government of andhra pradeshgovernment of andhra pradesh forest department facts and figures –...

399

Upload: others

Post on 08-Jan-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • GOVERNMENT OF ANDHRA PRADESH

    Forest Department

    Facts and Figures – 2013

    Compiled by

    ADDL. PRL.CHIEF CONSERVATOR OF FORESTS, R&D CIRCLE.

    Issued by

    THE PRINCIPAL CHIEF CONSERVATOR OF FORESTS & HOFF,

    ANDHRA PRADESH, HYDERABAD - 500004, INDIA.

  • i

    INDEX

    Table No.

    Title Page No.

    CHAPTER –I AREA STATISTICS

    1.1 Geographical and Forest Area 1

    1.2 Classification of Forest Area 1

    1.3 Forest cover in different forest types 1

    1.4 Distribution of Geographical and Forest Area and Circle Wise Percentages 2

    1.5 District Wise Distribution of Geographical and forest areas with population percentage and per capita forest areas

    2

    1.6.1 Forest Blocks by Legal Status – Circle and Division Wise 3

    1.6.2 Forest Blocks by Legal Status – Region, District and Division Wise 4

    1.7.1 Forest Areas by Legal Status from 1956-57 to 2012-2013 5

    1.7.2 Year Wise Forest Cover in Andhra Pradesh 6

    1.7.3 Year Wise Good, Degraded Forests & Water in Andhra Pradesh 6

    1.7.4 Year Wise Green Forests, Barren and Water in Andhra Pradesh 6

    1.8.1 Geographical Area and Forest Area by Legal Status (Circle & Division Wise) 7

    1.8.2 Geographical Area and Forest Area by Legal Status (District and Division Wise) 8

    1.9 Forest Blocks – Largest, Smallest and Average Area (Division, District and Region Wise) 9-11

    1.10.1 Circle Wise Quarterly Progress report on Diversion of Forest Area and Progress of Compensatory Afforestation under forest (Conservation) Act 1980 of Andhra Pradesh for the quarter ending with 30-03-2011

    12

    1.10.2 Circle & Division Wise Quarterly Progress report on Diversion of Forest Area and Progress of Compensatory Afforestation under forest (Conservation) Act 1980 of Andhra Pradesh for the quarter ending with 30-03-2011

    13-14

    1.10.3 Circle Wise Quarterly Progress report on Diversion of Forest Area and Progress of Compensatory Afforestation under forest (Conservation) Act 1980 of Andhra Pradesh for the quarter ending with 30-03-2012

    15

    1.10.4 Circle & Division Wise Quarterly Progress report on Diversion of Forest Area and Progress of Compensatory Afforestation under forest (Conservation) Act 1980 of Andhra Pradesh for the quarter ending with 30-03-2012

    16-17

    1.10.5 Circle Wise Quarterly Progress report on Diversion of Forest Area and Progress of Compensatory Afforestation under forest (Conservation) Act 1980 of Andhra Pradesh for the quarter ending with 30-03-2013

    18

    1.10.6 Circle & Division Wise Quarterly Progress report on Diversion of Forest Area and Progress of Compensatory Afforestation under forest (Conservation) Act 1980 of Andhra Pradesh for the quarter ending with 30-03-2013

    19-20

    1.11.1 Implementation of RoFR act, 2006 as on 31-03-2011 21

    1.11.2 Implementation of RoFR act, 2006 as on 31-03-2012 21

    1.11.3 Implementation of RoFR act, 2006 as on 31-03-2013 22

    1.12 Land Use Pattern in Andhra Pradesh 23

    1.13 Variation in Forest Areas, Population wise, Per Capita and Density 1956 to 2013 23

    1.14 Forest Area by Function in Region wise percentages 24

    1.15 Statement showing the Division wise of Working plans approved 24

    1.16 Geographical Limits of the Catchments as per the Pre-Investment Survey of Forest Resources 25

    1.17 Geographical Area, Forest Area (Inventorised and Non- Inventorised) Area of the Catchments as per the Pre-Investment Survey of Forest Resources in Andhra Pradesh

    25

    1.18 Forest Area by Topography – Catchment wise 26

  • ii

    Table No.

    Title Page No.

    1.19 Forest Area by Composition – Catchment wise 26

    1.20.1 Circle wise & Division wise Forest Cover in Andhra Pradesh

    (Data of Sept 2010 to Jan 2011) 27

    1.20.2 Region Wise, District Wise & Division wise Forest Cover in Andhra Pradesh

    (Data of Sept 2010 to Jan 2011) 28

    1.20.3 Circle Wise & Division wise Forest Cover in Andhra Pradesh

    (Data of Sept 2011 to Mar 2012) 29

    1.20.4 Region Wise, District Wise & Division wise Forest Cover in Andhra Pradesh

    (Data of Sept 2011 to Mar 2012) 30

    1.21.1 Circle Wise & Division Wise – Good, Degraded Forests & water in Andhra Pradesh

    (Data of Sept 2010 to Jan 2011) 31

    1.21.2 Region, District & Division Wise – Good, Degraded Forests & water in Andhra Pradesh

    (Data of Sept 2010 to Jan 2011) 32

    1.21.3 Circle Wise & Division Wise – Good, Degraded Forests & water in Andhra Pradesh

    (Data of Sept 2011 to Mar 2012) 33

    1.21.4 Region, District & Division Wise – Good, Degraded Forests & water in Andhra Pradesh

    (Data of Sept 2011 to Mar 2012) 34

    1.22.1 Circle Wise & Division Wise Green forests, barren and water in Andhra Pradesh

    Data of Sept 2010 to Jan 2011) 35

    1.22.2 Region, District & Division Wise – Green Forests, barren and water in Andhra Pradesh

    (Data of Sept 2010 to Jan 2011) 36

    1.22.3 Circle Wise & Division Wise Green forests, barren and water in Andhra Pradesh

    (Data of Sept 2011 to Mar 2012) 37

    1.22.4 Region, District &Division Wise Green forests, barren and water in Andhra Pradesh

    (Data of Sept 2011 to Mar 2012) 38

    1.23.1 Forest Cover Change Matrix in Andhra Pradesh – March 2011 39

    1.23.2 Forest Cover Change Matrix in Andhra Pradesh – March 2012 39

    1.24 Comparison with previous Inventories done in Andhra Pradesh 39

    1.25.1 Circle Wise Bamboo Resiurces in Andhra Pradesh 40

    1.25.2 Circle Wise Estimation of Bamboo in Andhra Pradesh 40

    1.26.1 Out Turn Timber Areas (Coupes) Worked by Departmental Agency Circle wise from 2008-09 to 2012-13

    40

    1.26.2 Out Turn Bamboo from Coupes by Departmental Agency Circle wise from 2008-09 to 2012-13

    41

    1.27.1 Actual Area Worked under different Silvicultural Systems from 2008-09 to 2012-13 41

    1.27.2 Area Worked under Teak Conservation Working Circle / Circle wise from 1976-77 to 2012-13

    42

    1.27.3 Area Worked under Coupes with Reserves Working Circle / Circle wise from 1976-77 to 2012-13

    42

    1.27.4 Area Worked under Fuel Working Circle / Circle wise from 1976-77 to 2012-13 43

    1.28.1 Boundaries of Reserve Forests upto 2010-11 43

    1.28.2 Boundaries of Reserve Forests upto 2011-12 44

    1.28.3 Boundaries of Reserve Forests upto 2012-13 44

    1.29.1 Protected Area wise Forest Cover in different forest Canopy in A.P. - 2012 (2009 Assesment compared with 2011 Assesment)

    45

    1.29.2 Protected Area wise Forest Cover in different forest Canopy in A.P. - 2013 (2009 Assesment compared with 2011 Assesment)

    46

    1.30.1 Divisionswise Forest Cover in VSS areas in Andhra Pradesh – 2012 47

    1.30.2 Divisionswise Forest Cover in VSS areas in Andhra Pradesh – 20123 48

  • iii

    Table No.

    Title Page No.

    CHAPTER –II GROWING STOCK AND RESOURCES

    2.1 The distribution of Growing Stock in different Canopy Classes 49

    2.2 Circle and division wise Growing Stock in Andhra Pradesh 49-50

    2.3 Circle and Division Wise – Canopy class wise average Growing Stock in A.P. 51

    2.4.1 Gowring Stock-Adilabad Catchment in Andhra Pradesh 52

    2.4.2 Gowring Stock-Nizamabad Catchment in Andhra Pradesh 52

    2.4.3 Gowring Stock-Hyderabad Catchment in Andhra Pradesh 52

    2.4.4 Gowring Stock-Warangal Catchment in Andhra Pradesh 53

    2.4.5 Gowring Stock-Khammam Catchment in Andhra Pradesh 53

    2.4.6 Gowring Stock-Visakhapatnam Catchment in Andhra Pradesh 53

    2.4.7 Gowring Stock-Rajahmundry Catchment in Andhra Pradesh 54

    2.4.8 Gowring Stock-Guntur Catchment in Andhra Pradesh 54

    2.4.9 Gowring Stock-Srisailam Catchment in Andhra Pradesh 54

    2.4.10 Gowring Stock-Kurnool Catchment in Andhra Pradesh 54

    2.4.11 Gowring Stock-Ananthapur Catchment in Andhra Pradesh 55

    2.4.12 Gowring Stock-Tirupati Catchment in Andhra Pradesh 55

    2.5.1 Zone Wise Distribution of Canopy Classes in Andhra Pradesh 55

    2.5.2 Division wise Distribution of Canopy Classes in Zone – I in Andhra Pradesh 56

    2.5.3 Division wise Distribution of Canopy Classes in Zone – II in Andhra Pradesh 56

    2.5.4 Division wise Distribution of Canopy Classes in Zone – III in Andhra Pradesh 56

    2.5.5 Division wise Distribution of Canopy Classes in Zone – IV in Andhra Pradesh 57

    2.5.6 Division wise Distribution of Canopy Classes in Zone – V in Andhra Pradesh 57

    2.5.7 Division wise Distribution of Canopy Classes in Zone – VI in Andhra Pradesh 57

    2.5.8 Division wise Distribution of Canopy Classes in Zone – VII in Andhra Pradesh 58

    2.6 Diameter class wise volumes top 15 species in A.P. 58

    2.7 Circle and Division wise Stems and Average Stems in Andhra Pradesh 59

    2.8.1 District Wise Plantations Raised Under Various Schemes (APCFM/FDA/RIDF/SF/FCA/TGP/RVP/CAMPA) from 2005-06 to 2010-11

    60

    2.8.2 Scheme Wise Plantations Raised in A.P. from 2005-06 to 2010-11 60

    2.9 FDAs Activities in Andhra Pradesh from 2008-09 to 2012-13 61

    2.10 Out-Turn of Timber, Fuel Wood, Bamboo & Beedi Leaf of Forest Department and APFDC for the year from 2008-09 to 2012-13

    61

    2.11 Out-Turn of Timber, Circle Wise for the years from 2008-09 to 2012-13 61

    2.12.1 Extraction of Timber and Fuel Wood Circle wise for the year 2010-11 Departmental Agency 62

    2.12.2 Extraction of Timber and Fuel Wood Circle wise for the year 2011-12 Departmental Agency 62

    2.12.3 Extraction of Timber and Fuel Wood Circle wise for the year 2012-13 Departmental Agency 63

    2.13 Extraction of Timber, Fuel Wood and Bamboo from 2008-09 to 2012-13 Departmental Agency

    63

    2.14 Extraction of Bamboo Circle wise for the years 2008-09 to 2012-13 Departmental Agency 64

  • iv

    Table No.

    Title Page No.

