GOVERNMENT OF INDIA MINISTRY OF RAILWAYS RAILWAY BOARD No. 2011/RSF/649/2/RP-II/RWF New Delhi, dt. 15.07.11 The Chief Mechanical Engineer, Rail Wheel Factory, Bangalore – 560 064. The Controller of Stores, All India Railways & P/Units. Sub:- Minutes of the Quarterly WTA Meeting for the planning of items for the period II/2011-12 (July - September, 2011). Minutes of quarterly WTA meeting for the period II/2011-12 (July - September, 2011) held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on 07.07.11 has been uploaded on India Railway’s website www.indianrailways.gov.in. To access the Minutes kindly click on “Railway Board Directorates” under “About Indian Railways” Tab. Then click on “Stores”. Then click on “Conferences / Meetings” to open the page containing the minutes of the meeting. Please ensure that the statement of requirements of WTA items for the Quarter III/2011- 12 (October - December, 2011) should reach this office latest by 15.09.11 positively. The exact date and venue of the meeting would be advised later on. (Hindi version will follow.) Encl.:- As above. ( Sanjeev Misra ) Director, Railway Stores (F) Railway Board. Copy of the Minutes of the meeting together with allocation statement is forwarded for information and necessary action please. 1. The Chief Mechanical Engineers, All India Railways and Production Units. 2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 3. M/s Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata – 700 028. 4. M/s Bharat Earth Movers Ltd., “BEML SOUDHA”, 23/1, 4 th Main, S.R. Nagar, Bangalore-560 027. 5. M/s Titagarh Wagons Ltd.,113, Park Street, Kolkata – 700 016. 6. M/s Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office Complex, Lodhi Road, New Delhi-110 003. 7. Adv.(RS), AM(ME), EDRS(C ), EDRS(P), EDME(Chg.), EDME (Tr.), EDEE(RS), DME(PU), DME(P)-1, DEE/G, DRS(W), DRS(M), DF(S)-1 and RS(WTA) Branches of Railway Board. 8. CWM, Eastern Railway, Kancharapara. 9. The Controller of stores, Metro Railway, Kolkata.

Upload: others

Post on 20-Mar-2020

19 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

GOVERNMENT OF INDIA MINISTRY OF RAILWAYS

RAILWAY BOARD

No. 2011/RSF/649/2/RP-II/RWF New Delhi, dt. 15.07.11

The Chief Mechanical Engineer, Rail Wheel Factory, Bangalore – 560 064. The Controller of Stores, All India Railways & P/Units.

Sub:- Minutes of the Quarterly WTA Meeting for the planning of items for the period II/2011-12 (July - September, 2011).

Minutes of quarterly WTA meeting for the period II/2011-12 (July - September, 2011)

held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on 07.07.11 has been uploaded on India Railway’s website www.indianrailways.gov.in. To access the Minutes kindly click on “Railway Board Directorates” under “About Indian Railways” Tab. Then click on “Stores”. Then click on “Conferences / Meetings” to open the page containing the minutes of the meeting.

Please ensure that the statement of requirements of WTA items for the Quarter III/2011-

12 (October - December, 2011) should reach this office latest by 15.09.11 positively. The exact date and venue of the meeting would be advised later on.

(Hindi version will follow.) Encl.:- As above.

( Sanjeev Misra ) Director, Railway Stores (F)

Railway Board.

Copy of the Minutes of the meeting together with allocation statement is forwarded for information and necessary action please.

1. The Chief Mechanical Engineers, All India Railways and Production Units. 2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 3. M/s Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata – 700 028. 4. M/s Bharat Earth Movers Ltd., “BEML SOUDHA”, 23/1, 4th Main, S.R. Nagar,

Bangalore-560 027. 5. M/s Titagarh Wagons Ltd.,113, Park Street, Kolkata – 700 016. 6. M/s Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office

Complex, Lodhi Road, New Delhi-110 003. 7. Adv.(RS), AM(ME), EDRS(C ), EDRS(P), EDME(Chg.), EDME (Tr.), EDEE(RS),

DME(PU), DME(P)-1, DEE/G, DRS(W), DRS(M), DF(S)-1 and RS(WTA) Branches of Railway Board.

8. CWM, Eastern Railway, Kancharapara. 9. The Controller of stores, Metro Railway, Kolkata.

Page 2: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

RWF MINUTES Minutes of Quarterly WTA meeting held with representatives of RWF on 7.7.2011 in Rail Bhawan, New Delhi for planning the requirement of WTA items for the 2nd Quarter (July-September, 2011).

General

• COSs of all Indian Railways and Production Units, CME and COS of RWF,

GM(SAIL/DSP) and other officials from Railway Board and Railways were welcomed to

the WTA meeting.

• RWF was complimented for the production & supply of over 18500 wheelsets. RWF was

requested to enhance its production capacity to meet additional requirement of wheelsets

/ wheels and axles.

• Against a targeted supply of 17000 wheels per quarter, M/s SAIL has supplied only

12000 wheels. On axle front also performance of SAIL is below the target. SAIL was

advised to ensure supply as per their commitment and also to makeup for shortfall (in

first quarter) in 2nd quarter of 2011-12.

