Page 1: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Contract no TREN07/FP6EN/S07.70775/038573 6th Framework Programme – CONCERTO II – Integrated Project

Deliverable 5.4 Project implementation in Copenhagen finalised November 2013 Cenergia and Kuben Management

Page 2: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

2

Content Summary............................................................................................................................................................ 3 Demo Project Overview – Status November 2013…………………………………………………....4 Revised map of Valby Concerto area .............................................................................................................. 19 Revised calculation of total energy savings and total economy for Valby Project ......................................... 20

Revised timetable and project phases for demo projects…………………………………………..................23

Page 3: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

3

Summary The Copenhagen team evaluated all the demo projects during December 2009 – which led to conclude that it was not possible to implement one of major demo projects (new-built office buildings on FL Smith site). The main reason for the delays in the planned demo projects was the significant “slow down” in the Danish building sector from autumn 2007. Positively the building sector was again more positive from last quarter of 2009 – and the Copenhagen team made agreements for substituting into some new demo projects.

Calculation on total economy and total energy savings for revised project showed that promised achieve-ments in approved project for Valby was much similar or even better in the revised project. To keep the same Concerto volume we had by Dec 2010 added some new demo projects from the list of project initiatives we had followed since the beginning of Concerto project in case replacing one or more projects was needed. The Green Solar Cities consortium asked for a project extension with one more year to also secure good monitoring results after a meeting with the EU technical officer in Brussels in December 2010. This has been approved by August 2011. Even with one more year project period, we had still problems to realize one of the demo projects – the bio-gasification plant – within the Concerto timeframe. Therefore, it was agreed to substitute this with a large 777 kWp PV plant – and achieve even better covering of needed energy supply with renewable energy in Valby. A positive aspect of the situation was also a much stronger support for the large scale PV implementation plan in Valby which was launched in year 2000 aiming at supplying 15 % of all electricity use in Valby by 30 MWp PV electricity established by year 2025. And the RTD costs for the biogasification plant development was not wasted – as the team has succeeded in using the developed concept for implementing such a plant in another municipality Hilleroed north of Co-penhagen. Now when the Concerto project in Valby / Copenhagen has been finalised, it has been confirmed, that it was possible to deliver the promised results in a very good way, and with respect to dissemination work the prep-aration work to make a book on the Concerto project, results has resulted in an agreement with Earthscan publishers to publish a 300 pages Green Solar Cities book by summer / autumn 2014, where all monitoring results can be included also with a link to the DVD video, which has been developed during the project. The final thematic magazine was published by the summer 2013 and results are being promoted in a number of magazines and conferences. All main results will be available at the website, and here there will also be ac-cess to the developed ASCOT total economy decision support tool, which can be used in a number of Euro-pean climates and cultures

Page 4: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

4

Demo Project Overview – June 2013

Building project

Project New/

retrofit

Use Status M² Solar

PV

kWp

Dr. Ingridshjem N Elderly Housing Finished 11,671 60

Henkel II (Building A) R Office,

Public

Finished 6,840

Hornemanns Vænge R Housing Finished 16,580 (600)

300

69,82

Karens Minde N Housing Finished 4,300 30,6

Langgadehus N Family and Elderly Housing

Finished 5,824

8,642

200

Lykkebo skole (school) R School Finished 896 3,78

Ny Ellebjerg N Housing Finished 7,900 - 10

Teglholmens skole /

Sydhavn skolen

(Kindergarten)

N Kindergarten Finished 1,260 8

Valby Hallen Area R Public sports center Finished 14

Water Culture House N Public Finished 3,230 19,11

Damhusåen waste water treatment plant

Public Finished 229,5 (777)

FSB Stakhaven R Housing Finished 20

A/B Lyshøjgård

R Housing Finished 24

Valby Citizen Center R Public Finished 12

Total 67.143 560 440,81

*) Projects is in accordance with the last CDS revision, but under “Public Buildings” heading transfer part of building area from school to Henkel II due to fire at the school.

