEMS IN FUME HOOD LAB TO BE SCOPE OF GC (PHASE 2A).

    NOTE: (REFERENCE ONLY)

    GENERAL: SIGNAGE

    1. CODE RELATED SIGNAGE ONLY2. ALL OTHER SIGNAGE BY TENANT

    PHASE 1B: ASSEMBLY

    1. RAISED WORKING PLATFORM TO BE BUILT BY TENANT.2. TAKT SUPERMARKET TO BE TENANT FURNISHED3. (6) WORKSTATIONS W (1) CHAIR (2) 120-V DUPLEX EACH (FURNITURE BY TENANT)

    PHASE 1B: EMBEDDED SYSTEMS LAB

    1. LAB TABLES PROVIDED BY TENANT2. EQUIPMENT FURNISHED BY TENANT

    PHASE 2A & B: COMPOSITES

    1. MOLDING MACHINE TO BE ASSEMBLED INSIDE OF THE LAB2. EXTRUSION MACHINE'S FILTER MACHINE TO BE OWNER PROVIDED3. VERIFY MOLD STORAGE4. (6) WORKSTATIONS W (1) CHAIR (2) 120-V DUPLEX EACH (FURNITURE BY TENANT)5. EQUIPMENT FURNISHED BY OWNER

    PHASE 2A: FUME HOOD LAB

    1. PHASE 2A INCLUDES INFILLING RATED DOOR & FRAME @ EXISTING FUME HOOD LAB OPENING.2. ENCLOSING EXISTING ELECTRICAL PANELS: INCLUDES (2) DOORS & FRAMES, SEE SCHEDULE.3. LAB CASEWORK (BY GC) BOD = VWR STANDARD STEEL LAB CASEWORK.4. LAB FURNITURE & BLAST RESISTANT REFRIGERATOR (BY GC)

    FUTURE: AV/IT

    1. CLEMSON NETWORK CONNECTION TO THE CAMPBELL CENTER, PHASE 3.

    CG-001 CU LAB INFORMATION SHEET

    CG-002 CU LAB CODE REVIEW & LIFE SAFETY PLAN

    CA-100 CLEMSON LAB FLOOR PLAN & WALL TYPES

    CA-121 CLEMSON LAB REFLECTED CEILING PLAN

    CA-160 CLEMSON LAB OVERALL EQUIPMENT PLAN

    CA-161 ENLARGED ROBOTICS LAB PLAN - PHASE 1A

    CA-301 CLEMSON LAB SECTIONS

    3/32" = 1'-0"A4

    CLEMSON LAB UPFIT - PHASING PLAN

    PROJECT PHASING PLAN

    No. Description Date

    7 AV REVISION 10/28/2015

    15 CU UPFIT PHASE 1A 12/16/2016

    16 CU UPFIT PHASE 1B 02/15/2017

    CE-001 CLEMSON LAB LEGEND

    CE-002 OVERALL POWER PLAN

    CE-101 CLEMSON LAB POWER

    CE-102 ROBOTICS POWER PLAN PHASE 1

    CE-501 EXISTING ELECTRICAL ONE-LINE DIAGRAM

    CE-601 ELECTRICAL SCHEDULES

    CM-001 MECHANICAL LEGENDS, NOTES AND ABBREVIATIONS

    CM-101 MECHANICAL NEW CONSTRUCTION PLAN PHASE 1A

    CMD-101 ROBOTICS MECHANICAL DEMOLITION PLAN PHASE 1A

  • 21

    Temp.Unit

    Temp.Unit

    ABB

    A3

    CA-301

    7'-6"

    EXIT DOOR

    68" 453

    75

    EXIT DOOR

    68" 453

    42

    EXIT DOOR

    36" 240

    42

    FEC

    FEC

    FEC

    EXIT DOOR

    68" 453

    1

    FEC

    SE

    GM

    EN

    T:

    60' -

    0"T

    O E

    XIT

    : 67' -

    0"

    TO

    EX

    IT:

    111' -

    0"

    TO

    EX

    IT:

    83' -

    6"

    34'-0"

    FEC

    3083 SF

    COMPOSITESLAB

    75 OCC

    1713 SF

    ASSEMBLYLAB

    29 OCC

    804 SF

    FUMEHOODLAB

    16 OCC

    946 SF

    ASSEMBLYSTUDY

    10 OCC

    189 SF

    ROBOTICSSTUDY

    2 OCC

    745 SF

    ROBOTICSLAB

    8 OCC307 SF

    EMBEDDEDSYSTEMS

    LAB

    2 OCC

    405 SF

    COMPOSITESSTUDY

    5 OCC

    77 SF

    CU IT

    1 OCC

    286 SF

    TAKTSUPERMARKET

    1 OCC

    BUSINESS [100 G]

    STORAGE [300 G]

    1 HR RATED WALL

    LIFE SAFETY PLAN KEY

    EDUCATION - VOCATIONAL [50 N]

    NOT IN SCOPE

    BUSINESS [100 G]

    STORAGE [300 G]

    OCCUPANCY COUNT

    EDUCATION - VOCATIONAL [50 N]

    17 OCC

    140 OCC

    3 OCC

    = TOTAL UPFIT OCCUPANCY160 OCC

    LOWER LEVEL EXIT LOCATIONS

    Greenville Technical College Enterprise Campus DevelopmentMillennium DriveGreenville, SC 29607Code Review 25 September 2014

    Codes In Use2012 International Building Code2012 International Fire Code2012 International Plumbing Code2012 International Mechanical Code2012 International Fuel Gas Code2012 International Energy Conservation Code2012 International Code Council Performance Codem, as approved2011 National Electrical Code2009 ICC ANSI 117.1South Carolina Elevator Code & RegulationsSate Fire Marshall rules, regulations and policiesState of SC Telephone Equipment Room and Communications/ Data Systems Policies

    Proposed UseGroup B_Business: Continuing Education above the 12th Grade

    Occupancy TypeAssembly A3: College classrooms with more than 50 persons and Multipurpose room not meeting (IBC Section 303.1.2)Business Group B: College classrooms less than 50 persons

    303.1.2 Small Assembly spaces.1: A building or tenant space used for an assembly purpose with an occupant load of less than 50 persons shall beclassified as a Group B occupancy.2: A room or space used for assembly purposes that is less than 750 sq ft in area and is accessory to another occupancyshall be classified as a Group B occupancy or as part of that occupancy.

    Chapter 4 - Special Requirements

    404 Atriums404.1.1 Atrium: connection of 2 or more stories Exception per 712.8: Two Story Opening is permitted.

    Chapter 5 - Height and Area ModificationsConstruction Type: IIBOccupancy Groups: Mixed Use: Group B, A-3, S

    Most restrictive: Group A-3

    Allowable ActualBuilding Area: A-3 = 9,500 SF SF

    B = 23,000 SFS = Ancillary Use

    Building Height: 55' 42'Number of Stories: 3 2

    Area SummaryLower Level 70,382 SFUpper Level 35,525 SF (excludes Roof Terraces)Total 105,907 SF**Includes exterior building envelope in area calculation

    Building Area Modifications: IBC 506Area increase factor due to frontage (506.2) & sprinkler protection (506.3)

    A-3 = 35,625 SFB = 86,250 SF

    508.2 Accessory Occupancies. Aggregate accessory occupancies shall not occupy more than 10% of the building area of the story in which they are located. No

    separation is required between accessory occupancies and the main occupancy (580.2.4)

    508.4 Separated Occupancies. 508.4.3: Allowable building area: In each story, the building area shall be such that the sum of the ratios of the actual building area of each

    separated occupancy divided by the allowable building area of each separated occupancy shall not exceed 1.

