TONNES OF CO2 EQUIVALENCE SAVED
... by designing the road’s pavement to be made of local natural gravel, instead
of quarried crushed rock. The project designed savings equivalent
to planting 12,589 trees.
19,932
5%-20%ABORIGINAL EMPLOYMENT
...was mandated and incentivised by contractual targets for local and non-local Aboriginal employment,
traineeships, and business engagement during construction.
REDUCTION IN CLEARING
15-33%
... high value vegetation avoided in route selection. 303 ha of native
revegetation was designed, replacing the total vegetation cleared for
construction purposes by 5 times.
KNOWLEDGE SHARING... GNH project team and Main Roads
shared many lessons with industry by presenting and providing panel speakers at ISCA conferences in
2015, 2016, 2017.
2015-2017
Great Northern HighwayMuchea to Wubin projectISCA Design Rating highlights
CMYKC95-M64-Y43-K27
RGBR5-G78-B102
WEB#54e66
CMYKC91-M60-Y30-K12
RGBR0-G128-B114
WEB#008072
REPLACEMENT OF POTABLE WATER
99%
...an early geotechnical investigation identified the alternative water sources
in the area that could supply the construction water to the project.
IN PARTNERSHIP WITH JACOBS | ARUP
DESIGN V1.2