Page 5: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

5

Karens Minde 36 new-built low energy prefab dwellings were finished in May 2008 according to Danish low energy class 2 (25% better than actual energy requirements) + improvement to reach Concerto standard (30% better). The total area of the dwellings is 4.300 sq. m. A PV-installation of 30,6 kWp has been included in spring 2010. The dwellings of Karensminde were the first dwellings of the affordable housing program of Ms. Ritt Bjer-regaard, the former Mayor of Copenhagen. The concept has now been taken over by a major social housing association KAB under the name Almen Bolig+ and spread out to the entire Denmark in cooperation with other social housing organisations.

Langgadehus New-built 8.723 m2 elderly centre including service areas and 68 apartments in ground floor and 1st floor. In addition to the elderly centre there is social housing on the 2nd and 3rd floor comprising 59 family dwellings of each 100 sq. m, 5.900 sq. m – in all 14.466 sq. m. The building is supplied with 200 sq. m solar heating. The work on the site started in autumn 2008 and the building was finished and ready for occupancy and monitoring in March 2011, a little delayed due to problems with a very heavy rainfall which gave damages to some of the apartments. The 59 prefabricated rooftop dwellings at Langgadehus have been made according to the same balanced building principles as for the Energibo concept (Carbon neutral rooftop concept), also living up to low energy class 1.

Prebricated rooftop dwellings in Langgadehus in Valby, which is build according to the Danish low energy class 2015 standard, utilising both solar heating for hot water, and inno-vative and energy efficient heat recovery ventilation units from the Danish company Ecovent.

Page 6: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

6

Langgadehus

Page 7: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

7

Hornemanns Vaenge Renovation of 288 dwellings in 6 blocks of social housing was originally delayed because of needed revised local planning documents to extend area, so that 66 planned extra rooftop apartments could be approved. Delay was caused by needed including consideration for a new railway track neighbouring the area. There-fore, to avoid waiting for that the board of the social housing decided to leave out rooftop apartments. After having approved extension with one more year for Concerto project it is possible to renovate all 6 blocks – and to have enough time for representative monitoring after implementation, and even the last two housing blocks has been possible to realise within the Concerto project period. A pilot project on ventilations systems with heat recovery was demonstrated in one apartment, the tenants approved the installation, and the solution was installed in all apartments. An extended monitoring program with before and after monitoring has as well been approved. The results will be disseminated by AlmenNet, which is a network for sharing experi-ences on refurbishment of social housing departments in Denmark.

Page 8: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

8

Photo from realization in 2012 / 2013 of large hous-ing retrofit project in Valby at Hornemanns Vaenge housing estate. 14 kWp PV (100 m²) and 100 m² solar thermal is used at each of 6 renovated housing blocks, as an example of a solar energy combined heat and power solution.

After site and basic work, the basic construction work started in August 2011 incl. new roofs with PV panels and solar thermal collectors in a rapid time schedule. Monitoring of first finished housing block from winter 2012/2013 The overall EMS system has however been time consuming to finalise. Water Cultural Centre 3.230 sq. m new-built public swimming pool with service areas built to low energy class 2. Part of the elec-tricity consumption is supplied by a 19,1 kWp PVsystem and heat is supplied by the district heating network. The building start was in March 2010 and official opening of the centre was on the 15th of March 2012. It was highly praised in newspaper articles during following days for quality in building and swim-ming/wellness facilities for the Valby families which are main customer target group. The Water Cultural Centre is the state-of-the-art in low energy performance for indoor swimming facilities on both building design and water treatment technology. The air and water temperature are at least 28 degree Celsius to achieve the best comfort for the visitors. Monitoring programme started 1st of May 2012.