BG Coaching Wheels

• CR, E.CoR, NER, SR, SCR, SWR and WR have projected the demands of BG coaching

wheels on higher side as compared to their EAC. They have demanded almost 50% of

their annual requirement during this quarter. These Railways were requested to review

and reassess their requirement of BG coaching wheels.

MG Coaching Wheels

• NE, NF & NWR have expressed urgency of MG coaching wheels as these wheels

though allotted were not dispatched by RWF in past . CME/RWF was requested to

manufacture urgent requirement of MG coaching wheels. On this CME/RWF stated that

RWF could manufacture only 36000 loose wheels during this quarter as wheel shop is

being shut down for annual maintenance from 16/08/2011. Due to this shut down RWF

will not be in a position to manufacture and supply more than 36000 loose wheels.

• AM/PU directed RWF to manufacture 1500 MG coaching wheels in one lot (considering

the need for optimizing production) during this quarter in addition to 18,000 wheelsets or

36000 loose wheels. 1500 MG coaching Wheels will be sufficient to meet the

requirement of Railways for next 2-3 years.

Page 3: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

- 2-

LHB Wheels

• EDRS(P) informed that 1800-2000 LHB wheels are being offered for inspection in 3rd

week of July and are expected to be available by Aug /Sept.2011. RCF, NR, ER and WR

were advised to note the same and ensure optimum utilization of LHB wheels and

wheelsets available with them. AM(PU) directed RCF and NR to give feedback on the

utilization of LHB wheels which became partly defective during wheelset pressing.

EDRS(P) requested M/s SAIL/DSP to explore the possibility of taking up manufacture of

LHB Wheel as requirement of LHB Wheels is increasing on the Railways. Necessary

details (specification, drawings etc.) will be furnished. M/s SAIL was advised to give a

feedback on this issue by next WTA meeting.

Address by AM(PU)

• AM/PU stated that Railways were advised to de-axle the released wheelsets from

condemned stock. No feed back in this regard has been received. He advised all the

Railways to ensure de-axling of the released wheelsets from condemned coaches and

wagons to meet their maintenance requirement for axles. No released Wheelsets should

be sent to RWF as scrap.

• RWF was also advised to process TTCI clearance etc for the development of LHB wheels

as requirement of these wheels will increase. He also desired that RDSO should urgently

give trial scheme of LHB Wheels. AM(PU) directed RCF and NR to give feedback on

the utilization of LHB wheels which became partly defective during wheelset pressing.

• In view of increased requirement of WTA items for Production and Maintenance of

wagons, coaches, the production of wheels and wheelsets for BLC wagons (not owned by

IR) will not be taken up in this quarter.

Address by Adv(RS)

• Adv/RS has stated that consumption of wheelsets during the last quarter has increased

due to increase in wagon production The inventory of wheelsets available with wagon

builders has come down and it is apprehended that short supply may affect wagon

production in near future. As the requirement is more than supply, capacity of RWF

should be utilized for maximizing production of WTA items required for BOX’N wagons

Page 4: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

- 3 -

and BG Coaches and Loco axles. Other WTA items can be sourced from DSP or through

purchase.

• Adv/RS also stated that in the last quarter number of global tenders for axles & wheelsets

have been processed. Procurement in these cases needs to be finalized on priority basis

and it is to be ensured that technical scrutiny etc. is done on top priority. Status of these

cases will be put up to AM/PU for review. In order to supplement supply of BOX-N

Wheels sets, procurement of 10000 nos wheelsets & 5000 nos BOX-N Axles have been

processed. This is in addition to the procurement of following items :-

1. Axles for WDG 4 locos

1986

2. Axles for LHB coaches

3350

3. BG coaching axles 6000

4. WAG7 & WDG3A Loco axles

1772

• Adv/RS expressed expressed his displeasure regarding non-supply of axles ordered by

RWF on M/s Amstead & directed COS/RWF to take penal action for firm’s failure to

supply.

Address by GM(Mills)/SAIL/DSP

• GM(Mills)/SAIL/DSP has stated that during inspections of wheels rejection due to batch

criteria is very high. Batch criteria of rejection of wheels was introduced by RDSO long

ago when inspection facilities at DSP were not adequate. Now every wheel produced at

SAIL/DSP under goes Dimensional checking, Ultrasonic Testing and Magnetic Particle

test . Thus batch criteria of rejection at this stage is unnecessary. This criteria is

hampering production of wheelsets at SAIL/DSP & also reducing supply of wheels to IR.

They requested to advise RDSO to review the rejection criteria during inspection. It was

decided that RDSO will examine this issue in light of present inspection methods adopted

at SAIL/DSP.

