good luck plaza 5-19 george st, blacktown
TRANSCRIPT
Good Luck Plaza
5-19 George St, Blacktown
CIVIL ENGINEERING STORMWATER MANAGEMENT REPORT
Disclaimer
This report has been prepared on behalf of and for the exclusive use of Good Luck Plaza and is
subject to and issued in accordance with the agreement between Good Luck Plaza and Northrop
Consulting Engineers. Northrop Consulting Engineers accepts no liability or responsibility
whatsoever for it in respect of any use of or reliance upon this report by any third party. Copying this
report without the permission of Good Luck Plaza and Northrop Consulting Engineers is not
permitted.
Document Control
Prepared for Good Luck Plaza
Project Name 5 – 19 George Street, Blacktown
File Reference 181363
Date 07/06/2019
Document Control
Stormwater Management Strategy Report
Rev Description
Prepared
by
Reviewed
by
Issue
Date
Client
App
Approval
Date
A Preliminary Issue for DA SAN SF 04/09/18
B - - -
C Issue for DA SAN 22/03/19
D Reissued for DA SAN 07/06/19
5-19 GEORGE ST, BLACKTOWN PAGE 3
1 Contents 1. Introduction ................................................................................................................................ 4
1.1. Site Description .................................................................................................................. 4
1.2. Proposed Development ...................................................................................................... 5
1.3. Council’s Requirements ...................................................................................................... 5
1.4. General Drainage Strategy ................................................................................................. 6
2. On-Site Detention ...................................................................................................................... 7
2.1. OSD Requirements............................................................................................................. 7
2.2. OSD Design........................................................................................................................ 7
2.3. Access and Maintenance .................................................................................................... 8
3. Water Quality ............................................................................................................................. 8
3.1. Section 7.11 Contribution.................................................................................................... 8
3.2. Gross Pollutant and Hydrocarbon Trap Requirement .......................................................... 9
4. Water Conservation ................................................................................................................. 10
4.1. Proposed Rainwater Reuse Scheme ................................................................................ 10
4.2. Demand ............................................................................................................................ 10
4.3. S3QM Modelling Results ................................................................................................... 11
5. Flood Planning ......................................................................................................................... 11
6. Conclusion ............................................................................................................................... 12
Appendix A – Survey ...................................................................................................................... 13
Appendix B – S3QM Certificate ....................................................................................................... 15
Appendix C – Catchment Plan ........................................................................................................ 20
Appendix D – Stormwater Management Plan and Details ............................................................... 22
Appendix E – Flooding Map ............................................................................................................ 26
5-19 GEORGE ST, BLACKTOWN PAGE 4
1. Introduction
Northrop Consulting Engineers Pty Ltd (Northrop) have been engaged by Good Luck Plaza to
prepare Civil Engineering design and documentation in support of a Development Application (DA)
for the proposed Mixed Use Development at 5 – 19 George St, Blacktown. This Stormwater
Management Plan has been developed to meet all of Council’s stormwater management
requirements, and covers the following:
- Connection to Council’s stormwater network;
- Deemed to Comply Certificate;
- On site detention (OSD) design;
- Water Quality;
- Water Conservation; and
- Flooding.
This report does not include an Erosion and Sediment Control Plan as this will be submitted with the
Construction Certificate application as per Council’s requirements.
This report should be read in conjunction with the Civil Engineering drawing set produced by Northrop,
which includes a detailed Stormwater Management Plan.
1.1. Site Description
5 – 19 George St is located within the Blacktown Local Government Area and is bounded by
George St to the south, Sunnyholt Road to the east and Humphries Lane to the north. The site is in
a B4 - Mixed Use zone, within walking distance to Blacktown Station.
The site occupies an area of 4,629 m2 and falls to the northwest with gradients around 4.7%. The
site is utilised as a car rental and vehicle storage yard. Figure 1 below shows an aerial of the
existing site, with a detailed survey included in Appendix A.