    2.15 Extraction of Bamboo(Long Bamboo) Circle wise for the years 2008-09 to 2012-13 64

    2.16 Extraction of Bamboo (Industrial cut) by Forest Department from 2005-06 to 2009-10 65

    2.17 Yield particulars of various species for the years from 2008-09 to 2012-13 65

    2.18 APFDC – Details of Species wise Planting Targets and Achievements for the years from 2008-09 to 2012-13

    65

    2.19 APFDC – Division Wise, Species Wise Area for the year 2010-11 66

    2.20 Cashew Nut – Bearing Areas and Yield per Ha. From APFDC Areas District wise for the years from 2008-09 to 2012-13

    66

    2.21 Coffee and Pepper Yield and Revenue Realized – APFDC for the years from 2008-09 to 2012-13

    67

    2.22 Cashew Nut – Yield and Revenue Realized – APFDC for the years from 2008-09 to 2012-13 67

    2.23 Beedi Leaf Targets and Achievement from 2008-09 to 2012-13 67

    2.24 Beedi Leaf Collection rates in Patta Lands and Forest Areas for the years from 2009 to 2013 67

    2.25 Beedi Leaf Collection Rates and Purchase Rates for the years from 2009 to 2013 68

    2.26 Beedi Leaf Targets & Achievements, Circle wise and Number of units operated (Quantity in SB’s) for the years from 2008-09 to 2012-13

    68

    2.27 Beedi Leaf Scheme in Andhra Pradesh 68

    2.28.1 Statement Showing the Progress of Beedi Leaves Final Collection during 2010 B.L. season 69

    2.28.2 Statement Showing the Progress of Beedi Leaves Final Collection during 2011 B.L. season 70

    2.28.3 Statement Showing the Progress of Beedi Leaves Final Collection during 2012 B.L. season 71

    2.29 Circle wise & Density Class wise stems in Andhra Pradesh 72

    2.30 Red Sanders – Extraction and Seized Material, Sales and Revenue for the years 2008-09 to 2012-13

    72

    2.31 Stock of Red Sanders in the Depots from 2008-09 to 2012-13 73

    2.32 Stock of Red Sanders Wood as on 73

    2.33 Out Turn of Sandal Wood for the years from 2008-09 to 2012-13 74

    2.34 Out Turn of Sandal Wood for the years from 2008-09 to 2012-13 (Division wise) 74

    2.35 Stock Position of Sandal Wood in Govt. Depots as on 31-03-2011 75

    2.36.1 Minor Forest Produce – Quantity Collected and Revenue Realized for the years 2010-11 to 2012-13

    76

    2.36.2 Agricultural Produce- – Quantity Collected and Revenue Realized for the years 2010-11 to 2012-13

    76

    CHAPTER –III GOVT. TIMBER AND BAMBOO DEPOTS

    3.1.1 Government Timber and Bamboo Depots for the year 2010-11 77

    3.1.2 Government Timber and Bamboo Depots for the year 2011-12 78

    3.1.3 Government Timber and Bamboo Depots for the year 2012-13 79

    3.2.1 Producer’s Prices of the Teak for the Year 2010-11 80

    3.2.2 Producer’s Prices of the Teak for the Year 2011-12 81

    3.2.3 Producer’s Prices of the Teak for the Year 2012-13 82

    3.3.1 Producer’s Prices of Non-Teak for the year 2010-11 83

    3.3.2 Producer’s Prices of Non-Teak for the year 2011-12 83

    3.3.3 Producer’s Prices of Non-Teak for the year 2012-13 84

    3.4.1 Producer’s Prices of Nallamaddi for the year 2010-11 84

    3.4.2 Producer’s Prices of Nallamaddi for the year 2011-12 85

  • v

    Table No.

    Title Page No.

    3.4.3 Producer’s Prices of Nallamaddi for the year 2012-13 85-86

    3.5.1 Producer’s Prices of Yegisa for the year 2010- 11 86

    3.5.2 Producer’s Prices of Yegisa for the year 2011- 12 86-87

    3.5.3 Producer’s Prices of Yegisa for the year 2012-13 87

    3.6.1 Producer’s Prices of Jitregi (Rose Wood) for the year 2010-11 87-88

    3.6.2 Producer’s Prices of Jitregi (Rose Wood) for the year 2011-12 88

    3.6.3 Producer’s Prices of Jitregi (Rose Wood) for the year 2012-13 88

    3.7 Producer’s Prices of Casuarina for the year 2010-11 89

    3.8.1 Producer’s Prices of Bandaru for the year 2010-11 89

    3.8.2 Producer’s Prices of Bandaru for the year 2011-12 89

    3.8.3 Producer’s Prices of Bandaru for the year 2012-13 89-90

    3.9.1 Producer’s Prices of Tuniki for the year 2010-11 90

    3.9.2 Producer’s Prices of Tuniki for the year 2011-12 90

    3.9.3 Producer’s Prices of Tuniki for the year 2012-13 90

    3.10.1 Producer’s Prices of Eucalyptus for the year 2010-11 90

    3.10.2 Producer’s Prices of Eucalyptus for the year 2011-12 90

    3.10.3 Producer’s Prices of Eucalyptus for the year 2012-13 91

    3.11.1 Producer’s Prices of Ganneru for the year 2011-12 91

    3.11.2 Producer’s Prices of Ganneru for the year 2012-13 91

    3.12.1 Producer’s Prices of Softwood for the year 2010-11 91

    3.12.2 Producer’s Prices of Softwood for the year 2011-12 91-92

    3.12.3 Producer’s Prices of Softwood for the year 2012-13 92

    3.13.1 Producer’s Prices of Chinduga for the year 2010-11 92

    3.13.2 Producer’s Prices of Chinduga for the year 2011-12 92

    3.13.3 Producer’s Prices of Chinduga for the year 2012-13 92-93

    3.14.1 Producer’s Prices of Gummadi for the year 2010-11 93

    3.14.2 Producer’s Prices of Gummadi for the year 2011-12 93

    3.14.3 Producer’s Prices of Gummadi for the year 2012-13 93

    3.15 Producer’s Prices of Maddi for the year 2010-11 93

    3.16 Producer’s Prices of Vepa for the year 2010-11 93

    3.17.1 Producer’s Prices of Bijasal for the year 2010-11 93

    3.17.2 Producer’s Prices of Bijasal for the year 2011-12 94

    3.17.3 Producer’s Prices of Bijasal for the year 2012-13 94

    3.18.1 Producer’s Prices of Batta Genapu for the year 2010-11 94

    3.18.2 Producer’s Prices of Batta Genapu for the year 2012-13 94

    3.19.1 Producer’s Prices of Bamboo for the year 2010-11 95 3.19.2 Producer’s Prices of Bamboo for the year 2011-12 95 3.19.3 Producer’s Prices of Bamboo for the year 2012-13 95 3.20.1 Producer’s Prices of Tangedu for the year 2011-12 95 3.20.2 Producer’s Prices of Tangedu for the year 2012-13 95 3.21.1 Producer’s Prices of Narayepa for the year 2010-11 95

    3.21.2 Producer’s Prices of Narayepa for the year 2011-12 96

    3.21.2 Producer’s Prices of Narayepa for the year 2012-13 96

    3.22.1 Producer’s Prices of Somidi for the year 2010-11 96

    3.22.2 Producer’s Prices of Somidi for the year 2011-12 96

    3.23.1 Producer’s Prices of Telusu for the year 2010-11 96

    3.23.2 Producer’s Prices of Telusu for the year 2011-12 96

    3.23.2 Producer’s Prices of Telusu for the year 2012-13 96

    3.24.1 Producer’s Prices of Sheesham for the year 2010-11 97

    3.24.2 Producer’s Prices of Sheesham for the year 2011-12 97

    3.24.3 Producer’s Prices of Sheesham for the year 2012-13 97

    3.25 Producer’s Prices of Yepi for the year 2011-12 97

    3.26.1 Producer’s Prices of Pines for the year 2011-12 97

    3.26.2 Producer’s Prices of Pines for the year 2012-13 97

    3.27.1 Producer’s Prices of Miscellaneous for the year 2010-11 98

    3.27.2 Producer’s Prices of Misc. & Others for the year 2011-12 98

  • vi

    Table No.

    Title Page No.

    3.27.3 Producer’s Prices of Misc. & Others for the year 2012-13 98-99

    3.28 Devasthanam – Approved rates for supply of Sandal Wood for the years from 2008-09 to 2012-13

    99

    3.29 Devasthanam – Approved rates for supply of Fuel Wood for the years from 2008-09 to 2012-13

    100

    3.30 Burood co-operative societies approved rates for the supply of bamboo for the years from 2008-09 to 2012-13

    100

    3.31.1 Supply of Red Sanders to A.P. Handicrafts Development Corpn. & Small Scale

    Handicrafts Industry in A.P. for the years from 2008-09 to 2012-13 101

    3.31.2 Supply of Pattudukarralu, Hand Sticks, Mullukarralu / Domathera karralu to chenchu

    society, Pacherla for the years from 2008-09 to 2012-13 101

    3.31.3 Supply of Poniki Wood Pala wood to Nirmal, Kondapally Toy Manufacturers for the years

    from 2008-09 to 2012-13 101

    3.31.4 Supply of Teak (Tectona gradis) wood to APHDC Ltd. Hyderabad for the years from 2008-

    09 to 2012-13 102

    3.32.1 Fixation of Rates for Certain Items of Forest Produce for the year 2011-12 102

    3.32.2 Fixation of Rates for Certain Items of Forest Produce for the year 2012-13 103

    CHAPTER –IV PLANTATION STATISTICS

    4.1 Teak (Tectona Grandis) Plantation – Plan wise and Circle wise 104

    4.2 Bamboo Plantations – Plan wise and Circle wise 105

    4.3 Eucalyptus Plantations – Plan wise and Circle wise 16

    4.4 Casuarina Plantations – Plan wise and Circle wise 107

    4.5 Cashew Plantations – Plan wise and Circle wise 108

    4.6 Sandal Wood and Red Sanders Plantations Plan wise and Circle wise 109

    4.7 Sissoo Plantations Plan wise and Circle wise 110

    4.8 Acacia Auriculiformis Plantations – Plan wise and Circle wise 111

    4.9 Bursera Plantations – Year wise and Circle wise 112

    4.10 Pine Plantations – Plan wise and Circle wise 113

    4.11 Babul Plantations – Plan wise and Circle wise 114

    4.12 Subabul Plantations – Plan wise and Circle wise 115

    4.13.1 Silver Oak, Afforestation – Plan wise and Circle wise 116

    4.13.2 Silver Oak, Avenue Plantations – Plan wise and Circle wise 117

    4.14 Miscellaneous Plantations – Plan wise and Circle wise 118

    4.15.1 Species wise Plantations upto 2010-11 119-121 4.15.2 Species wise Plantations upto 2011-12 122-124 4.15.3 Species wise Plantations upto 2012-13 125-127

    CHAPTER –V FOREST BASED INDUSTRIES & OTHER ORGANISATIONS

    5.1 Major Wood Based Industries 128

    5.2 Andhra Pradesh Paper Mills – Visakhapatnam & Rajahmundry supply of Bamboo on Lease

    year wise from 2001-02 to 2012-13 128

    5.3 Sirpur Paper Mills, Kagaznagar – Supply of Bamboo Circle wise during the Lease years from

    1987-88 to 2012-13 129

    5.4 Bhadrachalam Paper Boards, Bhadrachalam, Supply of Bamboo and Royalty collected Lease

    year wise from 2001-02 to 2012-13 129

  • vii

    Table No.

    Title Page No.

    5.5 Burood Co-operative Societies Supply of Bamboo year wise from 1987-88 to 2012-13 130

    5.6.1 Statement Showing Number Of Saw Mills, Timber And Bamboo Depots As On March 2011 131

    5.6.2 Statement Showing Number of Saw Mills, Timber And Bamboo Depots As On March 2012 132

    5.6.3 Statement Showing Number of Saw Mills, Timber And Bamboo Depots As On March 2013 133

    CHAPTER –VI FOREST REVENUE AND EXPENDITURE

    6.1 Revenue and Expenditure and Surplus or Deficit from 2004 - 05 to 2012-2013 134

    6.2 Statement showing the Revenue achieved for the years from 2008-09 to 2012-13 134

    6.3 Forest Expenditure under Major Heads, Plan and Non-Plan from 2003- 04 to 2011-12 135

    6.4 Zoological Parks – Expenditure (Plan and non-plan) from 2008-09 to 2011-12 135

    6.5 Major Head and Scheme wise Expenditure from 2008-09 to 2011-12 136

    6.6 2402 - Soil and Water Conservation, 2406-Forest & Wildlife under Centrally Sponsored Schemes Expenditure from 2008-09 to 2011-12

    137

    6.7 APFDC – Revenue and Expenditure – Scheme-wise targets from 2008-09 to 2012-13 138

    6.8 APFDC – Scheme-wise Revenue and Expenditure from 2008-09 to 2012-13 (Physical) 139

    6.9 APFDC – Scheme-wise Revenue and Expenditure from 2008-09 to 2012-13 (Financial) 140

    6.10 13th Finance Commission – Maintenance of Forests 141

    6.11 National Afforestation Programme (NAP) 141 6.12 Development of Project Elephant (Central Scheme) 141 6.13 Development of National Parks & Sanctuaries (CSS & MSS) 141

    6.14 Development of National Parks Sanctuaries (Normal State Plan) 142

    6.15 Zoological Parks (Normal State Plan) 142 6.16 Intensification of Forest Management Scheme (Integtated Forest Protection) (CSS & MSS) 142

    6.17 River Valley Project (CSS & MSS) 142

    6.18 River Valley Project (Normal State Plan) 143

    6.19 Twelfth Finance Commission Grant – Maintenance of forests 143

    6.20 RIDF Project 143

    6.21 Regional Offices (Silvicultural Research) 143

    6.22 Mixed Plantations 143

    6.23 Telugu Ganga Project 144

    6.24 Tree and Pasture Seed Development 144

    6.25 Environment Planting in Degraded Forest Around Urban Areas 144

    6.26 APSOF Yellandu 144 6.27.1 Budget Estimates and Expenditure under Non-Plan Schemes during 2010-11 144 6.27.2 Budget Estimates and Expenditure under Non-Plan Schemes during 2011-12 145 6.27.3 Budget Estimates and Expenditure under Non-Plan Schemes during 2012-13 145 6.28 Awards and prizes from 1997 (Works implemented under the scheme for the publicity) 145

    CHAPTER –VII 7.1 X-Plan year wise Approved Outlay & Expenditure from 2002-03 to 2006-07 146

    7.2 XI-Plan year wise Approved Outlay & Expenditure from 2007-08 to 2011-12 147

    7.3 Year wise (Plan) State and Central Sector – Outlay & Expenditure (Including U.C.S.S.) 148

    7.4 X-Five Year Plan Outlay & Expenditure on Agriculture & Allied Services and Forestry (Plan) 148

    7.5 XI-Five Year Plan Outlay & Expenditure on Agriculture & Allied Services and Forestry (Plan) 149

    7.6 Outlay & Expenditure during Annual Plans 2009-10 to 2011-12 150

    CHAPTER –VIII DEVELOPMENT ACTIVIVTIES

    8.1 NZP, Hyderabad – Revenue Particulars for the years 2008-09 to 2012-13 151

    8.2 NZP, Hyderabad – Expenditure for the years 2008-09 to 2012-13 151

    8.3 NZP, Hyderabad – Revenue and Expenditure from 2008-09 to 2012-13 151

    8.4 SVZP, Tirupati – Revenue particulars for the years 2009-10 to 2012-13 152

    8.5 SVZP, Tirupati – Expenditure for the years 2008-09 to 2012-13 152

    8.6 SVZP Tirupati – Revenue and Expenditure from 2008-09 to 2012-13 152

  • viii

    Table No.

