gondola alternative a (from lcc park-and-ride)
TRANSCRIPT
GONDOLA ALTERNATIVE A (FROM LCC PARK-AND-RIDE)
6/25/2021
WHITE PINETRAILHEAD
TANNERS FLATCAMPGROUND
BIGCOTTONWOOD
CANYON
LITTLE COTTONWOOD CANYON
WAS
ATCH
BLV
D.
BENGAL BLVD.
FORT UNION BLVD.
N. LITTLE COTTONWOOD RD.
WAS
ATCH
BLV
D.
215N
190190
209209
210210
GONDOLABASE STATION
GONDOLASNOWBIRD STATION
GONDOLAALTA STATION
GONDOLAANGLE STATION
NO LOADING/UNLOADING
G
G
G
P
ALTA
SNOWBIRDTO 9400 S.
ROADWAYWIDENINGWASATCH BLVD.
BUSPRIORITYSIGNAL PRIORITYON WASATCH BLVD.
MOBILITY HUB1,500 PARKING STALLS
GRAVEL PIT
P
P
MOBILITY HUB1,000 PARKING STALLS
9400 S./HIGHLAND DR.
T Proposed transit concept
Driving personal vehicle*
Per person travel time average
63MIN
38MIN
46MIN
* Gravel Pit Mobility Hub to Alta
ALTERNATIVE TRAVEL TIME COMPARISONAM/PM travel times would be similar
ABOUT THIS CONCEPTRiders would park at the Mobility Hub, bus to a gondola base station at mouth of the canyon,gondola up to Snowbird, then gondola to Alta. Buses would have priority on Wasatch Blvd.Gondola service information re�ects peak winter service.
63MINUTES TRAVEL TIME
2 TRANSFERS
DURING TRIP
$561M CAPITAL COSTS
SNOWBIRDSTATION
ALTASTATION
TRAVEL TIME/DISTRIBUTION
GONDOLABASE STATION
Gondola GondolaBusParking
12MIN
13MIN
4MIN
24MIN
10MIN
63MIN
GRAVEL PITMOBILITY HUB
Gondola$99 M – Mobility Hubs$62M – Wasatch Blvd. Roadway Widening$86M – Snow Sheds
$0.824M – Noise Wall
$5.8M – Trailhead Parking
$5M – Tolling Infrastructure
$43M – Buses
$260M – Gondola
=
ALTERNATIVEImpacts
(Properties)Costs
2Snow sheds
Snow sheds Addresstrailhead parking
2Hubs
Mobility hubs Tolling ormanagement of
vehicle occupancy
Widen WasatchBoulevard +bus priority
Capital costs
$561 M
Section 4(f)
1Site
Elimination ofwinter roadside
parking adjacentto ski resorts
Add bus only laneto S.R. 210 fromNorth LCC Road
to Alta
# People/peak hour +via transit/
personal vehicle
1,050 (Transit)
2,249 (Personal)
3,299 People
GONDOLA AWITH BUS FROMMOBILITY HUBS NO ADDITIONAL
ROADWAY CAPACITY
Relocations
1Residential
(already acquired)
# Vehicles/peakhour
Bus to baseevery 5 min.
Gondolaevery 2 min.
(30 gondolas per hour)
O&M costs
$9.5 MWinter
$5 MSummer
6/25/2021
GONDOLA ALTERNATIVE A (FROM LCC PARK-AND-RIDE)
ALTERNATIVE
• Not scalable - complete infrastructure requiredat start
Scalability
• System would not operate during avalanche mitigation
• Snow sheds improve gondola and roadway safety and reliability
• Gondola alignment separate from roadway increases roadway safety
Safety
• No change to pedestrian/cyclist facilities
Supports Active Transportation
• Not impacted by slide offs/crashes
• Gondola could operate while debris is removed from roadway
• Not impacted by snowfall
Travel Reliability
1,050people per hour
(Meets goal)
Mobility
GONDOLA AWITH BUS FROM MOBILITY HUBS
NO ADDITIONAL ROADWAY CAPACITY
OTHER TRANSPORTATION PERFORMANCE CONSIDERATIONS
ALTERNATIVE
0
1(already
acquired)
Relocations
Natural/BuiltEnvironment Impacts Costs
High
Visualchange
None
Impacted noise receptors
173
$561 M
Capital costs
- -
O&M costs
Substantially Reduce Vehicle Backups Distance from S.R. 209/S.R. 210 Intersection (Feet)
350
6,700
209
On S.R. 209
3,050
13,000
210
On S.R. 210
No-Action Alternative
Meets Project Purpose and Need
Air qualitystandards exceeded
No
No
No
No
Water qualitystandards exceeded
46MIN
80-85 MIN
$9.5 MWinter
$5 MSummer
GONDOLA AWITH BUS FROM MOBILITY HUBS
NO ADDITIONAL ROADWAY CAPACITY
ALTERNATIVE IMPACT SUMMARY
173No-actionbaseline
57Alternative
noise impact
+
Substantially Improve AveragePer Person Travel Time
(Across all travel modes for each user)