5-19 GEORGE ST, BLACKTOWN PAGE 5
Figure 1: Subject site. (Source: Six Maps, NSW Government)
1.2. Proposed Development
A mixed use development is proposed, with two towers, comprising of approximately 253
apartments (1, 2, 3 and 4 bedrooms), communal facilities, a basement car park, and a commercial
precinct with retail shops and a supermarket.
The proposed site coverage is 4,629 m2 (100%), as the basement will extend to all boundaries. The
development will comprise entirely of roof and podium catchments and will therefore have a
relatively high quality of runoff water.
1.3. Council’s Requirements
Council’s online ‘deemed to comply’ tool, S3QM, along with Section J of the DCP, was used to
determine the stormwater management requirements for this site.
It was found that this development:
- is required to pay a Section 7.11 (formally Section 94) Contribution for the management of
water quality;
- requires OSD, at a storage rate of 455m3/ha;
- requires a Groundwater Assessment and Management Plan (which is to be prepared by
others); and
- requires a rainwater storage volume sufficient to meet 80% of the non-potable demand.
The S3QM Certificate, showing a summary of how these requirements are met, is in Appendix B.
The following report provides more detail to support the drainage strategy designed using S3QM.
5-19 George St.
– Subject site
5-19 GEORGE ST, BLACKTOWN PAGE 6
1.4. General Drainage Strategy
Level 2 of the proposed development covers the entire site, therefore all the stormwater runoff will
be intercepted by the Level 2 podium and the tower rooves. The highest quality, roof runoff portion
only (as opposed to the podium drainage from areas accessible by building occupants), will be
directed to a rainwater tank, to be used for non-potable demands. The rainwater tank will overflow
into the OSD tank via a separating weir. All other podium drainage, such as terraces and courtyard
areas, will be directed to the OSD tank. Therefore, runoff from 100% of the site will be detained and
attenuated by the OSD tank. Figure 2 below shows a schematic of the rainwater tank, OSD tank
and catchment break up. A detailed catchment plan can be found in Appendix C, and the
Stormwater Management Plan in Appendix D.
The nearest downstream Council pit is in Humphries Lane, near the corner of Prince St,
approximately 35m away from the site boundary. It is therefore proposed that Council’s system be
extended as part of the development to run east to a new pit adjacent the site boundary. This would
then become the point of discharge to Council’s network, as shown in Figure 2 below. Kerb and
gutter is to be constructed along the southern side of Humphries Lane adjacent the site where it is
currently unformed. The pit and pipe network extension would therefore be done as part of the other
civil works to take place in Humphries Lane. There is a power pole located on the southern side of
Humphries Lane. If sufficient clearance from the pole cannot be achieved with the line extension
running on the southern side of the lane, the it should run on the northern side of the road, clear of
the existing sewer line.
Figure 2: Schematic showing catchments, connection to Council's network and proposed location of tanks.
5-19 GEORGE ST, BLACKTOWN PAGE 7
2. On-Site Detention
2.1. OSD Requirements
An OSD system is required, as this is a business and residential development with a footprint
greater than 150 m2, and located within an on-site stormwater detention area.
Blacktown requires a two-stage discharge from the OSD tank, to attenuate flow in both large events
(to protect against flooding), and smaller events (to protect against an increase to environmental
flows).
The total storage required is 455m3/ha of site area, to be detained behind the “emergency weir” and
outflow controlled to 190L/s/ha. The environmental component of the total storage is 300m3/ha, to
be detained below the 1.5 year ARI weir and outflow controlled to 40L/s/ha.
2.2. OSD Design
The OSD tank is to be located under the ground floor slab, adjacent George St. The tank will extend
down through a void in the first level of the basement, such that the bottom of the tank is within
basement level 2, at a level enabling sufficient clearance for carparking beneath. The layout of the
tank and detailed sections, are in Appendix D. This location of the tank enables the capture of 100%
of the site runoff, whilst providing sufficient head in the system to connect into Council’s relatively
shallow stormwater network.