    Title Page No.

    8.7 IGZP Visakhapatnam – Expenditure from 2008-09 to 2012-13 153

    8.8 IGZP Visakhapatnam – Revenue and Expenditure from 2008- 09 to 2012-13 153

    8.9 IGZP Visakhapatnam – Releases and Expenditure from 2008- 09 to 2012-13 153

    8.10 FDA – Agency wise Physical Achievements for the years 2008-09 to 2012-13 154 8.11 FDA – Agency wise amount Released and Expenditure upto March 2013 155-156

    8.12 FDA – Activity wise Target Achievements for the years 2002-03 to 2012-13 157

    8.13 Cumulative Report of the National Afforestation Programme ending 31st March 2012 158-159

    8.14 Social Forestry – Block Plantations from 2008-09 to 2012-13 160

    8.15 Social Forestry – Avenue Plantations from 2008-09 to 2012-13 161

    8.16.1 Social Forestry – District wise, Agency wise Nursery Stock for 2010-11 Planting Programme 162

    8.16.2 Social Forestry – District wise, Agency wise Nursery Stock for 2011-12 Planting Programme 163

    8.16.3 Social Forestry – District wise, Agency wise Nursery Stock for 2012-13 Planting Programme 164

    8.17.1 Social Forestry – District wise Nursery Stock Raised by All Agencies 2010-11 Planting Programme

    165-166

    8.17.2 Social Forestry – District wise Nursery Stock Raised by All Agencies 2011-12 Planting Programme

    167-168

    8.17.3 Social Forestry – District wise Nursery Stock Raised by All Agencies 2012-13 Planting Programme

    169-170

    8.18.1 Social Forestry – Species wise District Wise Seedlings raised by Social Forestry Divisions for 2011-12 Planting Programme

    171-172

    8.18.2 Social Forestry – Species wise District Wise Seedlings raised by Social Forestry Divisions for 2012-13 Planting Programme

    173-174

    8.19.1 Social Forestry – Species wise District Wise Seedlings raised by Territorial Divisions for 2011-12 Planting Programme

    175-176

    8.19.2 Social Forestry – Species wise District Wise Seedlings raised by Territorial Divisions for 2012-13 Planting Programme

    177-178

    8.20.1 Social Forestry – Species wise District Wise Seedlings raised by Other Agencies for 2011-12 Planting Programme

    179-180

    8.20.2 Social Forestry – Species wise District Wise Seedlings raised by Territorial Divisions for 2012-13 Planting Programme

    181-182

    8.21.1 Social Forestry – Circle & District Wise Seedlings raised by All Agencies for 2010-11 Planting Programme

    183

    8.21.2 Social Forestry – Species wise, District Wise Tall and Very Tall Seedlings raised by All Agencies for 2011-12 Planting Programme

    184-185

    8.21.3 Social Forestry – Species wise, District Wise Tall and Very Tall Seedlings raised by All Agencies for 2012-13 Planting Programme

    186-187

    8.22.1 Social Forestry – District Wise Nursery Stock Seedlings raised by SF Divisions for 2010-11 Planting Programme

    188

    8.22.2 Social Forestry – Species wise, District wise Tall Plants raised in SF Divisions for 2011-12 Planting Programme

    189-190

    8.22.3 Social Forestry – Species wise, District wise Tall Plants raised in SF Divisions for 2012-13 Planting Programme

    191-192

    8.23.1 Social Forestry –District Wise Nursery Stock Seedlings Raised by Territorial Divisions for 2010-11 Planting Programme

    193

    8.23.2 Social Forestry –District Wise Nursery Stock Seedlings Raised by Territorial Divisions for 2011-12 Planting Programme

    194-195

    8.23.3 Social Forestry –District Wise Nursery Stock Seedlings Raised by Territorial Divisions for 2012-13 Planting Programme

    196-197

    8.24.1 Social Forestry –District Wise Nursery Stock Seedlings Raised by Other Agencies for 2010-11 Planting Programme

    198

    8.24.2 Social Forestry –District Wise Nursery Stock Seedlings Raised by Other Agencies for 2011-12 Planting Programme

    199-200

    8.24.3 Social Forestry –District Wise Nursery Stock Seedlings Raised by Other Agencies for 2012-13 Planting Programme

    201-202

    8.25.1 Social Forestry – District Wise details of Seedlings Utilized from 2008-09 (2008 Season) to 2012-13 (2012 Season)

    203

  • ix

    Table No.

    Title Page No.

    8.25.2 Social Forestry – District Wise Plantations and Public Distribution of Seedlings and their Utilization – 2010-11 (2010 Season)

    204

    8.25.3 Social Forestry – District Wise Plantations and Public Distribution of Seedlings and their Utilization – 2011-12 (2011 Season)

    205

    8.25.4 Social Forestry – District Wise Plantations and Public Distribution of Seedlings and their Utilization – 2012-13 (2012 Season)

    206

    8.26 Wildlife – Scheme wise Plan Budget & Expenditure under Central and State Government 207

    8.27.1 Wildlife – Budget and Expenditure of Sanctuaries / National Parks under Centrally Sponsored Schemes for the year 2010-11

    208

    8.27.2 Wildlife – Budget and Expenditure of Sanctuaries / National Parks under Centrally Sponsored Schemes for the year 2011-12

    209

    8.27.3 Wildlife – Centrally Sponsored Scheme - Integrated Development of Wildlife 210-212

    8.28.1 Wildlife – Sanctuaries / National Parks under Normal State Plan (04) during the year 2011-12 213

    8.28.2 Wildlife – Sanctuaries / National Parks under Normal State Plan (04) during the year 2012-13 213

    8.29.1 Wildlife – Sanctuaries / National Parks under Normal State Plan (06) during the year 2011-12 214

    8.29.2 Wildlife – Sanctuaries / National Parks under Normal State Plan (06) during the year 2012-13 214

    8.30.1 FDA – National Afforestation Programme 215

    8.30.2 FDA – National Bamboo Mission 215

    8.30.3 13th Finance Commission 215

    8.30.4 Scheme Wise Physical and Financial Targets and Achievements during the year 2012-13 215

    8.30.5 Statement Showing the year wise Releases & Expenditure under Y.S. Rajasekhara Reddy Smruthi Vanam Project

    216

    8.31.1 District Wise VSS, Beneficiaries and Area 216

    8.31.2 Circle and Division wise FDA Physical and Financial – Targets and Achievements for the year 2012-13

    217

    8.31.3 Item Wise Annual Progress report for the year 2012-13 (upto March 2013) of Andhra Pradesh of SFDA

    218-219

    8.32 MGNREGS – Block, Avenue Plantations & Nursery Seedlings Raised 219

    8.33.1 CAMPA – Expenditure Incurred for CA & NVP for the year 2010-11 220-221

    8.33.2 CAMPA – Expenditure Incurred for CA & NVP for the year 2011-12 222-223

    8.33.3 CAMPA – Expenditure Incurred for CA & NVP for the year 2012-13 224-225

    CHAPTER –IX

    FOREST VEHICLES, ROADS, BUILDINGS, OFFENCE CASES

    9.1 Forest Vehicles, Roads, Buildings, Offence Cases Vehicles, Arms and Ammunitions under Forest Department from 2008-09 to 2012-13

    226

    9.2 Offences Detected and Disposed off from 2008-09 to 2012-13. (Where Vehicles are not involved)

    226

    9.3 Forest Offences Involving Vehicles Booked and Disposed off from 2008-09 to 2012-13 227

    9.4 Goat Browsing Cases Booked and Disposed off from 2008-09 to 2012-13 227

    9.5.1 O.R. Cases from 2008-09 to 2012-13 228

    9.5.2 Circle wise O.R. Cases for the years 2011-12 & 2012-13 228-229

    9.6.1 U.D.O.R. Cases from 2008-09 to 2012-13 230

    9.6.2 Circle wise U.D.O.R. Cases for the years 2011-12 & 2012-13 230-231

    9.7.1 Red Samders Cases from 2008-09 to 2012-13 232

    9.7.2 Circle wise Red Sanders Cases for the years 2011-12 & 2012-13 232

    9.8.1 Assault Cases from 2008-09 to 2012-13 233

    9.8.2 Vehicles Involved in Forest Offences from 2008-09 to 2012-13 233

    9.9 Buildings Under the Control of the Forest Department from 2008-09 to 2012-13 233

    9.10.1 Roads with Length under the control of the Forest Department from 2008-09 to 2012-13 234

    9.10.2 Roads Maintained by the Forest Department District wise as on 31-03-2011 234

    9.10.3 Roads Maintained by the Forest Department District wise as on 31-03-2012 235

    9.10.4 Roads Maintained by the Forest Department District wise as on 31-03-2013 236

  • x

    Table No.

    Title Page No.

    CHAPTER –X

    ORGANISATION OF FOREST DEPARTMENT

    10.1 Andhra Pradesh Came into Existence from November, 1956 with the Territorial Jurisdiction of part of Former Hyderabad State and the Andhra Region of the Former Madras Presidency.

    237

    10.2.1 Circle wise Average Forest Area and Number of Territorial Divisions

    (Ranges, Sections & Beats) 238

    10.2.2 District wise Average Forest Area of the Forest Divisions (Ranges, Sections & Beats) 238

    10.3.1 Circle wise Average Forest Area of the Forest Divisions (Ranges, Sections & Beats) 239

    10.3.2 District wise Average Forest Area of the Forest Divisions (Ranges, Sections & Beats) 240

    10.4 Statement Showing the List of Officers Including Deputations to other Offices 241

    10.5 Statement Showing the Circles, Divisions, Ranges, Sections and Beats in the Forest Department

    241

    10.6 Statement Showing the Category wise Strength (As per G.O.Ms.No.297, Dt:08-10-2008) 242-244

    10.7.1 Territorial and Functional – Circles and Divisions as on 31-03-2011 245-246

    10.7.2 Territorial and Functional – Circles and Divisions as on 31-03-2012 247-248

    10.7.3 Territorial and Functional – Circles and Divisions as on 31-03-2013 249-250

    10.8 The Sanctioned Strength of Executive Staff of Forest Department, Andhra Pradesh as on 28-04-2010

    251

    10.9 Statement Showing the Trainings Conducted at A.P. Forest Acadamy, Dulapally from 2008-09 to 2012-13 and No. of Participants attended.

    252

    CHAPTER –XI WILDLIFE CONSERVATION IN ANDHRA PRADESH

    11.1.1 Wildlife Sanctuaries in Andhra Pradesh 253

    11.1.2 Tiger Reserves 253

    11.1.3 National Parks 254

    11.1.4 Zoological Parks 254

    11.1.5 Deer Parks 254

    11.1.6 Other Parks 255

    11.2 National Zoological Parks of Andhra Pradesh – Stock Position of the Species of Birds and Animals 2008-09 to 2012-13

    255

    11.3.1 Nehru Zoological Park, Hyderabad – Stock Position of the Species of Birds and Animals 2008-09 to 2012-13

    256

    11.3.2 Nehru Zoological Park, Hyderabad Inventory Live Stock Position of the Species from 2008-08 to 2012-13

    256

    11.4.1 Sri Venkateshwara Zoological Park, Tirupati – Stock Position of the Species of Birds and Animals 2008-09 to 2012-13

    257

    11.4.2 Sri Venkateshwara Zoological Park, Tirupati Inventory Live Stock Position of the Species from 2008-09 to 2012-13

    257

    11.5.1 Indira Gandhi Zoological Park, Visakhapatnam Stock Position of Species of Birds and Animals from 2008-09 to 2012-13

    258

    11.5.2 Indira Gandhi Zoological Park, Visakhapatnam Inventory Live Stock Position of the Species from 2008-09 to 2012-13

    258

    11.6 Estimated Population of Tiger / panther in Protected areas of Andhra Pradesh (2009 to 2011) 259

    11.7 Statement Showing the Census Figures of Tigers / Panthers, Sanctuary wise of the year 2011 259

    11.8 Year wise Census Figures of Tigers for the years 1979 to 2011 (All India Census / Estimates) 260

    11.9 Statement Showing Number of Tigers Died in the Last Fourteen Years 1993 – 94 to 2012-13 260

    11.10 Estimation of Tigers and Other Wild Animals, Protected Area wise in Andhra Pradesh during the year 2001 – 02

    261

    11.11 Statement Showing the Census Figures, Panthers and Elephants (Sanctuary-wise) in Andhra Pradesh during May 2003

    262

  • xi

    Table No.

    Title Page No.

