Green River Filtration Facility
Plant Overview
PNWS-AWWA Conference
Bellevue, WA
Gary Fox & Hilary Lorenz
April 29, 2015
![Page 2: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/2.jpg)
IN THE BEGINNING…
2
![Page 3: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/3.jpg)
3
PILOT PLANT – OWNED AND OPERATED
BY TACOMA WATER STAFF
![Page 4: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/4.jpg)
4
ALL THAT HARD WORK PAID OFF
10 gpm/sf high rate
filtration approved by
Washington State DOH
April 2012.
Donating the trailer to
education – Green River
CC
![Page 5: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/5.jpg)
GREEN RIVER
FILTRATION FACILITY
5
![Page 6: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/6.jpg)
6
OVERVIEW OF THE GRFF
The Big Chunks:
• Sources - Green River and North Fork Well field
• Capacity - 90 MGD Conventional / 150 MGD Direct
• Chemicals – Coagulant, coagulant aid, polymers…
• Filter Media – Dual media: Sand and anthracite
• Solids – Process flow, Basins, Screw Press, and Haul
![Page 7: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/7.jpg)
7
GRFF SITE PLAN – WEST VS. SOUTH LAYOUT
SOLIDS
FILTERED WATER
![Page 8: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/8.jpg)
PROCESS FLOW DIAGRAMS
8
![Page 9: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/9.jpg)
9
MAY 15, 2012 - 0 MONTHS
![Page 10: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/10.jpg)
10
DECEMBER 21, 2012 – 7 MONTHS
![Page 11: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/11.jpg)
11
MAY 15, 2013 – 12 MONTHS
![Page 12: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/12.jpg)
12
DECEMBER 19, 2013 – 19 MONTHS
Upwards of 190 workers per day.
Pumping ~ 10 MGD Ground Water
![Page 13: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/13.jpg)
13
JUNE 17, 2014 – 26 MONTHS
~30,000 Cu/Yds of concrete poured site-wide
4464 Settling plates (304 SS material), pre-assembled in frames -per basin
![Page 14: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/14.jpg)
14
DECEMBER 2, 2014 – 33 MONTHS
14
Substantial Completion – December 16!
Declare filtration 5-1-15
![Page 15: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/15.jpg)
15
APRIL 5, 2015
15
![Page 16: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/16.jpg)
16
MAIN WATER PROCESS FLOW
![Page 17: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/17.jpg)
INTAKE STRUCTURE
IMPROVEMENTS
17
![Page 18: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/18.jpg)
GREEN RIVER INTAKE PROJECT
![Page 19: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/19.jpg)
19
GUIDE VANE ARRAY
![Page 20: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/20.jpg)
20
BRUSH SCREEN CLEANER
20
![Page 21: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/21.jpg)
21
BEHIND SCREEN-EDUCTOR BASIN
21
![Page 22: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/22.jpg)
22
THE GREEN RIVER SUPPLY CONDUITS
22
PROJECT AREA 1: 736’ - 8’ Diam. Polyurethane lined Steel (2003)
PROJECT AREA 2: 1180’ – concrete lined tunnel (1912, lined 1966)
PROJECT AREA 3: 716’ – 8’ Diam. Coal Tar lined Steel (1979)
PROJECT AREA 4: 506’ – TWIN 5’ Diam. Coal Tar lined Steel (1930 & 1960)
![Page 23: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/23.jpg)
23
AREA 2- CONCRETE FINAL TUNNEL
Tunnel Before Repair Work Tunnel After Repair Work