The tank has been designed in accordance with Blacktown’s guidelines and WSUD Standard
Drawings, having two orifice outlets, to store and attenuate the peak discharge from the site in
smaller events (1 in 1.5 year ARI) and in larger events (1 in 100 year ARI). An ‘emergency overflow
weir’ has been included (as per Council’s requirement), with a ø375mm outflow pipe, sized for the 1
in 100 year ARI flow (with tailwater assumed at top of kerb), to account for any orifice blockages that
may occur. The key OSD design parameters are presented in Table 1 below, and
Two grated access hatches have been included, one above the 1.5 year ARI control pit, and one
above the 100 year ARI control pit. The grates provide access to the outflow pits and ventilation to
the tank. In the unlikely event that the outlet pipe blocks, or in events larger than the 1 in 100 year
ARI, stormwater will surcharge through the grates. The level of the grates is to be set down 150mm
from the adjacent floor level, and located in an area graded away from the building towards George
St. The emergency overflow control weir within the tank is set 0.93m below the grate level, meaning
there is 0.98 total of freeboard from the 100 year top water level in the tank to the ground floor level.
Table 1: Summary of OSD Design Parameters
Total Storage Required (below emergency overflow weir) 210.16m3
Environmental Storage Component (below 1 in 1.5 year ARI weir) 138.45m3
Average Base RL 55.74
Emergency Overflow Weir RL 57.22
1.5 year ARI Weir RL 56.715
Average Depth 1.478
Footprint Required 142.2m2
5-19 GEORGE ST, BLACKTOWN PAGE 8
2.3. Access and Maintenance
Access to the tank will be via grated covers on George St, as well as water tight side entry hatches
accessible from the basement level 1, in the bin collection area. The grated surcharge lids on George
St will allow for visual inspection of the two outlet pits, and easy maintenance of the orifice plates, and
outlet pipes. The side entry hatches will provide maintenance to the rest of the tank. The hatches will
be located above the 100 year ARI top water level, and be inward opening to ensure the safety of the
maintenance personal in the unlikely event that the water level rises above the 100 year ARI top water
level. The tank will be fitted with a galvanised steel mesh platform on the inside and outside of the
tank wall fitted with the hatches, for ease of manoeuvring into the tank. Stairs will be provided from
basement level 1 up to the external access hatches. Access hatches, either the grates lids or side
hatches, will be within 6m reach from any point inside the tank, in accordance with Blacktown’s
requirements for tanks deeper than 2m, (note: while the maximum water depth is around 1.7m, the
total tank depth is greater than 2m due to the minimum of 900mm airspace provided above the top
water level). The minimum size of access hatch will be 900mm x 900mm in the area where the ground
floor level above is at a minimum level. However, the ground floor level steps up in two locations
above the tank, providing more airspace above the 100 year ARI top water level, allowing the hatches
to be larger (1.2m x 1.2m) and set higher above the top water level. It will be recommended in the
OSD Maintenance and Monitoring Schedule (to be submitted prior to Occupation), that the primary
access to the tank is via one of the larger, higher hatches to ensure the water level is below the top
water level, prior to use of the smaller, lower hatches.
3. Water Quality
3.1. Section 7.11 Contribution
According to the Contributions Plan and Voluntary Contributions Scheme map in the Part J of
Blacktown’s Development Control Plan (2015), the site is located in a Section 7.11 (formally Section
94) Contribution Plan No. 19, therefore, this development must meet the water quality requirements
through payment of a contribution. Figure 3 shows the location of the site within the Contribution
Plan area.
The contribution rate is $82,413 per hectare, subject to CPI indexation as at the date of payment
plus an administration fee of 1.5%.
The area of the site is 0.4629 ha. Therefore, the contribution will be in the order of $38,149, with an
administration fee of $572, resulting in a total of $38,721 (excluding indexation).