    Lower Level:(actual A-3 sf/ allowable A-3 sf) + (actual B sf/ allowable B sf) =

    Upper Level:(actual A-3 sf/ allowable A-3 sf) + (actual B sf/ allowable B sf) =

    Chapter 6 - Types of ConstructionIBC - Table 601 Fire - Resistance Requirements For Building Elements (hours)

    Fire Separation Distance(ft)

    I-A

    Others

    I-A, I-BII-B, V-BOthers

    X51030

    Type I

    Type of Construction Group H f Group F-1, M, S-1gGroup A, B, E, F-2, I, Rb,

    S-2g, Ub

    All 3 2 1

    All

    3

    2

    2

    1

    1

    1

    211

    101

    1d01d

    0 0 0

    Type II Type III Type IV Type VBuilding Element

    Structural Frame g(see Section 202)

    Bearing Walls Exterior f,g Interior

    Nonbearing walls and partitions Exterior

    Floor Construction(Including Supporting Beams &Joists)

    Roof Construction(Including Supporting Beams &Joists)

    3a 2a

    33a

    22a

    2

    1 1/2b

    A B Ad B Ad B Ad BHT

    1 0 1 0 HT 1 0

    11

    00

    21

    20

    21/HT

    11

    00

    2 1 0 1 0

    SeeSection602.4.6

    1 0

    1 b,c 1 b,c 0 c 1 b,c 0 HT 1 b,c 0

    IBC - Table 602 Fire - Resistance Requirements For Exterior Walls Based On Separation Distance

    Chapter 7 - Fire ResistanceIBC - Table 705.8.1 Maximum Area of Exterior Openings

    Greaterthan 30

    No Limit

    Classification ofOpening

    Greaterthan 25to 30 f,g

    Greaterthan 20to 25 f,g

    Greaterthan 15to 20 f,g

    Greaterthan 10

    to 15 e,f,g

    Greaterthan 5to 10 f,j

    0 to 3 b,cGreaterthan 3to 5 d,e

    Unprotected,nonsprinklered

    Unprotected,Sprinklered

    70%45%25%15% h10% hNot

    PermittedNot

    Permitted

    25%15% 45% 75% No Limit No Limit NotRequired

    704.3 Protection of the primary structural frame other than columns. Members of the primary structural frame other than columns are required to have protection to achieve a fire-resistance rating and support more than two

    floors or one floor and roof, or support a load bearing wall or a non-loadbearing wall more than 2 stories high, shall be provided with individualencasement protection by protecting them on all sides for the full length, including connections to other structural members, withe materials having therequired fire-resistance rating.

    707.3.1 Fire Barriers at Shaft Enclosures shall comply with the following:Section 713.4, 1 hour rating for less than 4 stories.Section 713.6 Exterior walls at shaft enclosures, fire resistance rating shall not apply.

    712.1.8 Two Story Openings. Permitted if it complies with all of the items below: 1) Does not connect more than two stories. 2) Does not contain a stair or ramp required as part of the required means of egress in Chapter 10. 3) Does

    not penetrate a horizontal assembly that separates fire areas or smoke barriers. 4) Is not concealed within the building construction. 5) Is not open to acorridor in Group I and R occupancies. 6) Is not open to a corridor on nonsprinklered floors in any occupancy. 7) Is separated from the floor openingsserving other floors by construction conforming to required shaft enclosures.

    713.11 Enclosure at the bottom. 1) Shafts that do not extend to the bottom of the building or structure shall, be enclosed at the lowest level with construction of the same fire resistance

    rating as the lowest floor thru which the shaft passes, but not less than the rating of the shaft. 2) They shall terminate in a room having a use related tothe purpose of the shaft. The room shall be separated from the remainder of the building by fire barriers not less than equal to the protection required atthe shaft or the room shall be protected by an automatic sprinkler system. 3) They shall be protected by approved fire dampers at the lowest floor levelwithin the shaft enclosure.

    713.12 Enclosure at the top. Shaft enclosure shall be sealed to the underside of the roof deck or shall be enclosed at the top with the same fire resistance ratingas the topmost floor penetrated by the shaft, but not less than the fire-resistance rating required for the shaft enclosure.

    713.14.1 Elevator Lobby: Not required, less than 3 stories.

    716.5 Opening Protection Table 715.4: 1 Hour Fire Barriers: Enclosures for Shafts, Exit access stairways and Exit Passageway walls:

    Fire Door: 1 HrDoor Vision Panel Size: 100 sq. inches of glass, max height: 33in, max width: 10in.Minimum Sidelite/ Transom assembly rating, Fire Resistance: 1 HrFire Rated Glazing Marking Sidelite/ Transom Panel, Fire Resistance: W-60

    Other 1 Hour fire barriers:Fire Door: 3/4 HrDoor Vision Panel Size: Maximum size testedMinimum Sidelite/ Transom assembly rating: 3/4 HrFire Rated Glazing Marking Sidelite/ Transom Panel: D-H-NT-45

    See Table 602

    Fire Separation Distance (feet)

    Chapter 8 - Finish ClassificationsIBC - Table 803.9 Interior Wall And Ceiling Finish Requirements By Occupancy (partial table)

    Sprinklered

    Building Element

    B

    Vertical Exits and ExitPassageways a,b

    Exit Access Corridors andOther Exitways

    Rooms and EnclosedSpaces

    A-3 B C

    Chapter 10 - Egress ComponentsOccupancy Calculation: Business (B)

    Lower LevelOccupancy Area per Occup. Area* Occupants*Assembly (A-3) 15 net 0 0Business (B) 100 gross 3,419 48Edu - Classrm 20 net 2,715 137Edu - Vocational 50 net 31,070 577Storage (S) 300 gross 4,501 21

    Subtotal 41,705 sf 783 Occupants

    Upper LevelOccupancy Area per Occup. Area* Occupants*Assembly (A-3) 15 net 5,737 385Business (B) 100 gross 9,972 112Edu - Classrm 20 net 4,532 229Storage (S) 300 gross 1,668 12

    Subtotal 21,909 sf 738 Occupants

    Total 73,614 sf 1,521 Occupants*Square footage and occupant load based on cumulative room by room calculation** Whole building circulation factor approximately 30%*** Calculated occupancy load per tuition = 250 students (anticipated) Max capacity of academic programming (long term) = 500 occupants (estimated)

    RequiredOccupants ***1521 = 760M / 761W

    1 per 25 for first 50, 1 per50 for remainder

    M=17

    Female (Business - B) Unisex

    Chapter 11 - Accessibility1104.4 Elevator is required for accessible route to upper floors.1105.1 Sixty percent of public entrances shall be accessible. Exception 2: Loading and Service Entrances that are not the only entrance to a tenant space.

    1006.1 Accessible Parking Spaces201-300 spaces 7 HC301-400 spaces 8 HC401-500 spaces 9 HC501-1000 spaces 2% of total

    1006.5 Van SpacesFor every six or fraction of six accessible parking spaces, at least one shall be a van-accessible space.

    1109.3 Sinks. Where sinks are provided, at least 5% but not less than one provided in accessible spaces shall comply with ICC A117.11109.4 Kitchens and kitchenettes shall be accessible.

    1109.5 Drinking Fountains. 50% of number provided to be accessible, 50% to be for standing persons.1109.12.3 Point of sale service counters. At least one of each type shall be accessible.

    Chapter 17 - Special Inspections - Required

    Chapter 29 - Plumbing RequirementsFrom IBC - Table 2902.1 Minimum Number of Plumbing Facilities

    FixtureProvided

    FemaleMaleMale (Business - B)

    0 0

    1 per 100 = 16 required2 provided per restroom bank (12 total)

    1 service sink required2 provided per floor

    Water Closet

    Lavatories

    Showers

    DrinkingFountains

    Service Sink

    Business (B)

    2 2

    1005.3 Egress WidthStairways w/ sprinkler: .2Other w/ sprinkler .15

    1007.1 Accessible Means of Egress: Minimum of 2 required.1007.3 Exit Stairways, to be considered as part of an accessible means of egress shall have a clear width of 48" minimum between the handrails and shallincorporate an area of refuge within an enlarged floor level landing or shall be accessed from an area of refuge complying not required with sprinkle system.1007.6 Areas of Refuge 1 per 200 occupants based on the occupant load of area served; Two way communication and instructional and directional signage, .1009.1 Minimum Stairway width 48" between handrails, per 1007.3.

    1014.3 Common Path of egress travel: Group A =75'; Group B 100' with sprinkler system Group B

    1015.1 Spaces with one means of EgressGroup A 49 OccupantsGroup B 49 Occupants

    1015.2.1 Exception 2Two exits required; separated distance between doors shall not be less than 1/3 the length of maximum diagonal of area served in

    sprinkled building.