![Page 24: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/24.jpg)
24
AREA 4: 1930’S 60” PIPELINE
24
1930’s Pipe Before Repair Work 1930’s Pipe Pitting Before Repair Work
![Page 25: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/25.jpg)
25
AREA 4: 1930’S 60” PIPELINE
25
1930’s Pipe After Repair Work 1930’s Pipe During Repair Work (prior to polyurea lining)
![Page 26: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/26.jpg)
26
AREA 4: 1960’S 60” PIPELINE
26
1960’s Pipe Before Repair Work 1960’s Pipe After Repair Work
![Page 27: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/27.jpg)
NORTH FORK
SUPPLY
27
![Page 28: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/28.jpg)
NORTH FORK SUPPLY
28
Natural river bank filtration
Remote sites – 7 miles upstream of GRFF
![Page 29: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/29.jpg)
29
NORTH FORK TANK = 3MG
BACKWASH SUPPLY TANK = 10 MG
29
Blending Valves
Existing 10 MG Tank (BW Supply)
NFW Tank
![Page 30: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/30.jpg)
TANK PIPING
30 From NFW
Wellfield
BF-14-RW-101
Ozone Injector
Pump Station
BF-14-RW-103
BF-14-RW-102
NFW Tank
Existing 10 MG Tank
2-way
Isolation
Vault
3-way
Isolation
Vault
![Page 31: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/31.jpg)
NEW NFW TANK VS. EXISTING 10 MG TANK
31
From North
Fork Wellfield
NFW Tank 10 MG Tank
To Filter
Backwash
Overflow
To Blending
Facility
![Page 32: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/32.jpg)
32
INSIDE THE 10MG TANK
![Page 33: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/33.jpg)
OZONE SYSTEM
33
![Page 34: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/34.jpg)
34
OZONE GENERATION AND SIDE-STREAM
INJECTION
34
![Page 35: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/35.jpg)
PRE-TREATMENT
AND FLASH MIX
35
![Page 36: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/36.jpg)
36
RAW WATER METERING STRUCTURE
![Page 37: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/37.jpg)
37
FLASH MIX INJECTION AT THE DECK
![Page 38: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/38.jpg)
38
CHEMICAL INJECTION GRID
![Page 39: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/39.jpg)
39
FLASH MIX ACROSS A CHANNEL
16’
![Page 40: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/40.jpg)
CHEMICAL BUILDING
AND COMPONENTS
40
![Page 41: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/41.jpg)
NUMBER OF NEW TANKS: 20 INCLUDING NEW
HYPO TANKS
![Page 42: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/42.jpg)
42
COMPLEX CHEMICAL PIPING - REDUNDANCY
![Page 43: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/43.jpg)
43
POINT A TO POINT Z FLEXIBILITY
MANIFOLD ASSEMBLY
COMMISSIONING AND STARTUP
![Page 44: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/44.jpg)
44
PUMPS AND ACCESSORIES
![Page 45: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/45.jpg)
45
Polymer Blending
Units
EMULSIFIED POLYMER ACTIVATION
![Page 46: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/46.jpg)
46
CHEMICALS - FROM POINT A TO POINT B
CPB 1
CPB 2
CPB 3
CPB 4 CPB 5
CPB 6 CPB 7
CPB 8
CPB 12
CPB 11
CPB 15
CPB 9
CPB 10
CPB 13
CPB 14
RED = Acidic
PURPLE = Basic
![Page 47: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/47.jpg)
LABELS, LABELS, LABELS- LEFT OR RIGHT?
