graz, june 28 th 2007 working package 3: handbook_1 work until june 2007: - 18 chapters as suggested...
TRANSCRIPT
Graz, June 28th 2007
WORKING PACKAGE 3:HANDBOOK_1
Work until June 2007:
- 18 chapters as suggested in the product card
- Chapters should give a ‚theoretical‘ overview about the content (if possible no numerical examples -> handbook_2)
- Dissemination of each chapter to ‚leading partners‘ and ‚supporting partners‘ respectively dependent on know-how, grant and complexity of the content
- To reach a good quality handbook_1 should have a final output of about 150 A4 pages
- A template for work on handbook_1 has been send to you
- You are kindly asked to send me the procedure notes (PRN2) ONE week before the quarterly report date (Next report on: July 10th 2007 !!!)
- Communication could be better !
Graz, June 28th 2007
DISSEMINATION OF WORK ON THE CHAPTERSChap
#Content # of pages Leading
PartnerSupporting
Partner
1 History of timber structures 5 P5
2 Wood properties 15 P5 P9
3 Structural timber 7 P3 P2
4 Wood adhesives 5 P2
5 Gluded laminated timber 15 P8
6 Wood-based panels 20 P3 P2
7 Design of timber structures 5 P1 P4
8 Servicebility limit states 5 P10 P2
9 Ultimate limit states - structural members 15 P1 P4
10 Ultimate limit states - joints 15 P3 P2
11 Planar timber structures 5 P10 P2, P6
12 Spatial timber structures 5 P1
13 Timber frame houses 10 P10 P2, P6
14 Bracing of timber buildings 5 P7
15 Timber bridges 10 P8
16 Durability of timber structures 5 P9
17 Fire resistance of timber structures 5 P5 P6
18 Timber structures in aggresive environment 5 P9
Graz, June 28th 2007
FURTHER STEPS:
- Call for the main headlines of each chapter (July 6th 2007)
- Call for the work until now (July 6th 2007)
- Dicussion of work until now between all partners
- Call for draft‘s of worked out chapters until August 31th 2007 (one month before the final date of interims report‘s period)
- Discussion of work until this date between all partners
- For the interims report (work within the period from 01/10/2006 until
30/09/2007) at least 70 A4 pages have to be send to the national LdV- agency)
- The chapters of handbook_1 to fulfill the requirements of the interims report have to be send to P1 until October 31th 2007 -> You are kindly ask to send me the finalised chapters TWO week‘s before (October 15th 2007)