    1016.2 Egress Travel Distance: Group A = 250'; Group B = 300' with sprinkler system

    1018.1 Corridor Fire Rating: Business and Assembly = 0 w/ sprinkler system1018.2 Corridor Width: 44" minimum1018.4 Dead End Corridors: Group A 20' maximum; Group B = 50' w/ sprinkler

    1021.2 Minimum Number of Exits1-500 occupants 2 exits required501-1000 occupants 3 exits requiredMore than 1000 4 exits required

    BB C C

    13 13

    19 19

    Chapter 9 - Fire Protection Systems

    903.2.1 Group A: Automatic Sprinkler System required. Provided throughout the floor area where Group A Occupancyare located and throughout the entire core and shell of the building.

    903.2.1.3 Group A-3 (Lecture Halls) : Sprinkler system required and provided.903.2.10.3 Buildings 55 feet or more in height: Automatic Sprinkler System required.903.3.1.1 NFPA 13 Sprinkler system is required.

    905.3.1 Standpipe not required. No occupied floors above 30'

    906.3.1 Fire extinguishers for Class A Fire Hazards: Maximum travel distance to extinguisher is 75 feet.

    1 per 25 for first 50, 1 per50 for remainder

    W=17

    1 per 40 for first 80, 1 per 80for remainder

    W=11

    Nonbearing walls and partitions Interior 0 0 0 0 0 0 0 0

    HT

    f. Not less than the fire resistance rating based on fire separation distance Table 602g. Not less than the fire resistance rating as referenced in Section 704.10

    Protected

    NotPermitted i

    NotPermitted

    25%15% 45% 75% No Limit No LimitNot

    Required

    803.1.1 Interior wall and ceiling finishes materials (classified in accordance with ASTM 84 or UL 723). Class A: = Flamespread index 0-25; smoke-developed index 0-450 Class B: = Flamespread index 26-75; smoke developed index 0-450 Class C: = Flamespread index 76-200; smoke developed index 0-450

    907.2 Fire Alarm system required for new buildings and structures. A minimum of one manual fire alarm box shall be provided in an approved location toinitiate fire alarm signal for fire alarm systems. Where elimination of fire alarm boxes due to sprinklers, a single fire alarm box shall be installed.

    907.2.1 Group A: Manual fire alarm system shall be installed in Group A having an occupant load more than 300. Exception: Manual fire alarm boxes are not required where the building is equipped throughout with an automatic sprinkler system and the alarm

    notification appliances will activate upon sprinkler waterflow.907.2.1.1 System initiation in Group A occupancies with an occupant load of 1,000 or more shall initiate a signal using an emergency voice/alarm

    communications system in accordance with NFPA 72. Exception: Where approved, the prerecorded announcement is allowed to be manually deactivated for a period of time not to exceed 3 minutes,

    for the sole purpose of allowing a live voice announcement from an approved, constantly attended location.907.2.1.2 Emergency Power - Voice/alarm communications systems shall be provided with an approved emergency power source.907.2.2 Fire Alarm Group B required in occupant load > 500 occupants or > 100 occupants above or below the lowest level of discharge. Exception: Manual fire boxes are not required where a building is equipped throughout with an automatic sprinkler system and the alarm

    notification devices will activate upon sprinkler water flow.907.2.12.1 Automatic Fire Detection. Smoke detectors shall be connected to an automatic fire alarm system. The activation of any detector required shall

    operate the emergency voice/alarm communications system.907.5 Occupant notification systems. Where a fire alarm is required, it shall be activated by automatic fire detectors, automatic sprinkler system waterflow

    devices, manual fire alarm boxes, and automatic fire-extinguishing system.

    1 per 40 for first 80, 1 per 80for remainder

    M=11

    CS C C

    LIFE SAFETY PLAN LEGEND

    48" 240

    137

    35" 233

    111

    EXIT CAPACITY (STAIR EGRESS WIDTH / .20)

    ANTICIPATED LOAD

    EGRESS WIDTH

    EXIT CAPACITY (DOOR EGRESS WIDTH / .15)

    ANTICIPATED LOAD

    EGRESS WIDTH

    OCCUPANCY LOAD

    ROOM AREA

    EGRESS TRAVEL PATH:DISTANCE NOTED IS ACTUAL.ALLOWABLE DISTANCE IS 300'-0"

    FEC FIRE EXTINGUISHER CABINETWITH FIRE EXTINGUISHER

    EXIT SIGN

    EXIT DOOR

    EXIT STAIR

    ROOMNAME

    150 SF

    1 OCC

    0' 16' 40'

    3/32" = 1'-0'

    8' 24' 32'

    CHECKED BY:

    DRAWN BY:

    DATE:

    PROJECT:

    REVISIONS:

    MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    COPYRIGHT 2013 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

    TEL. 864.235.0405 FAX 864.233.4027

    GREENVILLE, SOUTH CAROLINA 29601

    110 WEST NORTH STREET SUITE 300

    STATE PROJECT NO: H59 - 6083 - JM

    575 MILLENNIUM BOULEVARDGREENVILLE, SC 29607

    5/1

    /2017 5

    :25:0

    5 P

    M

    C:\

    Users

    \eliza

    beth

    co

    rr\D

    ocu

    men

    ts\A

    rch

    _G

    TC

    CM

    I_2015_elizab

    eth

    co

    rr.r

    vt

    3202-137050

    24 APRIL 2017

    EC

    CB JR

    CU LAB CODEREVIEW & LIFESAFETY PLAN

    CG-002

    EN

    TE

    RP

    RIS

    E C

    AM

    PU

    S D

    EV

    EL

    OP

    ME

    NT

    CLEMSON LAB UPFIT - PHASE 1A

    GREENVILLE

    TECHNICAL

    COLLEGE

    3/32" = 1'-0"C4

    CU LAB - ENLARGED LIFE SAFETY PLAN

    GRAPHIC SCALE

    LIFE SAFETY PLANCODE REVIEW (FOR REFERENCE ONLY)

    KEY PLAN

    FOR ENTIRE PROJECT: GREENVILLE TECH CENTER FOR MANUFACTURING INNOVATIONSTATE PROJECT NUMBER 3202-137050

    No. Description Date

    7 AV REVISION 10/28/2015

    15 CU UPFIT PHASE 1A 12/16/2016

    16 CU UPFIT PHASE 1B 02/15/2017

  • 872 5

    D

    F

    1 43

    E2

    G2

    A

    H2

    B

    C

    6 9

    DIAG BRACELOW END

    WALL TO SOFFIT,PHASE 1B

    ENCOLSURE &DOORS,

    PHASE 2A

    A2

    A2

    A2

    A2

    A2

    A2

    H1

    H1

    129

    125

    ST01A

    130C

    ST01B

    130B

    130A

    130

    130D

    127

    130F

    130E

    123

    120D

    131A

    131B

    131C

    5'-0"

    10'-3 3

    /8"

    29'-9"

    4'-6 1

    /2"

    0"

    0" 16'-0"

    DOOR, PHASE 2A

    EXISTING WALL

    PHASE 2A

    ROBOTICSLAB

    135

    EMBEDDEDSYSTEMS

    LAB

    131

    COMPOSITESLAB

    130

    FUMEHOODLAB

    134

    ASSEMBLYSTUDY

    137

    ROBOTICSSTUDY

    136

    COMPOSITESSTUDY

    138

    PHASE 3

    CU IT

    127

    ASSEMBLYLAB

    133

    A1

    TAKTSUPERMARKET

    132

    HALF WALLS,PHASE 1A

    BACKER ROD & SEALANT

    1 LAYER 5/8" GYPSUMWALLBOARD EACH SIDE

    DEFLECTION TRACK

    6" MTL. STUDS 16" O.C.

