Facilities Capital Projects
Facilities Design & Construction Capital Program Mission
“To encompass both significant modernization and planned replacement of facilities, based upon facility life cycles and changing program demands and services.”
Facilities Management Bureau Program Mission
“To provide high quality maintenance repair, custodial and motor pool services with in-house and contracted staff to over 80 County facilities so they are safe, functional, clean, comfortable and energy-efficient for employees and citizens.”
2
Total Proposed Funding= $275M over 10 Years
PAYG15%
BONDS74%
5%6%
Program Funding by Sources
PAYGBONDSDeveloper FundingOther Funding
Facilities50%
Acquisitions18%
Maintenance Capital 32%
Program Funding by Allocations
Facilities
Acquisitions
MaintenanceCapital
Proposed FY2017-26 CIP (over 10 years)
• MC includes CSI• Facilities includes FF&E• Acquisition includes placeholder for out year buildouts
of new properties.
Facilities Capital Projects
3
Facilities Design & Construction
Sleeping Area with Lockers
Accomplishments - Completed Projects
Specialty Laboratory Entrance & Reception Area Administrative Area for DHS Staff
Sequoia II and III- DHS Consolidation - $11M - reduced the County’s footprint from 93,000 SF in 5 older facilities (Edison Complex) into 73,000 SF at Sequoia Plaza.
Homeless Services Center - $9.8M- accomplished the goal of meeting program needs by increasing the SF from 12,000 SF to 25,000 SF
Front Façade Food Service Line 6
Facilities Design & ConstructionAccomplishments - Completed Projects
Ballston Garage Lighting - $1.26M
Fairlington Community Center ADA Improvements - $0.2M
New Accessible StairsBefore Upgrades New Accessible Ramp
Before Upgrades New Improved Lighting
• Increased lighting levels for safety
• Resulted in an annual energy savings of $60K
• Estimated savings of $20-40K on fixture replacement over 15 years of life
7
Facilities Design & Construction
Projects UnderwayIn Design - approximately $5.85M
• Aurora Hills Library/Senior Center- $1.5M• 2020 Building conversion infrastructure- $3.73M• Ballston Garage 4th and 5th floor repairs- $0.62M
In Construction - approximately $8.01M• Cultural Affairs Building ADA Improvements-
$0.5M• Gables/Independence House replacement-
$0.38M• Trades Center- 3rd Level Parking Garage- $4.94M• Central Library Phase I- $2.19M
• Summer 2017• Calendar Year 2018• Calendar Year 2018
• Summer 2016
• Fall 2016
• Fall 2017• Calendar Year 2018
8
Facilities Design & Construction
Courthouse Complex
13%
Fire32%
Libraries5%
DPR41%
FF&E4%
Facilities Master
Planning3%
DHS2%
PROGRAM CATEGORIES
TOTAL PROPOSED FUNDING $191M
PAYG3%
BONDS97%
Program Funding by SourcesFY2017-26 Ten Year Plan
9
Lubber Run Community Center Replacement ($47.9M - 2014/2016 Referenda); FY 15-18 planning, design & construction (pg. C-109)
• Proceed with April Board Guidance; gymnasium, underground/structured parking; return DPR staff
• Fall 2016 - Community process on building and site arrangements
• Value increased from previous CIP of $26M based on Board’s program guidance
• Complete in 2020
FY 2017 – FY 2022 Major Projects
10
Fire Station #8 ($15.1M – 2016/2018 Referenda); FY19-20 construction (pg. C-101)
FY 2017 – FY 2022 Major Projects
• Replace with 4-bay station to meet current standards
• Task Force recommends rebuilding at current site
• Funding for fire station only
• FY16 Referendum funding for design, FY18 value is placeholder pending site selection
• Board decision on site with CIP adoption in July
11
Northside Salt Facility/26th Street Planning ($2.4M - 2014 Referenda); FY17-18 construction (pg. C-111)
FY 2017 – FY 2022 Major Projects
• Replacement of salt storage structure at Old Dominion and 26th Street N.