    11.12 Protected Areas in Andhra Pradesh as on 31.08.2010 263-265

    11.13 Project Tiger Reserves of India as on Feb, 2014 266

    11.14 Tiger Population of India 267

    11.15 List of Tiger Reserves in India 268-270

    11.6 National Parks & Sanctuaries in India 271-272

    11.7 Development of National Parks & Sanctuaries 273-276

    CHAPTER –XII MISCELLANEOUS ITEMS IN ANDHRA PRADESH

    12.1 Growth of State Economy from 2008-09 to 2012-13 277

    12.2 Estimation of GSDP, NSDP and Per-capita income at current and constant (2004-2005) prices from 2006-07 to 2012-13

    277

    12.3 Land Utilization from 2008-09 to 2012-13 278

    12.4 Recorded Forest Area of Andhra Pradesh 278

    12.5 Actual Forest Cover of Andhra Pradesh 279

    12.6 Tree Cover Outside the notified Forest Area, Forest and Tree Cover 279

    12.7 District wise Mangrove Cover from 2005 to 2009 279

    12.8 District wise Forest Cover Scrub and Mangrove cover from 2005 to 2009 280

    12.9 District wise Forest Cover 281

    12.10.1 Classification of Geographical Area in Andhra Pradesh – District wise for the year 2010-11 282-283

    12.10.2 Classification of Geographical Area in Andhra Pradesh – District wise for the year 2011-12 284-285

    12.10.3 Classification of Geographical Area in Andhra Pradesh – District wise for the year 2012-13 286-287

    12.11 Variation in Population of Andhra Pradesh from 1901 to 2011 Census 287

    12.12 District Wise Area, Population, Census Villages, Density of Population and Growth rate of Population 2011 Census

    288

    12.13 District Wise Male and Female Population and Sex Ration 2011 Census 289

    12.14 District wise Rural and Urban Population And Sex Ration 2011Census 290-291

    12.15 District Wise Literate Population and Litracy Rate 2011 Census 292

    12.16 District wise Rural and Urban Wise Literate Population and Literacy Rate 2011Census 293-295

    12.17 District Wise Scheduled Caste and Scheduled Tribe Population and Sex Ratio 2011 Census 296-297

    12.18 District Wise Villages Classified According to size of Population and Un-inhabited Villages, 2011 Census

    298

    12.19.1 Gross Area Irrigated by different sources in Andhra Pradesh 299

    12.19.2 Net Area Irrigated by different source in Andhra Pradesh 299

    12.19.3 Area Irrigated by sources District Wise 300

    12.20 Livestock and Poultry Population, District wise, 2007 301-303

    12.21 Rainfall for the past 10 years south west monsoon rainfall from 2003-04 to 2012-13 and its share in total rainfall

    304

    12.22 Rainfall, Season-wise (actual) from 2003-04 to 2012-13 304

    12.23 Average Annual Rainfall, District – wise 305

    12.24.1 Rainfall, Season-wise, District-wise – 2010-11 306-307

    12.24.2 Rainfall, Season-wise, District-wise – 2011-12 308-309

    12.24.3 Rainfall, Season-wise, District-wise – 2012-13 310-311

    12.25 District-wise Annual Average Rainfall 312

    12.26 Number of Operational holding and area Operated according to Size class, District wise – 2010-11

    313-315

    12.27 Revenue Mandals, Divisions, Muncipalities, Grampanchayats District wise as on 31-06-2013 316

    12.28.1 Gross State Domestic Product of Andhra Pradesh by Industry of Origin at Current Prices 317

    12.28.2 Gross State Domestic Product of Andhra Pradesh by Industry of Origin at constant (2004-2005) Prices

    318

  • xii

    Table No.

    Title Page No.

    12.29.1 Net State Domestic Product of Andhra Pradesh by Industry of Origin at Current Prices 319

    12.29.2 Net State Domestic Product of Andhra Pradesh by Industry of Origin at constant (2004-2005) Prices

    320

    12.30.1 Inter-Class Area Changes in different Wasteland Categories in Andhra Pradesh during 2005-06 and 2008-09

    321

    12.30.2 District - wise distribution and category-wise distribution of wasteland during 2008-09 vis-a-vis 2005-06

    322-325

    CHAPTER – XIII INDIAN STATISTICS

    13.1 Rural and urban Population of India Since 1901 – 2011 326

    13.2 Population of India 1901 – 2011 326

    13.3 Area and Population State wise Census 2011 327

    13.4 Population Totals, A Comparative picture of the Population 328

    13.5 Ranking of States and Union Territories by Population 318

    13.6 Area and Population 2011 Census 330-331

    13.7 Population of India (1951-2011) 332

    13.8 Comparison of Andhra Pradesh with All India Demographic Characteristics 2011 333

    13.9 Comparison of Andhra Pradesh with All India – Land Utilization 334

    13.10 Land Utilization, State-wise 2010-11 335-336

    13.11 Distribution of Bamboo in Recorded Forests 337

    13.12 Bamboo bearing Area by Density in Recorded Forets 338

    13.13 Annual Consumption of Fuel wood in India 339

    13.14 Plan wise (All India Outlays) Under Forest Sector as compared to total public sector outlays from 1951-56 to 2002-07

    339

    13.15 Comparison of Andhra Pradesh with All India Livestock Census - 2003 339

    13.16 Livestock Population, State wise –Census 2003 (Provisional) 340-341

    13.17 Status of Diversion of Forest Land for Non-Forestry Purposes & Compensatory Afforestation done under (Conservation Act, 1980)

    342-343

    13.18 Biosphere Reserves of India as on 07-08-2011 (Area wise) 344

    13.19 Status of Forest Cover in India 2011 344

    13.20 State Wise Encroachment on Forest Lands and Eviction since may 2002 345

    13.21 Recorded Forest Area in States and UTs 346

    13.22 Forest Cover in State/Union Territories in India 347

    13.23 Forest Cover in Hill District 348

    13.24 Forest Cover in Tribal Districts 349

    13.25 Change in the Forest Cover between 2009 and 2011 Assessments 350

    13.26 Forest Cover in different Assessments from 1991 to 2011 351

    13.27 State/Union Territory wise Mangrove Cover Assessment for the year from 1987 to 2011 352

    13.28 District wise Mangrove Cover for the year 2011 350-354

    13.29 State/Union Territory wise Tree Cover Estimates 355

    13.30 Physiographic Zone wise Growing Stock (Volume) 356

    13.31 Growing Stock in Forest for Top Ten Species 356

    13.32 State/Union Territory wise Growing Stock 357

    13.33 Distribution of Districts within Physiographic Zones (Total No. of Districts:593) 358-360

    13.34 Demand and Availability of Wood/Timer from All Sources under Acceleration Management 361

    13.35.1 Category Wise Total Area under Wastelands during 2008-09 Vis-à-vis 2005-06 and change in different Categories

    361

    13.35.2 State Wise – Category Wise Total Area under Wastelands during 2008-09 008-09 Vis-à-vis 2005-06 and change in different Categories

    362-367

    13.35.3 Inter-Class Area Changes in different Wasteland Categories in India during 2005-06 and 2008-09

    368

    13.36 State Wise Total Area under Wastelands during 2008-0909 Vis-à-vis 2005-06 and change in different Categories

    368

  • xiii

    Table No.

    Title Page No.

    CHAPTER – XIV

    WORLD STATISTICS FIVE LEADING PRODUCING, IMPORTING, EXPORTING AND CONSUMING COUNTRIES WORLD WISE

    14.1 Producing Countries 369-370

    14.2 Five Leading Importing Countries 371-372

    14.3 Five Leading Exporting Countries 372-373

    14.4 Five Leading Consuming Countries 374-375

    14.5 Forest Areas of some Important Countries 375

    14.6 Agricultural Land and Forest Land of Certain Important Countries 375

    14.7 Forest Resources –2000 (Some Figures) 376

    14.8 Change in Forest Area – 1999-2000 377

    14.9 Forest Cover: International Comparisons – 2010 378

    14.10 Forest Area Changes: International Comparisons 378

    14.11 Top Ten Countries with the largest Forest Areas in 2005 378

    CHAPTER – XV CONVERSION TABLES

    15.1 Timber Measurements and their Metric Equivalents 379

    15.2 Weight and Volume for Forest Products 379

    15.3 Wood Based Products Measures of Rounded Equivalents 380

    15.4 Forest Products Measures of Round Wood Volume without Bark 380

    15.5 Conversion – Acres to Hectares 381

    15.6 Conversion – Cubic Feet to Cubic Meters 381

    15.7 Conversion – Cubic Meters to Cubic Feet 381

    15.8 Standard Units 382

    15.9 Conversion Co-Efficient (For Changing British units of Weight, Length and Capacity into Metric Units)

    383

  • 1

    CHAPTER – I

    AREA STATISTICS

    GEOGRAPHICAL AND FOREST AREA Table No. 1.1

    Sl.No. Particulars Unit Area

    1. Total Geographical Area Sq. Kms 2,75,068

    2. Total Forest Area Sq. Kms 63,814

    3. Forest Area as Percentage to geographical Area % 23.20

    CLASSIFICATION OF FOREST AREA Table No. 1.2

    Sl.No. Particulars Forest Area (In Sq. Kms.)

    Percentage

    1. Legal Status

    a) Reserved 50,478.63 79.10

    b) Protected 12,365.34 19.38

    c) Un-classed 969.76 1.52

    Total 63,813.73 100.00

    2. Ownership (Forest Department) 63,813.73 100.00

    3. Composition : Non-Coniferous (Broad – Leaved)

    a) Sal 47.16 0.07

    b) Teak 9,145.00 14.33

    c) Others 54,621.57 85.60

    Total 63,813.73 100.00

    4. Functional

    a) Protected Forests 38,449.47 60.25

    b) Production Forests 25,364.26 39.75

    Total 63,813.73 100.00

    FOREST COVER IN DIFFERENT FOREST TYPES (AS PER CHAMPION AND SETH CLASSIFICATION)

    Table No. 1.3

    Sl. No.

    Forest Type

    2009 2011

    Area (Sq. Km)

    Percentage to Total Forest

    Area

    Area (Sq. Km)

    Percentage to Total Forest

    Area

    1. Plantation 862.00 1.35 689.19 1.08

    2. Tropical Semi Ever Green Forests

    64.00 0.10 0 0

    3. Tropical Moist Deciduous Forests

    2540.00 3.98 2603.61 4.08

    4. Litoral & Swamp Forest 185.00 0.29 363.74 0.57

    5. Tropical Dry Deciduous Forests 56794.00 89.00 56654.07 88.78

    6. Tropical Thorn Forests 2750.00 4.31 2884.39 4.52

    7. Tropical dry Ever Green Forests 619.00 0.97 619.00 0.97

    Total: 63814.00 100.00 63814.00 100.00

    Source: India State of Forest Reprt 2009 & 2011

  • 2

    DISTRIBUTION OF GEOGRPHICAL, FOREST AREA AND CIRCLEWISE PERCENTAGES Table No.1.4

    Sl. No.

    Circle Geographical

    Area (in Sq. Kms)

    Forest Area (in Sq. Kms)

    Percentage of Forest Area to Geographical

    Area

    Percentage of Circle wise

    Forest Area to Total Forest

    Area

    1 Adilabad 16128 7231.89 44.84 11.33

    2 Nizamabad 17655 2718.09 15.40 4.26

    3 Hyderabad 35752 2140.86 5.99 3.35

    4 Warangal 24669 6254.97 25.36 9.80

    5 Khammam 16029 8436.94 52.64 13.22

    6 Visakhapatnam 23537 6291.10 26.73 9.86

    7 Rajahmundry 27276 4708.38 17.26 7.38

    8 Guntur 29992 6087.38 20.30 9.54

    9 Srisailam 18885 6224.53 32.96 9.75

    10 Kurnool 27549 5818.92 21.12 9.12

    11 Ananthapur 27074 4037.88 14.91 6.33

    12 Tirupati 10522 3862.79 36.71 6.05

    Total 275068 63813.73 23.20 100.00

    DISTRICT WISE DISTRIBUTION OF GEOGRAPHICAL AND FOREST AREA WITH POPULATION PERCENTAGE AND PER CAPITA FOREST AREAS

    Table No.1.5

    Sl. No.

    District

    Geo-graphical

    Area (in

    Sq. Kms)

    No. of Forest Blocks

    Forest Area (in Sq.

    Kms)

    2001 Census

    Population (in Lakhs)

    % of Forest Area to

    Geo-graphical

    Area

    % of District

    / Region

    wise Forest Area to Total

    Forest Area

    Per capita Forest Area (Ha.)

