GREEN ENERGY THAT WORKS

Greeley Colorado June 30, 2009Dan Perry – Wyoming/Colorado Equipment

AGENDA

• About Endurance

• Endurance Products

• Wind Working For You

About Endurance

• Surrey BC – Manufacturing

• R&D - Spanish Fork Utah

• Sales and Distribution – BTI Wind Energy – Greensburg KS

• Colorado Equipment - CO

Points of Interest!

Company Background• Dean Davis and David Laino – Founding Engineers

(Won DOE Grant to design and build this machine original Turbine)

• Formation of Company - Endurance Wind Power

(Partnered with Financial and Marketing Executives to become Endurance)

• Commercialize S250 5 kw Turbine

(Turbine designed to offset needs of home owner: Designed to large wind specs for safety/production)

• BTI Wind Energy – Greensburg

(Partnered with BTI Wind Energy to form tight Network of Sales/Service distributors from John Deere dealers)

• Acquire Energy PGE – 35 and 50 kw Turbine

(Bought larger turbine manufacturer to fill the needs of our customer base…Schools, Municipalities, Farmers, Ranchers, Small

Commercial, Small Industrial)

• 100 + S250 Installations

• G and E Series – 14 World Wide

Our vision:

World leader in distributed wind turbines.

Our mission:

Develop, manufacture and market, through a network of effective

and reputable dealers, a product line of reliable, high performance

wind turbines, specifically engineered to meet our customers’

needs.

Company Vision and Mission

Why Wind Power?

• Save money on electricity

• Hedge against ever increasing electricity prices

• Independence from the grid

• Impact on the environment

1.5 lbs CO2 emission p/kwh of power – US average

• Make a Statement

Why Endurance?

•Engineering

•Aesthetics

•Safety

•Efficiency

•High Production in Low Wind

•Quiet

•Excellent support network – BTI

Product Line-up

- S-343 5 kw model- E-3120 50 kw 3-phase*- G-3120 50 kw single phase*

*Power output can be reduced for states where net-metering regulation is limited to 40 kW

- Main application: Grid-tied

S-343 5kw Power and Output

G and E Series Description and Features

• Main principles that governed the design

• The highest energy production in its category.

• Swept area of 3120 ft² (290 m²).

• The blade aerodynamic profile is optimized for low wind sites.

• Quiet sound and aesthetically sound

• 20-year lifetime design (meets applicable IEC standards).

• Ease of installation to reduce costs.

• Designed for grid-tied connection (Three and single phase).

Description and Features

E3120 Power and Output

Wind – Working for YouSite Assessment and Feasibility

•Power profile

Match production to consumption!

•Wind resource evaluation

Firstlook, Windpro and others

•Turbine selection

Match carefully ..Do Not Try to Overproduce

•Site assessment

Data, Pictures, Measurments,Complete

•Interconnection

Provide complete and accurate technical data

•Incentives

Dsireusa.org, DOE – State Energy Office

•ROI

Must make sense for customer!

Wind – Working for YouThe “Paperwork”

•Interconnection

Request from your utility company, complete in full!

•Net Metering

Complete and return net metering agreement to utility!

•Incentives

Complete loan or grant paperwork or hire someone who has experience.

Must be VERY Thorough!

•Permits

Apply through municipality and follow steps.

Wind – Working for You

Installation and Commissioning

•Foundation

•Electrical

•Commissioning

•Start producing power

•Tell your friends!

Endurance World Tour

PGE 20/35

Cornwall, England

St-Jean-Port-Joli, Canada

Endurance World Tour

Makemo, French Polynesia6 wind turbines

PGE 20/32

Endurance World Tour

PGE 20/50

PGE test site, Saint-Jean-Port-JoliQuebec, Canada

Thank You!