Golden State Warriors
Multipurpose Arena in Mission Bay
SFMTA CAC
October 1, 2015
Setting
Site Plan
Street View
Baseline Improvements
Arena Specific Improvements
DRAFT Local/ Hospital Access Plan
DSEIR Analyzed Arena Path of Travel
DRAFT Local/ Hospital Access Plan
DSEIR Analyzed Arena Path of Travel
Local/UCSF Circulation
Owens Street Local Access (Arena Traffic Discouraged)
DRAFT Local/ Hospital Access Plan
DSEIR Analyzed Arena Path of Travel
Local/UCSF Circulation
Owens Street Local Access (Arena Traffic Discouraged)
PCO (DSEIR location)
On-site PCO Mgmt Ctr
PCO (New location)
PCO (SF Giants)
Proposed Southern Parking
Next Steps
• Oct 16 – SFMTA Policy Advisory Group
• November 3 – OCII Final Certification Hearing (am)
• November 3 – SFMTA Board Hearing (pm)
• 2016 – Arena Construction Scheduled to Begin
• 2018 – Scheduled Arena Opening