    1 Adilabad 16128 235 7231.89 24.88 44.84 11.33 0.29

    2 Nizamabad 7956 189 1812.15 23.46 22.78 2.84 0.08

    3 Medak 9699 233 905.94 26.70 9.34 1.42 0.03

    4 Rangareddy 7493 127 730.75 35.75 9.75 1.15 0.02

    5 Hyderabad 217 0 0 38.30 0 0 0

    6 Mahabubnagar 18432 86 3032.51 35.14 16.45 4.75 0.09

    7 Nalgonda 14240 26 836.93 32.48 5.88 1.31 0.03

    8 Karimnagar 11823 201 2544.83 34.92 21.52 3.99 0.07

    9 Warangal 12846 112 3710.14 32.46 28.88 5.81 0.11

    10 Khammam 16029 356 8436.94 25.79 52.64 13.22 0.33

    Telangana Region Total 114863 1565 29242.08 309.88 25.46 45.82 0.09

    11 Srikakulam 5837 79 686.41 25.38 11.76 1.08 0.03

    12 Vizianagaram 6539 103 1193.03 22.49 18.24 1.87 0.05

    13 Visakhapatnam 11161 188 4411.66 38.32 39.53 6.91 0.12

    14 East Godavari 10807 161 3232.44 49.01 29.91 5.07 0.07

    15 West Godavari 7742 50 811.66 38.04 10.48 1.27 0.02

    16 Krishna 8727 60 664.28 41.88 7.61 1.04 0.02

    17 Guntur 11391 118 1619.41 44.65 14.22 2.54 0.04

    18 Prakasham 17626 130 4424.99 30.59 25.10 6.93 0.14

    19 Nellore 13076 268 2519.37 26.69 19.27 3.95 0.09

    Coastal Andhra Region Total 92906 1157 19563.25 317.05 21.06 30.66 0.06

    20 Kurnool 17658 103 3515.49 35.29 19.91 5.51 0.10

    21 Kadapa 15359 154 5002.95 26.02 32.57 7.84 0.19

    22 Ananthapur 19130 103 1969.78 36.40 10.30 3.09 0.05

    23 Chittoor 15152 184 4520.18 37.46 29.83 7.08 0.12

    Rayalaseema Region Total 67299 544 15008.40 135.17 22.30 23.52 0.11

    Andhra Pradesh Total 275068 3266 63813.73 762.10 23.20 100.00 0.08

  • 3

    FOREST BLOCKS BY LEGAL STATUS – CIRCLE AND DIVISION WISE Table No. 1.6.1

    Sl. No.

    Circle Division

    Reserved Forest 1. Under Section 19 of

    Hyderabad Forest Act 2. Under Section 15

    of A.P. F. Act

    Protected Forest Un-

    classed Unnoti-

    fied

    Total U/S.4 A.P.F.

    Act

    U/S.24 To 27 A.P.F.

    Act

    U/S. 29

    A.P.F. Act

    Total

    1 Adilabad

    Adilabad 31 10 8 0 18 4 53

    Nirmal 30 16 0 2 18 0 48

    Jannaram 2 1 0 0 1 0 3

    Mancherial 20 7 0 0 7 0 27

    Bellampalli 35 16 0 0 16 5 56

    Kagaznagar 37 7 2 0 9 2 48

    Adilabad Circle Total 155 57 10 2 69 11 235

    2 Nizamabad

    Kamareddy 56 25 0 1 26 1 83

    Nizamabad 78 26 1 1 28 0 106

    Medak 144 73 4 10 87 2 233

    Nizamabad Circle Total 278 124 5 12 141 3 422

    3 Hyderabad

    Hyderabad (R.R) 78 49 0 0 49 0 127

    Hyderabad 0 0 0 0 0 0 0

    Mahabubnagar 49 22 0 0 22 0 71

    Nalgonda 0 0 25 0 25 1 26

    Hyderabad Circle Total 127 71 25 0 96 1 224

    4 Warangal

    Karimnagar (E) 31 8 0 0 8 4 43

    Karimnagar(W) 111 36 6 0 42 5 158

    Warangal (N) 46 18 5 0 23 11 80

    Warangal (S) 14 12 2 0 14 4 32

    Warangal Circle Total 202 74 13 0 87 24 313

    5 Khammam

    Khammam 46 9 1 0 10 1 57

    Kothagudem 28 16 0 3 19 0 47

    Paloncha 116 9 0 0 9 0 125

    Bhadrachalam(N) 56 4 0 0 4 0 60

    Bhadrachalam (S) 54 13 0 0 13 0 67

    Khammam Circle Total 300 51 1 3 55 1 356

    6 Visakhapatnam

    Srikakulm 45 9 13 0 22 12 79

    Viziangaram 75 16 0 0 16 12 103

    Visakhapatnam 22 24 1 0 25 11 58

    Narsipatnam 48 13 2 0 15 1 64

    Paderu 51 13 0 0 13 2 66

    Visakhapatnam Circle Total 241 75 16 0 91 38 370

    7 Rajahmundry

    Kakinada 111 11 39 0 50 0 161

    Eluru 44 6 0 0 6 0 50

    Krishna 37 23 0 0 23 0 60

    Rajahmundry Circle Total 192 40 39 0 79 0 271

    8 Guntur

    Guntur 118 0

    0 0 0 118

    Giddalur 63 4 0 0 4 0 67

    Nellore 262 5 1 0 6 0 268

    Guntur Circle Total 443 9 1 0 10 0 453

    9 Srisailam

    Achampet 9 5 1 0 6 0 15

    Markapur 62 1 0 0 1 0 63

    Atmakur 7 0 0 0 0 0 7

    Srisailam Circle Total 78 6 1 0 7 0 85

    10 Kurnool

    Kurnool 87 1 0 0 1 0 88

    Nandyal 8 0 0 0 0 0 8

    Proddatur 71 0 0 0 0 0 71

    Kadapa 35 0 0 0 0 0 35

    Kurnool Circle Total 201 1 0 0 1 0 202

    11 Ananthapur Anathapur 101 2 0 0 2 0 103

    Chittoor (W) 58 2 40 0 42 1 101

    Ananthapur Circle Total 159 4 40 0 44 1 204

    12 Tirupati Rajampet 48 0 0 0 0 0 48

    Chittoor (E) 51 32 0 0 32 0 83

    Tirupati Circle Total 99 32 0 0 32 0 131

    Grand Total 2475 544 151 17 712 79 3266

  • 4

    FOREST BLOCKS BY LEGAL STATUS – REGION, DISTRICT AND DIVISION WISE Table No. 1.6.2

    Sl. No.

    District Division

    Reserved Forest 1. Under Section 19 of Hyderabad Forest

    Act 2. Under Section 15 of A.P. F. Act

    Protected Forest Un-

    classed Un-

    notified

    Total U/S.4 A.P.F.

    Act

    U/S.24 To 27 A.P.F.

    Act

    U/S. 29

    A.P.F. Act

    Total

    1

    Adilabad

    Adilabad 31 10 8 0 18 4 53

    Nirmal 30 16 0 2 18 0 48

    Jannaram 2 1 0 0 1 0 3

    Mancherial 20 7 0 0 7 0 27

    Bellampalli 35 16 0 0 16 5 56

    Kagaznagar 37 7 2 0 9 2 48

    Adilabad District Total 155 57 10 2 69 11 235

    2 Nizamabad Kamareddy 56 25 0 1 26 1 83

    Nizamabad 78 26 1 1 28 0 106

    Nizamabad District Total 134 51 1 2 54 1 189

    3 Medak Medak 144 73 4 10 87 2 233

    4 RangaReddy Hyderabad 78 49 0 0 49 0 127

    5 Hyderabad Hyderabad 0 0 0 0 0 0 0

    6

    Mahabubnagar Mahabubnagar 49 22 0 0 22 0 71

    Achampet 9 5 1 0 6 0 15

    Mahabubnagar District Total 58 27 1 0 28 0 86

    7 Nalgonda Nalgonda 0 0 25 0 25 1 26

    8 Karimnagar Karimnagar (E) 31 8 0 0 8 4 43

    Karimnagar (W) 111 36 6 0 42 5 158

    Karimnagar District Total 142 44 6 0 50 9 201

    9 Warangal Warangal (N) 46 18 5 0 23 11 80

    Warangal (S) 14 12 2 0 14 4 32

    Warangal District Total 60 30 7 0 37 15 112

    10 Khammam

    Khammam 46 9 1 0 10 1 57

    Kothagudem 28 16 0 3 19 0 47

    Paloncha 116 9 0 0 9 0 125

    Bhadrachalam (N) 56 4 0 0 4 0 60

    Bhadrachalam (W) 54 13 0 0 13 0 67

    Khammam District Total 300 51 1 3 55 1 356

    Telangana Region Total 1071 382 55 17 454 40 1565

    11 Srikakulam Srikakulm 45 9 13 0 22 12 79

    12 Vizianagaram Viziangaram 75 16 0 0 16 12 103

    13 Visakhapatnam

    Paderu 51 13 0 0 13 2 66

    Narsipatnam 48 13 2 0 15 1 64

    Visakhapatnam 22 24 1 0 25 11 58

    Visakhapatnam District Total 121 50 3 0 53 14 188

    14 East Godavari Kakinada 111 11 39 0 50 0 161

    15 W.Godavari Eluru (Part) 44 6 0 0 6 0 50

    16 Krishna Eluru (Krishna) 37 23 0 0 23 0 60

    17 Guntur Guntur 118 0

    0 0 0 118

    18 Prakasham Giddalur 63 4 0 0 4 0 67

    Markapur 62 1 0 0 1 0 63

    Prakasham District Total 125 5 0 0 5 0 130

    19 Nellore Nellore 262 5 1 0 6 0 268

    Costal Andhra Region Total 938 125 56 0 181 38 1157

    20 Kurnool

    Atmakur 7 0 0 0 0 0 7

    Kurnool 87 1 0 0 1 0 88

    Nandyal 8 0 0 0 0 0 8

    Kurnool District Total 102 1 0 0 1 0 103

    21 Kadapa

    Kadapa 35 0 0 0 0 0 35

    Proddatur 71 0 0 0 0 0 71

    Rajampet 48 0 0 0 0 0 48

    Kadapa District Total 154 0 0 0 0 0 154

    22 Ananthapur Anathapur 101 2 0 0 2 0 103

    23 Chittoor Chittoor (E) 51 32 0 0 32 0 83

    Chittoor (W) 58 2 40 0 42 1 101

    Chittoor District Total 109 34 40 0 74 1 184

    Rayalaseema Region Total 466 37 40 0 77 1 544

    Andhra Pradesh Total 2475 544 151 17 712 79 3266

  • 5

    FOREST AREAS BY LEGAL STATUS FROM 1956-57 TO 2012-2013 Table No. 1.7.1 ( Area in Sq. Km.)

    Sl. No.

    Year Reserved Forests

    Protected Forests Unclassed Total % (+) increase over 1956-57 Forest Area

    1. 1956-57 40001.06 16728.89 2513.25 59243.20 -

    2. 1960-61 40345.23 16093.87 7573.81 64012.91 (+) 8.05

    3. 1965-66 40789.00 18481.00 6226.00 65496.00 (+) 10.55

    4. 1970-71 44756.85 19050.39 1149.42 64956.66 (+) 9.64

    5. 1975-76 47753.05 15043.83 1623.73 64420.61 (+) 8.74

    6. 1980-81 49414.87 13141.27 1415.30 63971.44 (+) 7.98

    7. 1981-82 49740.55 12571.40 1459.63 63771.58 (+) 7.64

    8. 1982-83 49821.11 12410.92 1539.55 63771.58 (+) 7.64

    9. 1983-84 49921.41 12342.79 1506.55 63770.75 (+) 7.64

    10. 1984.85 49463.84 12300.36 1506.55 63770.75 (+) 7.64

    11. 1985-86 50036.90 12310.31 1426.36 63773.57 (+) 7.65

    12. 1986-87 50099.50 12245.42 1430.95 63775.87 (+) 7.65

    13. 1987-88 50023.57 12030.68 1525.62 63579.87 (+) 7.32

    14. 1988-87 50075.29 11978.76 1672.35 63726.40 (+) 7.57

    15. 1989-90 50003.06 12169.42 1533.39 63705.87 (+) 7.53

    16. 1990-91 49929.60 12362.76 1486.86 63779.22 (+) 7.66

    17. 1991-92 50478.63 12365.34 969.76 63813.73 (+) 7.71

    18. 1992-93 50478.63 12365.34 969.76 63813.73 (+)7.71

    19. 1993-94 50478.63 12365.34 969.76 63813.73 (+)7.71

    20. 1994-95 50478.63 12365.34 969.76 63813.73 (+)7.71

    21. 1995-96 50478.63 12365.34 969.76 63813.73 (+)7.71

    22. 1996-97 50478.63 12365.34 969.76 63813.73 (+)7.71

    23. 1997-98 50478.63 12365.34 969.76 63813.73 (+)7.71

    24. 1998-99 50478.63 12365.34 969.76 63813.73 (+)7.71

    25. 1999-00 50478.63 12365.34 969.76 63813.73 (+) 7.71

    26. 2000-01 50479.00 12365.00 970.00 63814.00 (+) 7.72

    27. 2001-02 50479.00 12365.00 970.00 63814.00 (+) 7.72

    28. 2002-03 50479.00 12365.00 970.00 63814.00 (+) 7.72

    29. 2003-04 50479.00 12365.00 970.00 63814.00 (+) 7.72

    30. 2004-05 50479.00 12365.00 970.00 63814.00 (+) 7.72

    31. 2005-06 50479.00 12365.00 970.00 63814.00 (+) 7.72

    32. 2006-07 50479.00 12365.00 970.00 63814.00 (+) 7.72

    33. 2007-08 50479.00 12365.00 970.00 63814.00 (+) 7.72

    34. 2008-09 50479.00 12365.00 970.00 63814.00 (+) 7.72

    35. 2009-10 50479.00 12365.00 970.00 63814.00 (+) 7.72

    36. 2010-11 50479.00 12365.00 970.00 63814.00 (+) 7.72

    37. 2011-12 50479.00 12365.00 970.00 63814.00 (+) 7.72

    38. 2012-13 50479.00 12365.00 970.00 63814.00 (+) 7.72

  • 6

    YEAR WISE FOREST COVER IN ANDHRA PRADESH

    Table No. 1.7.2

    Sl. No.