Page 9: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

9

The official opening of the Water Cultural Centre the 15th March 2012 Monitoring work includes in the depth quality control on energy performance and building functions. Infra-red scanning has been used to check windows and doors for possible cold-bridges to avoid water condensa-tion and mould due to high indoor temperature and humidity. Biogasification plant The CHP plant should be able to supply 75-80% of needed electricity for the Water Cultural Centre and all the needed heat. Surplus heat should be delivered by connection to Copenhagen Energy’s general district heating network in the area. Electricity production should be 300 kW and heat production 600 kW. Unfortu-nately approval of agreements has been delayed since last reporting. Some remaining juridical issues regard-ing ownership to plant and ground and also some taxation questions are not solved yet. Therefore it has been relevant to shift to alternative project for a large PV plant which since project start in Valby has been aimed at without succeeding until now. The realised RTD work is however not wasted since the Bio synergy Team responsible for the technology has convinced the municipality of Hillerød, which is situated a little north of Copenhagen, also linked to the large district heating network in the region, to implement the same technology which was proposed for Val-by. Operation of the plant in Hillerød has started in 2013 and due to this Bio synergy received the Danish “ForskEL” price in 2011. Large PV-plant at Damhusaaen The market price on PV has fallen dramatically during the last years - and the Copenhagen team obtained a positive response on a large scale PV implementation in Valby within the Concerto timeframe. This ap-proach is a strong support to the Valby PV implementation plan, which was initiated in year 2000 with the aim to reach 15% PV electricity supply by 2025 by installing 30 MWp PV in Valby. See also www.europeangreencities.com/solivalby/index.htm as well as the new PV in Valby website www.solivalby.dk With the reduction in PV implementation costs it is realistic to realise an extra 900 kWp PV with 20 % sup-port and special BIPV and PV demands on quality assurance which means that a total PV implementation in Valby of 1,5 MWp PV can be met as a strong support for the Valby PV implementation plan, and as a spe-cial thing with an agreement to ensure internet based survey of the installed PV systems so the direct influ-ence of the installed PV system can be viewed continuously also concerning a good operation in practice. Included is a large 777 kWp PV plant at a large waste water treatment plant “Damhusaaen” in Valby, where it is working together with a sludge biogasification system reaching 50 % renewable energy supply of the

Page 10: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

10

waste water handling. The PV plant is located on top of a former filled up 20.000 sq. m waste water sludge deposit. An area of app. 13.000 sq. m is used for the 5.000 sq. m PV installed with 45 degree slope and a distance between the PV rows so that mutual shading is avoided.

Based on the recent years lowering of PV prices it was possible to install PV at 11 DKK/Wp in such a large plant (1.5 euro/Wp). This means 777 kWp implemented in Valby for approx. 8.600.000 DKK (1.146.500 euro). Electricity production from the 777 kWp will yearly contribute with 900 kWh/kWp – so achieved in total 700.000 kWh yearly. The tendering process was rather successful and a larger than anticipated installation was realised. Construc-tion work started in medio November 2012 and commissioning ultimo February 2013. The first solar results are better than anticipated as shown. See remote energy metering. Teglholmskolen/Sydhavnsskolen – new primary school In the south part of Copenhagen Harbour nearly all traditional merchant and industrial harbour activities has been closed down or moved to the northern part of the harbour. It has given space for new office buildings and residential areas. One of the ambitious areas is Teglholmen. The Teglholm and Sydhavn School will be the new primary school for the area servicing the new and coming dwellings in the area as well as the exist-

Page 11: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

11

ing urban areas of Valby. The school will be 10.500 sq. m and the development of the site has started Janu-ary 2010 along with the detailed architect project for the school by JJW Architects. Building start was in April 2011 with aimed finalisation by October 2012, leaving enough time for monitoring within the Concerto project period. The energy performance for the building is Low Energy Class 2015. However due to a fire in November 2012 it has been necessary with large reconstruction works for the school part while the kindergarten part was not affected, so only the latter is included in the final Concerto implementation by 1st. June 2013.