    BASE AS SCHEDULED

    A6A0.DFIRE RATING UL TEST NO. STC RATING - N/A

    N/A N/A N/AA1

    5/8" 6" 5/8"

    7 1/4"

    EXISTING GWB SOFFIT

    REVEAL AT CONNECTION TOEXISTING SOFFIT, ALIGNNEW GWB FACE TOEXISTING FACE OF GWB

    0 1 2 3 4

    5 6 7 8

    7/8"FURRINGCHANNEL

    1 5/8"METALSTUD

    2 1/2"METALSTUD

    3 5/8"METALSTUD

    4"METALSTUD

    2 1/2"C-HSTUD

    6"METALSTUD

    8"METALSTUD

    A3A1.T

    PARTITION CATEGORY

    PARTITION SIZE

    PARTITION STC

    PARTITION RATING

    PARTITION CATEGORY

    A - METAL STUDF - FURRINGH - SPECIFIED HEIGHT WALL

    PARTITION SIZE PARTITION STC (MIN)

    PARTITION RATING

    A - STC 0B - STC 45C - STC 50

    C - STRUCTURE TO DECK, FINISH TO 6" ABOVE CEILINGD - STRUCTURE AND FINISH TO DECKR - LOWER LEVEL SLAB TO ROOF DECK

    PARTITION ATTRIBUTE 0 - NON-RATED1 - 1 HOUR FIRE PARTITION

    PARTITION ATTRIBUTE2 1/2" C-H STUDAND 6" METALSTUD

    PARTITION DESIGNATION KEY

    MINERAL WOOL @ DECK FLUTES

    BACKER ROD & ACOUSTICALSEALANT, BOTH SIDES

    1 LAYER 5/8" GYPSUM BOARDEACH SIDE

    FIBERGLASS SOUND BATT

    DEFLECTION TRACK

    STEEL STUD (6" @ 24" O.C.)

    METAL DECK

    BASE AS SCHEDULED

    FIRE RATING UL TEST NO. STC RATING

    A6B1.D 1 HOUR V450 45

    BACKER ROD & ACOUSTICAL SEALANT,BOTH SIDES

    A2

    5/8" 6" 5/8"

    7 1/4"

    METAL TOP CAP TERMINATES GWB

    1 LAYER 5/8" GYPSUMWALLBOARD EACH SIDE

    DEFLECTION TRACK, SUPPORT AS REQ'D

    6" MTL. STUDS 16" O.C.

    BASE AS SCHEDULED

    H6A0FIRE RATING UL TEST NO. STC RATING - N/A

    N/A N/A N/AH1

    5/8" 6" 5/8"

    7 1/4"

    72" AFFMIN

    1 1

    /2"

    66" AFF

    CENTER OF DUPLEX

    1 LAYER 5/8" GYPSUM BOARD(ONE SIDE)

    6" STEEL STUD (24" O.C.)

    BASE AS SCHEDULED

    FIRE RATING STC RATING

    N/AF6A0

    N/AF3

    UL TEST NO.

    N/A

    6" 5/8"

    6 5/8"

    2"

    SEE SCHEDULE

    2"

    SE

    E S

    CH

    ED

    ULE

    TYPE F2

    2"

    TYPE DF TYPE DN

    SEE SCHEDULE

    SE

    E S

    CH

    ED

    ULE

    SEE SCHEDULE

    3'-6"

    MA

    X2'-9"

    3" 6" 6" 3"

    SE

    E S

    CH

    ED

    ULE

    1. DOORS TO BE INCLUDED IN PHASE 2A.2. WALL TYPE H1 IN PHASE 1A3. ALL NEW WALLS TO BE PAINTED TO MATCH EXISTING ADJACENT WALLS.4. GWB REVEALS TO BE NO FURTHER THAN 30 FT. INCLUDE REVEALS @ COLUMN LINES - MATCH EXISTING.

    INCLUDE REVEALS @ TRANSITION FROM EXISTING WALL TO NEW WALL.5. GC TO COORDINATE ALL DOOR HARDWARE WITH TENANT.6. FIRE RATING MUST BE MAINTAINED. ANY DAMAGE TO RATED WALLS WILL BE REPAIRED AS REQUIRED.7. CONCRETE FLOORS TO BE POLISHED TO MATCH EXISTING LAB FLOORS IN HIGH BAY LABS.

    FLOOR PLAN SHEET NOTES

    0' 4' 8' 16' 32'

    1/8"=1'-0"

    CHECKED BY:

    DRAWN BY:

    DATE:

    PROJECT:

    REVISIONS:

    MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    COPYRIGHT 2013 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

    TEL. 864.235.0405 FAX 864.233.4027

    GREENVILLE, SOUTH CAROLINA 29601

    110 WEST NORTH STREET SUITE 300

    STATE PROJECT NO: H59 - 6083 - JM

    575 MILLENNIUM BOULEVARDGREENVILLE, SC 29607

    5/1

    /2017 5

    :23:3

    1 P

    M

    C:\

    Users

    \eliza

    beth

    co

    rr\D

    ocu

    men

    ts\A

    rch

    _G

    TC

    CM

    I_2015_elizab

    eth

    co

    rr.r

    vt

    3202-137050

    24 APRIL 2017

    EC

    CB

    CLEMSON LABFLOOR PLAN &WALL TYPES

    CA-100

    EN

    TE

    RP

    RIS

    E C

    AM

    PU

    S D

    EV

    EL

    OP

    ME

    NT

    CLEMSON LAB UPFIT - PHASE 1A

    GREENVILLE

    TECHNICAL

    COLLEGE

    1/8" = 1'-0"B4

    CLEMSON LAB UPFIT - FLOOR PLAN

    PARTITION TYPES

    GRAPHIC SCALE

    KEY PLAN

    CU LAB DOOR & FRAME SCHEDULE

    NUM.

    DOOR

    DOORFINISH

    FRAME

    FRAMEFINISH

    HRDWRSET REMARKS

    SIZE

    TYPEFIRE

    RATING MATLFrameType MATLWD HT

    131A 6' - 0" 8' - 0" DN 45 MIN WD ST F2 PT PHASE 2A; CARD ACCESS REQUIRED

    131B 6' - 0" 8' - 0" DF WD ST F2 PT PHASE 2A

    131C 3' - 0" 8' - 0" F WD ST F2 PT PHASE 2A

    3/8" = 1'-0"

    CU FRAME TYPE LEGEND 3/8" = 1'-0"

    CU DOOR TYPE LEGEND

    DOORS & FRAMES (FUTURE PHASE, SHOWN FOR REFERENCE ONLY)

    No. Description Date

    7 AV REVISION 10/28/2015

    15 CU UPFIT PHASE 1A 12/16/2016

    16 CU UPFIT PHASE 1B 02/15/2017

    (FUTURE PHASE) (FUTURE PHASE)

    (FUTURE PHASE)(CURRENT PHASE)

  • 872 5

    D

    F

    1 43

    E2

    G2

    A

    H2

    B

    C

    6 9

    A4

    A1

    A1

    GYP

    11' - 6"

    GYP

    11' - 6"

    N10

    8

    8

    8

    10' - 0"

    10' - 4"

    GYP

    11' - 6"

    10' - 0"

    12' - 0"

    EXISTING SOFFIT

    WALL TO SOFFIT, PAINT TO MATCHEXISTING FINISH OF ADJACENT WALLS& SOFFIT; GWB CONTROL JOINT @EXISTING WALL - FUTURE PHASE

    EXISTINGEXIT SIGN

    EXISTINGEXIT SIGN

    EXISTINGEXIT SIGN

    ACT

    10' - 0"

    FUME HOODS,PHASE 2A

    RELOCATE DUCTWORK, SEEMECHANICAL DRAWINGS

    CA-163D1

    EXISTINGFIXTURES,TYP

    EXISTINGFIXTURES,TYP

    EXISTINGFIXTURES,TYP

    SEE MECHANICAL FOR REVISEDDUCT WORK IN HIGH BAY. ALLOTHER HIGH BAY ELEMENTS

    REMAIN AS IS.

