green field accelerator study
DESCRIPTION
Green Field Accelerator Study. W. Kaufmann A. Leonardo D. Valuch. Key design parameters. Pulse length: CW Average beam power: ~1.5 MW Beam Energy: 0.5 - 1 GeV (variable) Particle species: protons. Design considerations. World’s first truly environmentally friendly accelerator - PowerPoint PPT PresentationTRANSCRIPT
GreenFieldAcceleratorStudyW. KaufmannA. LeonardoD. Valuch
Key design parameters
Pulse length: CW Average beam power: ~1.5 MW Beam Energy: 0.5 - 1 GeV (variable) Particle species: protons
Design considerations
World’s first truly environmentally friendly accelerator
Technological breakthrough design
Minimal impact on the environment
User friendly operation
Accelerator layout
ECRSOURCE
BTTRLES
VGHES
BLE
TARGET
FFGX
0.05 - 500 MeV 500 - 1000 MeV50 keV
neutrons
ŇUF
FOO
HUH
GPS
POD
POD
POD
POD
POD
GRS
ADT
POD
POD
ECR source For CW machine an ECR source is the
choice as a proton source Well established technology,
commercial of the shelf
Low Energy Section
AC/DCconvertor
+ -
1,000,000 Voltsor more
BEAM IN
Basic building unit: 1 MeV gain block
Section of beampipe withequipotential rings
Wind turbine, 5kW min.
Blue LED
BEAM OUT
Low Energy Section cont.
AC/DCconvertor
AC/DCconvertor
AC/DCconvertor
AC/DCconvertor
… 500x
BEAM IN
BEAM OUT
High Energy Section
1,000,000 Voltsor more
BEAM INSection of beampipe withequipotential rings
1,000,000 solar cells in seriesor 1 hectare of fertile ground
Basic building unit: 1 MeV gain block
+ -
High Energy Section cont.
… 500x
Vacuum system
Revolutionary design, using only materials available from the nature
Not susceptible to wall currents, no problems with machine impedance
Vacuum systemBuilt in transversal self focusing feature
Vacuum system
1 MeV gain blockWith equipotential rings
1 MeV gain blockWith equipotential rings
1 MeV gain blockWith equipotential rings
Research program Mornings: Low energy studies
Day time: High energy studies
Noon: Energy of the day study
Evening: Low energy studies
Nights, spring, autumn, winter, low wind, fog, cloudy conditions: Technical stop
Key facts and figures
~500 employees 15 top management 150 consultants 100 administration managers 100 lawyers 100 external relations 1 scientist 1 engineer
Key facts and figures
In the construction and commissioning phase it will produce 2000 conference papers per year
In the decommissioning phase it will produce about 2000 tons of fuel wood
Summary: World’s first truly green accelerator
Revolutionary concept, Zero CO2, No RF emissions nor magnetic fields
No radiation or material activation (guaranteed by design !)
Not a single incandescent light bulb used!