5-19 GEORGE ST, BLACKTOWN PAGE 9
Figure 3: Map illustrating the Contributions Plan and Voluntary Contributions Scheme boundaries. (Source: Part J of Blacktown Development Control Plan, 2015)
3.2. Gross Pollutant and Hydrocarbon Trap Requirement
The development is also required to install a gross pollutant trap and a hydrocarbon trap. The intent
of this requirement is to intercept and filter out gross pollutants and hydrocarbons prior to the site
runoff entering Council’s system. Hydrocarbons in stormwater are largely due to vehicular traffic.
Runoff from this development is entirely from roof and podium catchments, therefore very low levels
of hydrocarbons are expected, as there are no trafficable areas generating runoff. Levels of gross
pollutants are also expected to be very low as there are no outdoor public areas. All podium
catchments are accessible to tenants of the building only, where the littering rate tends to be much
lower than in public areas. 100% of the site is to be directed to the OSD tank, which will be fitted
with trash screens over the outlets, preventing any gross-pollutants from being discharged off site.
Therefore, this development seeks dispensation from the requirement to install a gross pollutant
and hydrocarbon trap, as the quality of runoff will be very high in comparison to the developments
for which the intent of this requirement is aimed, and adequate capture of gross-pollutants will be
achieved via the trash screens in the OSD tank.
Site
location
5-19 GEORGE ST, BLACKTOWN PAGE 10
4. Water Conservation
4.1. Proposed Rainwater Reuse Scheme
This development is a mixed use development, consisting of commercial and residential
components. The water conservation requirements for the residential precinct will be covered in a
BASIX assessment, while the commercial components of the development must adhere to Council’s
water conservation guidelines. Council requires business and commercial developments to supply
80% of non-potable demand using non potable sources. Thus, a 30kL rainwater tank is included in
this development.
All roof runoff will be directed to the tank, however other podium runoff (from areas such as the
Level 2 open terraces), will not be directed to the rainwater tank, as it is not possible to control the
quality of this water to ensure it is fit for re-use. The rainwater tank overflow, along with the podium
drainage bypassing the tank will be directed to the OSD tank.
4.2. Demand
The roof catchment from which rainwater is harvested for re-use is extremely small in comparison to
the magnitude of non-potable demands, due to the high-rise nature of this development. Therefore
the suitable non-potable demand for this development, for which it is feasible to meet 80% with
rainwater, is the demand of retail and basement level toilets. Figure 4 below shows the diminishing
returns in the number of toilets that can be supplied by the tank for increases in tank volume. This
demonstrates that tank sizes above approximately 30kL are not efficient in meeting additional toilet
demands as the catchment is too small in comparison.
Figure 4: Tank size required to meet 80% of the demand of toilets, showing the diminishing returns by increasing
tank size.
0
5
10
15
20
25
30
35
40
45
0 50 100 150 200 250 300
Num
ber
of
Toile
ts S
upplie
d b
y th
e T
ank
Tank Size Required to Meet 80% of Demand (kL)
Tank Size Required Vs Toilet Demand Met
5-19 GEORGE ST, BLACKTOWN PAGE 11
4.3. S3QM Modelling Results
A 30kL tank is sufficient to meet the demand of the basement and retail toilets, or a total of any 13
toilets to be determined by the hydraulic services consultant. The S3QM results are shown below in
Table 2.
Table 2: S3QM Rainwater Tank Results
Tank Size 30kL
Demand on Tank 474.8 kL/year (13 toilets/ urinals)
Tank water used 385.2 kL/year
% Demand satisfied from tank 81.1 %
Tank spills 37.9 /year
5. Flood Planning
This development does not require a flood impact assessment since it is not located in a flood
affected area, as shown in Appendix E.
5-19 GEORGE ST, BLACKTOWN PAGE 12
6. Conclusion
This development is affected by Controls 4.2, 4.3 and 4.4 of Council’s DCP Part J.
Control 4.2 will be addressed through the payment of a mandatory contribution under the Section
7.11 Contributions Plan 19. Dispensation is sought from the requirement of a GPT and hydrocarbon
trap, on the basis that there are no trafficable catchments nor public open spaces proposed,
therefore levels of gross pollutants and hydrocarbons will be far lower than developments for which
this requirement is intended.