    0' 16' 40'

    3/32" = 1'-0'

    8' 24' 32'

    CHECKED BY:

    DRAWN BY:

    DATE:

    PROJECT:

    REVISIONS:

    MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    COPYRIGHT 2013 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

    TEL. 864.235.0405 FAX 864.233.4027

    GREENVILLE, SOUTH CAROLINA 29601

    110 WEST NORTH STREET SUITE 300

    STATE PROJECT NO: H59 - 6083 - JM

    575 MILLENNIUM BOULEVARDGREENVILLE, SC 29607

    5/1

    /2017 5

    :23:3

    3 P

    M

    C:\

    Users

    \eliza

    beth

    co

    rr\D

    ocu

    men

    ts\A

    rch

    _G

    TC

    CM

    I_2015_elizab

    eth

    co

    rr.r

    vt

    3202-137050

    24 APRIL 2017

    EC

    CB JR

    CLEMSON LABREFLECTEDCEILING PLAN

    CA-121

    EN

    TE

    RP

    RIS

    E C

    AM

    PU

    S D

    EV

    EL

    OP

    ME

    NT

    CLEMSON LAB UPFIT - PHASE 1A

    GREENVILLE

    TECHNICAL

    COLLEGE

    1/8" = 1'-0"A1

    CLEMSON LAB REFLECTED CEILING PLAN

    GRAPHIC SCALE

    KEY PLAN

    No. Description Date

    15 CU UPFIT PHASE 1A 12/16/2016

    16 CU UPFIT PHASE 1B 02/15/2017

  • 21

    Temp.Unit

    Temp.Unit

    ABB

    872 5

    D

    F

    1 43

    E2

    G2

    A

    H2

    B

    C

    6 9

    A3

    CA-301

    CA-163B1

    A1

    DIAG BRACELOW END

    7'-6"

    13'-1"

    19'-8"

    WALL, ALIGN W SOFFITABOVE (PHASE 1B)

    VERIFY EXISTING ELECTRICALPANEL LOCATIONS

    A2

    A2

    A2

    A2

    A2

    A2

    H1

    H1

    129

    125

    ST01A

    130C

    ST01B

    130B

    130A

    130

    130D

    127

    130F

    130E

    123

    120D

    131A

    131B

    131C

    5'-0"

    10'-3 3

    /8"

    29'-9"

    4'-6 1

    /2"

    0"

    0" 16'-0"

    EXTRUDER & PLUMBING

    A3

    PULTRUSION LINE

    (PHASE 1B)

    (PHASE 2A)

    HP-RTM(PHASE 2B)

    MOLDINGMACHINE

    (PHASE 2B)WORKSTATIONS

    (PHASE 1B)

    (PHASE 1B)

    (PHASE 1B)

    (PHASE 1B)

    (PHASE 1A)

    (PHASE 1A)

    (PHASE 2A)

    ROBOTICSLAB

    135

    EMBEDDEDSYSTEMS

    LAB

    131

    COMPOSITESLAB

    130

    FUMEHOODLAB

    134

    COMPOSITESSTUDY

    138

    ASSEMBLYLAB

    133

    ASSEMBLYSTUDY

    137

    ROBOTICSSTUDY

    136

    CU IT

    127

    (FUTUREPHASE)B3

    CA-163 B4

    STRUCTURAL SUPPORT@ BRIDGE CRANE

    LITTLE CITY LAB(PHASE 1B)

    TAKTSUPERMARKET

    132

    (PHASE 2B)

    MIN

    4F

    T C

    LE

    AR

    0' 4' 8' 16' 32'

    1/8"=1'-0"

    CHECKED BY:

    DRAWN BY:

    DATE:

    PROJECT:

    REVISIONS:

    MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    COPYRIGHT 2013 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

    TEL. 864.235.0405 FAX 864.233.4027

    GREENVILLE, SOUTH CAROLINA 29601

    110 WEST NORTH STREET SUITE 300

    STATE PROJECT NO: H59 - 6083 - JM

    575 MILLENNIUM BOULEVARDGREENVILLE, SC 29607

    5/1

    /2017 5

    :23:4

    7 P

    M

    C:\

    Users

    \eliza

    beth

    co

    rr\D

    ocu

    men

    ts\A

    rch

    _G

    TC

    CM

    I_2015_elizab

    eth

    co

    rr.r

    vt

    3202-137050

    24 APRIL 2017

    EC

    CB

    CLEMSON LABOVERALLEQUIPMENT PLAN

    CA-160

    EN

    TE

    RP

    RIS

    E C

    AM

    PU

    S D

    EV

    EL

    OP

    ME

    NT

    CLEMSON LAB UPFIT - PHASE 1A

    GREENVILLE

    TECHNICAL

    COLLEGE

    1/8" = 1'-0"A1

    CLEMSON LAB UPFIT - EQUIPMENT PLAN

    GRAPHIC SCALE

    KEY PLAN

    No. Description Date

    7 AV REVISION 10/28/2015

    15 CU UPFIT PHASE 1A 12/16/2016

    16 CU UPFIT PHASE 1B 02/15/2017

  • 875

    D

    F

    1 43

    E2

    G2

    H2

    6

    DIAG BRACELOW END

    A2

    A2

    A2

    H1

    H1

    ST01A

    ST01B

    130B

    130A

    130

    131A

    5'-0"

    10'-3 3

    /8"

    29'-9"

    4'-6 1

    /2"

    0"

    0" 16'-0"

    PHYSIOLOGICALSIGNAL ACQUISITIONEQUIPMENT &CONTROL DEVICES

    SIMULATEDOPERATIONENVIRONMENT

    INDUSTRIAL ROBOT &3D ENVIRONMENTAL

    SENSING SYSTEM

    NATURAL LANGUAGEPROCESSING EQUIPMENT

    ROBOTICS[2/5]

    ROBOTICS[3/5]

    ROBOTICS[1/5]

    ROBOTICS[4/5]

    ROBOTICS[5/5]

    TRANSPORTATIONROBOTICS

    6' - 0"

    6' - 0"

    GC TO COORDINATE TENANTPROCURED FURNITURE W/

    POWER REQUIRMENTS

    GC TO COORDINATE TENANTPROCURED FURNITURE W/

    POWER REQUIRMENTS

    LOCATE ALL ROBOTICS LAB DUPLEXESABOVE TABLE HEIGHT. GC TOCOORDINATE. NOTIFY ARCHITECT IF H1WALL HEIGHT IS NOT SUFFICIENT, TYP.

    EXISTING EGRESS STAIR

    ROBOTICSLAB

    135

    ROBOTICSSTUDY

    136

    H1

    A1

    1. SEE MEP DRAWINGS FOR LAB INFRASTRUCTURE.2. LOCATE ALL DUPLEXES ON HALF HEIGHT WALL ABOVE LAB TABLE HEIGHT. GC TO

    COORDINATE WITH TENANT BASED ON TENANT SUPPLIED TABLES & NOTIFYARCHITECT IF WALL HEIGHT IS NOT SUFFICIENT.

    3. GC TO COORDINATE EXISTING STROBE LOCATIONS WITH NEW UPFIT REQUIREMENTS& NOTIFY ARCHITECT OF CONFLICTS.

    4. EACH ROBOTICS WORKSTATION REQUIRES (2) 120-VOLT OUTLETS.

    SHEET NOTES

    0' 2' 4' 8' 16'

    1/4" = 1'-0"

    CHECKED BY:

    DRAWN BY:

    DATE:

    PROJECT:

    REVISIONS:

    MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    COPYRIGHT 2013 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

    TEL. 864.235.0405 FAX 864.233.4027

    GREENVILLE, SOUTH CAROLINA 29601

    110 WEST NORTH STREET SUITE 300

    STATE PROJECT NO: H59 - 6083 - JM

    575 MILLENNIUM BOULEVARDGREENVILLE, SC 29607

    5/1

    /2017 5

    :23:4

    9 P

    M

    C:\

    Users

    \eliza

    beth

    co

    rr\D

    ocu

    men

    ts\A

    rch

    _G

    TC

    CM

    I_2015_elizab

    eth

    co

    rr.r

    vt

    3202-137050

    24 APRIL 2017

    EC

    CB

    ENLARGEDROBOTICS LABPLAN - PHASE 1A

    CA-161

    EN

    TE

    RP

    RIS

    E C

    AM

    PU

    S D

    EV

    EL

    OP

    ME

    NT

    CLEMSON LAB UPFIT - PHASE 1A

    GREENVILLE

    TECHNICAL

    COLLEGE

    1/4" = 1'-0"A1

    ROBOTICS LAB - PHASE 1A

    No. Description Date

    15 CU UPFIT PHASE 1A 12/16/2016

    GRAPHIC SCALE

  • 21

    Temp.Unit

    Temp.Unit

    ABB

    87

    2

    5

    D

    F

    1

    4

    3

    E2

    G2

    H2

    B

    C

    6

    A3

    CA-301

    DIAG BRACELOW END

    7'-6"

    13'-1"

    19'-8"

    WALL ALIGNS WSOFFIT ABOVE

    A2

    A2

    A2

    H1

    H1

    ST01A

    130C

    ST01B

    130B

    130A

    130

    131A

    5'-0"

    10'-3 3

    /8"

    29'-9"

    4'-6 1

    /2"

    0"

    0" 16'-0"

    CA-163B1

    A1

    A3

    LITTLE CITY LAB

    TAKT PLATFORM BY TENANT.LOCATE ASSEMBLY LAB POWERON ADJACENT 6FT WALL, ABOVE

    PLATFORM, TYP.