Page 5: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

- 4 - The position regarding supplies made by RWF during the previous quarter i.e. April -

June, 2011 was discussed. The same is tabulated as under:-

SUPPLIES DURING APRIL - JUNE, 2011

No. Item Quantity Planned (April - June, 2011)

Actual Supplies (April - June, 2011)

Variation (+) excess (-) shortfall

Total Supplies from April – June, 2011

A LOOSE WHEELS (i) BOX ‘N’ Wheels

W/WL-4764/R 7050 4743 -2307 4743

(ii) MG Chg. Wheels MG/T-0-1-004 (W/WL-770/R) (WAP-W-031)

150 122 -28 122

(iii) BG Chg. Wheels W/WL-1660/R

11700 11040 -660 11040

(iv) BG Loco Wheels W/WL-4984/R

0 0 0 0

(v) MG Loco Wheels W/WL-4955/R

0 0 0 0

(vi) 840 mm dia wheels for CONCOR

650 603 -47 603

(vii) EMU/DMU Wheels to Drg. No. K-4004

0 0 0 0

(vii) Wheels for BVZC Wagons to Drg. No. W/WL-4747

0 0 0 0

TOTAL WHEELS 19550 16508 -3042 16508 B LOOSE AXLES (i) Nos. 7089 5821 -1268 5821 (ii) Equated Box ‘N’ Units 8143 6586 -1557 6586 C WHEELSETS (i) 16T BG Chg. Wheelsets 300 191 -109 191 (ii) Wheelsets for BVZI 0 0 0 (iii) BOX ‘N’ W/sets include

Wagon Builders & BLC Wagons

18500 18566 66 18566

(iv) EMU W/sets for Trailer Coaches

0 0 0

TOTALWHEELSETS 18800 18757 -43 18757 The detailed supply position (Railway wise/Consignee wise) is given in the enclosed

Annexure-I. The item-wise planning for July - September, 2011 is shown in Annexure - II.

Page 6: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

ANNEXURE - I Position regarding quantities planned vis a - vis actual supplies made by RWF/Bangalore during the Ist Quarter (April - June, 2011).

S.NOS. DRAWING &

DESCRIPTION RLY./CONSIGNEE QTY.

PLANNED (JANUARY - MARCH,11)

QTY. SUPPLIED (JANUARY - MARCH,11)

VARIATION (+) EXCESS (-) SHORTFALL

WHEELS ER/HLR/LLH/JMP 700 547 -153NR/JUDW 500 609 109NCR/JHS 2000 212 -1788NFR/NBQ 100 101 1NWR/AII 200 248 48SR/CW/PER 600 524 -76SCR/RYPS 1600 1152 -448SECR/RWSS 500 498 -2SWR/UBL 100 100 0WR/DHD 750 752 2

1 Wheel disc. BOX 'N' Type to Drg. No. W/WL-4764/R (WAP/SK/M-155)

Total 7050 4743 -2307

CR/MTN/PR 700 750 50ER/LLH 700 696 -4ER/JMP 200 72 -128Eco.R/MCS 200 210 10NR/AMV 200 212 12NR/ASR 700 708 8NER/GKP 300 241 -59NFR/NBQ 100 109 9NWR/AII/JU 700 760 60SR/LW/PER 100 92 -8SCR/TPTY 800 484 -316SER/KGP 500 248 -252SWR/UBL 600 1085 485SWR/UBL 400 0 -400WR/PL 1800 1871 71WCR/BPL 300 133 -167ICF 2000 1852 -148RCF 1400 1517 117

2 BG Chg. Wheels to Drg. No.W/WL-1660/R

Total 11700 11040 -660

NER/IZN 50 42 -8NFR/NBQ 50 50 0NWR/BKN 50 30 -20

3 MG Coaching Wheels to RDSO's Drg. No.CG-K 6099 (WAP-W-031) 150 122 -28

NR/JUDW 350 357 7NCR/JHS 200 173 -27WR/DHD 100 73 -27

4 840 dia wheel for CONCOR for BLC wagon

Total 650 603 -47

Page 7: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

TOTAL WHEELS 19550 16508 -3042 AXLES

NR/CB 20 20 0WR/DHD 10 10 0

1 BG DSL Loco Axles to Drg. No. W/WL-4973/R (WAP/SK/MA-245)

Total 30 30 0

DMW 120 119 -12 Axle for WDG-2 A

(Axle RT (with light wt. 5002 FZ) to Drg. No. TPL-5868 Alt 'b' part No.11231622

Total 120 119 -1

CLW 40 40 0

SER/KGP 10 9 -1

3 Axle rough turned for WAP-4 loco to Drg. No.03/2/11/55 Alt. 1 Total 50 49 -1

DLW 60 43 -174 Axle rough for WDS-

6 to Drg. No. TPL-2585 Total 60 43 -17

DMW 80 80 05 Axle driving rough

turned for WDM-2C & WDM-3A Locos to Drg. No.D/WL-5058/R Alt. NIL

Total 80 80 0

CLW 150 38 -112

CR/BSL 30 23 -7

6 Axles for WAG-9 & WAP-7 (Rough machined) to CLW's Drg. No.1209-01-011-002

Total 180 61 -119

CRBSL 10 0 -107 Axle (3-phase) for

WAP-5 loco to CLW's Drg. No. 1210-01-311-025

CLW 13 13 0

Total 23 13 -10

ER/JMP 20 0 -20

SWR/AP 12 0 -12

8 Axle rough machined for WDG-2, WDG-3A, WDM-3D Locos to Drg. No. TPL-6292

Total 32 0 -32

SER/KGP 10 10 0CLW 180 180 0

9 Axle rough machined for WDG-2 & WAG-7 to DRg. BHEL 120 68 -52

Page 8: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

No.06/2/11/2 Total 310 258 -52

SR/GOC 60 53 -7

SCR/BZA 25 20 -5

10 Axle rough for WDP-2 & WDM-2 to Drg. No. TPL-6687

Total 85 73 -12

NFR/NBQ 10 4 -6

SWR/AP 10 10 0

11 Axle rough for WDP-4 locos to Drg. No.WDG-4/PS/22 GM Pt. No.40088369 Total 20 14 -6

SCR/GY 6 0 -6

SWR/UBL 15 0 -15

12 Axle rough GM Loco to EMD Pt.No.40077315 (Geared) & DLW Part No.17230019 Total 21 0 -21

DLW 18 14 -413 Axle forWDG-5

locos to DLW's part No.17230330 Total 18 14 -4

NR/GZB 50 55 5WR/DHD 18 25 7

14 Axle rough machined for TAO-659 Hitachi type wheelset to Drg. No. SKEL-4516

Total 68 80 12

TOTAL AXLES (1) TO (14) IN NOS.