• Temporary structural repairs completed in 2012
• Larger capacity facility needed
• Community planning process to include existing and possible new uses of the site
• Future Board action on possible rezoning or use permit
12
Courthouse Complex Renovations & Infrastructure ($8.3M–2016/2018 Referenda); FY17-20 construction (pg. C-97)
• Over 1.0 million square feet owned in Courthouse Complex area
• Detention Facility • Courts/Police Building• Court Square West • 2020 14th Street N.
• Buildings range in age from 20 to 50 years
• Consideration Factors• Investments in Courts/Police
security, circulation improvement
• Court Square West infrastructure
• CHP Lease Negotiations
FY 2017 – FY 2022 Major Projects
13
Barcroft Gymnastics Expansion ($3.5M - 2016 Referenda); FY17 construction (pg. C-89)
• Phase I Completion – Fall 2017• Expand gymnastics program
into 2nd gymnasium
• Interior upgrades in gymnastics areas; LED lighting
• Phase II Completion – Spring 2018• Building HVAC and roof
replacement
FY 2017 – FY 2022 Major Projects
14
Facilities Design & ConstructionBallston Public Parking Garage Floors 1-7 ($10.5M – Ballston Garage Enterprise Fund); FY17-26 design & construction (pg. C-87)
• Structural repair major deterioration of concrete on 4th and 5th levels• Public Private partnership with Forest City for elevator modernization, lobby
improvements, and wayfinding• Out year funding to be further refined, possibly to include façade
improvements
County Childcare ($1.5M - 2016 Referenda); FY17 construction (pg. C-95)
• Accommodate approximately 75 more children• Analysis for potential site location• Final cost to be determined
FY 2017 – FY 2022 Major Projects
15
Facilities Design & ConstructionGovernment Facilities Planning & Construction- $49.5M (pg. C-105)
• New acquisitions –Buck Property• Place holder for future needs
Fire Station Replacements- $14.9M (pg. C-103)
• WRAPS Fire Station #10 developer funded
FY 2017 – FY 2022 Major Projects
16
Included in Previous CIP
• Trades Center Vehicle Wash Bay- $2.5M
• Relocate OEM and EOC- $11M
FY 2017 – FY 2022 NEEDS NOT INCLUDED
17
Fire Station Replacements- $17.2M (pg. C-103)
• Includes funding in 2025 for possible new fire station #11 investment
Courthouse Complex Renovations and Infrastructure- $4.2M (pg. C-97)
• Continuation of work
Out Years Projects FY 2023 – FY 2026
18
Facilities Design & Construction
Central Library Site Redevelopment Planning- $2M (pg. C-91)
• Consideration of a redeveloped Central Library and the potential for complementary uses of the site
• Compliments Quincy Park planning dollars included in FY23
Columbia Pike Library Replacement- $2.8M (pg. C-93)
• Initiate planning of an interior renovation of an existing or new space for the aging Columbia Pike Library
Out Years Projects FY 2023 – FY 2026
Total of Proposed CIP vs FY2015-24 CIP- $191M vs. $148M
19
Facilities Management Bureau
CIP MC AccomplishmentsFY2012-2017
• FMB has an established and structured renewal and replacement program to address and maintain maintenance capital.
• The previous 5 years of CIP planning has focused on fire station improvements, DHS, and DPR facilities. The current proposed CIP focuses on the Justice Center improvements and various DES/Trades facilities.