A rainwater tank has been supplied to meet the objectives if Control 4.3. A 30kL tank will meet 80%
of the demand from 13 toilets in the commercial sector of the building and provides total of
385.2kL/year of reuse.
The intent of Control 4.4 is to limit the peak discharge from the development to rates that will not
place strain on Council’s existing stormwater infrastructure, and not threaten receiving waters by
increasing the magnitude and frequency of discharge. The OSD tank proposed to attenuate these
peak flows has been sized and designed in accordance with Council’s requirements and WSUD
Standard Drawings. It is easily and safely accessible, has adequate freeboard to surrounding floor
levels, has an outflow pipe sized for the 1 in 100 year event, with a surcharge grate to the street,
and thereby meets all of Council’s requirements.
All modelling and design has been done with Council’s own S3QM tool, therefore the proposed
stormwater management scheme is a ‘Deemed to Comply’ solution. The proposed scheme is an
exemplary design for built form developments, incorporating stormwater management measures
into “dead space” in the architecture so as not to sterilise developable space, while meeting all of
Council’s stormwater management objectives.
5-19 GEORGE ST, BLACKTOWN PAGE 13
Appendix A – Survey
ELECTRICALCABINET & PIT
STAIRS
SUBSTATION
GATE
STAIRS
GATE
GATEPITS
M.G
.A.
LEGEND
LOTS 19-25D.P.11157
LOTS 26 & 27D.P.137472
SUBSTATION LINE 25m FROM RAIL BOUNDARY
61
61
60.5
60
6059
.5
59.5
59
59
58.5
58
58
57.5
57.5
56.5
56
55.5
55
54.5
54
54
57
57
59.5
58
CO
NC
RETE TR
AFFIC ISLAN
D
CO
NC
RETE R
AMP
PATHM
ESH
K & G
V/C
V/C
CO
NC
.
PAVED
MET
ALPI
CKE
TFE
NC
E
METAL
GATE
METAL PICKET FENCE ON BRICK WALL
CEMENTRENDERED SHOP
METAL ROOF1 GEORGE STREET
TWO STOREYCONCRETE &
GLASSBUILDING18 FIRSTAVENUE
BITUMENCARPARK
BITUMENCARPARK
BITUMENCARPARK
SHED
CO
NC
. K & G
CO
NC
. K & GC
ON
C.
METAL
FENC
EPATH
PATH
PAVED
PATHC
ON
C. K & G
P/C
P/C
P/C
P/C
PIT
PIT
PIT
TC
P/C CO
NC
.
61
HUMPHRIES LANE
LANE
LAN
E
ZOLYO
MI
BB
A A
A
'RAILWAY CORRIDOR'
SUN
NYH
OLT
RO
AD
HUMPHRIES LN.
PP
PPLPPP
PP
PPPPPP
PP
PP
PP PP
PP
PP
PPLP
LPLP
LP
LP LP
LP
LP
LP
LP
PP
LP
PPLP
PP
BOL
BOLBOL
HYD
SV
HYD
HYDSV
BOL
BOLWM
WMWM
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSS
SSSS
SS
SS
SS
SS
GP
TCP
TCP
GP GP
GP
GP GP GP GPGP GP
IE
SINGLE STOREYBRICK BUILDING
METAL ROOF
SINGLE STOREYCONCRETE
BLOCK BUILDINGMETAL ROOF
GRAVEL
GRAVEL
2 STOREYBRICK & CONCRETE
BUILDINGMETAL ROOF
BITUMEN
CONCRETE
SINGLE STOREYBRICK BUILDING
METAL ROOF
2 STOREYCONCRETE BUILDING
METAL ROOF
DR
AIN
DISH
DR
AIN
TC
TC
TC
CONCRETE
CONCRETE
CONCRETEPITPIT
RET.WALL
PIT
EDGE OF BITUMEN
P/C
P/C
P/C
VEHICLE CROSSINGRET. WALL
DR
AIN
DRAIN
DR
AIN
SING
LE STOR
EY
BRIC
K BUILD
ING
METAL R
OO
F
TOP OF BANK TANK
TCTC
METAL
POST
&W
IRE
MESH
FENC
E
SMH
SWP SWP
TC
V/C V/C
GRAVEL
TC
GRASS
SWPPIT
V/C V/CV/C
TCTC PITPIT
GARDEN
METAL
FENC
E
METAL PO
ST&
RAILIN
GFEN
CE
PIT
TC
DRAIN
METAL POST & WIRE MESH FENCE
METAL
FENC
E
EP
EP
V/C
V/C
P/CP/C
TC
TL
A.H.D.