1097 834 -263

TOTAL AXLES IN EQUATED NOS. (X by 1.9)=

2084 1585 -499.7

NR/GZB 10 0 -1015 BG EMU MTR Coach Axles to Drg. No. DC/EMU-M-0-1-005

Total 10 0 -10

ER/HLR 6 6 016 Axle for AC Motor

Coach to Drg. No.EMU/MC-1-025 Total 6 6 0

ICF 200 58 -142

Titagarh/KPA 24 0 -24

BEML 36 0 -36

17 EMU Motor Coach Axles to Drg. No.AC/DC-EMU/B-02-002 Alt. A/2 item 1 (WAP's Drg. No. WAP-A-087) Total 260 58 -202

Page 9: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

RCF 42 0 -42

CR/MTN 15 9 -618 Axle for MEMU/DMC

to Drg. No.EMU/M-0-1-025 Alt. 'a'

Total 57 9 -48

TOTAL EMU

AXLES IN NOS. 333 73 -260

TOTAL EMU AXLES IN EQUATED NOS. (X by 1.2)=

400 88 -312

ICF 500 789 289Titagarh/KPA 48 48 0BEML/MYSS 72 64 -8

19 EMU Axles for Trailor Coaches to Drg. No. AC/DC/EMU/02/204-001 00/RWF-A-157 Total 620 901 281

SR/CW/PER 15 0 -1520 BG EMU Axles to Drg. No. W/WL-4784/R Total 15 0 -15

MR/Kolkata 10 0 -1021 Axle rough turned

for Trailer Coach for Kolkata Metro to Drg. No.MRB-0-1-002 Alt. 4/b

Total 10 0 -10

RCF 170 0 -170NR/GZB 10 0 -10SCR/BZA 4 0 -4

22 BG MEMU TC Axles to Drg. No. WTAC3-0-2-303 Alt.F

Total 184 0 -184

ER/JMP 100 0 -100

SR/CW/PER 300 0 -300

23 Axles for BOX'N' to Drg. No.W/WL-4901/R (WD-89025/SL-2) Total 400 0 -400

NWR/BKN 50 0 -50RCF 16 16 0

24 MG ICF Coaching Axles to DRg. No. MG/T-0-2-023

Total 66 16 -50

25 20T powered axles for DHMU/DPC as

SCR/LGD 15 0 -15

Page 10: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

pe ICF Drg. No.DHMU/DPC/0-2-001 item KPC 733-804-01-50 alt. (A)

Total 15 0 -15

RCF/KXH 800 789 -11

ER/LLH 25 32 7

WR/PL 30 32 2

26 Axles for LHB coaches to Drg. No.LW 021049

Total 855 853 -2

CR/MTN/PR 175 175 0ER/HLR 100 89 -11ER/JMP 100 97 -3NR/AMV 50 42 -8NR/ASR 350 200 -150NER/GKP 100 50 -50NWR/JU 50 42 -8SCR/LGD 50 42 -8SWR/AP 50 50 0SWR/UBL 200 164 -36WR/PL 700 669 -31WCR/BPL 69 41 -28ICF 800 795 -5RCF 700 688 -12

27 BG Coaching Axles to Drg. No.WTAC-3-02-303

Total 3494 3144 -350

TOTAL AXLES S.NOS. 19 to 27 IN NOS.

5659 4914 -745

GRAND TOTAL

AXLES IN NOS.= 7089 5821 -1268

GRAND TOTAL

AXLES IN EQUATED UNITS =

8143 6586 -1556.7

WHEELSETS RCF 300 155 -145ER/ 0 36 36

1 16T BG CHG.Wheelsets

Total 300 191 -109

Wagon Builders 18500 18566 662 BOX 'N' Wheelsets Total 18500 18566 66

TOTAL

WHEELSETS 18800 18757 -43

Page 11: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

ANNEXURE - II

Allocation sheet for supply of WTA items for the IInd quarter i.e. July - September, 2011 on RWF/Bangalore.