21
Facilities Management Bureau
Maintenance Capital AccomplishmentsCompleted Projects- approximately $7.2M
• Equipment Bureau refresh- $4.20M
• Fairlington Community Center façade refresh- $0.46M
• Dawson Bailey House/Dawson Terrace Recreation Center historicalreconstruction and refresh- $0.98M
• Sullivan House refresh- $0.42M
• Central Library HVAC coil replacement- $0.25M
• Argus House HVAC modernization- $0.31M
• Fire Station #1 – apparatus bay doors replacement- $0.33M
• Fort CF Smith facade and roof refresh- $0.18M22
Facilities Management Bureau
MC Accomplishments - Completed ProjectsFort CF Smith- Roof and Clapboard Repair/Replacement- $0.18M
Before After
23
Facilities Management BureauMC Accomplishments - Completed Projects
Dawson Bailey House/Dawson Terrace Recreation Center- Historical Reconstruction and Refresh- $0.98M
Before After
24
Facilities Management BureauMC Accomplishments- Completed Projects
325
Before: Old Doors
After
Before
After
Before
Fire Station #1- Apparatus Bay Door Replacement-$0.33M
Argus House- HVAC Modernization- $0.31M
25
Facilities Management Bureau
Maintenance Capital Projects Underway
In Construction- approximately $5M
• Detention Facility electrical upgrades- $3.6M
• Old Signature Building roof replacement- $0.33M
• Residential Program Center (RPC) bathroom renovation- $0.53M
• Arlington Children’s Center playground improvements- $0.35M
26
Facilities Management Bureau
Residential Program Center Bathroom Refresh- $0.53M
Arlington Children’s Center Playground Improvements- $0.35M
Projects Underway - Photos
Existing: Children’s playground and fence Existing: Retaining wall to be replaced with stamped concrete wall
Existing: Restrooms deferred maintenance In Construction: New poured flooring and covebase
27
Facilities Management Bureau
Old Signature Building Roof Replacement- $0.33M
Justice Center Reline Main Sewer Line- $0.98M
MC Projects Underway - Photos
Before: Justice Center Garage- Main sewer line
In Construction: A/E Investigative study image of main sewer line using CCTV
Before: Failing roof with ponding In Construction: Roof replacement
28
Changes to Current FY2017-26 CIPNew MC Projects Proposed (FY2017-18)- approximately $13.33M
• Justice Center- reline main sewer line- $0.98M
• Westover Branch Library- remediate water infiltration issues -$0.67M
• Central Library - replace boilers- $1.2M
• Woodmont Center - roof replacement- $0.87M
• ACDF- Sheriff's Department Network Closet- $0.66M
• ACDF - refresh project phase I- $1.6M
• Court Square West elevator modernization- $0.7M
29
Changes to Current FY2017-26 CIPNew MC Projects Proposed (FY2017-18)- continued
• ACDF Central Control/Command Center interior refresh- $0.56M
• Shirlington Library/Signature Theater BAS upgrades- $ 0.25M
• Solid Waste/Traffic Engineering & Operations Building- bundled refresh project design& construction- $4.6M
• Water, Sewer and Streets maintenance/Warehouse Facility- roof replacement and HVAC modernization- $0.45M
• Facility Condition Assessments- of all County owned Facilities-$0.49M
• Critical Systems Infrastructure (CSI) Building Automation System (BAS) upgrades- $0.3M
30
Maintenance Capital FY2017- Proposed Photos
Woodmont Center- RoofCourt Square West-Elevator Modernization
Existing: Failing roof- deferred maintenance Existing: CSW failing elevator equipment- deferred maintenance 31
ACDF- Central Control/Command Center Interior Refresh
Existing: Failing millwork
Existing: Command Center wiring
ACDF- Sheriff’s Network Closet
Existing: Program requirements have surpassed original design creating space issues
Maintenance Capital FY2017- Proposed Photos
32
Facilities Management Bureau
Total Proposed Funding- $84M over 10 Years:• Bonds- $54M (includes CSI Program)• PAYG- $30M
PAYG30%
BONDS70%
Program Funding by Sources-FY2017-2026 (10-year plan)
33
Facilities Management Bureau
Libraries9%
Justice Center/Sheriff's
Department30%
DES Facilities55%
DHS2%
DPR2%
CSI2%
Program Categories by Customer
Life Safety5%
Conveying10%
Building Envelope
(Roofs,Windows and Exterior)
26%
Foundation/Site/Structural/ Walls/
Flooring25%
MEP (Mechanical,
Electrical, Plumbing-HVAC/BAS)
31%
CSI3%
Major Maintenance Categories by Percent
$14.9M Proposed over 2 Years
FY2017-18 (Two Year Plan)
34
Future Challenges
Deferred investments• Courts/Police Building- over 20 years old• Community Residence replacement- converted house over 92
years old
Near term planning issues• Buck proposed for November 2017• New location for Head Start program at Edison site• Potential acquisition of VA Hospital sites
CIP facility placeholders• Fire Station #8 replacement total costs• North Side Salt Facility replacement- site planning process
Maintenance Capital (MC) funding• Maintain what we have- requires consistent $8-10M/year• Future: growth and complexity/technology turnover
35