    Year Survey Period

    Publication VDF MDF OF SF NF WB Total Encroach-

    ment

    1 2007 Oct 2007 to Dec 2007

    2010 950.14 18681.43 22723.65 13488.41 7319.59 650.91 63814.13

    2 2008 Oct 2008 to Dec 2008

    2011 950.14 18651.80 22645.07 13501.08 7414.88 651.24 63814.21

    3 2009 Dec 2009 to Mar 2010

    2011 950.14 18629.45 22583.57 13501.75 7498.06 651.24 63814.21

    4 2010 Sept 2010 to Jan 2011

    2012 931.73 18408.48 22651.28 13550.31 7622.49 649.86 63814.15 36.44

    5 2011 Sept 2011 to Mar 2012

    2013 931.73 18400.61 22594.92 13517.84 7719.19 649.86 63814.15 43.77

    *Source: APSFR’s

    YEAR WISE GOOD, DEGRADAD FORESTS & WATER IN ANDHRA PRADESH

    Table No. 1.7.3

    Sl. No.

    Year Survey Period Publication Good

    Forests Degraded Forests

    Water Bodies

    Total

    1 2007 Oct 2007 to Dec 2007 2010 42355.22 20808.00 650.91 63814.13

    2 2008 Oct 2008 to Dec 2008 2011 42247.01 20915.96 651.24 63814.21

    3 2009 Dec 2009 to Mar 2010 2011 42163.16 20999.81 651.24 63814.21

    4 2010 Sept 2010 to Jan 2011 2012 41991.49 21172.80 649.86 63814.15

    5 2011 Sept 2011 to Mar 2012 2013 41991.49 21172.80 649.86 63814.15

    *Source: APSFR’s

    YEAR WISE GREEN FORESTS, BARREN AND WATER IN ANDHRA PRADESH

    Table No. 1.7.4

    Sl. No.

    Year Survey Period Publication Green

    Forests Barren

    Water Bodies

    Total

    1 2007 Oct 2007 to Dec 2007 2010 55843.63 7319.59 650.91 63814.13

    2 2008 Oct 2008 to Dec 2008 2011 55748.09 7414.88 651.24 63814.21

    3 2009 Dec 2009 to Mar 2010 2011 55664.91 7498.06 651.24 63814.21

    4 2010 Sept 2010 to Jan 2011 2012 55541.80 7622.49 649.86 63814.15

    5 2011 Sept 2011 to Mar 2012 2013 55445.10 7719.19 649.86 63814.15

    *Source: APSFR’s

  • 7

    GEOGRAPHICAL AREA AND FOREST AREA BY LEGAL STATUS (CIRCLE & DIVISION WISE) Table No. 1.8.1

    (Area in Sq. Kms)

    Sl. No.

    Circle Division Geo-

    graphical Area

    Legal Status % to Total Geog. Area

    Reserved Protected Un-

    classed Total

    1 Adilabad

    Adilabad 4809 996.47 820.32 13.56 1830.35 38.06 Nirmal 3310 354.57 743.17 80.66 1178.40 35.60 Jannaram 705 80.82 537.12 0.00 617.94 87.65 Mancherial 2177 1180.64 24.09 1.10 1205.83 55.39 Bellampalli 3486 1337.74 163.58 39.24 1540.56 44.19 Kagaznagar 1641 650.62 206.58 1.61 858.81 52.33

    Adilabad Circle Total 16128 4600.86 2494.86 136.17 7231.89 44.84

    2 Nizamabad

    Nizamabad 5219 530.36 319.95 22.26 872.57 16.72 Kamareddy 2737 598.56 252.18 88.84 939.58 34.33 Medak 9699 634.22 255.63 16.09 905.94 9.34 Medak WLM 0 0 0 0 0 0

    Nizamabad Circle Total 17655 1763.14 827.76 127.19 2718.09 15.40

    3 Hyderabad

    Hyderabad (R.R) 7493 379.96 244.70 106.09 730.75 9.75 Hyderabad 217 0 0 0 0 0.00 Mahabubnagar 13802 442.44 118.77 11.97 573.18 4.15 Nalgonda 14240 832.26 0.20 4.47 836.93 5.88

    Hyderabad Circle Total 35752 1654.66 363.67 122.5 2140.86 11.39

    4 Warangal

    Karimnagar (E) 2065 1248.60 24.75 20.35 1293.70 62.65 Karimnagar (W) 9758 1035.08 202.04 14.01 1251.13 12.82 Warangal (N) 9056 1634.09 733.82 22.80 2390.71 26.40 Warangal (S) 3790 643.69 673.33 2.41 1319.43 34.81 Warangal WLM 0 0 0 0 0 0

    Warangal Circle Total 24669 4561.46 1633.94 59.57 6254.97 25.36

    5 Khammam

    Khammam 3402 1131.25 112.74 2.20 1246.19 36.63 Kothagudem 2182 1321.03 217.01 0 1538.04 70.49 Badrachalam (N) 2220 1418.72 333.70 111.40 1863.82 83.96 Badrachalam (S) 1969 1076.69 479.53 76.05 1632.27 82.90 Paloncha 6256 1545.80 498.04 112.78 2156.62 34.47 Paloncha WLM 0 0 0 0 0 0

    Khammam Circle Total 16029 6493.49 1641.02 302.4 8436.94 52.64

    6 Visakhapatnam

    Srikakulam 5837 422.45 242.79 21.17 686.41 11.76 Vizianagaram 6539 716.27 420.10 56.66 1193.03 18.24 Visakhapatnam 3768 438.94 507.82 0.56 947.32 25.14 Narsipatnam 4243 970.51 1329.72 3.98 2304.21 54.31 Paderu 3150 825.23 327.10 7.80 1160.13 36.83

    Visakhapatnam Circle Total 23537 3373.40 2827.53 90.17 6291.10 26.73

    7 Rajahmundry Kakinada 10807 2701.31 531.13 0 3232.44 29.91 Eluru 7742 768.70 42.96 0 811.66 10.48 Eluru (Krishna) 8727 430.24 234.04 0 664.28 7.61

    Rajahmundry Circle Total 27276 3900.25 808.13 0 4708.38 17.26

    8 Guntur Guntur 11391 1619.41 0 0 1619.41 14.22 Giddalur 5525 1908.69 39.91 0 1948.60 35.27 Nellore 13076 2500.01 14.46 4.90 2519.37 19.27

    Guntur Circle Total 29992 6028.11 54.37 4.90 6087.38 20.34

    9 Srisailam

    Achampet 4630 1950.44 507.23 1.66 2459.33 53.11 Markapur 12101 2476.39 0 0 2476.39 20.46 Atmakur 2154 1204.44 0 84.37 1288.81 59.83 Nagarjuna Sagar 0 0 0 0 0 0

    Srisailam Circle Total 18885 5631.27 507.23 86.03 6224.53 32.96

    10 Kurnool

    Kurnool 12904 1154.45 37.17 0.48 1192.10 9.24 Nandyal 2600 1034.58 0 0 1034.58 39.79 Poddatur 4521 1549.48 114.07 0 1663.55 36.80 Kadapa 7524 1914.08 14.61 0 1928.69 25.63

    Kurnool Circle Total 27549 5652.59 165.85 0.48 5818.92 25.80

    11 Ananthapur Ananthapur 19130 1921.48 14.73 33.57 1969.78 10.30 Chittoor (W) 7944 1510.53 550.85 6.72 2068.10 26.03

    Ananthapur Circle Total 27074 3432.01 565.58 40.29 4037.88 18.93

    12 Tirupati Rajampet 3314 1410.71 0 0 1410.71 42.57 Chittoor (E) 7208 1976.68 475.40 0 2452.08 34.02 Tirupati 0 0 0 0 0 0

    Tirupati Circle Total 10522 3387.39 475.40 0 3862.79 36.71 Grand Total 275068 50478.63 12365.34 969.76 63813.73 23.20

  • 8

    GEOGRAPHICAL AREA AND FOREST AREA BY LEGAL STATUS (DISTRICT AND DIVISION WISE)

    Table No. 1.8.2 (Area in Sq. Kms)

    Sl. No.

    District Division Geo-

    graphical Area

    Legal Status % to Total Geog. Area

    Reserved Protected Un-

    classed Total

    1 Adilabad

    Adilabad 4809 996.47 820.32 13.56 1830.35 38.06 Nirmal 3310 354.57 743.17 80.66 1178.40 35.60 Jannaram 705 80.82 537.12 0.00 617.94 87.65 Mancherial 2177 1180.64 24.09 1.10 1205.83 55.39 Bellampalli 3486 1337.74 163.58 39.24 1540.56 44.19 Kagaznagar 1641 650.62 206.58 1.61 858.81 52.33

    Adilabad District Total 16128 4600.86 2494.86 136.17 7231.89 44.84

    2 Nizamabad Nizamabad 5219 530.36 319.95 22.26 872.57 16.72 Kamareddy 2737 598.56 252.18 88.84 939.58 34.33

    Nizamabad District Total 7956 1128.92 572.13 111.1 1812.15 22.78

    3 Medak Medak 9699 634.22 255.63 16.09 905.94 9.34

    4 Rangareddy Hyderabad 7493 379.96 244.70 106.09 730.75 9.75

    5 Hyderabad Hyderabad 217 0 0 0 0 0

    6 Mahabubnagar Mahabubnagar 13802 442.44 118.77 11.97 573.18 4.15 Achampet 4630 1950.44 507.23 1.66 2459.33 53.11

    Mahabubnagar District Total 18432 2392.88 626 13.63 3032.51 16.45

    7 Nalgonda Nalgonda 14240 832.26 0.20 4.47 836.93 5.88

    8 Karimnagar Karimnagar (E) 2065 1248.60 24.75 20.35 1293.70 62.65 Karimnagar (W) 9758 1035.08 202.04 14.01 1251.13 12.82

    Karimnagar District Total 11823 2283.68 226.79 34.36 2544.83 21.52

    9 Warangal Warangal (N) 9056 1634.09 733.82 22.80 2390.71 26.40 Warangal (S) 3790 643.69 673.33 2.41 1319.43 34.81

    Warangal District Total 12846 2277.78 1407.15 25.21 3710.14 28.88

    10 Khammam

    Khammam 3402 1131.25 112.74 2.20 1246.19 36.63 Kothagudem 2182 1321.03 217.01 0.00 1538.04 70.49 Paloncha 6256 1545.80 498.04 112.78 2156.62 34.47 Badrachalam(N) 2220 1418.72 333.70 111.40 1863.82 83.96 Badrachalam (S) 1969 1076.69 479.53 76.05 1632.27 82.90

    Khammam Circle Total 16029 6493.49 1641.02 302.4 8436.94 52.64 Telangana Total 114863 21024.1 7468.48 749.6 29242.08 25.46

    11 Srikakulam Srikakulam 5837 422.45 242.79 21.17 686.41 11.76

    12 Vizianagaram Vizianagaram 6539 716.27 420.10 56.66 1193.03 18.24

    13 Visakhapatnam Visakhapatnam 3768 438.94 507.82 0.56 947.32 25.14 Narsipatnam 4243 970.51 1329.72 3.98 2304.21 54.31 Paderu 3150 825.23 327.10 7.80 1160.13 36.83

    Visakhapatnam District Total 11161 2234.68 2164.64 12.34 4411.66 39.53

    14 East Godavari Kakinada 10807 2701.31 531.13 0 3232.44 29.91

    15 West Godavari Eluru 7742 768.70 42.96 0 811.66 10.48

    16 Krishna Eluru 8727 430.24 234.04 0 664.28 7.61

    17 Guntur Guntur 11391 1619.41 0 0 1619.41 14.22

    18 Prakasham Markapur 12101 2476.39 0 0 2476.39 20.46 Giddalur 5525 1908.69 39.91 0 1948.60 35.27

    Prakasham District Total 17626 4385.08 39.91 0 4424.99 25.10

    19 Nellore Nellore 13076 2500.01 14.46 4.90 2519.37 19.27 Coastal Andhra Total 92906 15778.15 3690.03 95.07 19563.25 21.06

    20 Kurnool Kurnool 12904 1154.45 37.17 0.48 1192.10 9.24 Atmakur 2154 1204.44 0.00 84.37 1288.81 59.83 Nandyal 2600 1034.58 0.00 0.00 1034.58 39.79

    Kurnool Distsrict Total 17658 3393.47 37.17 84.85 3515.49 19.91

    21 Kadapa Poddatur 4521 1549.48 114.07 0 1663.55 36.80 Kadapa 7524 1914.08 14.61 0 1928.69 25.63 Rajampet 3314 1410.71 0 0 1410.71 42.57

    Kadapa District Total 15359 4874.27 128.68 0.00 5002.95 32.57

    22 Ananthapur Ananthapur 19130 1921.48 14.73 33.57 1969.78 10.30

    23 Chittoor Chittoor (E) 7208 1976.68 475.40 0 2452.08 34.02 Chittoor (W) 7944 1510.53 550.85 6.72 2068.10 26.03

    Chittoor District Total 15152 3487.21 1026.25 6.72 4520.18 29.83 Rayalaseema Total 67299 13676.4 1206.83 125.1 15008.40 22.30

    Andhra Pradesh Total 275068 50478.63 12365.34 969.76 63813.73 23.20

  • 9

    FOREST BLOCKS – LARGEST, SMALLEST AND AVERAGE AREA (DIVISION, DISTRICT AND REGION WISE)

    Table No.1.9

    Sl. No.