By end of 2012 the building was nearly finished but problems occured due to a fire the 27th of November. Dronning Ingrids Plejehjem, AAB, Carl Jakobsens Vej – new elderly institution Dronning Ingrids Plejehjem is 132 elderly dwellings with connected service facilities in total 11.671 sq. m. The detailed architect project was prepared and the building process started in autumn 2009 and was finished autumn 2010 for the first phase, while the second phase was finished May 2012. It has been possible to have

Page 12: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

12

a good monitoring here for at least one year. Triple glazing, better insulation and solar DHW is the added EU Concerto qualities. 60 sq. m thermal solar collectors is integrated on the roof.

Dronning Ingrids Plejehjem – Phase 1 and 2 The building process of the second phase was finished in May 2012 and commissioning of the second phase took place in June 2012. Lykkeboskolen – new sports hall Lykkeboskole is an extension on an existing school with 896 sq. m for a new sports facility. Building is low energy class 2 and Concerto standard with a 3,8 kWp PV installation integrated in the roof. Construction started May 2010 and was finished January 2011. Monitoring is on-going.

Lykkeboskolen sports facility Ny Ellebjerg (KAB housing area) Carl Jacobsens Vej in Valby

Page 13: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

13

A housing area in low energy Class1 is being established with Vandkunsten Architects, comprising 52 social housing units, 30 elderly housing units and a kindergarten. The KAB housing association is utilising the developed balanced building concept for the roof top dwellings. Building start was in autumn 2011. Due to the implementation time schedule ending in December 2012 only the PV panels is included as a Concerto funded project.

KAB low energy Class1 housing project at Carl Jacobsens Vej in Valby. Henkel site II (new demo project added to Concerto project, east of area 1) This is 2 large 13.149 sq. m old industrial buildings being renovated into a low energy standard and with use of ground coupled heat pump operation with vertical ducts as basis of covering the heat demand. The build-ing process finished in September 2011 for the first building and December 2011 for the second. Commis-sioning took place during 2012 and both buildings were fully used in September 2012. Monitoring is on-going, with an interesting focus on electricity use by help of real time online presentation of results and with an aim to compare to the performance of similar types of building renovation projects in Valby incl. the Ku-ben Management building which has included a low energy design as well.

Henkel site II April 2012

Page 14: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

14

Valby Citizen Centre 12 kWp PV has been established here on a building gable/ the roof. Outside Concerto there is also estab-lished PV along a pathway in combination with lightning savings.

40 small scale PV installations 30 installations have been implemented until now. The total installed until now is 40,7 kW PV. Rest installation according to agreement with GSC partner DONG Energy is 17,3 kW of total 58 kW. Rest implementation is expected during 2012.

PV on façade and Roof – Solbakken - student accommodation and a single family dwelling at Strindbergsvej

Page 15: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

15

Lyshøjgård PV integration

PV at Valby Hallen roof

Page 16: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

16

PV implementation in Valby, Stakhaven.

More large scale PV installations Revised plan for installing large PV plant at Damhusaaen to replace first planned biogasification plant makes it possible to implement further large scale PV installations for the same EU Concerto support: - Valby Hallen area (sports centre) 40 kW - FSB Stakhaven (social housing) 69 kWp - Lyshøjgaard (social housing) 72 kWp

Revised list of EU-CONCERTO – ecobuilding projects realised within Concerto timeframe in Valby by 1. June 2013 A. New built Housing EU support 1. Karensminde - 36 dwellings 4.300 m2 2. Langgadehus - 68 dwellings + 59 roof top dwellings 14.466 m2 3. Dr. Ingrids Hjem – 132 dwellings 11.671 m2 4. Ny Ellebjerg – 52 social dwellings + 30 elderly units (*) 7.900 m2 38.337 m2 Total dwellings – new built housing 377 B. Housing Renovation

EU support

5. Hornemannsvænge – 288 dwellings (6 blocks) 22.230 m2 Total dwellings – housing renovation 288 Total dwellings A. + B. (number) 665