    4'-0"

    COORDINATE POWER W TENANTSUPPLIED WORKSTATIONS

    MOLDINGMACHINE(PHASE 2)

    DOOR INFILLED IN PHASE 2A

    11'-9 1/2"

    B3

    CA-163 B4

    FUTURE ELECTRICALSERVICE (PHASE 2)

    STORAGE BY TENANT

    FURNITURE BY TENANT

    R 1

    7' -

    0"

    R 17

    ' - 0"

    R 1

    7' -

    0"

    TENANT TO COORDINATE ENDOF PLATFORM & ANTICIPATEDSUV TURNING RADIUS

    75

    A

    B

    C

    6

    130F

    130E

    SEE MEP DRAWINGS FOR OWNER SUPPLIEDACCESSORY EXTRUDER EQUIPMENT

    (6) COMPOSTE STUDENTWORKSTATIONS (TENANT SUPPLIED)

    COORDINATE W POWER REQM'TS

    COMPOSITESLAB

    130

    COORDINATE EXTRUDER PLACEMENT WITHEXISTING STEEL COLUMNS & ROOF DRAINS

    4'-0"

    MIN

    EMERGENCY SHOWER & EYE WASH, HANDSINK, AND FLOOR DRAIN (PHASE 1B).SEE PLUMBING FOR DETAILS.

    COMPOSITESSTUDY

    138

    EXTRUDER TRANSFORMER(PHASE 1B) BY TENANT

    NOTE: COORDINATE SOAP & PAPER TOWELDISPENSER AT SINK WITH BUILDING OWNER

    1. EXTRUDER MACHINE REQUIRES DRAINAGE. THRU WALL PENETRATION TOHOSE BIB WILL BE USED TO TEMPORARILY DRAIN THE EXTRUDER COOLINGBATH BY CONNECTING AN EXTERIOR HOSE TO DRAIN TO THE TRENCH DRAIN.THE MACHINE WILL BE ATTACHED TO A CLOSED-LOOP SYSTEM IN A FUTUREPHASE AND THIS HOSE BIB WILL BECOME A BACK-UP SOLUTION.

    SHEET NOTES

    0' 2' 4' 8' 16'

    1/4" = 1'-0"

    CHECKED BY:

    DRAWN BY:

    DATE:

    PROJECT:

    REVISIONS:

    MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    COPYRIGHT 2013 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

    TEL. 864.235.0405 FAX 864.233.4027

    GREENVILLE, SOUTH CAROLINA 29601

    110 WEST NORTH STREET SUITE 300

    STATE PROJECT NO: H59 - 6083 - JM

    575 MILLENNIUM BOULEVARDGREENVILLE, SC 29607

    5/1

    /2017 5

    :23:5

    1 P

    M

    C:\

    Users

    \eliza

    beth

    co

    rr\D

    ocu

    men

    ts\A

    rch

    _G

    TC

    CM

    I_2015_elizab

    eth

    co

    rr.r

    vt

    3202-137050

    24 APRIL 2017

    EC

    CB

    ENLARGEDASSEMBLY &EXTRUDERPLANS - PHASE1B

    CA-162

    EN

    TE

    RP

    RIS

    E C

    AM

    PU

    S D

    EV

    EL

    OP

    ME

    NT

    CLEMSON LAB UPFIT - PHASE 1A

    GREENVILLE

    TECHNICAL

    COLLEGE

    1/4" = 1'-0"A1

    ASSEMBLY LAB - PHASE 1B

    1/4" = 1'-0"B5

    COMPOSITES LAB - PHASE 1B

    No. Description Date

    15 CU UPFIT PHASE 1A 12/16/2016

    16 CU UPFIT PHASE 1B 02/15/2017

    GRAPHIC SCALE

  • 87

    D

    F

    NEW 36"x96" RATED DOUBLEDOOR

    CEILING CHASE ABOVE

    SMALLER FUME HOOD FORNANO PARTICLES. HEPAFILTER & RECYCLING HOOD.

    PLUMBED EM SHOWER & EYEWASH STATION W FLOOR DRAIN

    BELOW

    FLAMMABLE MATERIALLAB REFRIGERATOR

    CHEMICAL RESISTANT FLOORING(SEAMLESS MARMOLEUM)

    CHEMICAL STORAGE UNIT

    FEC

    STANDING HEIGHT LAB TABLESGLASSWARE DEEPSINK ANDPEGBOARDSTORAGE

    ENCLOSE EXISTING ELECPANELS & TRANSFORMERS.LOCATE DOORS TO ACHIEVECLEARANCES REQ'D.

    T

    T

    P P P

    P

    P

    3'-6"

    5'-0"

    3'-2"3'-2"REF

    16'-4"

    4'-4"

    8"

    4'-0"

    2'-10" 8"

    4'-1"

    1'-8"

    CA-163B1

    A1

    A3

    STEEL LAB CASEWORK WITHGLASS FRONTS

    (BOD = VWR MTL CASEWORK)

    A2

    A2

    A2

    A2

    CHEMICAL WASTE BIN

    4'-0"

    P

    CLEAR

    5'-0"

    GASES AND MANIFOLD/DISTRIBUTION TO HOODS:a. NITROGENb. ARGONc. AIRd. SPARE

    14" TYP

    CLR

    1' -

    0"

    B3

    COUNTER MOUNTEDEYEWASH STATION

    A3

    A2

    A2

    A3

    6'-0"

    COORDINATE SNORKELLOCATION WITH REACH

    SNORKEL ROTATION

    5'-0"

    10'-0"

    15'-0"

    CA-163 B4

    CARD READER

    1. PROCUREMENT OF ALL FUME HOOD ROOM EQUIPMENT, CASEWORK, &FURNITURE BY GC.

    2. VERIFY DIMENSIONS OF EXISTING ELECTRICAL PANELS AND MAINTAINCLEARANCE REQUIRMENTS AT NEW DOOR AND WALL ENCLOSURE.

    3. VERIFY ALL EQUIPMENT SPECIFICATIONS WITH TENANT.4. VERIFY GAS TANK STORAGE REQUIREMENTS

    PRICING NOTES

    LOWER LEVEL0' - 0"

    7

    2'-9" 2'-9" 2'-9" 2'-9"

    3'-0"

    4'-6"

    GLASS FRONT STEELUPPER CASEWORK

    A5

    CA-163

    CHEMICAL RESISTANT EPOXYCOUNTER TOP & 4" BACKSPLASH, TYP.

    P. LAM CASEWORKFRONTS, TYP.

    2'-9" 2'-9" 2'-9" 2'-9"

    SPLASHGUARD @ SINK

    3'-0"

    1'-6"

    7'-6"

    COORDINATE SNORKELWITH REACH

    LOWER LEVEL0' - 0"

    2'-9"

    A5

    CA-163

    EMERGENCY SHOWER &EYE WASH STATION, ADJTO FLOOR DRAIN

    FEC

    2'-9" 2'-9" 2'-9"

    2'-9" 2'-9" 2'-9" 2'-9"

    11'-0"

    3'-0"

    1'-6"

    3'-0"

    GLASS FRONT STEELUPPER CASEWORK

    CHEMICAL RESISTANTEPOXY COUNTER TOP & 4"BACKSPLASH, TYP.

    STEEL CASEWORKFRONTS, TYP.

    SPLASHGUARD @ SINK

    7'-6"

    LOWER LEVEL0' - 0"

    7COORD CASEWORK W/FLUSH COL AT WALL

    BLAST RESISTANTREFRIGERATOR, CONFIRMSPECS WITH TENANT

    CHEMICALWASTEBIN

    EMERGENCY SHOWER &EYE WASH STATION, ADJTO FLOOR DRAIN

    CHEMICAL RESISTANTEPOXY COUNTER TOP & 4"

    BACKSPLASH, TYP.

    STEEL DOORS ANDDRAWER FRONTS

    STD STEELPULLS (TYP.)

    WOOD BLOCKINGAS REQUIRED

    4" RUBBER BASE

    STANDARD STEELSHELVING, TYP.

    LINE BORING @ 1" O.C.