DRAINAGE PIPE SIZE AND INVERT LEVEL
AUSTRALIAN HEIGHT DATUM
BENCH MARK
HYDRANT
OVERHEAD POWERLINE
TREE
POWER POLE
TELECOMMUNICATION PIT
SEWER MAINTENANCE HOLE
POWER & LIGHT POLE
STORM WATER PIPE
STOP VALVE
GULLY PIT WITH LINTEL
VEHICLE CROSSING
STREET SIGN
LIGHT POLE
PIT (SERVICES)
PRAM CROSSING
TRAFFIC LIGHT
BOLLARD
ELECTRICAL PILLAR
TRAFFIC CONTROL PIT
SWP
SMH
WATER METER
SLOPING BANKTOP
BOTTOM
TL
TL
TL TL
P/C
P/C
SMH
V/C V/C
P/C
CONC. K & G
REDUCED LEVEL
CONCRETE KERB & GUTTER
FLAG POLE
SEWER INSPECTION EYE
BM
BM NAIL IN KERBR.L. 60.03 (A.H.D.)
VACANT
LP CONCRETE PATH
V/C
LEGEND (DBYD)
APPROXIMATE LOCATION OF WATER MAIN (VIDE DBYD)
APPROXIMATE LOCATION OF SEWER (VIDE DBYD)
STORM WATER PIT
ELEVATION A-ASCALE 1:200
WINDOWS
WINDOWS
ELEVATION B-BSCALE 1:200
WINDOWS
WINDOWSWINDOWS
WINDOWS
Survey Notes:-Location of structures approximate only.
The levels and details on this plan have been determined by stadiamethods and are within the general accepted accuracies for suchsurveys. All set out levels must be referred to the bench mark.
Bearings and Distances are by deed only and are subject to FinalSurvey. Except where shown by dimension, the relationship ofimprovements to boundaries is diagrammatic only. The truepositions are subject to Final Survey.
Tree sizes are estimates and indicative only.
Services and utilities shown have been located by physicalevidence and/or by reference to service plans from the relevantauthorities. Subsurface utility information shown in accordancewith AS5488-2013 QL-D. Pits may not have been opened to verifythe type of utility. Excavation has not been carried out to confirmunderground location. Service details should be confirmed with therelevant service authority during design and prior tocommencement of construction.
As part of your duty of care, please contact the following wherenecessary :-
Ausgrid Ph. 131535Dial Before You Dig Ph. 1100Endeavour Energy Ph. 131081Jemena Gas Company Ph. 131245NBN Ph. 1800 881 816Optus Communications Ph. 1800 505 777Sydney Water Ph. 132092Telstra Corporation Ph. 132203
This plan has been prepared for the exclusive use of the principalas listed in the title block.
Any construction on or near the boundaries will require furthersurvey so that marks defining boundaries can be placed.
All set out levels must be referred to the bench mark.
© Copyright Craig & Rhodes Pty. Ltd. 2018.
No part of this survey may be reproduced, stored in a retrievalsystem or transmitted in any form without the express permissionof the copyright owner except as permitted under the Copyright Act1968.
Any permitted downloading, electronic storage, display, print, copyor reproduction of this survey should contain no alteration oraddition to the original.
These notes must not be erased.