    District Division Largest Block Smallest Block

    Average Area of the

    Block

    Name Area (in Ha) Name Area(in Ha)

    1 2 3 4 5 6 7 8

    1. Adilabad

    1.Adilabad

    RF Utnoor 17,612.12 Mahagan 83.33

    3,845.32 Dedra Ext. 68.57

    (Po) Satnala 43,488.00 Madhupur 90.14

    (UC) Kothur Satnala Ext. 20.00

    2.Nirmal RF Mamda 11,693.56 Rasimetla 64.75

    2289.74 PF Kadam 16,248.00 Dhimmadurthi 26.31

    3. Jannaram RF Rally (Part) 5,652.65 Kawal Ext. 2,025.00

    20696.00 PF Kawal 54,410.71 - -

    4. Mancherial

    RF Rally (Part) 38,845.55 Venkatapur Ext. 16.59 4208.58

    PF Indaram 1,296.20 Budharam 89.03

    * Rally Block

    Mancherial 38,845.55

    Baionpalli & Jannaram DNS 13,588.04

    Total : 52,433.59

    5. Bellampally

    RF Tiryani 30,328.79 Rechi Ext. 10.12

    2686.20 Manikgarh 22,700.05 Garlapet

    Ext. 10

    10.52

    PF Garlapeta 7,723.52

    *Manikoerth

    In Bellampalli 22,700.05

    In Adilabad DN 11,904.65

    Total : 34,604.70

    6. Kagaznagar

    RF Kadamba 22,924.97 Kadamba IV 6.47 1,883.23

    PF Garlapet (part) 16,192.88 Bikjur Ext. 5 27.92

    * Garlapet

    In Bellampalli 7,723.52

    In Kagaznagar 16,192.88

    Total : 23,916.40

    District Adilabad Kawal 54,410.71 Kadamba 6.47 3,107.46

    2. Nizamabad Nizamabad RF Ramaredam 10,147.85 Nallapalli Ext 22.86 1,093.78

    RF Bheemgal 20,938.14 Mallaram II 16.39 778.76

    District Nizamabad Bheemgal 20,938.14 Mallaram 16.39 917.16

    3. Medak 1. Medak RF Ibrahimpur 4,698.45 Bhelampur 35.98

    422.86 PF Pilletla 4,016.05 Pothamahetpally 15.78

    District Medak RF Ibrahimpur 4,698.45 Pothamahetpally 15.78

    4. Hyderabad - - - - - -

    5. Ranga Reddy 1. Hyderabad RF Mohmedabad 8,395.45 Nadergul 42.89

    427.62 PF Ananthagiri 1,504.62 Tallapally II 29.14

    District Ranga Reddy Mohmedabad 8,395.45 Tallapally II 29.14 427.62

    6. Mahabub-nagar

    1.Mahabubnagar (RF)

    RF Katkonda 6,806.73 Tadikonda 80.41 812.29

    PF Wanaparthy 4,267.43 Kothur II 32.40

    2. Achampet RF Amrabad 104,718.40 Yattam 276.05

    11,180.85 PF Ghanpur 3,226.09 Lingal II 194.25

    District Mahabubnagar Amrabad 104,718.40 Kothur II 32.40 2,620.76

    7. Nalgonda 1. Nalgonda (RF) PF Nimbapur 1,296.23 Venkatapur III 37.23 217.42

    8. Karimnagar

    1.Karimnagar

    East (DN)

    RF Mahdevpur 22,539.24 Dummur II Singaram

    North Ext.

    8.90 3,622.78

    2. Karimnagar (W) (DN)

    RF Arsikota 23,363.42 Irkula 7.15 848.00

    3. Karimnagar Arsikota 23,363.42 Irkula 7.15 1,441.61

  • 10

    Sl. No.

    District Division Largest Block Smallest Block

    Average Area of the

    Block

    Name Area (in Ha) Name Area(in Ha)

    1 2 3 4 5 6 7 8

    9. Warangal

    1. Warangal North RF Tadvai 42,546.04

    Aylapur-I

    (Chityal Ext.)

    4.46

    2,959.89

    PF Bandal 48,108.40 Palampet 20.65

    2. Warangal South RF Pakal 39,949.96 Pakal Ext. No. 6 66.77

    4,548.40 PF Guddur 39,220.60 Pakal Ext. No.11 19.41

    District Warangal Bandal 48,108.40 Aylapur-I

    (Chityal Ext.)

    6.46 3,413.75

    10. Khammam

    1. Khammam

    RF Shimolaphad 21,671.55 Kathur Ext. 6 26.26

    2,179.95 RF Vedanitapuram 2,253.20 Kathkur Ext. 9 16.19

    2. Kothagudem RF Chatakonda 21,351.04 Yellandu Ext. II 13.76

    3,163.64 PF Bayyaram 8,178.03 Darmatog X 12.14

    3. Paloncha RF Markode 19,698.02 Progallapalli Ext II 13.76 1,658.73

    4. Bhadrachalam (N) RF Pedamindi

    Sielru Ext. 24,928.01

    Progallapalli Ext I 15.38 2,421.50

    5. Bhadrachalam (S) RF Nuguru 63,446.09 Peruru Ext. II 15.36 1,879.96

    District Khammam RF Nuguru 63,446.09 Darmatog X 12.14 2,112.33

    TELANGANA Amrabad 104,718.40 Ailapuri Chityal Ext 6.46 1,727.27

    11. Srikakulam

    1. Srikakulam

    RF, Jal-andrakota 3,890.68 Barnakonda Ext III 5.06

    812.31 RF Kothuru Batteli 12,081.50 Bendikonda III 84.34

    Kothur Batteli

    12,081.50 Barnakonda

    Ext. III 5.06 812.31

    12. Vizianagaram 1. Vizianagaram RF Tadjure 4,312.74 Likkidi I & II 2.28

    1,111.92 PF Vaduruvada II 13,843.07 Kakkilli Ext. 18.29

    District Vizianagaram Vaduravada 13,843.07 Likkidi I & II 2.28 1,111.92

    13. Visakha-patnam

    1. Paderu RF Sersapalli 17,474.44 Srasapalli Ext. I&II 19.83 1,584.27

    PF Jakkam 8,045.53 Bohiguda 141.24

    2. Narsipatnam RF Darkonda

    18,877.00 Madalamma

    Ext. III 2.02

    3,404.90

    PF Gudem 35,080.08 Sanivaram Ext. VI 44.52

    3. Visakhapatnam RF Ananthagiri 20,745.00 Kasiguda 120.25

    2,093.54

    PF Sankaram 28,860.00

    Rebertnan

    Plantation 164.00

    District Visakhapatanam Darkonda 18,877.00 Mabalamma 2.02 2,361.18

    14. East Godavari

    1. Kakinada RF Coringa

    19,467.20 Poramamidi 14.57 1,980.10

    15. West Godavari

    1.Eluru

    (part)

    RF Nagavaramattah 9,671.96 Errempalem Bl.II 12.14

    1,623.32 PF Uddathpalli

    Block 5,103.14 Linga gudem 59.80

    PF Nagavaramattah 9,671.96 Errampalem Bl. II 12.14 1,623.32

    16. Krishna 1. Eluru

    (Part)

    RF Kondapalli

    Ext. 9,137.19 Kasuvagattu 44.52

    998.42 PFA Kondur 3,599.82 Nuthallagattu 68.80

    Kondapalli Ext. 9,137.19 Kasuvagattu 44.52 982.05

  • 11

    Sl. No.

    District Division Largest Block Smallest Block

    Average Area of the

    Block

    Name Area (in Ha) Name Area(in Ha)

    1 2 3 4 5 6 7 8

    17. Guntur 1. Guntur

    RF Gunthikonda Block I

    11,315.12 Tadepalli, Ext.I 5.66 1,371.64

    Gunthikonda Bl.I 11,315.12 Tadepalli, Ext.I 5.66 1,371.64

    18. Prakasam

    1. Giddalur

    RFGumbam (Part) 46,728.58 Velligonda (N) Ext. II 1.55 2,906.13

    PF Malkonda 2,922.26 Taticharla Bl. II 150.36

    2. Markapur

    RF Markapur 130,665.00

    Ramayapatnam

    Ext. 24.28 3,973.92

    Markapur 130,665.00 Velligonda (N) 1.55 2,423.60

    19. Nellore 1. Nellore

    RF Bhiravanikonda 8,652.16

    Venkatachala

    satram

    4.02

    935.37 PF Venkatagiri Hills 26,676.38 Nellore Ext. 318.08

    PF Venkatagiri Hills 26,676.38 Venkatachala satram 4.02 935.37

    COSTAL ANDHRA Markapur 130665.00 VELLIGONDA (NORTH)

    1.55 1,626.81

    20. Kurnool

    1. Athmakur RF Nandikotkur

    71,788.00 Guvlakunta

    Block A 402.00 17,219.14

    2. Kurnool RF Servel (part) 34,705.40 Peapalli Addn I 1.30 1,920.41

    3. Nandyal RF Nandyal

    75,937.81 Sirvel Addn I

    Kotakonda 443.23 22,508.25

    Nandyal 75,937.81 Peapalli Addn. 1.30 4,559.19

    21. Kadapa

    1. Kadapa RF Palakonda &

    Vangimalla 46,721.38

    Konduru Topes 4.86 5,830.35

    2. Proddatur RF Kothakota 15,571.16 1.Pennar Block II 5.67 2,075.80

    2.Diguvapatnam 5.67

    3. Rajampeta

    RF

    Sheshachalam

    Rollamadugu

    53,721.78

    Koduru R.S.

    Plantation 15.30 2,930.82

    Sheshachalam

    Rollamadugu 53,721.78 Konduru Topes 4.86 3,195.60

    22. Ananthapur

    1. Ananthapur RF Nigadis Ext 10,293.94 Badrampalli Ext. 1 38.37

    1,880.20

    PF Nagira 1,476.16 Katrimala West

    Est. I & II

    12.22

    District Anantapur Nigadis Ext. 10,293.94 Katrimala Est. I & II 12.22 1,880.20

    23. Chittoor

    1. Chittoor East

    PF Mungleput 10,570.20 Kesnetipally Ext. B 10.00 2423.11

    PR Advaram 12,142.40 Balakrishnapuram 165.16

    2. Chittoor West

    RF Peder 6,676.57 Balareddypalli

    Tope Block 1.87

    1872.60 Gujullapalli Ext.III 44.52

    PF Kangundi 19,987.64 Balareddypalli

    Tope Block 1.87 2,120.93

    RAYALASEEMA Nandyala 75,937.81 Peapalli 1.30 1,073.37

    ANDHRA PRADESH MARKAPUR 130665.00 PEAPALLI 1.30 1,895.04

  • 12

    CIRCLE WISE QUARTERLY PROGRESS REPORT ON DIVERSION OF FOREST AREA AND PROGRESS OF COMPENSATORY AFFORESTATION UNDER FOREST (CONSERVATION) ACT 1980 OF ANDHRA PRADESH AS ON 31-03-2011

    Table No. 1.10.1

    Sl. No Name of the

    Circle

    Forest area

    diverted in Ha.

    C.A. Stipulation in Ha. Addl C.A., Penal C.A. & Safety Zone

    Financial amount required

    to be deposited

    by user agency

    (Rs in La.)

    Implementation of stipulation Amount spent till the end

    of reporting quarter (Rs in Lakhs)

    Balance area to be afforestated in Ha.

    Fund made

    available by user agency (Rs in La.)

    Area afforested in Ha.

    On Forest Land

    On Non-Forest land

    Total (14+15) In Forest

    Land

    In Non Forest Land

    Total (4+5)

    On Forest Land

    On Non-Forest land

    Total (10+11)

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17

    1 T. G. Project 10371.400 0 10400.000 10400.000 0 2904.370 2822.100 0 10400.000 10400.000 2914.780 0 0 0

    2 Adilabad 5853.998 273.472 853.540 1127.012 1195.275 1165.309 1171.534 1330.447 762.200 2092.647 856.313 139.000 155.050 294.050

    3 Ananthapur 556.419 67.282 1083.636 1150.918 392.420 1288.600 1288.600 176.451 504.596 681.047 290.839 283.277 581.450 864.727

    4 Guntur 1209.255 1576.444 1838.158 3414.602 81.918 1307.685 1304.645 1753.152 862.549 2615.701 579.395 1.710 978.369 980.079

    5 Hyderabad 808.450 42.000 1742.597 1784.597 18.576 796.652 796.652 58.818 1176.379 1235.197 497.189 1.798 566.863 568.661

    6 Khammam 9475.522 1010.110 2216.148 3226.258 669.101 1899.945 1887.945 1536.161 689.408 2225.569 973.254 899.500 637.960 1537.460

    7 Kurnool 1866.573 739.020 1515.804 2254.824 48.190 1608.315 1608.315 762.340 1082.085 1844.425 649.872 24.870 433.719 458.589

    8 Nizamabad 353.412 72.775 62.810 135.585 22.900 173.937 173.793 71.210 33.150 104.360 34.575 36.465 17.660 54.125

    9 Rajahmundry 2309.176 411.087 3444.754 3855.841 540.290 2550.536 2550.536 878.237 546.324 1424.561 331.978 67.600 2906.540 2974.140

    10 Visakhapatnam 273.695 35.070 1322.790 1357.860 0.500 2625.024 2939.984 1243.880 25.000 1268.880 73.424 0.030 1297.790 1297.820

    11 Warangal 2304.822 316.815 578.710 895.525 172.036 156.723 102.610 46.000 475.325 521.325 92.603 236.900 308.600 545.500

    12 FDPT Srisailam 847.470 7.760 1024.305 1032.065 0 7586.328 7547.668 7.760 776.740 784.500 718.399 0.000 247.565 247.565

    13 WLM Tirupathi 408.789 262.278 874.486 1136.764 139.321 821.862 822.962 320.085 364.340 684.425 171.678 115.093 476.728 591.821

    14 WLM Hyderabad 128.530 0 0 0 0 55.000 55.000 0 0 0 0 0 0 0

    All Circles Grand Total. 36767.511 4814.113 26957.738 31771.851 3280.527 24940.286 25072.344 8184.541 17698.096 25882.637 8184.299 1806.243 8608.294 10414.537

    Source: O/o PCCF-FCA Section

  • 13

    CIRCLE & DIVISION WISE QUARTERLY PROGRESS REPORT ON DIVERSION OF FOREST AREA AND PROGRESS OF COMPENSATORY AFFORESTATION UNDER FOREST (CONSERVATION) ACT 1980 OF ANDHRA PRADESH AS ON 31-03-2011

    Table No. 1.10.2

    Sl. No.