Page 17: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

17

Total dwellings A. + B. (m2) 60.567 C. Public & Commercial buildings EU support 7. Water Cultural House (public) 3.230 m2 8. Teglholmskolen (public), Kindergarten 1.260 m2 9. Lykkeboskolen (public) 896 m2 10. Henkel site II (commercial) (**) 13.500 m2 11. Ny Ellebjerg, KAB site, kindergarten (public) (finish Dec. 2013) 1.100 m2 Total m2 19.986 m2 A. Housing

new built B. Housing renovation

C. Public Total

Actual status 38.377 m2 22.230 m2 19.986 m2 80.553 Promised in contract A + B = 48.000 m2 C = 15.000 m2 63.000

(*) Following Concerto Valby standard – Final things realised Dec. 2013 (**) Following Concerto Valby standard – but with reduced EU support (6.840 m²)

D. PV – solar cells EU support 1. 40 small scale PV installations 58,0 kW 2. Karensminde 30,6 kW 3. Water Cultural Centre 19,1 kW 4. Lykkebo Skole 3,8 kW 5 Valby Citizen Centre 12,0 kW 6. Teglholmskolen (*) 10,0 kW 7. Ny Ellebjerg, KAB site 20,0 kW 8. Hornemanns Vænge 85,0 kW 9. Valby Hallen area (*) 40,0 kW 10. Damhusaaen – waste water treatment plant (*) 777,0 kW 11. FSB Stakhaven (social housing) (*) 70,0 kW 12. A/S Lyshøjgaard (*) 72,8 kW (promised in contract 468 kW) 1198,3 kW (*) Following Concerto Valby standard – but with reduced EU support app. 20%

Page 18: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

18

The falling prices on PV in Denmark has been utilized in the agreements with Third Party builders to imple-ment more kW PV for the same Concerto support. This makes it possible to get as much as 68% of energy consumption in the total new-built and renovated Concerto buildings covered by renewables. E Solar heating EU support 1. Langgadehus 200 m2 2. Dronning Ingrids Plejehjem 60 m2 3. Hornemanns Vaenge 600 m2 (promised in contract minimum 500 m2) 860 m2

Page 19: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

19

Revised map of Valby Concerto area

Here is map referring to first approved project An-nex I dated 14-07 2008 Below is shown revised map including correction for urban areas Teglholmen, where new demo pro-ject for school is located – and urban area Damhu-saaen, where new demo project for large PV-plant is located.

Page 20: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

20

Revised calculation of total energy savings and total economy for Valby Project

Yearly energy balance for EU-Concerto area in Valby community: Here is shown the buildings, which will receive EU-support ( 67.143 m²) like in contract. Besides we have extra building areas of approx. 13.410 m2 m² which will not receive EU-support, but is included in the Con-certo demonstration programme. MWh Common electricity use Concerto area :

19.986 m² public/commercial building x 10 22.230 m² retrofit housing x 6 18.023 m² new built housing x 6 20.314 m² elderly people housing(new) x 15

200 134 108 305

Total 747 District heating use Concerto area:

19.986 m² public/commercial building x 23 kWh/m² = 22.230 m² retrofit housing x 41 kWh/m² = 18.023 m² new built housing x 28 kWh/m² = 20.314 m² elderly people housing(new)x 43 kWh/m² =

459 911 505 874

Total 2.749 Aimed at maximum heat losses in district heating,

10% =

275 District heating Total 3.024 Comment: New energy balance by 2012 for EU-Concerto area in Valby based on official energy frame value calcula-tions from the Danish energy rules. Details can be found in handover certificates. m²

Building area (A)

Energy frame value kWh/²,year (B)

Energy use Calculated as energy frame value MWh/year

1. Water Cultural House 3.230 50 161 2. Dr. Ingrids Plejehjem 11.671 63 735 3. Langgadehus - family 5.823 33,3 193 - Elderly peo-

ple home 8.643 101,9 881

4. Karens Minde housing 4.300 66 283 5. Hornemanns Vænge housing renovation 22.230 55 1222 7. Teglholm School 1.260 50 63 8. Ny Ellebjerg housing 7.900 36 284 9. Lykkebo School 896 45 40 10. Henkel II 13.500 45 608 11. Ny Ellebjerg kindergarten 1.100 45 50 Total excl. district heating losses 80.553 4.520 MWh