S.NOS. DRAWING & DESCRIPTION

RLYS./PUs QTY. PLANNED (JULY -

SEPTEMBER, 2011

Consignee Remarks

WHEELS ER 400 HLR NR 100 JUDW NCR 1000 JHS SCR 400 RYPS SECR 400 RWSS

1 Wheel disc. BOX 'N' Type to Drg. No. W/WL-4764/R (WAP/SK/M-155)

Total 2300 ER 400 LLH SR 300 GOC SER 200 KGP SWR 200 UBL For BVZI WR 700 PL For supply of

wheelsets to BEML

ICF 500 RCF 900

2 BG Chg. Wheels to Drg. No.W/WL-1660/R

Total 3200 NR 300 JUDW NCR 100 JHS

3 840 dia Wheel for CONCOR for BLC Wagon Total 400

NER 200 IZN NFR 400 NBQ NWR 100 BKN WR 50 BVP

4 MG Chg. Wheels to RDSO's Drg. No.CG-K 6099 (WAP-W-031)

Total 750

TOTAL WHEELS 6650 AXLES

SR 25 GOC 1 BG DSL Loco Axles to Drg. No. W/WL-4973/R (WAP/SK/MA-245)

Total 25

CR 30 PR NR 20 CB NER 10 GKP DMW 267

2 Axle for WDG-2 A (Axle RT (with light wt. 5002 FZ) to Drg. No. TPL-5868 Alt. 'b' part No. 11231622

Total 327

CLW 100 3 Axle rough turned for WAP-4 Loco to Drg. No.03/2/11/55 Total 100

DMW 220 4 Axle driving rough

turned for WDM-2C CR 10 PR

Page 12: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

ER 10 JMP Locos to Drg. No. D/WL-5058/R Alt. NIL Total 240

ER 10 JMP 5 Axle rough machined

for WDG-2, WDG-3A, WDM-3D Locos to Drg. No. TPL-6292

Total 10

ER 30 KPA NR 10 LDH NCR 6 CNB SR 6 LW/PER SER 15 KGP WR 15 DHD CLW 250

BHEL 120

6 Axle rough machined for WDG-2 & WAG-7 to Drg. No.06/2/11/2

Total 452

DLW 60 7 Axle rugh for WDS-6 to Drg. No. TPL-2585 Total 60

CLW 370 CR 50 BSL

8 Axles for WAG-9 & WAP-7 (Rough machined) to CLW's Drg. No. 1209-01-011-002 Alt.

Total 420

CR 10 BSL

CLW 50

9 Axle (3 Phase) for WAP-5 Loco to CLW Drg. No. 1210-01-311-025 Total 60

SWR 10 UBL SCR 6 TPTY

10 Axle rough GM Loco to EMD Pt. No.40077315 (Geared) & DLW Part No.1730019 Total 16

DLW 360 WR 6 DHD

11 Axle rough for WDG-4 & WDP-4 to EMS-804 Drg. No.D/WL-5061/R Total 366

SR 4 GOC 12 X Class Loco Axle to

Drg. No.L/WL/2D/X Total 4

13 Axle rough turned for 140T Crane CR/808 ER 20 JMP

Page 13: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

Total 20

CR 100 BSL SER 30 KGP

14 Axle rough machined for TAO-659 Hitachi type wheelset to Drg. No. SKEL-4516

Total 130

TOTAL AXLES (1) TO (14) IN NOS.

2230

TOTAL AXLES IN EQUATED NOS. (X by 1.9)=

4237

ICF 300 15 EMU Axles for Motor

Coaches to Drg. No. AC/DC/EMU/B-02-002 Alt. A/2 item 1 (WAP-A-087)

Total 300

RCF 65 16 Axle for MEMU/DMC to Drg. No. EMU/M-0-1-025 Alt. a Total 65

TOTAL EMU AXLES

IN NOS. 365

TOTAL EMU AXLES IN EQUATED NOS. (X by 1.2)=

438

ICF 400 17 EMU Axles for Trailor

Coaches to Drg. No. AC/DC/EMU/02/204-001 00/RWF-A-157

Total 400

RCF 150 18 BG MEMU TC Axles to

Drg. No. WTAC3-0-2-303 Alt.F

Total 150

RCF 240 KXH ER 20 LLH

19 Axles for LHB Coaches to Drg. No.LW 021049

Total 240

CR 50 MTN

ER 100 HLR

Eco.R 50 MCS

NR 50 JUDW NER 100 GKP

NWR 50 JU

20 16 T BG Coaching Axles to Drg. No. CG-K 6015

SR 200 CW/PER

Page 14: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

SCR 50 TPTY

SWR 100 UBL

100 UBL For BVZI

WR 350 PL For supply of wheelsets to BEML

ICF 1000 RCF 600 Total 2800

TOTAL AXLES S.NOS. 17 to 20 IN NOS.

3590

GRAND TOTAL

AXLES IN NOS.= 6185

GRAND TOTAL

AXLES IN EQUATED UNITS =

8265

WHEELSETS

Wagon Builders

18500

Consignee to be advised by DRS(W)

1 BOX 'N' Wheelsets

Total 18500 TOTAL WHEELSETS 18500

Page 15: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

GOVERNMENT OF INDIA MINISTRY OF RAILWAYS

RAILWAY BOARD No. 2011/RSF/649/2/RP-II/DSP New Delhi, dt . 15.07.11

1. M/s Steel Authority of India Ltd., Central Marketing Organisation, S&RM Division, Ispat Bhawan, 40-Jawahar Lal Nehru Marg, Kolkata – 700 071.

2 The Controller of Stores, All India Railways & P/Units.

Sub:- Minutes of the Quarterly WTA Meeting for the planning of WTA items for the period II/2011-12 (July - September, 2011).