ORIGIN OF LEVELS: ORIGIN OF LEVELS S.S.M.46850 R.L.62.029 A.H.D. (VIDE SCIMS DATED 10/3/17)
AMEND. No.: DATE: DETAILS:01 04/05/2017 RAIL BOUNDARY OFFSET ADDEDAMEND. No.: DATE: DETAILS:02 21/08/2018 ADD DETAIL SUNNYHOLT RD. & INT. HUMPHRIES LN. & PRINCE ST.
A1A B C D E F G H I J K L M N O P
12
34
56
78
910
11
Proj.Man.
Council Ref.
L.G.A.
Drawn.
Date
Calc's
Principal:
Datum
Scale
Project:
Dwg File Ref. [Rev] - Sheet Ref.
OurRef.
Client Ref:
ABN 77 050 209 991 ACN 050 209 991Suite 701, Level 7, 3 Rider Boulevard,
Rhodes, NSW, 2138PO Box 3220, Rhodes NSW 2138
Tel. [email protected]
www.craigandrhodes.com.au© Craig & Rhodes
ISO 14001Environmental
Management System
AS/NZS 4801OH&S
Management System
018-17
018-17G T01 [02]- SHEET 1 OF 1
CLG DEVELOPMENT Pty Ltd
1:400
20 APRIL 2017
A.H.D. BLACKTOWN
D.E. K.S. A.K.
5-19 GEORGE ST, BLACKTOWN PAGE 15
Appendix B – S3QM Certificate
S3QM Deemed to Comply CertificateCertificate Number: 4022
This certificate confirms that the proposed development will meet Blacktown City Council’s requirements for water sensitiveurban design described in Blacktown Development Control Plan (Part J) 2015.Terms used in this certificate or in the commitments have the meaning given by Blacktown Development Control Plan (PartJ) 2015.
General Manager
Blacktown City Council
Date of Issue: Tue Jun 04 2019
To be valid this certificate must be lodged within 3 months of the date of issue:
Project Summary
Author [email protected]
Project Name Goodluck Plaza - George St_revision 2
Site Address 5-19 George St, Blacktown
Lot/DP Number 19-25/11157 & 26-27/137472
Project Number 181363
Land use Business
Compliance
Does the project comply with all relevant criteria? Yes
Site Details
Site Area (m ) 4629
Roof Area (m ) 2162
Road Area (m ) 0
Other Impervious Area (m ) 2467
Pervious Area (m ) 0
Applicable Development Controls
2
2
2
2
2
Water Conservation Yes
On-site water quality No
On-site works, Section 94 or VPA Section 94 mandatory contribution required and theconstruction of a Gross Pollutant Trap and a HydrocarbonTrap.
On-site detention Yes
Groundwater (more than 1.5m of cut or fill or morethan 1m of cut or fill if development is on waterfrontland)
Yes
Waterfront Land (within 40m of a waterway) No
Statement of CommitmentsOSD Commitments
Site
Site Area (m²) 4629
Site Area NOT draining to OSD (m²) 0
Reduced Levels (AHD)
RL of Top of Tank (m) 57.495
RL of Bottom of OSD Tank (m) 55.74
RL of 1.5 Year ARI Overflow Weir (m) 56.715
RL of Emergency Overflow Weir (m) 57.22
RL of 1.5 Year ARI Orifice Centreline (m) 55.55
RL of 100Year ARI Orifice Centreline (m) 55.44
RL of Invert of Discharge to Council Drainage (m) Pit 54.45
RL of obvert of Pit outlet pipe (m) 54.775
Minimum RL of Garage Floor (m) 57.585