    STD STEELPULLS, TYP

    SEALANT

    3'-0"

    1'-6"

    4"

    3'-0"

    1'-0"

    2'-1"

    1 1

    /2"

    3/4

    "6"

    3/4

    "4"

    1"

    3"

    STEEL CABINET FRAME WGLASS INSERT

    STEEL OPEN SHELVING PART OF CASEGOODS

    FUME HOODS BEYOND

    3'-0"

    1'-6"

    3'-0"

    131C

    GASES AND MANIFOLD/DISTRIBUTION TO HOODS:a. NITROGENb. ARGONc. AIRd. SPARE

    TYP

    14"

    2'-6"3'-6"3'-6"2'-6"

    LOWER LEVEL0' - 0"

    3'-0"3'-6" 3'-6"3'-0"

    3'-0"

    1'-6"

    3'-0"

    7'-6"

    3'-0" 3'-0" 3'-0" 3'-0"

    GLASS FRONT STEELUPPER CASEWORK

    CHEMICALRESISTANT EPOXYCOUNTER TOP & 4"BACKSPLASH, TYP.

    STEEL CASEWORKFRONTS, TYP.

    COUNTERMOUNTED EYEWASH STATION

    87

    F

    ACT CEILING(BOD: USG DX/DXL TO MATCHEXISTING BUILDING CLG TILE)

    FUME HOOD DUCTS,SEE MECHANICAL

    NEW 2X4 LED FIXUTRES.

    MECH CHASE TO ROOF

    NO CEILING

    0' 2' 4' 8' 16'

    1/4" = 1'-0"

    CHECKED BY:

    DRAWN BY:

    DATE:

    PROJECT:

    REVISIONS:

    MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    COPYRIGHT 2013 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

    TEL. 864.235.0405 FAX 864.233.4027

    GREENVILLE, SOUTH CAROLINA 29601

    110 WEST NORTH STREET SUITE 300

    STATE PROJECT NO: H59 - 6083 - JM

    575 MILLENNIUM BOULEVARDGREENVILLE, SC 29607

    5/1

    /2017 5

    :23:5

    6 P

    M

    C:\

    Users

    \eliza

    beth

    co

    rr\D

    ocu

    men

    ts\A

    rch

    _G

    TC

    CM

    I_2015_elizab

    eth

    co

    rr.r

    vt

    3202-137050

    24 APRIL 2017

    EC

    CB

    ENLARGED FUMEHOOD LABPRICING PLAN -PHASE 2A

    CA-163

    EN

    TE

    RP

    RIS

    E C

    AM

    PU

    S D

    EV

    EL

    OP

    ME

    NT

    CLEMSON LAB UPFIT - PHASE 1A

    GREENVILLE

    TECHNICAL

    COLLEGE

    1/4" = 1'-0"D4

    FUME HOOD LAB - PHASE 2A

    1/4" = 1'-0"A1

    FUME HOOD ELEVATION_EAST

    1/4" = 1'-0"B1

    FUME HOOD ELEVATION_NORTH

    1/4" = 1'-0"A3

    FUME HOOD ELEVATION_WEST

    No. Description Date

    16 CU UPFIT PHASE 1B 02/15/2017

    1" = 1'-0"A5

    TYP. LAB BASE/UPPER CABINET SECTION

    GRAPHIC SCALE

    1/4" = 1'-0"B3

    FUME HOOD ELEVATION_SOUTH 1 1/4" = 1'-0"

    B4FUME HOOD ELEVATION_SOUTH 2

    1/4" = 1'-0"D1

    FUME HOOD REFLECTED CEILING PLAN (PHASE 2A)

  • 21

    Temp.Unit

    Temp.Unit

    ABB

    7

    2

    5

    D

    1

    C1

    CA-301

    43

    A

    B

    C

    6

    A3

    CA-301

    DIAG BRACE LOW END

    130C

    130D

    130F

    130E

    COMPOSITESLAB

    130

    MOLD STORAGE AREA -VERIFY REQUIREMENTS

    WITH TENANT

    PULTRUSION LINE - ASSEMBLED BY TENANT.COORDINATE UTILITY REQUIREMENTS, PHASE 2B

    EXTRUDER INSTALLED INPREVIOUS PHASE 1B

    PHASE 1B

    PHASE 1B

    MOLDING MACHINE - VERIFYSIZE, WEIGHT, INSTALLATIONREQUIREMENTS & UTILITIES

    WITH MANUFACTURER

    NOTE:VERIFY SPECIFICATIONS FOR MOLDING MACHINE.VERIFY ASSOCIATED MACHINES, LAYOUT, AND INSTALLATION.VERIFY MOLD STORAGE SPECIFICATIONS.

    EXISTING DOOR

    EXISTING WALL & STOREFRONT

    EXISTING DOOR

    8 INCH SLAB

    6 INCH SLAB

    BRIDGE CRANE

    MEZZANINE ABOVEPULTRUSION LINE(PHASE 2B)

    EXTRUDER TRANSFORMER(PHASE 1B) BY TENANT

    D1

    CA-302

    LINE OF MEZZANINE ABOVE

    PANELS FOR NEW ELECTRICALSERVICE, PHASE 2B

    NEW LADDER TO MEZZANINE

    13'-6"

    FORKLIFTCHARGINGSTATION

    HEAVY DUTYCONCRETE(EXISTING)

    SEE CIVIL FORADDITION OF HEAVYDUTY ASPHALT FORSEMI TRUCK TURN-AROUND (PHASE 2B)

    50 TON CHILLER

    NEW ELEC SERVICE TRANSFORMER

    16'-0"

    20'-0"

    SAFETY SHOWER & EYE WASH

    TENSILE TESTING MACHINE (480VPOWER FOR CLIMATE CHAMBER)

    6'-0"

    9'-8"

    STORAGEROOM

    PHASE 2: COMPOSITES LAB & FUME HOOD LAB

    1. COMPOSITES LAB EQUIPMENT INCLUDES:

    MOLDING MACHINEHEATING SYSTEMSTACKING SYSTEMHP-RTM MACHINE

    EXTRUDER (PHASE 1B)PULTRUSION LINE (PHASE 2A)MOLD STORAGE SYSTEMFORK LIFT CHARGING STATION - CONFIRM IF USING BLDG OWNER FORKLIFT.

    NOTE: COMPOSTES LAB FURNITURE PROVIDED BY TENANT.

    2. FUME HOOD LAB EQUIPMENT INCLUDES:

    (4) SIX FOOT FUME HOODS - (1) WITH INTEGRAL SINK(1) FOUR FOOT NANO FUME HOOD(4) LAB BENCHES W (2) SINKSBLAST RESISTANCE REFRIGERATORGAS TANK STORAGE(1) SNORKEL EXHAUST TO REACH RADIUS SHOWN IN PLAN

    3. FUME HOOD LAB FURNISHINGS INCLUDE:

    FLAMMABLE TALL STORAGE CABINET (1 MIN)STANDING HEIGHT STAINLESS STEEL LAB TABLESFUME HOOD LAB CASEWORK, SEE PLANS & ELEVATIONSSAFETY SHOWER & EYEWASH STATIONFLOOR DRAIN @ EMERGENCY SHOWER(6) STUDENT WORKSTATIONS W (1) CHAIR EACHFIRE EXTINGUISHER AS DETERMINED BY LAB SAFETY OFFICER (CU)

    PRICING NOTES

    COMPOSITE LAB NOTES

    1. DEDICATED EXHAUST SYSTEM REQUIRED FOR HIGH BAY

    2. MANUAL CONTROLED SNORKELS (3-4) LOCATIONS TBD

    3. ELECTRICAL: ADD LIGHTING UNDER MEZZANINE, ADD POWER AND CONVENIENCEPOWER ON MEZZANINE.

    4. ADD ADDITIONAL EXIT & FIRE ALARM DEVICES PER MEZZANINE

    5. EXISTING LIGHTING LEVELS IN LOW LAB AND HIGH BAY LAB ARE ADEQUATE

    6. PHASE 2A DRAWINGS INCLUDE ADDITIONAL LIGHTING IN CHEMICAL LAB.

    7. FIRE PROTECTION: ADD SPRINKLER HEADS UNDER THE MEZZANINE

    8. CARD ACCESS REQUIRED AT CHEMICAL LAB, ENTRY TO LAB FROM CORRIDOR. MAGLOCK AT GLASS EXTERIOR DOORS.

    0' 2' 4' 8' 16'

    1/4" = 1'-0"

    CHECKED BY:

    DRAWN BY:

    DATE:

    PROJECT:

    REVISIONS:

    MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    COPYRIGHT 2013 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

    TEL. 864.235.0405 FAX 864.233.4027

    GREENVILLE, SOUTH CAROLINA 29601

    110 WEST NORTH STREET SUITE 300

    STATE PROJECT NO: H59 - 6083 - JM

    575 MILLENNIUM BOULEVARDGREENVILLE, SC 29607

    5/1

    /2017 5

    :24:0

    6 P

    M

    C:\

    Users

    \eliza

    beth

    co

    rr\D

    ocu

    men

    ts\A

    rch

    _G

    TC

    CM

    I_2015_elizab

    eth

    co

    rr.r

    vt

    3202-137050

    24 APRIL 2017

    Author

    Checker

    ENLARGED HIGHBAY PRICINGPLAN - PHASE 2B

    CA-164

    EN

    TE

    RP

    RIS

    E C

    AM

    PU

    S D

    EV

    EL

    OP

    ME

    NT

    CLEMSON LAB UPFIT - PHASE 1A

    GREENVILLE

    TECHNICAL

    COLLEGE

    1/4" = 1'-0"A1

    COMPOSITES LAB PLAN - PHASE 2B

    No. Description Date

    16 CU UPFIT PHASE 1B 02/15/2017

  • 21

    RS Compact

    Hard

    ener

    Resin

    21

    Temp.Unit

    Temp.Unit

    ABB

    7

    2

    5

    D

    1

    C1

    CA-301

    43

    A

    B

    C

    6

    A3

    CA-301

    D1

    CA-302

    A2

    130C

    130D

    130F

    130E

    HP-RTM

    PHASE 1B

    MOLDING MACHINE - VERIFYSIZE, WEIGHT, INSTALLATIONREQUIREMENTS & UTILITIES

    WITH MANUFACTURER

    NOTE:VERIFY SPECIFICATIONS FOR MOLDING MACHINE.VERIFY ASSOCIATED MACHINES, LAYOUT, AND INSTALLATION.VERIFY MOLD STORAGE SPECIFICATIONS.

    EXISTING DOOR

    EXISTING WALL &STOREFRONT

    8 INCH SLAB

    6 INCH SLAB

    BRIDGE CRANE STRUCTUREINDEPENDENT FROM EXISTING

    BUILIDNG STRUCTURE

    3'-0"

    10'-0"

    60'-0"

    4'-6"

    HYDRAULIC

    4'-6"

    1'-6"

    4'-0"

    6 FT MIN

    15'-0"

    ACCESS HATCH TO HOPPER BELOW

    STEEL DIAMOND PLATE MEZZANINEDECK WITH REMOVEABLE TUBE STEELHANDRAILS FOR FORK LIFT ACCESS.

    14'-0"

    10' - 0"

    CHECKED BY:

    DRAWN BY:

    DATE:

    PROJECT:

    REVISIONS:

    MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    COPYRIGHT 2013 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

    TEL. 864.235.0405 FAX 864.233.4027

    GREENVILLE, SOUTH CAROLINA 29601

    110 WEST NORTH STREET SUITE 300

    STATE PROJECT NO: H59 - 6083 - JM

    575 MILLENNIUM BOULEVARDGREENVILLE, SC 29607

    5/1

    /2017 5

    :24:1

    7 P

    M

    C:\

    Users

    \eliza

    beth

    co

    rr\D

    ocu

    men

    ts\A

    rch

    _G

    TC

    CM

    I_2015_elizab

    eth

    co

    rr.r

    vt

    3202-137050

    24 APRIL 2017

    Author

    Checker

    ENLARGED HIGHBAY MEZZANINEPLAN - PHASE 2B

    CA-165

    EN

    TE

    RP

    RIS

    E C

    AM

    PU

    S D

    EV

    EL

    OP

    ME

    NT

    CLEMSON LAB UPFIT - PHASE 1A

    GREENVILLE

    TECHNICAL

    COLLEGE

    No. Description Date

    16 CU UPFIT PHASE 1B 02/15/2017

    1/4" = 1'-0"A1

    COMPOSITES LAB MEZZANINE PLAN - PHASE 2B

  • LOWER LEVEL0' - 0"

    UPPER LEVEL15' - 6"

    DF E2G2 AH2 BC

    27'-9"

    25' -

    1"

    NOT IN SCOPENOT IN SCOPE

    EXISTING DOOR BEYOND

    H1ROBOTICS

    LAB

    FUTURECOMPOSITES

    LAB

    STRUCTURE, REVISED MECHANICAL DUCTS & ELECTRICALFIXTURES TO REMAIN. VERIFY HEIGHT REQUIREMENTS FORMOLDING MACHINE INSTALLATION WITH MANUFACTURER

    NEWWALL

    REVISED DUCTS,SEE MECHANICAL

    LOWER LEVEL0' - 0"

    UPPER LEVEL15' - 6"

    7 25 4 36

    EXISTING WALL

    OPENOPEN

    EXISTING STRUCTURAL & LIGHTFIXTURES TO REMAIN

    EXISTINGSTOREFRONT

    131A

    EXISTING BUILDING

    REVISED DUCTWORK, PHASE 1A

    HALF WALL BEYOND

    H1

    CHECKED BY:

    DRAWN BY:

    DATE:

    PROJECT:

    REVISIONS:

    MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    COPYRIGHT 2013 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

    TEL. 864.235.0405 FAX 864.233.4027

    GREENVILLE, SOUTH CAROLINA 29601

    110 WEST NORTH STREET SUITE 300

    STATE PROJECT NO: H59 - 6083 - JM

    575 MILLENNIUM BOULEVARDGREENVILLE, SC 29607

    5/1

    /2017 5

    :24:2

    6 P

    M

    C:\

    Users

    \eliza

    beth

    co

    rr\D

    ocu

    men

    ts\A

    rch

    _G

    TC

    CM

    I_2015_elizab

    eth

    co

    rr.r

    vt

    3202-137050

    24 APRIL 2017

    EC

    CB

    CLEMSON LABSECTIONS

    CA-301

    EN

    TE

    RP

    RIS

    E C

    AM

    PU

    S D

    EV

    EL

    OP

    ME

    NT

    CLEMSON LAB UPFIT - PHASE 1A

    GREENVILLE

    TECHNICAL

    COLLEGE

    1/4" = 1'-0"C1

    E/W SECTION @ CLEMSON LAB

    1/4" = 1'-0"A3

    N/S HIGH BAY LAB SECTION 1

    No. Description Date

    15 CU UPFIT PHASE 1A 12/16/2016

  • LOWER LEVEL0' - 0"

    UPPER LEVEL15' - 6"

    72 51 6

    B.O. DECK (N) LOW30' - 4 1/2"

    REMOVEABLE PIPE RAILING @ MEZZANINE, TYP

    VERIFY EQUIPMENT FOR MEZZANINE

    MEZZANINE 10' - 0"

    SAFETY SHOWER, EYE WASH & SINKPULTRUSION LINE, PHASE 1B & 2ABRIDGE CRANE

    CHECKED BY:

    DRAWN BY:

    DATE:

    PROJECT:

    REVISIONS:

    MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

    1

    A

    2 3 4 5 6

    B

    C

    D

    E

    COPYRIGHT 2013 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

    TEL. 864.235.0405 FAX 864.233.4027

    GREENVILLE, SOUTH CAROLINA 29601

    110 WEST NORTH STREET SUITE 300

    STATE PROJECT NO: H59 - 6083 - JM

    575 MILLENNIUM BOULEVARDGREENVILLE, SC 29607

    5/1

    /2017 5

    :24:3

    1 P

    M

    C:\

    Users

    \eliza

    beth

    co

    rr\D

    ocu

    men

    ts\A

    rch

    _G

    TC

    CM

    I_2015_elizab

    eth

    co

    rr.r

    vt

    3202-137050

    24 APRIL 2017

    Author

    Checker

    CLEMSON LABSECTIONS

    CA-302

    EN

    TE

    RP

    RIS

    E C

    AM

    PU

    S D

    EV

    EL

    OP

    ME

    NT

    CLEMSON LAB UPFIT - PHASE 1A

    GREENVILLE

    TECHNICAL

    COLLEGE

    No. Description Date

    1/4" = 1'-0"D1

    N/S HIGH BAY LAB SECTION 2