Minutes of quarterly WTA meeting for the period II/2011-12 (July - September, 2011) held with the representatives of M/s SAIL/DSP and Zonal Railways/PUs in Rail Bhawan, New Delhi on 07.07.11 has been uploaded on India Railway’s website www.indianrailways.gov.in. To access the Minutes kindly click on “Railway Board Directorates” under “About Indian Railways” Tab. Then click on “Stores”. Then click on “Conferences / Meetings” to open the page containing the minutes of the meeting.

Please ensure that the statement of requirements of WTA items for the Quarter III/2011-12 (October - December, 2011) should reach this office latest by 15.09.11 positively. The exact date and venue of the meeting would be advised later on.

(Hindi version will follow.)

( Sanjeev Misra )

Director, Railway Stores (F) Railway Board.

Copy to: 1. The Chief Mechanical Engineers, All Indian Railways/Production Units. 2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 3. GM (BBM & WAP), M/s SAIL/DSP, Durgapur – 713203. 4. The DGM I/C, WAP, M/s SAIL/DSP, Durgapur – 713203. 5. The Chief Marketing Manager, M/s SAIL, Commercial Directorate, 13th Floor,

Hindustan Times Building, 10-20 K.G. Marg, New Delhi. 6. Shri Vinay Kumar, Dy.GM, M/s SAIL/DSP, SCOPE MINAR (20th floor), North Block,

Laxmi Nagar District Centre, Delhi – 110 092. 7. GM(I), M/s RITES (ER), Quality Assurance Division, Central Station Building (Metro),

56, CR Avenue, 3rd Floor, Kolkata – 700 012. 8. S.I.E(M) Incharge, Inspection Wing, M/s RITES c/o DSP, Durgapur-713203. 9. M/s Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata – 700 028. 10. M/s Titagarh Wagons Ltd., 113, Park Street, Kolkata – 700 016. 11. M/s Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office

Complex, Lodhi Road, New Delhi-110 003 12. Adv./RS, AM/ME, AM/PU. EDRS(P), EDRS ( C), EDEE(RS), DME(PU), DME(P)-I,

DRS(W), DRS(M) & RS(WTA) Branch. 13. The Controller of stores, Metro Railway, Kolkata.

Page 16: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

DSP Minutes Minutes of Quarterly WTA meeting held with representatives of RWF on 7.7.2011 in Rail Bhawan, New Delhi for planning the requirement of WTA items for the 2nd Quarter (July-September, 2011).

General

• COSs of all Indian Railways and Production Units, CME and COS of RWF,

GM(SAIL/DSP) and other officials from Railway Board and Railways were welcomed to

the WTA meeting.

• RWF was complimented for the production & supply of over 18500 wheelsets. RWF was

requested to enhance its production capacity to meet additional requirement of wheelsets

/ wheels and axles.

• Against a targeted supply of 17000 wheels per quarter, M/s SAIL has supplied only

12000 wheels. On axle front also performance of SAIL is below the target. SAIL was

advised to ensure supply as per their commitment and also to makeup for shortfall (in

first quarter) in 2nd quarter of 2011-12.

BG Coaching Wheels

• CR, E.CoR, NER, SR, SCR, SWR and WR have projected the demands of BG coaching

wheels on higher side as compared to their EAC. They have demanded almost 50% of

their annual requirement during this quarter. These Railways were requested to review

and reassess their requirement of BG coaching wheels.

MG Coaching Wheels

• NE, NF & NWR have expressed urgency of MG coaching wheels as these wheels

though allotted were not dispatched by RWF in past . CME/RWF was requested to

manufacture urgent requirement of MG coaching wheels. On this CME/RWF stated that

RWF could manufacture only 36000 loose wheels during this quarter as wheel shop is

being shut down for annual maintenance from 16/08/2011. Due to this shut down RWF

will not be in a position to manufacture and supply more than 36000 loose wheels.

• AM/PU directed RWF to manufacture 1500 MG coaching wheels in one lot (considering

the need for optimizing production) during this quarter in addition to 18,000 wheelsets or

36000 loose wheels. 1500 MG coaching Wheels will be sufficient to meet the

requirement of Railways for next 2-3 years.

Page 17: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

- 2 -

LHB Wheels

• EDRS(P) informed that 1800-2000 LHB wheels are being offered for inspection in 3rd

week of July and are expected to be available by Aug /Sept.2011. RCF, NR, ER and WR

were advised to note the same and ensure optimum utilization of LHB wheels and

wheelsets available with them. AM(PU) directed RCF and NR to give feedback on the

utilization of LHB wheels which became partly defective during wheelset pressing.

EDRS(P) requested M/s SAIL/DSP to explore the possibility of taking up manufacture of

LHB Wheel as requirement of LHB Wheels is increasing on the Railways. Necessary

details (specification, drawings etc.) will be furnished. M/s SAIL was advised to give a

feedback on this issue by next WTA meeting.

Address by AM(PU)

• AM/PU stated that Railways were advised to de-axle the released wheelsets from

condemned stock. No feed back in this regard has been received. He advised all the

Railways to ensure de-axling of the released wheelsets from condemned coaches and

wagons to meet their maintenance requirement for axles. No released Wheelsets should

be sent to RWF as scrap.