Minimum RL of House Floor (m) 57.685
OSD Details
Internal Height (m) 1.755
Required Storage BELOW 1.5 Year ARI Overflow Weir (m ) 138.45
Required Storage BELOW Emergency Overflow Weir (m ) 210.16
Additional Details
Length of Emergency Overflow Weir (m) 2.4
Number of 1.5 Year ARI Orifices 1
Number of 100 Year ARI Orifices 1
1.5 Year ARI Orifice Size (mm) 90
100 Year ARI Orifice Size (mm) 176.5
Discharge Details
Using Filter Cartridges to manage Water Quality No
1.5 Year ARI Discharge (l/s) 18.5
1.5 Year ARI Orifice Discharge (l/s) 18.5
100 Year ARI Discharge (l/s) 88
100 Year ARI Orifice Discharge (l/s) 88
Water Conservation Commitments
3
3
Catchment 1
Roof area connect to tank 100 %
Total Tank Capacity 30.0 kl
Irrigated Area 0 m
Number of Toilets and Urinals 13
Non Potable Demand 0 kl/day
Water Quality Commitments
Water Quality Commitments Not Required
2
5-19 GEORGE ST, BLACKTOWN PAGE 20
Appendix C – Catchment Plan
POST-DEVELOPMENT
CATCHMENT PLAN
03DAC05.01
NOT FOR CONSTRUCTION
Sydney
Level 11 345 George Street, Sydney NSW 2000
Ph (02) 9241 4188 Fax (02) 9241 4324
Email [email protected] ABN 81 094 433 100
181363
CIVIL ENGINEERING WORKS
DEVELOPMENT APPLICATION
GOOD LUCK PLAZA
5 - 19 GEORGE STREET,
BLACKTOWN
5-19 GEORGE ST, BLACKTOWN PAGE 22
Appendix D – Stormwater Management Plan and Details
SITEWORKS AND STORMWATER
MANAGEMENT PLAN - BASEMENT 1
01DAC02.02
NOT FOR CONSTRUCTION
Sydney
Level 11 345 George Street, Sydney NSW 2000
Ph (02) 9241 4188 Fax (02) 9241 4324
Email [email protected] ABN 81 094 433 100
181363
CIVIL ENGINEERING WORKS
DEVELOPMENT APPLICATION
GOOD LUCK PLAZA
5 - 19 GEORGE STREET,
BLACKTOWN
NOT FOR CONSTRUCTION
CIVIL ENGINEERING WORKS
SKETCH
NOT FOR CONSTRUCTION
CIVIL ENGINEERING WORKS
CONSTRUCTION CERTIFICATE
Da
te
:
Plo
tte
d B
y :
Fo
un
d :
15.02
.2
018
11
:2
4 A
MS
TE
PH
AN
IE
N
OB
LE
T:\2018 Jo
bs\1813
63 - G
oo
dlu
ck P
laza
- G
eo
rg
e S
t, B
la
ck
to
wn
\D
-D
raw
in
gs\D
-N
orth
ro
p\C
-C
IV
IL
\2
-C
AD
\2
-C
AD
F
IL
ES
\1-D
A\1
81
36
3_D
AC
02.0
2.d
wg
STORMWATER MANAGEMENT
DEVICES - SHEET 01
2DAC03.01
NOT FOR CONSTRUCTION
Sydney
Level 11 345 George Street, Sydney NSW 2000
Ph (02) 9241 4188 Fax (02) 9241 4324
Email [email protected] ABN 81 094 433 100
181363
CIVIL ENGINEERING WORKS
DEVELOPMENT APPLICATION
GOOD LUCK PLAZA
5 - 19 GEORGE STREET,
BLACKTOWN
· ℄· ℄
STORMWATER MANAGEMENT
DEVICES AND OTHER DETAILS -
SHEET 02
03DAC03.02
NOT FOR CONSTRUCTION
Sydney
Level 11 345 George Street, Sydney NSW 2000
Ph (02) 9241 4188 Fax (02) 9241 4324
Email [email protected] ABN 81 094 433 100
181363
CIVIL ENGINEERING WORKS
DEVELOPMENT APPLICATION
GOOD LUCK PLAZA
5 - 19 GEORGE STREET,
BLACKTOWN
5-19 GEORGE ST, BLACKTOWN PAGE 26
Appendix E – Flooding Map