gondola alternative a (from lcc park-and-ride)

2
GONDOLA ALTERNATIVE A (FROM LCC PARK-AND-RIDE) 6/25/2021 WHITE PINE TRAILHEAD TANNERS FLAT CAMPGROUND BIG COTTONWOOD CANYON LITTLE COTTONWOOD CANYON WASATCH BLVD. BENGAL BLVD. FORT UNION BLVD. N. L I T T L E C O TTONWOOD R D. W A S A T C H B L V D. 215 N 190 190 209 209 210 210 GONDOLA BASE STATION GONDOLA SNOWBIRD STATION GONDOLA ALTA STATION GONDOLA ANGLE STATION NO LOADING/UNLOADING G G G P ALTA SNOWBIRD TO 9400 S. ROADWAY WIDENING WASATCH BLVD. BUS PRIORITY SIGNAL PRIORITY ON WASATCH BLVD. MOBILITY HUB 1,500 PARKING STALLS GRAVEL PIT P P MOBILITY HUB 1,000 PARKING STALLS 9400 S./HIGHLAND DR. T Proposed transit concept Driving personal vehicle * Per person travel time average 63 MIN 38 MIN 46 MIN * Gravel Pit Mobility Hub to Alta ALTERNATIVE TRAVEL TIME COMPARISON AM/PM travel times would be similar ABOUT THIS CONCEPT Riders would park at the Mobility Hub, bus to a gondola base station at mouth of the canyon, gondola up to Snowbird, then gondola to Alta. Buses would have priority on Wasatch Blvd. Gondola service information reflects peak winter service. 63 MINUTES TRAVEL TIME 2 TRANSFERS DURING TRIP $ 561M CAPITAL COSTS SNOWBIRD STATION ALTA STATION TRAVEL TIME/ DISTRIBUTION GONDOLA BASE STATION Gondola Gondola Bus Parking 12 MIN 13 MIN 4 MIN 24 MIN 10 MIN 63 MIN GRAVEL PIT MOBILITY HUB Gondola $ 99 M Mobility Hubs $ 62 M Wasatch Blvd. Roadway Widening $ 86M Snow Sheds $ 0.824M Noise Wall $ 5.8 M Trailhead Parking $ 5 M Tolling Infrastructure $ 43M Buses $ 260M Gondola = ALTERNATIVE Impacts (Properties) Costs 2 Snow sheds Snow sheds Address trailhead parking 2 Hubs Mobility hubs Tolling or management of vehicle occupancy Widen Wasatch Boulevard + bus priority Capital costs $561 M Section 4(f) 1 Site Elimination of winter roadside parking adjacent to ski resorts Add bus only lane to S.R. 210 from North LCC Road to Alta # People/ peak hour + via transit/ personal vehicle 1,050 (Transit) 2,249 (Personal) 3,299 People GONDOLA A WITH BUS FROM MOBILITY HUBS NO ADDITIONAL ROADWAY CAPACITY Relocations 1 Residential (already acquired) # Vehicles/peak hour Bus to base every 5 min. Gondola every 2 min. (30 gondolas per hour) O&M costs $9.5 M Winter $5 M Summer

Upload: others

Post on 29-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

GONDOLA ALTERNATIVE A (FROM LCC PARK-AND-RIDE)

6/25/2021

WHITE PINETRAILHEAD

TANNERS FLATCAMPGROUND

BIGCOTTONWOOD

CANYON

LITTLE COTTONWOOD CANYON

WAS

ATCH

BLV

D.

BENGAL BLVD.

FORT UNION BLVD.

N. LITTLE COTTONWOOD RD.

WAS

ATCH

BLV

D.

215N

190190

209209

210210

GONDOLABASE STATION

GONDOLASNOWBIRD STATION

GONDOLAALTA STATION

GONDOLAANGLE STATION

NO LOADING/UNLOADING

G

G

G

P

ALTA

SNOWBIRDTO 9400 S.

ROADWAYWIDENINGWASATCH BLVD.

BUSPRIORITYSIGNAL PRIORITYON WASATCH BLVD.