![Page 48: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/48.jpg)
FLOCCULATION /
SEDIMENTATION
48
![Page 49: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/49.jpg)
49
FLOCCULATION AND SEDIMENTATION
49
• 4 flocculation trains • 32 flocculators • 44’x88’ floc trains • 20 minutes detention time @ 42
MGD
• 2 sedimentation basins with 90 MGD capacity winter 168 MGD summer (algae)
• 89’x89’ sed basins • Hybrid filtration plant
![Page 50: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/50.jpg)
50
FLOW THROUGH FLOCCULATION AND SEDIMENTATION BASIN
![Page 51: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/51.jpg)
51
PLATE SETTLERS
![Page 52: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/52.jpg)
52
SLUDGE SCRAPERS
![Page 53: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/53.jpg)
53
SOLIDS BUILDUP
![Page 54: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/54.jpg)
54
CONSIDER THE MATTER SETTLED
![Page 55: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/55.jpg)
FILTERS
55
![Page 56: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/56.jpg)
56
FILTER SPECS: NUMBERS FOR THE NUMBERS
PEOPLE Plant Capacity: 150 mgd Initial
168 mgd Ultimate
Filter Type : Constant Level & Rate
Number of Filters: 8
Cell Dimensions: 42 ft x 20 ft
Cells per Filter: 2
Filter Area (each): 1,680 sf
Filter Area (total): 13,440 sf
Filtration Rate (Nominal – not including recycle):
-All 8 Filters 7.7 gpm/sf (150 mgd)
8.7 gpm/sf (168 mgd)
-One Off-Line 8.9 gpm/sf (150 mgd)
9.9 gpm/sf (168 mgd)
![Page 57: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/57.jpg)
FILTER MEDIA SPECS:
57
Criterion Value
Anthracite Media
-Depth 50 in
-Effective Size 1.32 ± 0.05
-Uniformity Coefficient <1.4
-Specific Gravity 1.65
Number of super sacks (2500 lbs) 1360
Sand Media
-Depth 20 in
-Effective Size 0.66 ± 0.03
-Uniformity Coefficient <1.4
-Specific Gravity 2.63
Number of super sacks (4000 lbs) 688
![Page 58: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/58.jpg)
STAINLESS STEEL UNDERDRAINS
58
Filtration
Low Rate Backwash
with Air Scour
![Page 59: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/59.jpg)
LOADING FILTER MEDIA
59
![Page 60: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/60.jpg)
60
FILTERING SOLIDS
SETTLED WATER INTO FILTERS
BACKWASH WATER OUT OF FILTERS
![Page 61: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/61.jpg)
61
FILTER PIPE GALLERY
![Page 62: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/62.jpg)
FINISHED WATER
PUMP STATION
62
![Page 63: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/63.jpg)
63
5 PUMPS – 200 HP EACH – 73 MGD CAPACITY
![Page 64: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/64.jpg)
64
![Page 65: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/65.jpg)
65
FILTER OUTLET WEIR STRUCTURE
Filtered unchlorinated
SHC, CS, F- added
![Page 66: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/66.jpg)
66
108” BUTTERFLY VALVE
![Page 67: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/67.jpg)
CLEARWELLS
67
![Page 68: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/68.jpg)
CLEARWELLS
68
6.6 MG Capacity
1.3 MG Capacity
285’D x 15’H
80’D x 35’H
![Page 69: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/69.jpg)
Total Volume
Operational Volume
Max. Design Flow of Served Pipeline
Emergency Supply Duration at Peak Flow
P1 Clearwell 1.3 MG 0.45 MG 73 MGD 25 min (3 hour with 10 MG tank supply)
P5 Clearwell 6.6 MG 6.2 MG 95 MGD 1.6 hour
69
BACKGROUND – WHAT IS CLEARWELL USED FOR?
• Clearwells provide operational storage to accommodate short-term variations between plant
production and plant outflow, to allow for a controlled shutdown and to maintain hydraulic grade
lines in P1 and P5 pipelines.
• CT is achieved in P1 and P5 pipelines, not in the clearwells.