• RWF was also advised to process TTCI clearance etc for the development of LHB wheels

as requirement of these wheels will increase. He also desired that RDSO should urgently

give trial scheme of LHB Wheels. AM(PU) directed RCF and NR to give feedback on

the utilization of LHB wheels which became partly defective during wheelset pressing.

• In view of increased requirement of WTA items for Production and Maintenance of

wagons, coaches, the production of wheels and wheelsets for BLC wagons (not owned by

IR) will not be taken up in this quarter.

Address by Adv(RS)

• Adv/RS has stated that consumption of wheelsets during the last quarter has increased

due to increase in wagon production The inventory of wheelsets available with wagon

builders has come down and it is apprehended that short supply may affect wagon

production in near future. As the requirement is more than supply, capacity of RWF

should be utilized for maximizing production of WTA items required for BOX’N wagons

Page 18: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

- 3 -

and BG Coaches and Loco axles. Other WTA items can be sourced from DSP or through

purchase.

• Adv/RS also stated that in the last quarter number of global tenders for axles & wheelsets

have been processed. Procurement in these cases needs to be finalized on priority basis

and it is to be ensured that technical scrutiny etc. is done on top priority. Status of these

cases will be put up to AM/PU for review. In order to supplement supply of BOX-N

Wheels sets, procurement of 10000 nos wheelsets & 5000 nos BOX-N Axles have been

processed. This is in addition to the procurement of following items :-

1. Axles for WDG 4 locos

1986

2. Axles for LHB coaches

3350

3. BG coaching axles 6000

4. WAG7 & WDG3A Loco axles

1772

• Adv/RS expressed expressed his displeasure regarding non-supply of axles ordered by

RWF on M/s Amstead & directed COS/RWF to take penal action for firm’s failure to

supply.

Address by GM(Mills)/SAIL/DSP

• GM(Mills)/SAIL/DSP has stated that during inspections of wheels rejection due to batch

criteria is very high. Batch criteria of rejection of wheels was introduced by RDSO long

ago when inspection facilities at DSP were not adequate. Now every wheel produced at

SAIL/DSP under goes Dimensional checking, Ultrasonic Testing and Magnetic Particle

test . Thus batch criteria of rejection at this stage is unnecessary. This criteria is

hampering production of wheelsets at SAIL/DSP & also reducing supply of wheels to IR.

They requested to advise RDSO to review the rejection criteria during inspection. It was

decided that RDSO will examine this issue in light of present inspection methods adopted

at SAIL/DSP.

Page 19: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

- 4 - The position regarding supplies made by M/s SAIL/DSP during the previous quarter i.e.

April - June, 2011 was discussed. The same is tabulated as under:-

SUPPLIES DURING APRIL - JUNE, 2011 S.No. Item Quantity

Planned (April - June,

2011)

Actual Supplies

(April - June, 2011)

Variation (+) excess (-) shortfall

Total Supplies from April, –

June, 2011

A ASSEMBLED WHEELSETS

(i) 16T BG Coaching Wheelsets

300 177 123 177

B LOOSE WHEELS

(i) BG Chg. Wheels W/WL-1660/R

6000 5116 884 5116

(ii) BG Loco Wheels W/WL-4948/R

5349 4897 452 4897

(iii) BG Loco Wheels “S” Shaped

3300 1661 1639 1661

(iv) MG Loco Wheels W/WL-4955/R

185 0 185 0

(v) EMU/DEMU Wheels to Drg. No.K-4004

1460 284 1176 284

TOTAL WHEELS 16294 11958 4336 11958 C LOOSE AXLES (i) 16T BG Coaching

Axles WTAC-3-02-303

2550 890 1660 890

(ii) Axles forgings (heat treated and tempered but without machining)

0 0 0 0

TOTAL AXLES 2550 890 1660 890 The detailed supply position (Railway wise/Consignee wise) is given in the enclosed

Annexure-I.

The item-wise planning for July - September, 2011 is shown in Annexure - II.

Page 20: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

ANNEXURE - I Position regarding quantities planned vis a - vis actual supplies made by M/s SAIL/DSP during the Ist Quarter (April - June, 2011). S.NOS. DRAWING &

DESCRIPTION RLY./CONSIGNEE QTY.

PLANNED (APRIL - JUNE, 11)

QTY. SUPPLIED (APRIL - JUNE, 11)

VARIATION (+) EXCESS (-) SHORTFALL

AXLES CR/MTN 50 41 -9ER/LLH 300 100 -200Eco.R/MCS 100 42 -58NR/AMV 100 85 -15NER/GKP 200 0 -200NFR/NBQ 100 73 -27NWR/AII 50 42 -8SR/GOC 100 96 -4SCR/TPTY 50 42 -8SER/KGP 100 42 -58SWR/UBL 200 0 -200ICF 700 193 -507RCF 500 134 -366

1 BG Chg. Axles to Drg. No. WTAC-3-02-303

TOTAL 2550 890 -1660 TOTAL AXLES 2550 890 -1660 WHEELS

CR/MTN 400 323 -77ER/LLH/HLR 400 360 -40Eco.R/MCS 300 261 -39NR/AMV 200 170 -30NER/GKP 300 289 -11NFR/DBRT 100 69 -31SR/CW/PER 100 85 -15SCR/LGD 700 665 -35SER/KGP 800 800 0SWR/AP 500 470 -30WCR/BPL 200 200 0ICF 1000 814 -186RCF 1000 610 -390