Page 21: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

21

And compared to this we have a PV output of 1.078 MWh from 1.198 kWp PV as the new total PV imple-mentation size in the Concerto project in Valby. Multiplied with 2,5 we then have an Energy Frame value of : 2.695 MWh And besides Solar thermal implementation of: 387 MWh Total: 3.082 MWh = 68,2 % of the total building related energy frame value of 4.520 MWh Overview of energy frame values for different types of buildings: Energy

frame value MWH

Building area m²

Energy frame value in kWh/ m2,year

Of which elec-tricity use : energy frame value and (consumption) kWh/m²,year

District heat-ing con-sumption kWh/m²,year

1. Public / commercial buildings 882 19.986 44 25/(10) 19 2. Retrofit housing 1.222 22.230 55 15/(6) 40 3. New build housing 776 18.023 43 15/(6) 28 4. Elderly people housing new-

built 1.616 20.314 80 37/(15) 43

Reference project MWh Common electricity use : 19.986 m² public/commercial building x 20 kWh/m2/y

22.230 m² retrofit housing x 12 kWh/m2/year 18.023 m² new built housing x 12 kWh/m2/year 20.314 m² elderly people housing(new) x 25 kWh/m2/

400 267 216 508

Total 1.391 District heating use : 19.986 m² public/commercial building x 45 kWh/m2/y

23.990 m² retrofit housing x 160 kWh/m2/year 18.023 m² new built housing x 56 kWh/m2/year 20.314 m² elderly people housing(new) x 80 kWh/m2/

899 3.557 1.009 1.625

Total 7.090 District heating Including 25% net heat losses : 8.863 Calculation as energy frame value we have: 1.391 x 2,5 + 8.863 = 12.341 MWh Savings in all in Valby community based on new 2006/2010 energy rules in Denmark Electricity in MWh : (1.391 – 747) MWh= 644 MWh (54 %)

Page 22: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

22

Electricity in EURO : 644 MWh x 227 EURO/MWh 146.188 EURO District heating incl. network losses in MWh

(8.863 – 3.024) MWh : 5.839 MWh (66 %)

District heating in EURO : 5.839 x 48 EURO/MWh 280.272 EURO The Concerto demonstration calculation as energy frame value: 747 x 2,5 + 3.024 = 4.891 MWh This is only 39 % of the reference value. Total Energy Supply from Renewables MWh 1.198 kWp PV x 900 kWh/kWp = 1.078 860 m² solar collectors x 450 kW/m² = 387

Total renewables : Electricity : 1078 MWh (100% of 747 MWh) and (1078 – 747 =

331 x 2,5 = 828 MWh as support for district heating District heating/solar heating : 387 + 828 = 1.215 MWh (40% of 3.024 MWh) Total investment for Valby community including design: 5.128.000 EURO (see economy calculation next page) RES savings EURO Savings from solar energy PV-electricity: 1.078 MWh x 227 EURO/MWh

Solar heating: 387 MWh x 60 EURO/MWh 244.706

23.220 Renewables in total 267.926 Total economy: Total energy saving value : 267.926 + 280.272 + 146.188 = 694.386 Maintenance costs : ½ % of investment = 3.472 Real saving : 694.386 – 3.472 = 690.914 Payback time : 5.128/691 = 7,4 years excl. EU-funding Taking the risk into account when using new technologies this will lead to an acceptable overall economy for the project. Here it should be noted that part of the investment does not get funding from the EU. If this is taken into account the payback time is around 10 years.