M
NaO
H
SH
C
NaO
H
SH
C
SHC
HF
A
HF
A
NaO
H
SH
C PEG
10 MG Tank
From Filter Effluent
Filter Outlet
Weir Structure
Finished Water
Pump Station
Backwash
Pump Station
P1 Clearwell
P5 Clearwell
P1
P5
M
SA18
SA19
SA20
SA21
Existing
Sample
Station #5
Stormwater
Wetpond
Max WSE 905’
Min Service EL 893’
Max WSE 876’
Min Service EL 860’
Max WSE 957.5’
Min Service EL 922’
Energy
Dissipation
structure
M
M
M
M
![Page 70: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/70.jpg)
P1 CLEARWELL & STAND PIPE
70
BF-07-FW-101
BF-07-FW-102
BF-07-FW-103
N
![Page 71: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/71.jpg)
P1 CLEARWELL – 10’ STAND PIPE
71
![Page 72: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/72.jpg)
SCHEMATIC OF BACKWASH SUPPLY – FIGURE
13-1
72
![Page 73: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/73.jpg)
P5 CLEARWELL
73
EL 874.00
![Page 74: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/74.jpg)
INSIDE P5 CLEARWELL
74
![Page 75: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/75.jpg)
SOLIDS
PRODUCTION
FACILITY
75
![Page 76: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/76.jpg)
76
SOLIDS HANDLING – MAIN PROCESS FLOW
![Page 77: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/77.jpg)
SOLIDS PROCESS FLOW DAIGRAM
77
FWW
From
Filters
Washwater
Equalization
Basins
Washwater
Equalization
Basins
Pump
Station PE
G
M
Sludge From
Flocculation/
Sedimentatio
n Basins
M
M
Washwater
Clarifiers Solids Metering
Vault
PE
G
Thickener Sludge
Blending Tank
Sludge
Thickener
Decant
Screw Press No. 1
Screw Press No. 2
PE
G
PE
G
Hauled Offsite
Hauled Offsite
Hauled Offsite Pressate
Pressate
Thickened
Sludge Pump
Station
Return Water To
Ozone Reactors
Return Water To
Rapid Mix Channel
Decant Structure
Return
Equalizatio
n Basin
Sludge Storage Basin
Geobags
From
FTW
Floc/Sed Drain
and Sludge
Bypass
Decant
Overflow
Ove
rflo
w
Sludge Storage
Basin
Pump Station
SH
C
![Page 78: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/78.jpg)
78
EAST PLANT SOLIDS PRODUCTION
![Page 79: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/79.jpg)
79
RETURN WATER PS
![Page 80: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/80.jpg)
80
THICKENER
![Page 81: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/81.jpg)
WASHWATER CLARIFIERS
• 2 BASINS (20’X42’ EACH)
• SIDE WATER DEPTH =
15 FEET
• DESIGN FLOW:
o 3,200 gpm (Normal)
o 6,400 gpm (Max)
• SURFACE LOADING
RATE =
3.8 GPM/SF
• EFFECTIVE PLATE
LOADING RATE =
0.35 GPM/SF
81
Inflow pipes from Washwater
EQ Basins Pump Station
![Page 82: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/82.jpg)
INCLINED PLATE SETTLERS
DESIGN CRITERIA: DESIGN CAPACITY: 6,400 GPM (9.22 MGD); 3,200 GPM / BASIN DESIGN EFFECTIVE LOADING RATE: 0.35 GPM/SF HYDRAULIC CAPACITY: 6,400 GPM / BASIN 0.7 GPM/SF
82
![Page 83: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/83.jpg)
83
SLUDGE BLENDING 3-5% SOLIDS
![Page 84: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/84.jpg)
84
THICKENED SLUDGE PUMP STATION – PROGRESSIVE
CAVITY PUMPS
![Page 85: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/85.jpg)
MECHANICAL
DEWATERING
85
![Page 86: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/86.jpg)
86
SCREW PRESS CROSS SECTION
STEAM INLET
http://www.fkcscrewpress.com/spintro.html
![Page 87: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/87.jpg)
87
SCREW PRESSES - 24 DRY TONS / DAY
3.3’
18’
![Page 88: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/88.jpg)
88
SCREW PRESS FLOCCULATION TANK
-SNF Polydyne Chemical A-6320 (Anionic polymer) -Dosing 7 lbs active polymer per dry ton of solids
![Page 89: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/89.jpg)
89
PRESSATE
![Page 90: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/90.jpg)
90
CAKE- 25% SOLIDS
![Page 91: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/91.jpg)
91
CONTAINER BAYS
![Page 92: Green River Filtration Facility Plant Overview](https://reader030.vdocuments.site/reader030/viewer/2022040911/624e780b4a5f9b222f7145e8/html5/thumbnails/92.jpg)
92
AWAY THEY GO