MOBILITY HUB1,500 PARKING STALLS

GRAVEL PIT

P

P

MOBILITY HUB1,000 PARKING STALLS

9400 S./HIGHLAND DR.

T Proposed transit concept

Driving personal vehicle*

Per person travel time average

63MIN

38MIN

46MIN

* Gravel Pit Mobility Hub to Alta

ALTERNATIVE TRAVEL TIME COMPARISONAM/PM travel times would be similar

ABOUT THIS CONCEPTRiders would park at the Mobility Hub, bus to a gondola base station at mouth of the canyon,gondola up to Snowbird, then gondola to Alta. Buses would have priority on Wasatch Blvd.Gondola service information re�ects peak winter service.

63MINUTES TRAVEL TIME

2 TRANSFERS

DURING TRIP

$561M CAPITAL COSTS

SNOWBIRDSTATION

ALTASTATION

TRAVEL TIME/DISTRIBUTION

GONDOLABASE STATION

Gondola GondolaBusParking

12MIN

13MIN

4MIN

24MIN

10MIN

63MIN

GRAVEL PITMOBILITY HUB

Gondola$99 M – Mobility Hubs$62M – Wasatch Blvd. Roadway Widening$86M – Snow Sheds

$0.824M – Noise Wall

$5.8M – Trailhead Parking

$5M – Tolling Infrastructure

$43M – Buses

$260M – Gondola

=

ALTERNATIVEImpacts

(Properties)Costs

2Snow sheds

Snow sheds Addresstrailhead parking

2Hubs

Mobility hubs Tolling ormanagement of

vehicle occupancy

Widen WasatchBoulevard +bus priority

Capital costs

$561 M

Section 4(f)

1Site

Elimination ofwinter roadside

parking adjacentto ski resorts

Add bus only laneto S.R. 210 fromNorth LCC Road

to Alta

# People/peak hour +via transit/

personal vehicle

1,050 (Transit)

2,249 (Personal)

3,299 People

GONDOLA AWITH BUS FROMMOBILITY HUBS NO ADDITIONAL

ROADWAY CAPACITY

Relocations

1Residential

(already acquired)

# Vehicles/peakhour

Bus to baseevery 5 min.

Gondolaevery 2 min.

(30 gondolas per hour)

O&M costs

$9.5 MWinter

$5 MSummer

6/25/2021

GONDOLA ALTERNATIVE A (FROM LCC PARK-AND-RIDE)

ALTERNATIVE

• Not scalable - complete infrastructure requiredat start

Scalability

• System would not operate during avalanche mitigation

• Snow sheds improve gondola and roadway safety and reliability

• Gondola alignment separate from roadway increases roadway safety

Safety

• No change to pedestrian/cyclist facilities

Supports Active Transportation

• Not impacted by slide offs/crashes

• Gondola could operate while debris is removed from roadway

• Not impacted by snowfall

Travel Reliability

1,050people per hour

(Meets goal)

Mobility

GONDOLA AWITH BUS FROM MOBILITY HUBS

NO ADDITIONAL ROADWAY CAPACITY

OTHER TRANSPORTATION PERFORMANCE CONSIDERATIONS

ALTERNATIVE

0

1(already

acquired)

Relocations

Natural/BuiltEnvironment Impacts Costs

High

Visualchange

None

Impacted noise receptors

173

$561 M

Capital costs

- -

O&M costs

Substantially Reduce Vehicle Backups Distance from S.R. 209/S.R. 210 Intersection (Feet)

350

6,700

209

On S.R. 209

3,050

13,000

210

On S.R. 210

No-Action Alternative

Meets Project Purpose and Need

Air qualitystandards exceeded

No

No

No

No

Water qualitystandards exceeded

46MIN

80-85 MIN

$9.5 MWinter

$5 MSummer

GONDOLA AWITH BUS FROM MOBILITY HUBS

NO ADDITIONAL ROADWAY CAPACITY

ALTERNATIVE IMPACT SUMMARY

173No-actionbaseline

57Alternative

noise impact

+

Substantially Improve AveragePer Person Travel Time

(Across all travel modes for each user)