Page 23: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Green Solar Cities Actual design work and implementation status for Valby December 2012

23

Overall economy of the Green Solar Cities Project Valby part: M DKK M EURO

304 Housing units, retrofit 54.917 m² x 35 EU-RO/m² (=262.5 DKK/m²) (2.3% extra costs)

67.143 m² x 262.5 DKK/m² = 17.63 M DKK

67.143 m² x 35 EURO/m² = 2.350 M EURO

59 Prefabricated low energy, class 1 rooftop apartments

318 Other new built housing units

8.996 m²

Public and commercial buildings 12.226 m² x 35 EU-RO/m² (=262,5 DKK/m²)

3.230 m²

Water Cultural House at Valby Sports Park area. :

Concerto community energy management system incl. necessary metering of energy flows

0.56 M DKK

0.074 M EURO

451,1 kWp PV x 37.380 DKK / kWp (4.984 Euro/Wp)(Actually it is 1.198 kWp in all)

16.86 M DKK

2.248 M EUR

560 m² Solar collectors x 2.752 DKK/m² (367 €/m2);; 183.000 € + innovative PV system in combination with ventilation 70.000 €

1.54 M DKK 0.206 M EUR

Individual and common energy meters incl. user interfaces in CONCERTO project.

1.13 M DKK 0.150 M EUR

Total costs 37.71 M DKK

5.028 M EUR

Design costs, 2 % : 0.754 M DKK 0.100 M EUR Total eligible investment and design costs : 38.46 M DKK 5.128 M EUR (1 Euro = 7,50 DKK) :

Page 24: Green Solar Cities CONCERTO II - FBBB D 5.4 Project... · 2014. 2. 27. · Green Solar Cities Actual design work and implementation status for Valby December 2012 3 Summary The Copenhagen

Revised plan

Building progress

Demo project Program / Design Building permis. Tendering Construction Commissioning Monitoring x)

Karensminde / Vildrose l & ll 2007 2007 Ultimo 2007 2008 May 2008 2008 - 2010

Langgadehus 2007-2008 2009 2009 2009-2010 March 2011 March 2011- May 2012Hornemanns Vaenge 2010-2011 Jan. 2011 Spring 2011 Aug. 2011- Mar. 2013 From Aug. 2012 Aug. 2012 - 2013

Dr. Ingrids Plejehjem 2008- 2009 Medio 2009 20101. phase 2009-2010 2. phase 2010-2012

1. phase ultimo 2010 2. phase May 2012 2012 - 2013

Lykkebo School – new sports hall 2009 -2011 Spring 2010

Medio 2010 - Jan. 2011 (PV installed nov. 10) Jan. 2011 2012

30 PV (54 kW) installations in Valby - 40,7 kW installed 2007-2010 2008-2011 2008-2011 2012Water Cultural Centre 2008 -2009 Primo 2010 2010-2012 15 March 2012 May 2012 - 2013Valby Citizen Centre (PV) ultimo 2011 spring 2012 apr-12 January 2013 January 2013 2013Teglholmskolen – new primary school (extension Concerto area no 9 area) 2009-2010 Medio 2010 Nov.-Dec. 2010 January 2011 Jan. 2013 Jan. 2013 - 2013Ny Ellebjerg - 52 social dwellings - 30 elderly dwellings - kindergarten 2010 Ultimo 2010 Primo 2011 Nov. 2011 - Dec. 2013 Dec. 2013 2013 - 2014Henkel site II 2009-2010 2010 2010 2010-2011 Ultimo 2011 2012-2013Valby - Renseanlæg Damhusaaen (PV) Feb. 2012 Mar. 2012 Apr. 2012 Nov. 2012 - Jan. 2013 Jan. 2013 2013Valby Hallen area (PV) Ultimo 2011 Ultimo 2011 Ultimo 2011 Mar. 2012 Apr. 2012 2012-2013A/B Lyshøjgaard ultimo 2011 spring 2012 Apr. 2012 June 2012 aug-12 2012-2013FSB Stakhaven - Social Housing (PV) 2011 Ultimo 2011 Primo 2012 May 2012 June 2012 2012-2013 x) For all projects monitoring will be ongoing until summer 2014, where it will be available in the GSC website and in the published GSC block.

23