graeme cox beng (ag) phd dave cox farmer by. evolution of landforming we have been landforming...
DESCRIPTION
optisurface.com Evolution of Landforming –1900s Dumpy & Stakes –1970s Laserplane –1990s Multiplane –2000s OptiSurface* *Patent PendingTRANSCRIPT
Graeme Cox BEng (Ag) PhD
Dave Cox Farmer
By
optisurface.com
Evolution of Landforming
We have been landforming since agriculture began
optisurface.com
Evolution of Landforming – 1900s Dumpy & Stakes
– 1970s Laserplane
– 1990s Multiplane
– 2000s OptiSurface**Patent Pending
optisurface.com
Benefits of LandformingHigher Yields, Quality and Profit
through• Minimised water logging• Improve infiltration uniformity• Sooner trafficability • Improved crop establishment• Improved uniformity of crop maturity• Reduced weed problems
optisurface.com
OptiSurface Landforming
MUCH BETTER!!
…provides all of the benefits of traditional laser landforming only:
• Much cheaper (up to 80%)• Much less topsoil removal • Much faster
optisurface.com
Case Study C7
• Block: C7 Area: 92 Ha
• Location: DAVCO Farming, Burdekin
• Row Cropping (sugar cane)
• Lateral Move Irrigation
optisurface.com
Existing Topography
32.0
32.5
33.0
33.5
34.0
34.5
35.0
35.5
36.0
Ele
vatio
n (m
)
35.5-36.035.0-35.534.5-35.034.0-34.533.5-34.033.0-33.532.5-33.032.0-32.5
0m
920m
0m
980m50
0m
500m
C7 Not
e: v
ertic
al s
cale
exa
gger
ated
x 1
00
optisurface.com
Plane of Best Fit
C7
optisurface.com
Plane of Best Fit - Cut\Fill Map
Cut: 791m3/ha Cost: $1,190/ha Max Cut: 0.350mC7
optisurface.com
OptiSurface Design Constraints
Minimum Downslope: 1: 900 0.111%Maximum Downslope: 1: 300 0.333%
Max. Downslope change: 1: 4000 0.025%Minimum Cross-slope: 1: -200 -0.500%
Maximum Cross-slope: 1: 200 0.500%Max. Cross-slope change: 1: 1000 0.100%
optisurface.com
32.0
32.5
33.0
33.5
34.0
34.5
35.0
35.5
36.0
Elev
atio
n (m
)
35.5-36.035.0-35.534.5-35.034.0-34.533.5-34.033.0-33.532.5-33.032.0-32.5
0m
920m
0m
980m50
0m
500m
OptiSurface Design
C7
optisurface.com
OptiSurface - Cut\Fill Map
Cut: 180m3/ha Cost: $270/ha Max Cut: 0.270mC7
optisurface.com
Long Section Plot
Long section plot
C7
Downslope: 0.111% to 0.333%
optisurface.com
Long Section Plot
C7
Downslope:0.050% to 1.000%
optisurface.com
OptiSurface - Downslope Map
C7
optisurface.com
Runoff Velocity MapFLOW
DIRECTION
C7
Rainfall: 75mm/hr Max Velocity: 0.44m/s
optisurface.com
Runoff Depth Map
C7
Rainfall: 75mm/hr Infiltration:0mm Max Depth: 0.170m
FLOW
DIRECTION
optisurface.com
OptiSurface - Downslope Map
C7
optisurface.com
Design Surface Options– OptiSurface 1D
Row drainage in one direction only
– OptiSurface 2D Row drainage in two directions
– OptiSurface 4DCan drain in any direction as long as it
leaves the field
optisurface.com
Case Study C8 – Existing
C8
LS1LS2
optisurface.com
OptiSurface 2D Design
C8
LS1LS2
optisurface.com
Long Section 1
C8
optisurface.com
Long Section 2
C8
optisurface.com
OptiSurface 4D Design
C8
optisurface.com
OptiSurface 4D Existing
C8
optisurface.com
Mass Haul Optimisation
–Optimise for haul distance
–Reduce cost by up to 70%
–Mass haul value allows for more accurate earthmoving quotes
optisurface.com
OptiSurface - Cut\Fill Map
Cut: 95m3/ha
Cost: $200/ha
Max Cut: 0.163m
B8&B9
optisurface.com
Mass Haul Optimisation
Iteration Cut (m3/ha)
Mass Haul (m3.m)
0 92 2.1 million1 92 1.4 million2 95 0.7 million3 97 1.0 million