1 BG Chg. Wheels to Drg. No.W/WL-1660/R

TOTAL 6000 5116 -884CR/BSL/PR 1200 1025 -175ER/KPA 250 225 -25NR/CB 550 550 0NCR/CNB 135 115 -20NWR/AII 164 143 -21SR/GOC/LW/PER 400 378 -22SCR/RYPS/TPTY 600 563 -37

SER/KGP/Tatanagar 1000 975 -25SECR/RWSS 50 31 -19SWR/AP 150 96 -54WR/DHD 500 486 -14DMW 200 200 0

2 BG Loco Wheels /DSL Mono Block Rough machined WDM2, WDM3 and WAG5 to Drg. No. D/WL-4948/R

BHEL 150 110 -40

Page 21: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

TOTAL 5349 4897 -452

CR/BSL 400 274 -126NR/ASR 200 115 -85SER/KGP 600 476 -124WR/DHD 100 100 0CLW 700 246 -454DMW 600 450 -150

3 BG Loco Wheels "S" Shaped to Drg. No. D/WL-5060/R

TOTAL 2600 1661 -939

SWR/UBL/MYSS 300 0 -300WR/DHD 50 0 -50DLW 350 0 -350

4 BG Loco Wheels "S" Shaped to DLW's Drg. No. 17230251 "C" TOTAL 700 0 -700

NFR/NBQ 120 0 -120NWR/AII 35 0 -35SR/GOC 30 0 -30TOTAL 185 0 -185

5 MG Loco Wheels to Drg. No.W/WL-4955/R

CR/MTN 400 284 -116NR/GZB 200 0 -200NWR/AII 20 0 -20SCR/LGD 180 0 -180WR/DHD 100 0 -100RCF 200 0 -200TITAGARH/KPA 144 0 -144BEML/MYSS/RWF 216 0 -216

6 EMU/DEMU Wheels to Drg. No.K-4004

TOTAL 1460 284 -1176

TOTAL WHEELS 16294 11958 -4336 WHEELSETS

RCF 300 177 -1231 16T BG Coaching Wheelsets

TOTAL 300 177 -123

Page 22: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

ANNEXURE - II Allocation sheet for supply of WTA items for the IInd quarter i.e. July - September, 2011 on M/s SAIL/DSP.

S.NOS. DRAWING & DESCRIPTION

RLYS./PUs QTY. PLANNED

(JULY - SEPTEMBER,

2011)

Consignee Remarks

AXLES CR 100 MTN ER 200 LLH Eco.R 50 MCS NR 100 AMV NER 200 GKP NFR 100 NBQ NWR 100 AII SR 100 CW/PER SCR 100 LGD SER 50 KGP SECR 24 R WR 100 PL WCR 100 BPL ICF 800 RCF 500

1 BG Chg. Axles to Drg. No. WTAC-3-02-303

TOTAL 2624 WHEELS

CR 500 MTN ER 600 300-LLH

300-HLR

Eco.R 400 MCS NR 600 300-ASR

300-AMV

NER 300 GKP

NFR 400 NBQ

NWR 500 250-AII 250-JU

SR 500 CW/PER

SCR 500 LGD SER 400 KGP SECR 100 R SWR 300 UBL WR 200 PL WCR 400 BPL ICF 1500

1 BG Chg. Wheels to Drg. No.W/WL-1660/R

RCF 1200

Page 23: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

TOTAL 8400 NER 50 IZN NFR 50 NBQ NWR 90 AII SR 50 GOC WR 75 SBI

2 MG Loco Wheels to Drg. No.W/WL-4955/R

TOTAL 315 CR 600 BSL

ER 500 KPA

Eco.R 100 VSKP

NR 200 100-CB 100-ASR

NCR 100 CNB NWR 100 AII

SR 300 200-GOC 100-LW/PER

SCR 300 200-RYPS 100-TPTY

SER 800 600-KGP 200-Tatanagar

SECR 100 RWSS SWR 100 AP WR 100 DHD DMW 300 BHEL 240

3 BG Loco Wheels /DSL Mono Block Rough machined WDM2, WDM3 and WAG5 to Drg. No. W/WL-4948/R

TOTAL 3840 CR 300 PR ER 300 JMP SR 100 GOC SCR 300 RYPS SER 300 KGP WR 100 DHD CLW 1000 DMW 300

4 BG Loco Wheels "S" Shaped to Drg. No. D/WL-5060/R

TOTAL 2700

DLW 1000 5 BG Loco Wheels "S" Shaped to Drg. No. 17230251 "C"

TOTAL 1000

CR 350 MTN

NWR 20 AII

SCR 180 LGD

6 EMU/DEMU Wheels to Drg. No. K-4004

BEML 216 144-ICF 72-MYSS on

BEML A/C

Page 24: GOVERNMENT OF INDIA RAILWAY BOARD - Indian Railwayindianrailways.gov.in/railwayboard/uploads/directorate/stores/downloads/meetings/...- 2- LHB Wheels • EDRS(P) informed that 1800-2000

TOTAL 766 TOTAL WHEELS 17021 WHEELSETS

RCF 350 1 Complete Wheelsets (Forged) TOTAL 350

*******