    Name of the Circle.

    Name of the Division

    Forest area

    diverted in

    hectares

    C.A.Stipulation Addl C.A., Penal C.A. & Safety Zone

    Financial Amount required

    to be deposited

    by user agency

    (Rs in La.)

    Implementation of stipulation Amount spent till the end

    of reporting quarter (Rs in Lakhs)

    Balance area to be afforestated

    Fund made

    available by user agency (Rs in La.)

    Area afforested

    On Forest Land

    On Non-Forest land

    Total (15+16)

    In Forest Land in

    Ha.

    In Non Forest Land in

    Ha.

    Total (5+6)

    On Forest Land

    On Non-Forest land

    Total (11+12)

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

    1 Telugu Ganga Project 10371.400 0 10400.000 10400.000 0 2904.370 2822.100 0 10400.000 10400.000 2914.780 0 0 0

    2 Adilabad

    Adilabad 125.070 164.000 43.480 207.480 0 200.941 194.547 60.000 0.200 60.200 74.188 104.000 43.280 147.280

    Nirmal 195.296 0 290.540 290.540 38.100 130.698 129.195 38.100 282.480 320.580 123.372 0 8.060 8.060

    WLM Jannaram 0 0 93.480 93.480 0 25.864 26.322 0 93.480 93.480 21.246 0 0 0

    Mancherial 4375.172 87.772 229.830 317.602 1062.665 605.120 618.784 1115.437 189.830 1305.267 479.951 35.000 40.000 75.000

    Bellampally 1094.750 21.700 196.210 217.910 94.510 197.511 197.511 116.910 196.210 313.120 157.556 0 0 0

    Kagaznagar 63.710 0 0.000 0 0 5.175 5.175 0 0 0 0 0 63.710 63.710

    Adialabad Total 5853.998 273.472 853.540 1127.012 1195.275 1165.309 1171.534 1330.447 762.200 2092.647 856.313 139.000 155.050 294.050

    3 Ananthapur

    Ananthapur 416.438 25.000 916.676 941.676 91.791 1006.083 1006.083 101.475 448.646 550.121 220.594 15.320 470.240 485.560

    Chittoor (W) 139.981 42.282 166.960 209.242 300.629 282.517 282.517 74.976 55.950 130.926 70.245 267.957 111.210 379.167 Ananthapur Total 556.419 67.282 1083.636 1150.918 392.420 1288.600 1288.600 176.451 504.596 681.047 290.839 283.277 581.450 864.727

    4 Guntur Guntur 869.863 507.220 48.794 556.014 62.848 229.750 229.750 570.068 48.794 618.862 177.481 0 0 0.000

    Giddalur 63.848 445.462 1400.744 1846.206 1.820 720.230 720.230 503.622 511.705 1015.327 182.100 0.660 891.799 892.459

    Nellore 275.544 623.762 388.620 1012.382 17.250 357.705 354.665 679.462 302.050 981.512 219.814 1.050 86.570 87.620

    Guntur Total 1209.255 1576.444 1838.158 3414.602 81.918 1307.685 1304.645 1753.152 862.549 2615.701 579.395 1.710 978.369 980.079

    5 Hyderabad Hyderabad 217.812 0 32.210 32.210 12.661 21.309 21.309 10.863 32.210 43.073 15.963 1.798 0 1.798

    Mahabubnagar 0.355 0 1393.240 1393.240 0.355 457.027 457.027 0.355 1045.830 1046.185 433.021 0 347.310 347.310

    Nalgonda 590.283 42.000 317.147 359.147 5.560 318.316 318.316 47.600 98.339 145.939 48.205 0 219.553 219.553

    Hyderabad Total 808.450 42.000 1742.597 1784.597 18.576 796.652 796.652 58.818 1176.379 1235.197 497.189 1.798 566.863 568.661

    6 Khammam

    Khammam 333.932 110.000 351.108 461.108 90.010 358.181 346.181 0 345.458 345.458 130.990 200.010 5.650 205.660

    Kothagudem 3125.540 10.020 30.000 40.020 230.781 142.344 142.344 163.991 30.000 193.991 70.598 76.810 0 76.810

    Paloncha 2973.660 890.090 831.500 1721.590 341.640 870.027 870.027 1256.500 108.720 1365.220 515.346 622.680 75.000 697.680

    Bhadrachalam(N) 299.240 0 607.340 607.340 6.670 386.330 386.330 115.670 74.550 190.220 217.059 0 421.790 421.790

    Bhadrachalam(S) 2738.370 0 396.200 396.200 0 143.063 143.063 0 130.680 130.680 39.261 0 135.520 135.520

    WLM Paloncha 4.780 0 0 0.000 0 0 0 0 0 0 0 0 0 0

    Khammam Total 9475.522 1010.110 2216.148 3226.258 669.101 1899.945 1887.945 1536.161 689.408 2225.569 973.254 899.500 637.960 1537.460

    7 Kurnool

    Kadapa 275.125 388.000 226.200 614.200 16.920 328.221 328.221 393.000 17.800 410.800 99.078 11.920 208.400 220.320

    Kurnool 1297.506 305.020 673.335 978.355 8.150 769.493 769.493 300.220 577.765 877.985 368.818 12.950 95.570 108.520

    Nandyal 219.242 18.000 0 18.000 0 1.350 1.350 18.000 0 18.000 1.350 0 0 0

    Proddatur 74.700 28.000 616.269 644.269 23.120 509.251 509.251 51.120 486.520 537.640 180.626 0 129.749 129.749

  • 14

    Kurnool Total 1866.573 739.020 1515.804 2254.824 48.190 1608.315 1608.315 762.340 1082.085 1844.425 649.872 24.870 433.719 458.589

    Sl. No.

    Name of the Circle.

    Name of the Division

    Forest area

    diverted in

    hectares

    C.A.Stipulation Addl C.A., Penal C.A. & Safety Zone

    Financial Amount required

    to be deposited

    by user agency

    (Rs in La.)

    Implementation of stipulation Amount spent till the end

    of reporting quarter (Rs in Lakhs)

    Balance area to be afforestated

    Fund made

    available by user agency (Rs in La.)

    Area afforested

    On Forest Land

    On Non-Forest land

    Total (15+16)

    In Forest Land in

    Ha.

    In Non Forest Land in

    Ha.

    Total (5+6)

    On Forest Land

    On Non-Forest land

    Total (11+12)

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

    8 Nizamabad

    Nizamabad 99.327 4.225 41.150 45.375 22.600 53.431 53.431 34.600 29.150 63.750 13.659 4.225 0 4.225

    Kamareddy 244.065 49.810 0 49.810 0 71.090 71.090 17.870 0 17.870 11.893 31.940 0 31.940

    Medak 10.020 18.740 21.660 40.400 0.300 49.416 49.272 18.740 4.000 22.740 9.023 0.300 17.660 17.960

    Nizamabad Total 353.412 72.775 62.810 135.585 22.900 173.937 173.793 71.210 33.150 104.360 34.575 36.465 17.660 54.125

    9 Rajahmundry

    Kakinada 695.421 11.087 1631.184 1642.271 101.701 1130.184 1130.184 112.788 481.954 594.742 103.191 0 1152.340 1152.340

    Eluru 286.938 400.000 1791.020 2191.020 237.120 1304.103 1304.103 632.120 41.820 673.940 173.502 0 1754.200 1754.200

    Krishna 1326.817 0 22.550 22.550 201.469 116.249 116.249 133.329 22.550 155.879 55.285 67.600 0 67.600

    Rajahmundry Total 2309.176 411.087 3444.754 3855.841 540.290 2550.536 2550.536 878.237 546.324 1424.561 331.978 67.600 2906.540 2974.140

    10 Visakhapatnam

    Visakhapatnam 157.665 33.810 539.000 572.810 0.500 1174.480 1174.480 34.280 12.000 46.280 66.036 0.030 527.000 527.030

    Narsipatnam 19.670 0 349.350 349.350 0 290.326 290.326 0 0 0 3.039 0 349.350 349.350

    Vizianagaram 55.110 1.260 53.850 55.110 0 924.866 1239.826 1209.600 13.000 1222.600 4.104 0 40.850 40.850

    Srikakuklam 41.250 0 380.590 380.590 0 235.352 235.352 0 0 0 0.245 0 380.590 380.590

    Visakhapatnam Total 273.695 35.070 1322.790 1357.860 0.500 2625.024 2939.984 1243.880 25.000 1268.880 73.424 0.030 1297.790 1297.820

    11 Warangal

    Karimnagar (E) 1277.991 69.315 568.400 637.715 172.036 89.300 83.328 11.000 469.615 480.615 81.853 24.400 304.000 328.400

    Karimnagar (W) 4.790 5.000 0 5.000 0 4.150 4.150 5.000 0 5.000 2.867 0 0 0

    Warangal (S) 129.051 0 5.710 5.710 0 6.627 6.627 0 5.710 5.710 2.750 0 0 0

    Warangal (N) 892.990 242.500 4.600 247.100 0 56.646 8.505 30.000 0 30.000 5.133 212.500 4.600 217.100

    Warangal Total 2304.822 316.815 578.710 895.525 172.036 156.723 102.610 46.000 475.325 521.325 92.603 236.900 308.600 545.500

    12 FDPT Srisailam

    WLM Atmakur 372.150 0 480.710 480.710 0 657.762 618.602 0 480.710 480.710 263.575 0 0 0

    WLM Achampet 200.640 7.000 245.000 252.000 0 5856.550 5856.550 7.000 200.000 207.000 217.290 0 45.000 45.000

    N. Sagar 81.760 0.760 272.089 272.849 0 532.324 532.324 0.760 96.030 96.790 148.400 0 176.059 176.059

    WLM Markapur 192.920 0 26.506 26.506 0 539.692 540.192 0 0 0 89.134 0 26.506 26.506

    FDPT Srisailam Total 847.470 7.760 1024.305 1032.065 0 7586.328 7547.668 7.760 776.740 784.500 718.399 0 247.565 247.565

    13 WLM Tirupathi

    Chittoor (East) 296.679 138.250 409.366 547.616 88.555 318.312 319.412 222.050 67.400 289.450 80.500 43.173 303.548 346.721

    WLM Rajampet 22.380 35.960 460.680 496.640 40.960 440.170 440.170 0 292.500 292.500 67.689 71.920 173.180 245.100

    WLM Tirupathi 86.490 81.588 4.440 86.028 9.806 57.010 57.010 91.555 4.440 95.995 21.044 0 0 0

    WLM Sullurpet 3.240 6.480 0 6.480 0 6.370 6.370 6.480 0 6.480 2.445 0 0 0

    WLM Tirupathi Total 408.789 262.278 874.486 1136.764 139.321 821.862 822.962 320.085 364.340 684.425 171.678 115.093 476.728 591.821

    14

    WLM Hyderabad

    WLM Hyderabad 128.530 0 0 0 0 55.000 55.000 0 0 0 0 0 0 0

    WLM Hyderabad Total 128.530 0 0 0 0 55.000 55.000 0 0 0 0 0 0 0

    All Circles Grand Total 36767.511 4814.113 26957.738 31771.851 3280.527 24940.286 25072.344 8184.541 17698.096 25882.637 8184.299 1806.243 8608.294 10414.537 Source: O/o PCCF-FCA Section

  • 15

    CIRCLE WISE QUARTERLY PROGRESS REPORT ON DIVERSION OF FOREST AREA AND PROGRESS OF COMPENSATORY AFFORESTATION UNDER FOREST (CONSERVATION) ACT 1980 OF ANDHRA PRADESH AS ON 31-03-2012

    Table No. 1.10.3

    Sl. No.

    Name of the Circle.

    Forest area

    diverted in

    hectares

    C.A.Stipulation Addl C.A., Penal C.A. & Safety Zone

    Financial amount required

    to be deposited

    by user agency (Rs in La.)

    Implementation of stipulation Amount spent till the end

    of reporting quarter (Rs in Lakhs)

    Balance area to be afforestate